| Type |
Request Date |
Result |
Inspector |
|
BLD - BUILDING FINAL |
05/17/2024 |
FINAL APPROVED |
BTAYLOR |
|
Note:
5/16/2024 - PREVIOUS INSPECTION NOTES
cancelled via phone call from JJ
|
|
BLD - BUILDING FINAL |
05/16/2024 |
CANCELLED BY APPLICANT |
LMILLER |
|
Note: cancelled via phone call from JJ
|
|
ALL ROUGH |
05/14/2024 |
APPROVED |
JWALKER |
|
ROOF VALLEY & METAL |
05/14/2024 |
Disapproved - NO FEE |
JWALKER |
|
Note: Gate Code 1033 provide to the city did not work. The contractor will need to leave the gate code in the applicant notes below. It is my understanding the gate code changes frequently at this location.
|
|
ROOF VALLEY & METAL |
05/14/2024 |
APPROVED |
JWALKER |
|
Note:
5/14/2024 - PREVIOUS INSPECTION NOTES
Gate Code 1033 provide to the city did not work. The contractor will need to leave the gate code in the applicant notes below. It is my understanding the gate code changes frequently at this location.
|
|
FRAMING |
05/09/2024 |
APPROVED |
LMILLER |
|
Note: 5-9-24
prior notes resolved
5/1/2024 - PREVIOUS INSPECTION NOTES
5-1-24
1. Plywood missing nails at 4 inches OC at panel edges per plan note 2 under Lumber on sheet S2.0and within 5 feet of the ridge and edge around perimeter
2. Missing 2x4 SYP blocking w/2 inch diameter ventilation sawhole per Sheet S1.0 Eave/Soffit Detail 1
3. 2x8 valley plate missing 3 inch Simpson strong drive SS SDWS stating at 16 inches OC per note 2 under key notes on sheet S1.0
4. 2x8 ledger plate missing 2- half inch x 5 inch galv. Lag bolts starting at 4 inches of each end and at 32 OC max per note 3 under key notes on sheet S1.0
5. Missing new 2x8 SYP PT Cont. Fastened to top of CMU wall w/1 half inch x 6 inch anchor bolt w/washer starting 4 inches of each end and 32 OC max
6. Rafters cannot be notched more than one fourth the rafter depth R802.7.1 Sawn lumber. Cuts, notches and holes in solid lumber joists, rafters, blocking and beams cannot be cut or notched more than one fourth the depth of the board and must bear on the heal portion of the cut per FBC-R 802.7.1 and figure 802.7.1.1 and 802.7.1.2
4/30/2024 - PREVIOUS INSPECTION NOTES
COULD NOT GET IN. ON SITE AFTER 4PM
|
|
ROOF SHEATHING / BRACES/TIES/DOWN CELL |
05/09/2024 |
APPROVED |
LMILLER |
|
Note: 5-9-24
prior notes resolved
5/1/2024 - PREVIOUS INSPECTION NOTES
5-1-24
1. Plywood missing nails at 4 inches OC at panel edges per plan note 2 under Lumber on sheet S2.0and within 5 feet of the ridge and edge around perimeter
2. Missing 2x4 SYP blocking w/2 inch diameter ventilation sawhole per Sheet S1.0 Eave/Soffit Detail 1
3. 2x8 valley plate missing 3 inch Simpson strong drive SS SDWS stating at 16 inches OC per note 2 under key notes on sheet S1.0
4. 2x8 ledger plate missing 2- half inch x 5 inch galv. Lag bolts starting at 4 inches of each end and at 32 OC max per note 3 under key notes on sheet S1.0
5. Missing new 2x8 SYP PT Cont. Fastened to top of CMU wall w/1 half inch x 6 inch anchor bolt w/washer starting 4 inches of each end and 32 OC max
6. Rafters cannot be notched more than one fourth the rafter depth R802.7.1 Sawn lumber. Cuts, notches and holes in solid lumber joists, rafters, blocking and beams cannot be cut or notched more than one fourth the depth of the board and must bear on the heal portion of the cut per FBC-R 802.7.1 and figure 802.7.1.1 and 802.7.1.2
4/30/2024 - PREVIOUS INSPECTION NOTES
COULD NOT GET IN
|
|
FRAMING |
05/01/2024 |
Disapproved - NO FEE |
LMILLER |
|
Note: 5-1-24
1. Plywood missing nails at 4 inches OC at panel edges per plan note 2 under Lumber on sheet S2.0and within 5 feet of the ridge and edge around perimeter
2. Missing 2x4 SYP blocking w/2 inch diameter ventilation sawhole per Sheet S1.0 Eave/Soffit Detail 1
3. 2x8 valley plate missing 3 inch Simpson strong drive SS SDWS stating at 16 inches OC per note 2 under key notes on sheet S1.0
4. 2x8 ledger plate missing 2- half inch x 5 inch galv. Lag bolts starting at 4 inches of each end and at 32 OC max per note 3 under key notes on sheet S1.0
5. Missing new 2x8 SYP PT Cont. Fastened to top of CMU wall w/1 half inch x 6 inch anchor bolt w/washer starting 4 inches of each end and 32 OC max
6. Rafters cannot be notched more than one fourth the rafter depth R802.7.1 Sawn lumber. Cuts, notches and holes in solid lumber joists, rafters, blocking and beams cannot be cut or notched more than one fourth the depth of the board and must bear on the heal portion of the cut per FBC-R 802.7.1 and figure 802.7.1.1 and 802.7.1.2
4/30/2024 - PREVIOUS INSPECTION NOTES
COULD NOT GET IN. ON SITE AFTER 4PM
|
|
ROOF SHEATHING / BRACES/TIES/DOWN CELL |
05/01/2024 |
Disapproved - NO FEE |
LMILLER |
|
Note: 5-1-24
1. Plywood missing nails at 4 inches OC at panel edges per plan note 2 under Lumber on sheet S2.0and within 5 feet of the ridge and edge around perimeter
2. Missing 2x4 SYP blocking w/2 inch diameter ventilation sawhole per Sheet S1.0 Eave/Soffit Detail 1
3. 2x8 valley plate missing 3 inch Simpson strong drive SS SDWS stating at 16 inches OC per note 2 under key notes on sheet S1.0
4. 2x8 ledger plate missing 2- half inch x 5 inch galv. Lag bolts starting at 4 inches of each end and at 32 OC max per note 3 under key notes on sheet S1.0
5. Missing new 2x8 SYP PT Cont. Fastened to top of CMU wall w/1 half inch x 6 inch anchor bolt w/washer starting 4 inches of each end and 32 OC max
6. Rafters cannot be notched more than one fourth the rafter depth R802.7.1 Sawn lumber. Cuts, notches and holes in solid lumber joists, rafters, blocking and beams cannot be cut or notched more than one fourth the depth of the board and must bear on the heal portion of the cut per FBC-R 802.7.1 and figure 802.7.1.1 and 802.7.1.2
4/30/2024 - PREVIOUS INSPECTION NOTES
COULD NOT GET IN
|
|
ROOF SHEATHING / BRACES/TIES/DOWN CELL |
04/30/2024 |
Disapproved - NO FEE |
FWILLIS |
|
Note: COULD NOT GET IN
|
|
FRAMING |
04/30/2024 |
Disapproved - NO FEE |
FWILLIS |
|
Note: COULD NOT GET IN. ON SITE AFTER 4PM
|
| Department |
Status |
Date In |
Date Out |
|
BLD |
COMPLETE |
05/02/2024 |
05/07/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
|
|
BLD |
COMPLETE |
04/04/2024 |
04/09/2024 |
| Note: Released By: JIM WALKER - (386)529-4112 - JWALKER@PALMCOASTGOV.COM
|
|
DSD |
COMPLETE |
03/19/2024 |
03/19/2024 |
| Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM
|
|
DSD |
HOLD |
03/13/2024 |
03/14/2024 |
| Note: Held By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM
Please submit a city of palm coast color and material sheet. |
|
BLD |
HOLD |
03/13/2024 |
03/20/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
1. ok
2. ok
Repeat comment:
3. Provide completed city of palm coast product approval worksheet. include all materials and structural components.
Partial repeat comment:
4. Provide completed city of palm coast roofing worksheet. (Need Revision number and decimal point for roofing and underlayment. Underlayment number does not match the one on the previous product approval worksheet)
|
|
BADMIN |
INFORMATION |
03/08/2024 |
03/08/2024 |
| Note: Marked INFORMATION By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
seals on plans are missing |
|
BLD |
HOLD |
02/20/2024 |
02/27/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
1. Plans sheets need to be uploaded separately and need to be digitally signed sealed and verifiable per F.S. 471.025
2. Plans need to be deisgned per FBC Residential 2023. Update all code years.
3. Provide completed city of palm coast product approval worksheet. include all materials and structural components.
4. Provide completed city of palm coast roofing worksheet
|
|
DSD |
HOLD |
02/20/2024 |
02/22/2024 |
| Note: Held By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM
Please submit a color and material sheet. |
|
BADMIN |
HOLD |
02/20/2024 |
02/20/2024 |
| Note: Held By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM
Staff - Verify the address has been checked before release. |