Permit #2024020906

Permit Details

Status: FINAL

Parcel Id: 07-11-31-7007-00080-0190
PATIO/DECK (NO ROOF) : 374 sqft
Total Square Footage: 374 sqft
Block: 00080
Subdivision: 2185 - SECTION 7-FLORIDA PARK
Job Phone: 386-999-1042
Location Address: 85 FORTUNE LN
Type: PO - POOL
Issue Date: 02/27/2024
NOC: RECORDED
Applicant name: RYDER N BRAY
Owner: LYNN JOHNSON

Address

85 FORTUNE LANE

PALM COAST, FL 32137

Lot: 0190
Contracted Stated Job Value: ¤65,000.00
Job Description: New Pool w/ Existing Fence
Type: CN

Contractor

HAVEN POOLS LLC
Status Location Address State License Number Phone
ACTIVE

25 PUTTER LANE

PALM COAST, FL 32164

CPC1460243 (Exp: 08/31/2026) 386-999-1042

Sub Contractors

JOHN EDWARD GAMBONE
Status Location Address Mailing Address State License Number Phone
ACTIVE

15 HARGROVE LN

PALM COAST, FL 32137

1G

PALM COAST, FL 32137

EC13006037 (Exp: 08/31/2026) 386-586-9144

Inspection History

Type Request Date Result Inspector
POOL FINAL 07/30/2024 FINAL APPROVED FWILLIS
Note: 7/29/2024 - PREVIOUS INSPECTION NOTES PROPERTY HAS A PRIVACY FENCE, KNOCKED AND RANG BELL, (NO ANSWER), NEED SOMEONE HOME TO GRANT SAFE ACCESS TO BACK YARD FOR INSPECTION OF POOL.
POOL FINAL 07/29/2024 Disapproved -FEE REQUIRED FWILLIS
Note: PROPERTY HAS A PRIVACY FENCE, KNOCKED AND RANG BELL, (NO ANSWER), NEED SOMEONE HOME TO GRANT SAFE ACCESS TO BACK YARD FOR INSPECTION OF POOL.
U -UTILITY RESIDENTIAL FINAL 07/26/2024 FINAL APPROVED BWRIGHT
ROW- FINAL SURVEY/GRADING CERTIFICATION 07/25/2024 APPROVED EMADISON
Note:
ROW FIELD SURVEY /GRADING CERTIFICATION 07/25/2024 APPROVED EMADISON
ROW - FINAL INSPECTION 07/25/2024 APPROVED EMADISON
ROW- FINAL SURVEY/GRADING CERTIFICATION 07/11/2024 Disapproved -FEE REQUIRED EMADISON
Note: ** 07/11/24 BUILDER YOU NEED TO READ THE REQUIREMENTS AS NOTED IN THIS INSPECTION AND PREVIOUS INSPECTIONS NTING THE CORRECTIONS THAT ARE NEEDED ** BUILDER REMOVE ALL FLOW ARROWS FROM FINAL SURVEY INSPECTOR NEEDS ELEVATION SHOTS THAT CAPTURE YOUR DRAINAGE . YOU NEED TO SHOW A POSITIVE FLOW OF DRAINAGE AWAY FROM THE STRUCTURE MOVING YOUR WATER FROM THE REAR TO THE FRONT ** REQUIRED ALL FFE OF ADJACENT PROPERTIES THAT ARE IMPROVED IF VACANT NOTATE VACANT ADJACENT MEANS ANY PROPERTY THAT ADJOINS YOUR PROPERTY. ** AS INDICATED IN PREVIOUS INSPECTIONS OF FINAL SURVEY NEED THE ELEVATION SHOTS ALONG THE EDGE OF THE POOL STRUCTURE (LEFT REAR CORNER, CENTER , RIGHT REAR CORNER ) THESE SHOTS ARE ON THE OUTSIDE OF YOUR STRUCTURE. SHOW POSITIVE FLOW AWAY FROM STRUCTURE AND YOUR DRAINAGE CONVEYANCE WHERE TYE WATER WILL TRAVEL. ** Sec 300.01D1 The elevations along all property lines must be at a minimum of 20 foot intervals. Sec 300.01 D2 The elevations on all adjacent identified (e.g. vacant or improved etc.) properties at a minimum of 20 foot intervals on a 10 foot offset outside the property lines. All undeveloped properties must be properly identified on the site plan and Final Survey. There must be sufficient elevation shots to indicate the intended drainage pattern. The subject lots drainage must not negatively impact any adjacent property. (B) B.Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6) _______________________________________________________________________________________________________________________ 7/3/2024 - PREVIOUS INSPECTION NOTES **07/03/24 AS INDICATED IN THE PREVIOUS FINAL SURVEY INSPECTION DATED 04/28/24 BUILDER NEEDS TO READ NOTES AND RELAY NOTES TO THE SURVEY COMPANY AS TO WHAT IS REQUIRED 06/28/24= NEED ELEVATION AT THE END OF THE POOL DECKENSURE PROPER DRAINAGE AWAY FROM THE POOL DECK.Sec 300.01D1 The elevations along all property lines must be at a minimum of 20 foot intervals. Sec 300.01 D2 The elevations on all adjacent identified (e.g. vacant or improved etc.) properties at a minimum of 20 foot intervals on a 10 foot offset outside the property lines. All undeveloped properties must be properly identified on the site plan and Final Survey. There must be sufficient elevation shots to indicate the intended drainage pattern. The subject lots drainage must not negatively impact any adjacent property. (B) B.Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6) ** YOUR FINAL SURVEY DOES NOT MATCH YOUR PROPOSED DRAINAGE SITE PLAN YOU NEED TO MOVE THE YOUR STORMWATER FRONT REAR TO FRONT AS PROPOSED YOUR FINAL SURVEY SHOWS WATER GOING TO THE REAR WHICH WILL NEGATIVELY IMPACT THE ADJACENT PROPERTIES IN THE REAR ** BUILDER THIS LETTER WAS SENT OUT AS A REMINDER TO ALL CONTRACTORS: 4/28/24= NEED ELEVATION AT THE END OF THE POOL DECKENSURE PROPER DRAINAGE AWAY FROM THE POOL DECK.Sec 300.01D1 The elevations along all property lines must be at a minimum of 20 foot intervals. Sec 300.01 D2 The elevations on all adjacent identified (e.g. vacant or improved etc.) properties at a minimum of 20 foot intervals on a 10 foot offset outside the property lines. All undeveloped properties must be properly identified on the site plan and Final Survey. There must be sufficient elevation shots to indicate the intended drainage pattern. The subject lots drainage must not negatively impact any adjacent property. (B) B.Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6) ** YOUR FINAL SURVEY DOES NOT MATCH YOUR PROPOSED DRAINAGE SITE PLAN YOU NEED TO MOVE THE YOUR STORMWATER FRONT REAR TO FRONT AS PROPOSED YOUR FINAL SURVEY SHOWS WATER GOING TO THE REAR WHICH WILL NEGATIVELY IMPACT THE ADJACENT PROPERTIES IN THE REAR ** BUILDER THIS LETTER WAS SENT OUT AS A REMINDER TO ALL CONTRACTORS: ** DATED: 04/09/2024 CONTRACTORS NEWSFLASH Grading and Final Surveys April 9, 2024 The Stormwater Division would like to remind contractors the importance of adhering to the approved site plan throughout the entire construction process unless revisions have been submitted and approved in accordance with COPC permitting procedures. Recently we have received several Final Surveys with significant and unapproved departures from the original site plan. We understand that sometimes site conditions and circumstances arise during construction which require alterations to the original plan. In such cases, the contractor is required to submit a revised site plan for review and approval PRIOR to the execution of work. Alterations to grading and drainage shall not be made without prior approval from the Stormwater Division. Updated requirements for grading and finished floor elevations in the February 2024 updated Technical Manual. https://www.palmcoast.gov/community-development Please contact the Stormwater Division at 386-986-4750 with any questions/concerns. ____________________________________________________________________________________________________________________ 6/28/2024 - PREVIOUS INSPECTION NOTES 4/28/24= NEED ELEVATION AT THE END OF THE POOL DECKENSURE PROPER DRAINAGE AWAY FROM THE POOL DECK.Sec 300.01D1 The elevations along all property lines must be at a minimum of 20 foot intervals. Sec 300.01 D2 The elevations on all adjacent identified (e.g. vacant or improved etc.) properties at a minimum of 20 foot intervals on a 10 foot offset outside the property lines. All undeveloped properties must be properly identified on the site plan and Final Survey. There must be sufficient elevation shots to indicate the intended drainage pattern. The subject lots drainage must not negatively impact any adjacent property. (B) B.Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6) ** YOUR FINAL SURVEY DOES NOT MATCH YOUR PROPOSED DRAINAGE SITE PLAN YOU NEED TO MOVE THE YOUR STORMWATER FRONT REAR TO FRONT AS PROPOSED YOUR FINAL SURVEY SHOWS WATER GOING TO THE REAR WHICH WILL NEGATIVELY IMPACT THE ADJACENT PROPERTIES IN THE REAR ** BUILDER THIS LETTER WAS SENT OUT AS A REMINDER TO ALL CONTRACTORS: ** DATED: 04/09/2024 The Stormwater Division would like to remind contractors the importance of adhering to the approved site plan throughout the entire construction process unless revisions have been submitted and approved in accordance with COPC permitting procedures. Recently we have received several Final Surveys with significant and unapproved departures from the original site plan. We understand that sometimes site conditions and circumstances arise during construction which require alterations to the original plan. In such cases, the contractor is required to submit a revised site plan for review and approval PRIOR to the execution of work. Alterations to grading and drainage shall not be made without prior approval from the Stormwater Division. 4/19/2024 - PREVIOUS INSPECTION NOTES ** 04/19/24The subject lots drainage must not negatively impact any adjacent property. (B) B.Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6) ** YOUR FINAL SURVEY DOES NOT MATCH YOUR PROPOSED DRAINAGE SITE PLAN YOU NEED TO MOVE THE YOUR STORMWATER FRONT REAR TO FRONT AS PROPOSED YOUR FINAL SURVEY SHOWS WATER GOING TO THE REAR WHICH WILL NEGATIVELY IMPACT THE ADJACENT PROPERTIES IN THE REAR ** BUILDER THIS LETTER WAS SENT OUT AS A REMINDER TO ALL CONTRACTORS: ** DATED: 04/09/2024 The Stormwater Division would like to remind contractors the importance of adhering to the approved site plan throughout the entire construction process unless revisions have been submitted and approved in accordance with COPC permitting procedures. Recently we have received several Final Surveys with significant and unapproved departures from the original site plan. We understand that sometimes site conditions and circumstances arise during construction which require alterations to the original plan. In such cases, the contractor is required to submit a revised site plan for review and approval PRIOR to the execution of work. Alterations to grading and drainage shall not be made without prior approval from the Stormwater Division.
ROW- FINAL SURVEY/GRADING CERTIFICATION 07/03/2024 Disapproved -FEE REQUIRED EMADISON
Note: **07/03/24 AS INDICATED IN THE PREVIOUS FINAL SURVEY INSPECTION DATED 04/28/24 BUILDER NEEDS TO READ NOTES AND RELAY NOTES TO THE SURVEY COMPANY AS TO WHAT IS REQUIRED 06/28/24= NEED ELEVATION AT THE END OF THE POOL DECKENSURE PROPER DRAINAGE AWAY FROM THE POOL DECK.Sec 300.01D1 The elevations along all property lines must be at a minimum of 20 foot intervals. Sec 300.01 D2 The elevations on all adjacent identified (e.g. vacant or improved etc.) properties at a minimum of 20 foot intervals on a 10 foot offset outside the property lines. All undeveloped properties must be properly identified on the site plan and Final Survey. There must be sufficient elevation shots to indicate the intended drainage pattern. The subject lots drainage must not negatively impact any adjacent property. (B) B.Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6) ** YOUR FINAL SURVEY DOES NOT MATCH YOUR PROPOSED DRAINAGE SITE PLAN YOU NEED TO MOVE THE YOUR STORMWATER FRONT REAR TO FRONT AS PROPOSED YOUR FINAL SURVEY SHOWS WATER GOING TO THE REAR WHICH WILL NEGATIVELY IMPACT THE ADJACENT PROPERTIES IN THE REAR ** BUILDER THIS LETTER WAS SENT OUT AS A REMINDER TO ALL CONTRACTORS: 4/28/24= NEED ELEVATION AT THE END OF THE POOL DECKENSURE PROPER DRAINAGE AWAY FROM THE POOL DECK.Sec 300.01D1 The elevations along all property lines must be at a minimum of 20 foot intervals. Sec 300.01 D2 The elevations on all adjacent identified (e.g. vacant or improved etc.) properties at a minimum of 20 foot intervals on a 10 foot offset outside the property lines. All undeveloped properties must be properly identified on the site plan and Final Survey. There must be sufficient elevation shots to indicate the intended drainage pattern. The subject lots drainage must not negatively impact any adjacent property. (B) B.Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6) ** YOUR FINAL SURVEY DOES NOT MATCH YOUR PROPOSED DRAINAGE SITE PLAN YOU NEED TO MOVE THE YOUR STORMWATER FRONT REAR TO FRONT AS PROPOSED YOUR FINAL SURVEY SHOWS WATER GOING TO THE REAR WHICH WILL NEGATIVELY IMPACT THE ADJACENT PROPERTIES IN THE REAR ** BUILDER THIS LETTER WAS SENT OUT AS A REMINDER TO ALL CONTRACTORS: ** DATED: 04/09/2024 CONTRACTORS NEWSFLASH Grading and Final Surveys April 9, 2024 The Stormwater Division would like to remind contractors the importance of adhering to the approved site plan throughout the entire construction process unless revisions have been submitted and approved in accordance with COPC permitting procedures. Recently we have received several Final Surveys with significant and unapproved departures from the original site plan. We understand that sometimes site conditions and circumstances arise during construction which require alterations to the original plan. In such cases, the contractor is required to submit a revised site plan for review and approval PRIOR to the execution of work. Alterations to grading and drainage shall not be made without prior approval from the Stormwater Division. Updated requirements for grading and finished floor elevations in the February 2024 updated Technical Manual. https://www.palmcoast.gov/community-development Please contact the Stormwater Division at 386-986-4750 with any questions/concerns. ____________________________________________________________________________________________________________________ 6/28/2024 - PREVIOUS INSPECTION NOTES 4/28/24= NEED ELEVATION AT THE END OF THE POOL DECKENSURE PROPER DRAINAGE AWAY FROM THE POOL DECK.Sec 300.01D1 The elevations along all property lines must be at a minimum of 20 foot intervals. Sec 300.01 D2 The elevations on all adjacent identified (e.g. vacant or improved etc.) properties at a minimum of 20 foot intervals on a 10 foot offset outside the property lines. All undeveloped properties must be properly identified on the site plan and Final Survey. There must be sufficient elevation shots to indicate the intended drainage pattern. The subject lots drainage must not negatively impact any adjacent property. (B) B.Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6) ** YOUR FINAL SURVEY DOES NOT MATCH YOUR PROPOSED DRAINAGE SITE PLAN YOU NEED TO MOVE THE YOUR STORMWATER FRONT REAR TO FRONT AS PROPOSED YOUR FINAL SURVEY SHOWS WATER GOING TO THE REAR WHICH WILL NEGATIVELY IMPACT THE ADJACENT PROPERTIES IN THE REAR ** BUILDER THIS LETTER WAS SENT OUT AS A REMINDER TO ALL CONTRACTORS: ** DATED: 04/09/2024 The Stormwater Division would like to remind contractors the importance of adhering to the approved site plan throughout the entire construction process unless revisions have been submitted and approved in accordance with COPC permitting procedures. Recently we have received several Final Surveys with significant and unapproved departures from the original site plan. We understand that sometimes site conditions and circumstances arise during construction which require alterations to the original plan. In such cases, the contractor is required to submit a revised site plan for review and approval PRIOR to the execution of work. Alterations to grading and drainage shall not be made without prior approval from the Stormwater Division. 4/19/2024 - PREVIOUS INSPECTION NOTES ** 04/19/24The subject lots drainage must not negatively impact any adjacent property. (B) B.Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6) ** YOUR FINAL SURVEY DOES NOT MATCH YOUR PROPOSED DRAINAGE SITE PLAN YOU NEED TO MOVE THE YOUR STORMWATER FRONT REAR TO FRONT AS PROPOSED YOUR FINAL SURVEY SHOWS WATER GOING TO THE REAR WHICH WILL NEGATIVELY IMPACT THE ADJACENT PROPERTIES IN THE REAR ** BUILDER THIS LETTER WAS SENT OUT AS A REMINDER TO ALL CONTRACTORS: ** DATED: 04/09/2024 The Stormwater Division would like to remind contractors the importance of adhering to the approved site plan throughout the entire construction process unless revisions have been submitted and approved in accordance with COPC permitting procedures. Recently we have received several Final Surveys with significant and unapproved departures from the original site plan. We understand that sometimes site conditions and circumstances arise during construction which require alterations to the original plan. In such cases, the contractor is required to submit a revised site plan for review and approval PRIOR to the execution of work. Alterations to grading and drainage shall not be made without prior approval from the Stormwater Division.
ROW- FINAL SURVEY/GRADING CERTIFICATION 06/28/2024 Disapproved -FEE REQUIRED GBERTOLA
Note: 4/28/24= NEED ELEVATION AT THE END OF THE POOL DECKENSURE PROPER DRAINAGE AWAY FROM THE POOL DECK.Sec 300.01D1 The elevations along all property lines must be at a minimum of 20 foot intervals. Sec 300.01 D2 The elevations on all adjacent identified (e.g. vacant or improved etc.) properties at a minimum of 20 foot intervals on a 10 foot offset outside the property lines. All undeveloped properties must be properly identified on the site plan and Final Survey. There must be sufficient elevation shots to indicate the intended drainage pattern. The subject lots drainage must not negatively impact any adjacent property. (B) B.Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6) ** YOUR FINAL SURVEY DOES NOT MATCH YOUR PROPOSED DRAINAGE SITE PLAN YOU NEED TO MOVE THE YOUR STORMWATER FRONT REAR TO FRONT AS PROPOSED YOUR FINAL SURVEY SHOWS WATER GOING TO THE REAR WHICH WILL NEGATIVELY IMPACT THE ADJACENT PROPERTIES IN THE REAR ** BUILDER THIS LETTER WAS SENT OUT AS A REMINDER TO ALL CONTRACTORS: ** DATED: 04/09/2024 The Stormwater Division would like to remind contractors the importance of adhering to the approved site plan throughout the entire construction process unless revisions have been submitted and approved in accordance with COPC permitting procedures. Recently we have received several Final Surveys with significant and unapproved departures from the original site plan. We understand that sometimes site conditions and circumstances arise during construction which require alterations to the original plan. In such cases, the contractor is required to submit a revised site plan for review and approval PRIOR to the execution of work. Alterations to grading and drainage shall not be made without prior approval from the Stormwater Division. 4/19/2024 - PREVIOUS INSPECTION NOTES ** 04/19/24The subject lots drainage must not negatively impact any adjacent property. (B) B.Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6) ** YOUR FINAL SURVEY DOES NOT MATCH YOUR PROPOSED DRAINAGE SITE PLAN YOU NEED TO MOVE THE YOUR STORMWATER FRONT REAR TO FRONT AS PROPOSED YOUR FINAL SURVEY SHOWS WATER GOING TO THE REAR WHICH WILL NEGATIVELY IMPACT THE ADJACENT PROPERTIES IN THE REAR ** BUILDER THIS LETTER WAS SENT OUT AS A REMINDER TO ALL CONTRACTORS: ** DATED: 04/09/2024 The Stormwater Division would like to remind contractors the importance of adhering to the approved site plan throughout the entire construction process unless revisions have been submitted and approved in accordance with COPC permitting procedures. Recently we have received several Final Surveys with significant and unapproved departures from the original site plan. We understand that sometimes site conditions and circumstances arise during construction which require alterations to the original plan. In such cases, the contractor is required to submit a revised site plan for review and approval PRIOR to the execution of work. Alterations to grading and drainage shall not be made without prior approval from the Stormwater Division.
ROW- FINAL SURVEY/GRADING CERTIFICATION 04/19/2024 Disapproved - NO FEE EMADISON
Note: ** 04/19/24The subject lots drainage must not negatively impact any adjacent property. (B) B.Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6) ** YOUR FINAL SURVEY DOES NOT MATCH YOUR PROPOSED DRAINAGE SITE PLAN YOU NEED TO MOVE THE YOUR STORMWATER FRONT REAR TO FRONT AS PROPOSED YOUR FINAL SURVEY SHOWS WATER GOING TO THE REAR WHICH WILL NEGATIVELY IMPACT THE ADJACENT PROPERTIES IN THE REAR ** BUILDER THIS LETTER WAS SENT OUT AS A REMINDER TO ALL CONTRACTORS: ** DATED: 04/09/2024 The Stormwater Division would like to remind contractors the importance of adhering to the approved site plan throughout the entire construction process unless revisions have been submitted and approved in accordance with COPC permitting procedures. Recently we have received several Final Surveys with significant and unapproved departures from the original site plan. We understand that sometimes site conditions and circumstances arise during construction which require alterations to the original plan. In such cases, the contractor is required to submit a revised site plan for review and approval PRIOR to the execution of work. Alterations to grading and drainage shall not be made without prior approval from the Stormwater Division.
ELECTRIC AND ALARM 04/05/2024 APPROVED BTAYLOR
POOL DECK 03/20/2024 APPROVED AGAETANO
Note: 3/19/2024 - PREVIOUS INSPECTION NOTES 03-19-2024 Knocked on the door twice. Need access for inspection.
POOL DECK 03/19/2024 Disapproved - NO FEE AGAETANO
Note: 03-19-2024 Knocked on the door twice. Need access for inspection.
STEEL AND GROUND 03/12/2024 CANCELLED BY APPLICANT WEB
Note: 3/11/2024 - PREVIOUS INSPECTION NOTES PROPERTY HAS A PRIVACY FENCE, KNOCKED AND RANG BELL, (NO ANSWER), NEED SOMEONE HOME TO GRANT SAFE ACCESS TO BACK YARD FOR INSPECTION FBC 110.1 dog barking, car in driveway
STEEL AND GROUND 03/12/2024 APPROVED AGAETANO
Note: New inspection due to canceled inspection 3/11/2024 - PREVIOUS INSPECTION NOTES PROPERTY HAS A PRIVACY FENCE, KNOCKED AND RANG BELL, (NO ANSWER), NEED SOMEONE HOME TO GRANT SAFE ACCESS TO BACK YARD FOR INSPECTION FBC 110.1 dog barking, car in driveway
STEEL AND GROUND 03/11/2024 Disapproved - NO FEE LMILLER
Note: PROPERTY HAS A PRIVACY FENCE, KNOCKED AND RANG BELL, (NO ANSWER), NEED SOMEONE HOME TO GRANT SAFE ACCESS TO BACK YARD FOR INSPECTION FBC 110.1 dog barking, car in driveway

Review History

Department Status Date In Date Out
BLD COMPLETE 02/27/2024 02/27/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ZON COMPLETE 02/27/2024 02/27/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD HOLD 02/21/2024 02/26/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide note on plans showing existing fence has gates opening out that are self-closing and latching with latches at 54 inches from ground
ELEC COMPLETE 02/21/2024 02/26/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
MECH COMPLETE 02/21/2024 02/26/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 02/21/2024 02/26/2024
Note: Released By: TOM POLACEK - (386)346-8986 -
ZON HOLD 02/21/2024 02/21/2024
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM No record of existing fence Please have owner do a fence acknowledgment. They can either apply online or come in person Pool permit will be on hold until fence acknowledgment is completed

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 07/29/2024
SURCHARGE FS 533.721 ¤2.00 02/27/2024
SURCHARGE - FS 468.631 ¤2.00 02/27/2024
SW ENG INSPECTION 40 ¤40.00 02/27/2024
SW ENG - REVIEW 20 ¤20.00 02/27/2024
SITE PLAN 30 ¤30.00 02/27/2024
ADJUSTMENT 50% (¤127.50) 02/27/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 02/27/2024
INSPECTION- POOL ¤160.00 02/27/2024
PLAN REVIEW - RESIDENTIAL ¤65.00 02/27/2024
Fees Total Due: ¤0.00 Total Paid: ¤261.50