I want to search for...
Permit #2024020906
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7007-00080-0190 |
| PATIO/DECK (NO ROOF) : 374 sqft |
| Total Square Footage: 374 sqft |
| Block: 00080 |
| Subdivision: 2185 - SECTION 7-FLORIDA PARK |
| Job Phone: 386-999-1042 |
| Location Address: 85 FORTUNE LN |
| Type: PO - POOL |
| Issue Date: 02/27/2024 |
| NOC: RECORDED |
| Applicant name: RYDER N BRAY |
| Owner: LYNN JOHNSON |
|
Address 85 FORTUNE LANE PALM COAST, FL 32137 |
| Lot: 0190 |
| Contracted Stated Job Value: ¤65,000.00 |
| Job Description: New Pool w/ Existing Fence |
| Type: CN |
Contractor
HAVEN POOLS LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
25 PUTTER LANE PALM COAST, FL 32164 |
CPC1460243 (Exp: 08/31/2026) | 386-999-1042 |
Sub Contractors
JOHN EDWARD GAMBONE
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
15 HARGROVE LN PALM COAST, FL 32137 |
1G PALM COAST, FL 32137 |
EC13006037 (Exp: 08/31/2026) | 386-586-9144 |
Inspection History
| Type | Request Date | Result | Inspector |
| POOL FINAL | 07/30/2024 | FINAL APPROVED | FWILLIS |
| Note: 7/29/2024 - PREVIOUS INSPECTION NOTES PROPERTY HAS A PRIVACY FENCE, KNOCKED AND RANG BELL, (NO ANSWER), NEED SOMEONE HOME TO GRANT SAFE ACCESS TO BACK YARD FOR INSPECTION OF POOL. | |||
| POOL FINAL | 07/29/2024 | Disapproved -FEE REQUIRED | FWILLIS |
| Note: PROPERTY HAS A PRIVACY FENCE, KNOCKED AND RANG BELL, (NO ANSWER), NEED SOMEONE HOME TO GRANT SAFE ACCESS TO BACK YARD FOR INSPECTION OF POOL. | |||
| U -UTILITY RESIDENTIAL FINAL | 07/26/2024 | FINAL APPROVED | BWRIGHT |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 07/25/2024 | APPROVED | EMADISON |
| Note: | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/25/2024 | APPROVED | EMADISON |
| ROW - FINAL INSPECTION | 07/25/2024 | APPROVED | EMADISON |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 07/11/2024 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 07/11/24 BUILDER YOU NEED TO READ THE REQUIREMENTS AS NOTED IN THIS INSPECTION AND PREVIOUS INSPECTIONS NTING THE CORRECTIONS THAT ARE NEEDED ** BUILDER REMOVE ALL FLOW ARROWS FROM FINAL SURVEY INSPECTOR NEEDS ELEVATION SHOTS THAT CAPTURE YOUR DRAINAGE . YOU NEED TO SHOW A POSITIVE FLOW OF DRAINAGE AWAY FROM THE STRUCTURE MOVING YOUR WATER FROM THE REAR TO THE FRONT ** REQUIRED ALL FFE OF ADJACENT PROPERTIES THAT ARE IMPROVED IF VACANT NOTATE VACANT ADJACENT MEANS ANY PROPERTY THAT ADJOINS YOUR PROPERTY. ** AS INDICATED IN PREVIOUS INSPECTIONS OF FINAL SURVEY NEED THE ELEVATION SHOTS ALONG THE EDGE OF THE POOL STRUCTURE (LEFT REAR CORNER, CENTER , RIGHT REAR CORNER ) THESE SHOTS ARE ON THE OUTSIDE OF YOUR STRUCTURE. SHOW POSITIVE FLOW AWAY FROM STRUCTURE AND YOUR DRAINAGE CONVEYANCE WHERE TYE WATER WILL TRAVEL. ** Sec 300.01D1 The elevations along all property lines must be at a minimum of 20 foot intervals. Sec 300.01 D2 The elevations on all adjacent identified (e.g. vacant or improved etc.) properties at a minimum of 20 foot intervals on a 10 foot offset outside the property lines. All undeveloped properties must be properly identified on the site plan and Final Survey. There must be sufficient elevation shots to indicate the intended drainage pattern. The subject lots drainage must not negatively impact any adjacent property. (B) B.Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6) _______________________________________________________________________________________________________________________ 7/3/2024 - PREVIOUS INSPECTION NOTES **07/03/24 AS INDICATED IN THE PREVIOUS FINAL SURVEY INSPECTION DATED 04/28/24 BUILDER NEEDS TO READ NOTES AND RELAY NOTES TO THE SURVEY COMPANY AS TO WHAT IS REQUIRED 06/28/24= NEED ELEVATION AT THE END OF THE POOL DECKENSURE PROPER DRAINAGE AWAY FROM THE POOL DECK.Sec 300.01D1 The elevations along all property lines must be at a minimum of 20 foot intervals. Sec 300.01 D2 The elevations on all adjacent identified (e.g. vacant or improved etc.) properties at a minimum of 20 foot intervals on a 10 foot offset outside the property lines. All undeveloped properties must be properly identified on the site plan and Final Survey. There must be sufficient elevation shots to indicate the intended drainage pattern. The subject lots drainage must not negatively impact any adjacent property. (B) B.Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6) ** YOUR FINAL SURVEY DOES NOT MATCH YOUR PROPOSED DRAINAGE SITE PLAN YOU NEED TO MOVE THE YOUR STORMWATER FRONT REAR TO FRONT AS PROPOSED YOUR FINAL SURVEY SHOWS WATER GOING TO THE REAR WHICH WILL NEGATIVELY IMPACT THE ADJACENT PROPERTIES IN THE REAR ** BUILDER THIS LETTER WAS SENT OUT AS A REMINDER TO ALL CONTRACTORS: 4/28/24= NEED ELEVATION AT THE END OF THE POOL DECKENSURE PROPER DRAINAGE AWAY FROM THE POOL DECK.Sec 300.01D1 The elevations along all property lines must be at a minimum of 20 foot intervals. Sec 300.01 D2 The elevations on all adjacent identified (e.g. vacant or improved etc.) properties at a minimum of 20 foot intervals on a 10 foot offset outside the property lines. All undeveloped properties must be properly identified on the site plan and Final Survey. There must be sufficient elevation shots to indicate the intended drainage pattern. The subject lots drainage must not negatively impact any adjacent property. (B) B.Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6) ** YOUR FINAL SURVEY DOES NOT MATCH YOUR PROPOSED DRAINAGE SITE PLAN YOU NEED TO MOVE THE YOUR STORMWATER FRONT REAR TO FRONT AS PROPOSED YOUR FINAL SURVEY SHOWS WATER GOING TO THE REAR WHICH WILL NEGATIVELY IMPACT THE ADJACENT PROPERTIES IN THE REAR ** BUILDER THIS LETTER WAS SENT OUT AS A REMINDER TO ALL CONTRACTORS: ** DATED: 04/09/2024 CONTRACTORS NEWSFLASH Grading and Final Surveys April 9, 2024 The Stormwater Division would like to remind contractors the importance of adhering to the approved site plan throughout the entire construction process unless revisions have been submitted and approved in accordance with COPC permitting procedures. Recently we have received several Final Surveys with significant and unapproved departures from the original site plan. We understand that sometimes site conditions and circumstances arise during construction which require alterations to the original plan. In such cases, the contractor is required to submit a revised site plan for review and approval PRIOR to the execution of work. Alterations to grading and drainage shall not be made without prior approval from the Stormwater Division. Updated requirements for grading and finished floor elevations in the February 2024 updated Technical Manual. https://www.palmcoast.gov/community-development Please contact the Stormwater Division at 386-986-4750 with any questions/concerns. ____________________________________________________________________________________________________________________ 6/28/2024 - PREVIOUS INSPECTION NOTES 4/28/24= NEED ELEVATION AT THE END OF THE POOL DECKENSURE PROPER DRAINAGE AWAY FROM THE POOL DECK.Sec 300.01D1 The elevations along all property lines must be at a minimum of 20 foot intervals. Sec 300.01 D2 The elevations on all adjacent identified (e.g. vacant or improved etc.) properties at a minimum of 20 foot intervals on a 10 foot offset outside the property lines. All undeveloped properties must be properly identified on the site plan and Final Survey. There must be sufficient elevation shots to indicate the intended drainage pattern. The subject lots drainage must not negatively impact any adjacent property. (B) B.Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6) ** YOUR FINAL SURVEY DOES NOT MATCH YOUR PROPOSED DRAINAGE SITE PLAN YOU NEED TO MOVE THE YOUR STORMWATER FRONT REAR TO FRONT AS PROPOSED YOUR FINAL SURVEY SHOWS WATER GOING TO THE REAR WHICH WILL NEGATIVELY IMPACT THE ADJACENT PROPERTIES IN THE REAR ** BUILDER THIS LETTER WAS SENT OUT AS A REMINDER TO ALL CONTRACTORS: ** DATED: 04/09/2024 The Stormwater Division would like to remind contractors the importance of adhering to the approved site plan throughout the entire construction process unless revisions have been submitted and approved in accordance with COPC permitting procedures. Recently we have received several Final Surveys with significant and unapproved departures from the original site plan. We understand that sometimes site conditions and circumstances arise during construction which require alterations to the original plan. In such cases, the contractor is required to submit a revised site plan for review and approval PRIOR to the execution of work. Alterations to grading and drainage shall not be made without prior approval from the Stormwater Division. 4/19/2024 - PREVIOUS INSPECTION NOTES ** 04/19/24The subject lots drainage must not negatively impact any adjacent property. (B) B.Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6) ** YOUR FINAL SURVEY DOES NOT MATCH YOUR PROPOSED DRAINAGE SITE PLAN YOU NEED TO MOVE THE YOUR STORMWATER FRONT REAR TO FRONT AS PROPOSED YOUR FINAL SURVEY SHOWS WATER GOING TO THE REAR WHICH WILL NEGATIVELY IMPACT THE ADJACENT PROPERTIES IN THE REAR ** BUILDER THIS LETTER WAS SENT OUT AS A REMINDER TO ALL CONTRACTORS: ** DATED: 04/09/2024 The Stormwater Division would like to remind contractors the importance of adhering to the approved site plan throughout the entire construction process unless revisions have been submitted and approved in accordance with COPC permitting procedures. Recently we have received several Final Surveys with significant and unapproved departures from the original site plan. We understand that sometimes site conditions and circumstances arise during construction which require alterations to the original plan. In such cases, the contractor is required to submit a revised site plan for review and approval PRIOR to the execution of work. Alterations to grading and drainage shall not be made without prior approval from the Stormwater Division. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 07/03/2024 | Disapproved -FEE REQUIRED | EMADISON |
| Note: **07/03/24 AS INDICATED IN THE PREVIOUS FINAL SURVEY INSPECTION DATED 04/28/24 BUILDER NEEDS TO READ NOTES AND RELAY NOTES TO THE SURVEY COMPANY AS TO WHAT IS REQUIRED 06/28/24= NEED ELEVATION AT THE END OF THE POOL DECKENSURE PROPER DRAINAGE AWAY FROM THE POOL DECK.Sec 300.01D1 The elevations along all property lines must be at a minimum of 20 foot intervals. Sec 300.01 D2 The elevations on all adjacent identified (e.g. vacant or improved etc.) properties at a minimum of 20 foot intervals on a 10 foot offset outside the property lines. All undeveloped properties must be properly identified on the site plan and Final Survey. There must be sufficient elevation shots to indicate the intended drainage pattern. The subject lots drainage must not negatively impact any adjacent property. (B) B.Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6) ** YOUR FINAL SURVEY DOES NOT MATCH YOUR PROPOSED DRAINAGE SITE PLAN YOU NEED TO MOVE THE YOUR STORMWATER FRONT REAR TO FRONT AS PROPOSED YOUR FINAL SURVEY SHOWS WATER GOING TO THE REAR WHICH WILL NEGATIVELY IMPACT THE ADJACENT PROPERTIES IN THE REAR ** BUILDER THIS LETTER WAS SENT OUT AS A REMINDER TO ALL CONTRACTORS: 4/28/24= NEED ELEVATION AT THE END OF THE POOL DECKENSURE PROPER DRAINAGE AWAY FROM THE POOL DECK.Sec 300.01D1 The elevations along all property lines must be at a minimum of 20 foot intervals. Sec 300.01 D2 The elevations on all adjacent identified (e.g. vacant or improved etc.) properties at a minimum of 20 foot intervals on a 10 foot offset outside the property lines. All undeveloped properties must be properly identified on the site plan and Final Survey. There must be sufficient elevation shots to indicate the intended drainage pattern. The subject lots drainage must not negatively impact any adjacent property. (B) B.Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6) ** YOUR FINAL SURVEY DOES NOT MATCH YOUR PROPOSED DRAINAGE SITE PLAN YOU NEED TO MOVE THE YOUR STORMWATER FRONT REAR TO FRONT AS PROPOSED YOUR FINAL SURVEY SHOWS WATER GOING TO THE REAR WHICH WILL NEGATIVELY IMPACT THE ADJACENT PROPERTIES IN THE REAR ** BUILDER THIS LETTER WAS SENT OUT AS A REMINDER TO ALL CONTRACTORS: ** DATED: 04/09/2024 CONTRACTORS NEWSFLASH Grading and Final Surveys April 9, 2024 The Stormwater Division would like to remind contractors the importance of adhering to the approved site plan throughout the entire construction process unless revisions have been submitted and approved in accordance with COPC permitting procedures. Recently we have received several Final Surveys with significant and unapproved departures from the original site plan. We understand that sometimes site conditions and circumstances arise during construction which require alterations to the original plan. In such cases, the contractor is required to submit a revised site plan for review and approval PRIOR to the execution of work. Alterations to grading and drainage shall not be made without prior approval from the Stormwater Division. Updated requirements for grading and finished floor elevations in the February 2024 updated Technical Manual. https://www.palmcoast.gov/community-development Please contact the Stormwater Division at 386-986-4750 with any questions/concerns. ____________________________________________________________________________________________________________________ 6/28/2024 - PREVIOUS INSPECTION NOTES 4/28/24= NEED ELEVATION AT THE END OF THE POOL DECKENSURE PROPER DRAINAGE AWAY FROM THE POOL DECK.Sec 300.01D1 The elevations along all property lines must be at a minimum of 20 foot intervals. Sec 300.01 D2 The elevations on all adjacent identified (e.g. vacant or improved etc.) properties at a minimum of 20 foot intervals on a 10 foot offset outside the property lines. All undeveloped properties must be properly identified on the site plan and Final Survey. There must be sufficient elevation shots to indicate the intended drainage pattern. The subject lots drainage must not negatively impact any adjacent property. (B) B.Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6) ** YOUR FINAL SURVEY DOES NOT MATCH YOUR PROPOSED DRAINAGE SITE PLAN YOU NEED TO MOVE THE YOUR STORMWATER FRONT REAR TO FRONT AS PROPOSED YOUR FINAL SURVEY SHOWS WATER GOING TO THE REAR WHICH WILL NEGATIVELY IMPACT THE ADJACENT PROPERTIES IN THE REAR ** BUILDER THIS LETTER WAS SENT OUT AS A REMINDER TO ALL CONTRACTORS: ** DATED: 04/09/2024 The Stormwater Division would like to remind contractors the importance of adhering to the approved site plan throughout the entire construction process unless revisions have been submitted and approved in accordance with COPC permitting procedures. Recently we have received several Final Surveys with significant and unapproved departures from the original site plan. We understand that sometimes site conditions and circumstances arise during construction which require alterations to the original plan. In such cases, the contractor is required to submit a revised site plan for review and approval PRIOR to the execution of work. Alterations to grading and drainage shall not be made without prior approval from the Stormwater Division. 4/19/2024 - PREVIOUS INSPECTION NOTES ** 04/19/24The subject lots drainage must not negatively impact any adjacent property. (B) B.Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6) ** YOUR FINAL SURVEY DOES NOT MATCH YOUR PROPOSED DRAINAGE SITE PLAN YOU NEED TO MOVE THE YOUR STORMWATER FRONT REAR TO FRONT AS PROPOSED YOUR FINAL SURVEY SHOWS WATER GOING TO THE REAR WHICH WILL NEGATIVELY IMPACT THE ADJACENT PROPERTIES IN THE REAR ** BUILDER THIS LETTER WAS SENT OUT AS A REMINDER TO ALL CONTRACTORS: ** DATED: 04/09/2024 The Stormwater Division would like to remind contractors the importance of adhering to the approved site plan throughout the entire construction process unless revisions have been submitted and approved in accordance with COPC permitting procedures. Recently we have received several Final Surveys with significant and unapproved departures from the original site plan. We understand that sometimes site conditions and circumstances arise during construction which require alterations to the original plan. In such cases, the contractor is required to submit a revised site plan for review and approval PRIOR to the execution of work. Alterations to grading and drainage shall not be made without prior approval from the Stormwater Division. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 06/28/2024 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: 4/28/24= NEED ELEVATION AT THE END OF THE POOL DECKENSURE PROPER DRAINAGE AWAY FROM THE POOL DECK.Sec 300.01D1 The elevations along all property lines must be at a minimum of 20 foot intervals. Sec 300.01 D2 The elevations on all adjacent identified (e.g. vacant or improved etc.) properties at a minimum of 20 foot intervals on a 10 foot offset outside the property lines. All undeveloped properties must be properly identified on the site plan and Final Survey. There must be sufficient elevation shots to indicate the intended drainage pattern. The subject lots drainage must not negatively impact any adjacent property. (B) B.Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6) ** YOUR FINAL SURVEY DOES NOT MATCH YOUR PROPOSED DRAINAGE SITE PLAN YOU NEED TO MOVE THE YOUR STORMWATER FRONT REAR TO FRONT AS PROPOSED YOUR FINAL SURVEY SHOWS WATER GOING TO THE REAR WHICH WILL NEGATIVELY IMPACT THE ADJACENT PROPERTIES IN THE REAR ** BUILDER THIS LETTER WAS SENT OUT AS A REMINDER TO ALL CONTRACTORS: ** DATED: 04/09/2024 The Stormwater Division would like to remind contractors the importance of adhering to the approved site plan throughout the entire construction process unless revisions have been submitted and approved in accordance with COPC permitting procedures. Recently we have received several Final Surveys with significant and unapproved departures from the original site plan. We understand that sometimes site conditions and circumstances arise during construction which require alterations to the original plan. In such cases, the contractor is required to submit a revised site plan for review and approval PRIOR to the execution of work. Alterations to grading and drainage shall not be made without prior approval from the Stormwater Division. 4/19/2024 - PREVIOUS INSPECTION NOTES ** 04/19/24The subject lots drainage must not negatively impact any adjacent property. (B) B.Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6) ** YOUR FINAL SURVEY DOES NOT MATCH YOUR PROPOSED DRAINAGE SITE PLAN YOU NEED TO MOVE THE YOUR STORMWATER FRONT REAR TO FRONT AS PROPOSED YOUR FINAL SURVEY SHOWS WATER GOING TO THE REAR WHICH WILL NEGATIVELY IMPACT THE ADJACENT PROPERTIES IN THE REAR ** BUILDER THIS LETTER WAS SENT OUT AS A REMINDER TO ALL CONTRACTORS: ** DATED: 04/09/2024 The Stormwater Division would like to remind contractors the importance of adhering to the approved site plan throughout the entire construction process unless revisions have been submitted and approved in accordance with COPC permitting procedures. Recently we have received several Final Surveys with significant and unapproved departures from the original site plan. We understand that sometimes site conditions and circumstances arise during construction which require alterations to the original plan. In such cases, the contractor is required to submit a revised site plan for review and approval PRIOR to the execution of work. Alterations to grading and drainage shall not be made without prior approval from the Stormwater Division. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 04/19/2024 | Disapproved - NO FEE | EMADISON |
| Note: ** 04/19/24The subject lots drainage must not negatively impact any adjacent property. (B) B.Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6) ** YOUR FINAL SURVEY DOES NOT MATCH YOUR PROPOSED DRAINAGE SITE PLAN YOU NEED TO MOVE THE YOUR STORMWATER FRONT REAR TO FRONT AS PROPOSED YOUR FINAL SURVEY SHOWS WATER GOING TO THE REAR WHICH WILL NEGATIVELY IMPACT THE ADJACENT PROPERTIES IN THE REAR ** BUILDER THIS LETTER WAS SENT OUT AS A REMINDER TO ALL CONTRACTORS: ** DATED: 04/09/2024 The Stormwater Division would like to remind contractors the importance of adhering to the approved site plan throughout the entire construction process unless revisions have been submitted and approved in accordance with COPC permitting procedures. Recently we have received several Final Surveys with significant and unapproved departures from the original site plan. We understand that sometimes site conditions and circumstances arise during construction which require alterations to the original plan. In such cases, the contractor is required to submit a revised site plan for review and approval PRIOR to the execution of work. Alterations to grading and drainage shall not be made without prior approval from the Stormwater Division. | |||
| ELECTRIC AND ALARM | 04/05/2024 | APPROVED | BTAYLOR |
| POOL DECK | 03/20/2024 | APPROVED | AGAETANO |
| Note: 3/19/2024 - PREVIOUS INSPECTION NOTES 03-19-2024 Knocked on the door twice. Need access for inspection. | |||
| POOL DECK | 03/19/2024 | Disapproved - NO FEE | AGAETANO |
| Note: 03-19-2024 Knocked on the door twice. Need access for inspection. | |||
| STEEL AND GROUND | 03/12/2024 | CANCELLED BY APPLICANT | WEB |
| Note: 3/11/2024 - PREVIOUS INSPECTION NOTES PROPERTY HAS A PRIVACY FENCE, KNOCKED AND RANG BELL, (NO ANSWER), NEED SOMEONE HOME TO GRANT SAFE ACCESS TO BACK YARD FOR INSPECTION FBC 110.1 dog barking, car in driveway | |||
| STEEL AND GROUND | 03/12/2024 | APPROVED | AGAETANO |
| Note: New inspection due to canceled inspection 3/11/2024 - PREVIOUS INSPECTION NOTES PROPERTY HAS A PRIVACY FENCE, KNOCKED AND RANG BELL, (NO ANSWER), NEED SOMEONE HOME TO GRANT SAFE ACCESS TO BACK YARD FOR INSPECTION FBC 110.1 dog barking, car in driveway | |||
| STEEL AND GROUND | 03/11/2024 | Disapproved - NO FEE | LMILLER |
| Note: PROPERTY HAS A PRIVACY FENCE, KNOCKED AND RANG BELL, (NO ANSWER), NEED SOMEONE HOME TO GRANT SAFE ACCESS TO BACK YARD FOR INSPECTION FBC 110.1 dog barking, car in driveway |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 02/27/2024 | 02/27/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/27/2024 | 02/27/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | HOLD | 02/21/2024 | 02/26/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide note on plans showing existing fence has gates opening out that are self-closing and latching with latches at 54 inches from ground | |||
| ELEC | COMPLETE | 02/21/2024 | 02/26/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 02/21/2024 | 02/26/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 02/21/2024 | 02/26/2024 |
| Note: Released By: TOM POLACEK - (386)346-8986 - | |||
| ZON | HOLD | 02/21/2024 | 02/21/2024 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM No record of existing fence Please have owner do a fence acknowledgment. They can either apply online or come in person Pool permit will be on hold until fence acknowledgment is completed |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/29/2024 |
| SURCHARGE FS 533.721 | ¤2.00 | 02/27/2024 |
| SURCHARGE - FS 468.631 | ¤2.00 | 02/27/2024 |
| SW ENG INSPECTION 40 | ¤40.00 | 02/27/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 02/27/2024 |
| SITE PLAN 30 | ¤30.00 | 02/27/2024 |
| ADJUSTMENT 50% | (¤127.50) | 02/27/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 02/27/2024 |
| INSPECTION- POOL | ¤160.00 | 02/27/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤65.00 | 02/27/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤261.50 |