I want to search for...
Permit #2024020585
Permit Details
Status: COED
| Parcel Id: 07-11-31-7063-00430-0060 |
| CONDITIONED SPACE: 2082 sqft |
| GARAGE: 402 sqft |
| OPENED PORCH (WITH ROOF) : 182 sqft |
| OPENED PORCH (WITH ROOF) : 87 sqft |
| Total Square Footage: 2753 sqft |
| Block: 00430 |
| Subdivision: 2174 - SECTION 63-ZEBULAHS TRAIL |
| Job Phone: 904-531-5923 |
| Location Address: 9 ZACHARIAS PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 04/15/2024 |
| NOC: RECORDED |
| Applicant name: TAVARIS JEROME DAVIS |
| Owner: BRIGHTLAND HOMES OF FLORIDA |
|
Address 15725 N DALLAS PARKWAY SUITE 300 ADDISON, TX 75001 |
| Lot: 0060 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: Single Family Construction |
| Type: CN |
Contractor
BRIGHTLAND HOMES OF FLORIDA, LLC
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
3505 EAST FRONTAGE RD ADDISON, TX 75001 |
STE 145 TAMPA, FL 33607 |
CBC1267320 (Exp: 08/31/2026) | 904-531-5923 |
Sub Contractors
LARRY LAVON TURNAGE
| Status | Location Address | State License Number | Phone |
| CANCEL |
531 CODISCO WAY SANFORD, FL 32771 |
CMC1249777 (Exp: 08/31/2024) | 407-333-2665 |
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
OLIN MARSHALL CANNON
| Status | Location Address | State License Number | Phone |
| INACTIVE |
1794 ROGERO RD #2 JACKSONVILLE, FL 32211 |
CFC1426140 (Exp: 08/31/2026) | 904-343-4344 |
JAMES E LINTON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
200 COLLEGE DR ORANGE PARK, FL 32065 |
EC0001152 (Exp: 08/31/2026) | 904-272-0272 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - STORMWATER FINAL | 01/17/2025 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: STILL TO PICK UP ALL TRASH AND CONSTRUCTION DEBRIS FROM VACANTS. SEC 300,03 F4 V-21 ------------------------------------------------------------------- 1/16/2025 - PREVIOUS INSPECTION NOTES 1) NEED TO FINISH ALL SWALE REPAIRS BEFORE PASSING 2) NEED TO PICK UP ALL TRASH AND CONSTRUCTION DEBRIS FROM VACANTS. SEC 300,03 F4 V-21-The Stormwater Final Inspection will include visual inspection of the site and adjacent properties for debris, proper clean up and repair to damaged terrain. Bare earth on the site or surrounding properties must be sodded, or seeded with pine straw cover, to prevent soil erosion. Bare earth and damage to any City roadside swales, drainage ditches, canals or other drainage conveyances must be graded to the proper elevation and sodded to prevent soil erosion. Road damage in the area of construction is also attributable to the Permittee, unless a preconstruction inspection has previously documented the damage. ------------------------------------------------------------------------------------- 1/10/25 SWALE REPAIR WILL BE HELD OUT TILL ROW FINAL. PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED Inspector Notes from Inspection 9465 1/9/25 APPROVING THIS FIELD INSPECTION AS NOTED AS A COURTESY TO ALLOW YOU TO MOVE FORWARD. YOU ARE REQUIRED TO REPAIR AND SOD TO GRADE VACANT LOT ON RIGHT BEFORE ROW FINAL PASSAGE. . _______________________________________________________________________________________________________________________ 12/27/2024 - PREVIOUS INSPECTION NOTES 12/27/24 UPON WALKING PROPERTY DETERMINED YOU WILL NEED TO SOD ALL BARE AREA IN REAR TO PREVENT EROSION AND WASHOUTS . YOU WILL NEED TO REPAIR AREA ON RIGHT SIDE FRONT SWALE. AS NOTED BY PEVIOUS INSPECTOR BUILDER NEED AT THE END OF THE PROJECT, BUILDER NEED TO RE ESTABLISH THE SWALE ON THE EMPTY LOT ON THE RIGHT . AND ALSO NEED TO REMOVE ANY SEDIMENT INSIDE THE CITY DITCH LINE | |||
| ROW - STORMWATER FINAL | 01/17/2025 | APPROVED - AS NOTED | PFLANAGAN |
| Note: TALKED WITH NICK HE STATES THAT HE WILL TAKE CARE OF ALL CONSTRUCTION DEBRIS PASSING AS NOTED THAT HE WILL TAKE CARE OF THIS. ------------------------------------------------------------------ 1/17/2025 - PREVIOUS INSPECTION NOTES STILL TO PICK UP ALL TRASH AND CONSTRUCTION DEBRIS FROM VACANTS. SEC 300,03 F4 V-21 ------------------------------------------------------------------- 1/16/2025 - PREVIOUS INSPECTION NOTES 1) NEED TO FINISH ALL SWALE REPAIRS BEFORE PASSING 2) NEED TO PICK UP ALL TRASH AND CONSTRUCTION DEBRIS FROM VACANTS. SEC 300,03 F4 V-21-The Stormwater Final Inspection will include visual inspection of the site and adjacent properties for debris, proper clean up and repair to damaged terrain. Bare earth on the site or surrounding properties must be sodded, or seeded with pine straw cover, to prevent soil erosion. Bare earth and damage to any City roadside swales, drainage ditches, canals or other drainage conveyances must be graded to the proper elevation and sodded to prevent soil erosion. Road damage in the area of construction is also attributable to the Permittee, unless a preconstruction inspection has previously documented the damage. ------------------------------------------------------------------------------------- 1/10/25 SWALE REPAIR WILL BE HELD OUT TILL ROW FINAL. PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED Inspector Notes from Inspection 9465 1/9/25 APPROVING THIS FIELD INSPECTION AS NOTED AS A COURTESY TO ALLOW YOU TO MOVE FORWARD. YOU ARE REQUIRED TO REPAIR AND SOD TO GRADE VACANT LOT ON RIGHT BEFORE ROW FINAL PASSAGE. . _______________________________________________________________________________________________________________________ 12/27/2024 - PREVIOUS INSPECTION NOTES 12/27/24 UPON WALKING PROPERTY DETERMINED YOU WILL NEED TO SOD ALL BARE AREA IN REAR TO PREVENT EROSION AND WASHOUTS . YOU WILL NEED TO REPAIR AREA ON RIGHT SIDE FRONT SWALE. AS NOTED BY PEVIOUS INSPECTOR BUILDER NEED AT THE END OF THE PROJECT, BUILDER NEED TO RE ESTABLISH THE SWALE ON THE EMPTY LOT ON THE RIGHT . AND ALSO NEED TO REMOVE ANY SEDIMENT INSIDE THE CITY DITCH LINE | |||
| ROW - STORMWATER FINAL | 01/16/2025 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) NEED TO FINISH ALL SWALE REPAIRS BEFORE PASSING 2) NEED TO PICK UP ALL TRASH AND CONSTRUCTION DEBRIS FROM VACANTS. SEC 300,03 F4 V-21-The Stormwater Final Inspection will include visual inspection of the site and adjacent properties for debris, proper clean up and repair to damaged terrain. Bare earth on the site or surrounding properties must be sodded, or seeded with pine straw cover, to prevent soil erosion. Bare earth and damage to any City roadside swales, drainage ditches, canals or other drainage conveyances must be graded to the proper elevation and sodded to prevent soil erosion. Road damage in the area of construction is also attributable to the Permittee, unless a preconstruction inspection has previously documented the damage. ------------------------------------------------------------------------------------- 1/10/25 SWALE REPAIR WILL BE HELD OUT TILL ROW FINAL. PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED Inspector Notes from Inspection 9465 1/9/25 APPROVING THIS FIELD INSPECTION AS NOTED AS A COURTESY TO ALLOW YOU TO MOVE FORWARD. YOU ARE REQUIRED TO REPAIR AND SOD TO GRADE VACANT LOT ON RIGHT BEFORE ROW FINAL PASSAGE. . _______________________________________________________________________________________________________________________ 12/27/2024 - PREVIOUS INSPECTION NOTES 12/27/24 UPON WALKING PROPERTY DETERMINED YOU WILL NEED TO SOD ALL BARE AREA IN REAR TO PREVENT EROSION AND WASHOUTS . YOU WILL NEED TO REPAIR AREA ON RIGHT SIDE FRONT SWALE. AS NOTED BY PEVIOUS INSPECTOR BUILDER NEED AT THE END OF THE PROJECT, BUILDER NEED TO RE ESTABLISH THE SWALE ON THE EMPTY LOT ON THE RIGHT . AND ALSO NEED TO REMOVE ANY SEDIMENT INSIDE THE CITY DITCH LINE | |||
| BLD - BUILDING FINAL | 01/15/2025 | Approval - Private Provider | PPROVIDER |
| Note: 1/14/2025 8:42:54 AM- PREVIOUS INSPECTION NOTES | |||
| BLD - BUILDING FINAL | 01/14/2025 | CANCELLED BY APPLICANT | PPROVIDER |
| ROW - FINAL APRON (AFTER POUR) | 01/10/2025 | APPROVED - AS NOTED | FSLADISH |
| Note: 1/10/25 SWALE REPAIR WILL BE HELD OUT TILL ROW FINAL. PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED Inspector Notes from Inspection 9465 1/9/25 APPROVING THIS FIELD INSPECTION AS NOTED AS A COURTESY TO ALLOW YOU TO MOVE FORWARD. YOU ARE REQUIRED TO REPAIR AND SOD TO GRADE VACANT LOT ON RIGHT BEFORE ROW FINAL PASSAGE. . _______________________________________________________________________________________________________________________ 12/27/2024 - PREVIOUS INSPECTION NOTES 12/27/24 UPON WALKING PROPERTY DETERMINED YOU WILL NEED TO SOD ALL BARE AREA IN REAR TO PREVENT EROSION AND WASHOUTS . YOU WILL NEED TO REPAIR AREA ON RIGHT SIDE FRONT SWALE. AS NOTED BY PEVIOUS INSPECTOR BUILDER NEED AT THE END OF THE PROJECT, BUILDER NEED TO RE ESTABLISH THE SWALE ON THE EMPTY LOT ON THE RIGHT . AND ALSO NEED TO REMOVE ANY SEDIMENT INSIDE THE CITY DITCH LINE | |||
| U -UTILITY RESIDENTIAL FINAL | 01/10/2025 | FINAL APPROVED | BWRIGHT |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/09/2025 | APPROVED - AS NOTED | FSLADISH |
| Note: 1/9/25 APPROVING THIS FIELD INSPECTION AS NOTED AS A COURTESY TO ALLOW YOU TO MOVE FORWARD. YOU ARE REQUIRED TO REPAIR AND SOD TO GRADE VACANT LOT ON RIGHT BEFORE ROW FINAL PASSAGE. . _______________________________________________________________________________________________________________________ 12/27/2024 - PREVIOUS INSPECTION NOTES 12/27/24 UPON WALKING PROPERTY DETERMINED YOU WILL NEED TO SOD ALL BARE AREA IN REAR TO PREVENT EROSION AND WASHOUTS . YOU WILL NEED TO REPAIR AREA ON RIGHT SIDE FRONT SWALE. AS NOTED BY PEVIOUS INSPECTOR BUILDER NEED AT THE END OF THE PROJECT, BUILDER NEED TO RE ESTABLISH THE SWALE ON THE EMPTY LOT ON THE RIGHT . AND ALSO NEED TO REMOVE ANY SEDIMENT INSIDE THE CITY DITCH LINE | |||
| U-CROSS CONNECTION | 12/30/2024 | APPROVED | BWRIGHT |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 12/27/2024 | APPROVED | FSLADISH |
| Note: Inspector Notes from Inspection 9270 11/8/24 After conversation with tim baker determined that there was not a bm in the asphalt it had been moved to the pp to the right side across ditch. culvert pipe matched up to within tolerance based on this bm. Ready to pour at this time. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIEMENT ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR Inspector Notes from Inspection 9470 11/7/24 PORTA POTTA REMOVED TO SITE FROM THE ROAD AT THE TIME OF THIS INSPECTION. WILL MONITOR SITE FOR SITE DRAINAGE REQUIREMENTS THROUGHOUT THE CONSTRUCTION PROCESS. APPROVING AS NOTED. ________________________________________________________________________________________________________________________ 11/1/2024 - PREVIOUS INSPECTION NOTES 11/1/24 NO CHANGES MADE AT THE TIME OF THIS INSPECTION. PLEASE READ PREVIOUS INSPECTION NOTES. ______________________________________________________________________________________________________________________ 10/30/2024 - PREVIOUS INSPECTION NOTES 10/30/24 TPOLACEK*** BUILDER NEEDS TO REMOVE PORTA POTTY FROM ROAD AND KEEP SWALE OPEN. NEXT INSPECTION 11/01/24 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 10/28/2024 - PREVIOUS INSPECTION NOTES __________________________________________________________________________________________________________________________ 10/24/2024 - PREVIOUS INSPECTION NOTES BUILDER NEED TO REMOVE THE PALETS FROM THE CITY ROAD AND THE PORTA POTTY OUT OF THE CITY ROAD. INSPECTOR WILL BE BACK 10/28/24. PICTURES ATTACHED. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 12/27/2024 | Disapproved - NO FEE | FSLADISH |
| Note: 12/27/24 UPON WALKING PROPERTY DETERMINED YOU WILL NEED TO SOD ALL BARE AREA IN REAR TO PREVENT EROSION AND WASHOUTS . YOU WILL NEED TO REPAIR AREA ON RIGHT SIDE FRONT SWALE. AS NOTED BY PEVIOUS INSPECTOR BUILDER NEED AT THE END OF THE PROJECT, BUILDER NEED TO RE ESTABLISH THE SWALE ON THE EMPTY LOT ON THE RIGHT . AND ALSO NEED TO REMOVE ANY SEDIMENT INSIDE THE CITY DITCH LINE | |||
| ROW- PRE-APRON (PRE-POUR) | 11/08/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 11/8/24 After conversation with tim baker determined that there was not a bm in the asphalt it had been moved to the pp to the right side across ditch. culvert pipe matched up to within tolerance based on this bm. Ready to pour at this time. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIEMENT ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR Inspector Notes from Inspection 9470 11/7/24 PORTA POTTA REMOVED TO SITE FROM THE ROAD AT THE TIME OF THIS INSPECTION. WILL MONITOR SITE FOR SITE DRAINAGE REQUIREMENTS THROUGHOUT THE CONSTRUCTION PROCESS. APPROVING AS NOTED. ________________________________________________________________________________________________________________________ 11/1/2024 - PREVIOUS INSPECTION NOTES 11/1/24 NO CHANGES MADE AT THE TIME OF THIS INSPECTION. PLEASE READ PREVIOUS INSPECTION NOTES. ______________________________________________________________________________________________________________________ 10/30/2024 - PREVIOUS INSPECTION NOTES 10/30/24 TPOLACEK*** BUILDER NEEDS TO REMOVE PORTA POTTY FROM ROAD AND KEEP SWALE OPEN. NEXT INSPECTION 11/01/24 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 10/28/2024 - PREVIOUS INSPECTION NOTES __________________________________________________________________________________________________________________________ 10/24/2024 - PREVIOUS INSPECTION NOTES BUILDER NEED TO REMOVE THE PALETS FROM THE CITY ROAD AND THE PORTA POTTY OUT OF THE CITY ROAD. INSPECTOR WILL BE BACK 10/28/24. PICTURES ATTACHED. | |||
| ROW - DRAINAGE | 11/07/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 11/7/24 PORTA POTTA REMOVED TO SITE FROM THE ROAD AT THE TIME OF THIS INSPECTION. WILL MONITOR SITE FOR SITE DRAINAGE REQUIREMENTS THROUGHOUT THE CONSTRUCTION PROCESS. APPROVING AS NOTED. ________________________________________________________________________________________________________________________ 11/1/2024 - PREVIOUS INSPECTION NOTES 11/1/24 NO CHANGES MADE AT THE TIME OF THIS INSPECTION. PLEASE READ PREVIOUS INSPECTION NOTES. ______________________________________________________________________________________________________________________ 10/30/2024 - PREVIOUS INSPECTION NOTES 10/30/24 TPOLACEK*** BUILDER NEEDS TO REMOVE PORTA POTTY FROM ROAD AND KEEP SWALE OPEN. NEXT INSPECTION 11/01/24 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 10/28/2024 - PREVIOUS INSPECTION NOTES __________________________________________________________________________________________________________________________ 10/24/2024 - PREVIOUS INSPECTION NOTES BUILDER NEED TO REMOVE THE PALETS FROM THE CITY ROAD AND THE PORTA POTTY OUT OF THE CITY ROAD. INSPECTOR WILL BE BACK 10/28/24. PICTURES ATTACHED. | |||
| ROW - DRAINAGE | 11/01/2024 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 11/1/24 NO CHANGES MADE AT THE TIME OF THIS INSPECTION. PLEASE READ PREVIOUS INSPECTION NOTES. ______________________________________________________________________________________________________________________ 10/30/2024 - PREVIOUS INSPECTION NOTES 10/30/24 TPOLACEK*** BUILDER NEEDS TO REMOVE PORTA POTTY FROM ROAD AND KEEP SWALE OPEN. NEXT INSPECTION 11/01/24 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 10/28/2024 - PREVIOUS INSPECTION NOTES __________________________________________________________________________________________________________________________ 10/24/2024 - PREVIOUS INSPECTION NOTES BUILDER NEED TO REMOVE THE PALETS FROM THE CITY ROAD AND THE PORTA POTTY OUT OF THE CITY ROAD. INSPECTOR WILL BE BACK 10/28/24. PICTURES ATTACHED. | |||
| ROW - DRAINAGE | 10/30/2024 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 10/30/24 TPOLACEK*** BUILDER NEEDS TO REMOVE PORTA POTTY FROM ROAD AND KEEP SWALE OPEN. NEXT INSPECTION 11/01/24 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 10/28/2024 - PREVIOUS INSPECTION NOTES __________________________________________________________________________________________________________________________ 10/24/2024 - PREVIOUS INSPECTION NOTES BUILDER NEED TO REMOVE THE PALETS FROM THE CITY ROAD AND THE PORTA POTTY OUT OF THE CITY ROAD. INSPECTOR WILL BE BACK 10/28/24. PICTURES ATTACHED. | |||
| ROW - DRAINAGE | 10/28/2024 | PARTIALLY APPROVED | FSLADISH |
| Note: 10/28/25 NEED TO MOVE PORTA POTTY ONTO YOUR SITE FROM ROAD. BE BACK FOR REINSPECTION 10/30/24 __________________________________________________________________________________________________________________________ 10/24/2024 - PREVIOUS INSPECTION NOTES BUILDER NEED TO REMOVE THE PALETS FROM THE CITY ROAD AND THE PORTA POTTY OUT OF THE CITY ROAD. INSPECTOR WILL BE BACK 10/28/24. PICTURES ATTACHED. | |||
| ROW - DRAINAGE | 10/24/2024 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: BUILDER NEED TO REMOVE THE PALETS FROM THE CITY ROAD AND THE PORTA POTTY OUT OF THE CITY ROAD. INSPECTOR WILL BE BACK 10/28/24. PICTURES ATTACHED. AT THE END OF THE PROJECT, BUILDER NEED TO RE ESTABLISH THE SWALE ON THE EMPTY LOT ON THE RIGHT . AND ALSO NEED TO REMOVE ANY SEDIMENT INSIDE THE CITY DITCH LINE | |||
| GRAVITY SEWER TEST | 10/14/2024 | Approval - Private Provider | PPROVIDER |
| Note: Inspector Notes from Inspection 2095 THIS WAS A VIRTUAL INSPECTION | |||
| SEWER TIE IN | 10/14/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| ELECTRIC - EARLY POWER | 10/14/2024 | Approval - Private Provider | PPROVIDER |
| Note: 9/23/2024 10:09:26 AM- PREVIOUS INSPECTION NOTES | |||
| ELECTRIC - EARLY POWER | 09/23/2024 | CANCELLED BY APPLICANT | PPROVIDER |
| LATH/BRICK/ WATER BARRIER | 09/18/2024 | Approval - Private Provider | PPROVIDER |
| PEP TANK INSTALLATION REQUEST | 08/29/2024 | APPROVED | CBOWERMASTER |
| INSULATION | 08/26/2024 | Approval - Private Provider | PPROVIDER |
| ELECTRIC-TUG | 08/23/2024 | Approval - Private Provider | PPROVIDER |
| INSULATION | 08/22/2024 | CANCELLED BY APPLICANT | WEB |
| ALL ROUGH | 08/14/2024 | Approval - Private Provider | PPROVIDER |
| Note: 8/13/2024 11:35:59 AM- PREVIOUS INSPECTION NOTES 8/5/2024 9:10:22 AM- PREVIOUS INSPECTION NOTES | |||
| ALL ROUGH | 08/12/2024 | CANCELLED BY APPLICANT | PPROVIDER |
| Note: 8/5/2024 9:10:22 AM- PREVIOUS INSPECTION NOTES | |||
| ALL ROUGH | 08/02/2024 | Disapproved- Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/29/2024 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 07/29/2024 | Approval - Private Provider | PPROVIDER |
| WALL SHEATHING | 07/24/2024 | Approval - Private Provider | PPROVIDER |
| FOUND SURVEY APPROVED (OFFICE) | 07/23/2024 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 06/13/2024 | CANCELLED BY APPLICANT | WEB |
| MONOLITHIC SLAB | 06/13/2024 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH UNDERGROUND | 06/11/2024 | Approval - Private Provider | PPROVIDER |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 06/10/2024 | APPROVED | JMUNSON |
| WATER METER INSTALLATION REQUEST | 04/24/2024 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 07/23/2024 | 07/23/2024 |
| Note: Released By: JEFF CREWS - - JCREWS@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 07/18/2024 | 07/23/2024 |
| Note: Held By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM 1) Please provide proposed elevations along the right of way line 2) Please provide the driveway apron width at edge of pavement | |||
| ENGIN1 | COMPLETE | 07/18/2024 | 07/23/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/18/2024 | 07/18/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/16/2024 | 07/17/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 07/16/2024 | 07/18/2024 |
| Note: Held By: JEFF CREWS - - JCREWS@PALMCOASTGOV.COM Needs corrected BM | |||
| ZON | COMPLETE | 07/16/2024 | 07/16/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 07/10/2024 | 07/11/2024 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM COPC will have a survey crew confirm slab elevation. | |||
| ENGIN1 | HOLD | 06/26/2024 | 06/26/2024 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Foundation slab elevation is more than .2' higher than approved site plan. | |||
| ZON | COMPLETE | 06/26/2024 | 06/26/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/06/2024 | 06/10/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/22/2024 | 05/22/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/22/2024 | 05/22/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/22/2024 | 05/22/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 04/16/2024 | 04/16/2024 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM The signature area on the notice needs to include the printed name of the corporation and the title of the person signing on behalf of the corporation. | |||
| ZON | COMPLETE | 03/15/2024 | 03/15/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/15/2024 | 03/19/2024 |
| Note: Released By: JPI | |||
| MECH | COMPLETE | 03/15/2024 | 03/20/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 03/15/2024 | 03/21/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 03/15/2024 | 03/22/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 approval valid with the following note: Final PEP location to be provided by the City of Palm Coast. The stormwater conveyance swales associated with the lot’s grading shall be diverted around the PEP lids/covers. | |||
| BADMIN | COMPLETE | 02/14/2024 | 02/20/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | HOLD | 02/14/2024 | 02/19/2024 |
| Note: Held By: JPI 1. City of Palm Coast Color and Material Sheet (form) appears OMITTED from submission. FBC 105 2. Provide specific product numbers including current revisions (i.e. 11473.# R6) for ALL products listed on Product Approval Specification Sheet; several have been OMITTED. 3. Provide roof underlayment and shingle revision number on Florida Product Approval Specification Sheet that corresponds with the Roofing Worksheet; underlayment Florida Product Approval number on Roofing Worksheet does not include revision number. 107.2.4 4. Provide Florida Product Approval number for shutters. 107.2.4 5. Architectural drawings do NOT have a signed seal by the Architect of Record/Engineer of Record. 6. Reference to 2023 Florida Residential Code, Section R302.3. 7. Provide elevation (height) for Second Floor on ALL Elevations. 107.3.5 8. Provide pitch/slopes of ALL roofs on the Elevations.. R802 | |||
| CUSVC | COMPLETE | 02/14/2024 | 02/16/2024 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 02/14/2024 | 02/20/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. All outlets in laundry and garage need to be GFCI protected. NEC 2020 210.8 2. DW outlet can not be located behind the DW. NEC 2020 422.16 3. Need correct outlet spacing in gameroom. NEC 2020 210.52 | |||
| ENGIN1 | COMPLETE | 02/14/2024 | 02/14/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 02/14/2024 | 02/20/2024 |
| LOCATE | COMPLETE | 02/14/2024 | 02/15/2024 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | HOLD | 02/14/2024 | 02/20/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Direction house faces on Energy Calcs does not match the site plan. Revise to match per R405.4.2.1 FBC Energy Conservation 2023 8Th Edition | |||
| SW1 | COMPLETE | 02/14/2024 | 02/14/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | HOLD | 02/14/2024 | 02/15/2024 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Lot square footage missing on site plan/survey AC pad location missing on site plan and landscape plan AC must be screened with 7 gallon shrubs One additional tree required for this lot size Must have a minimum 16 foundation plantings with at least 8 along the front and 4 along each side wrapping front corners the 1 gallon shrubs do not count toward this total | |||
| SWALE | COMPLETE | 02/14/2024 | 04/05/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 01/20/2025 |
| ADMINISTRATIVE - RESID PP | ¤225.00 | 01/20/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 01/20/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 01/20/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 01/20/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 01/20/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 01/20/2025 |
| SW ENG REINSPECTION 20 | ¤20.00 | 01/20/2025 |
| SW ENG REINSPECTION 20 | ¤20.00 | 01/20/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 04/15/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 04/15/2024 |
| SEWER INSPECTION | ¤25.00 | 04/15/2024 |
| SEWER CAPITAL FACILITY | ¤5,441.03 | 04/15/2024 |
| WATER CAPITAL FACILITY FEE | ¤3,994.51 | 04/15/2024 |
| SITE PLAN 30 | ¤30.00 | 04/15/2024 |
| WATER- TURN ON | ¤25.00 | 04/15/2024 |
| ADJUSTMENT 50% | (¤699.82) | 04/15/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 04/15/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 04/15/2024 |
| SW ENG PRE APRON | ¤30.00 | 04/15/2024 |
| INSPECTION - RESIDENTIAL | ¤1,067.00 | 04/15/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤302.64 | 04/15/2024 |
| CONNECTION FEES | ¤1,187.26 | 04/15/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 04/15/2024 |
| IMPACT FEE FIRE | ¤428.09 | 04/15/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 04/15/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 04/15/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 04/15/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 04/15/2024 |
| IMPACT FEE TRANSPORTATION | ¤1,862.00 | 04/15/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 04/15/2024 |
| SURCHARGE FS 533.721 | ¤7.00 | 04/15/2024 |
| SURCHARGE - FS 468.631 | ¤10.50 | 04/15/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 04/15/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤22,269.20 |