Permit #2024021022

Permit Details

Status: COED

Parcel Id: 42-10-30-3210-00000-1730
GARAGE: 558 sqft
CONDITIONED SPACE: 2250 sqft
OPENED PORCH (WITH ROOF) : 331 sqft
OPENED PORCH (WITH ROOF) : 60 sqft
Total Square Footage: 3199 sqft
Block: 00000
Subdivision: 2094 - CONSERVATORY AT HAMMOCK BEACH
Job Phone: 386-447-4400
Location Address: 403 BOURGANVILLE DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 03/29/2024
NOC: RECORDED
Applicant name: DAVID PAUL CROCKETT
Owner: CHRISTOPHER DE TREMPE AND CORINNE DE TREMPE

Address

1418 N OAK HILL DRIVE

SOUTH BEND, IN 46637

Lot: 1730
Contracted Stated Job Value: ¤703,000.00
Job Description: Single Family Residence
Type: CN

Contractor

SALTWATER HOMES INC
Status Location Address Mailing Address State License Number Phone Fax
DECEASED

138 PALM COAST PARKWAY

PALM COAST, FL 32137

SUITE 328

PALM COAST, FL 32137

RG0041345 (Exp: 08/31/2025) 386-447-4400 866-244-9639

Sub Contractors

RUSSELL J CARTER
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 302

DELAND, FL 32721

CFC1425938 (Exp: 08/31/2026) 386-736-4220 386-736-4219
WILLIAM FRANK DUDLEY JR.
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 978

Bunnell, FL 32110

EC0003177 (Exp: 08/31/2026) (386)437-3068
PEDRO DANIEL CHINCHILLA
Status Location Address State License Number Phone
ACTIVE

324 COVENT GARDENS PL

DELTONA, FL 32725

CCC1333997 (Exp: 08/31/2026) 386-679-6228
MOISES MERINO DIAZ
Status Location Address State License Number Phone
ACTIVE

3104 ORANOLE ROAD

ORLANDO, FL 32810

CAC1820980 (Exp: 08/31/2026) 407-225-3149
NATHAN H DEPRINZIO
Status Location Address State License Number Phone
INACTIVE

400 N US HIGHWAY 1

ORMOND BEACH, FL 32174

LQ30030 (Exp: 06/24/2024) 386-672-8494

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 02/11/2025 APPROVED PPROVIDER
U-CROSS CONNECTION 02/05/2025 APPROVED - AS NOTED LFITZGERALD
Note: master reclaim back flow-no cross connection
ROW - FINAL APRON (AFTER POUR) 02/05/2025 APPROVED PFLANAGAN
Note: CORRECTIONS MADE At the time of the inspection, all minimum city requirements were met. The builder's responsible for ensuring that nothing changes after this Inspection is approved. ------------------------------------------------------------------------------------- ** 01/29/25 BEFORE ROW STORMWATER FINAL IS APPROVED ** RIGHT REAR NEED TO REMOVE THE LANDSCAPING OUT OF THE DRAINAGE CONVEYANCE AS BARL MULCH WILL WASH INTO THE POND ** NEED TO RAISE ALL POP-UP DRAINS SO THEY ARE ON TOP OF THE SOD NOT UNDERNEATH AS IT WILL CAUSE WASHOUTS UNDERNEATH SOD ** REMOVE PORT-A-JOHN OUT OF THE CUL-DE-SAC
ROW - STORMWATER FINAL 02/05/2025 APPROVED PFLANAGAN
Note: At the time of the inspection, all minimum city requirements were met. The builder's responsible for ensuring that nothing changes after this Inspection is approved. ----------------------------------------------------------------------------------- ** 01/29/25 BEFORE ROW STORMWATER FINAL IS APPROVED ** RIGHT REAR NEED TO REMOVE THE LANDSCAPING OUT OF THE DRAINAGE CONVEYANCE AS BARL MULCH WILL WASH INTO THE POND ** NEED TO RAISE ALL POP-UP DRAINS SO THEY ARE ON TOP OF THE SOD NOT UNDERNEATH AS IT WILL CAUSE WASHOUTS UNDERNEATH SOD ** REMOVE PORT-A-JOHN OUT OF THE CUL-DE-SAC
U -UTILITY RESIDENTIAL FINAL 02/05/2025 FINAL APPROVED LFITZGERALD
ROW- FINAL SURVEY/GRADING CERTIFICATION 01/29/2025 APPROVED EMADISON
ROW FIELD SURVEY /GRADING CERTIFICATION 01/29/2025 APPROVED - AS NOTED EMADISON
Note: ** 01/29/25 BEFORE ROW STORMWATER FINAL IS APPROVED ** RIGHT REAR NEED TO REMOVE THE LANDSCAPING OUT OF THE DRAINAGE CONVEYANCE AS BARL MULCH WILL WASH INTO THE POND ** NEED TO RAISE ALL POP-UP DRAINS SO THEY ARE ON TOP OF THE SOD NOT UNDERNEATH AS IT WILL CAUSE WASHOUTS UNDERNEATH SOD ** REMOVE PORT-A-JOHN OUT OF THE CUL-DE-SAC
ROW- PRE-APRON (PRE-POUR) 01/07/2025 APPROVED - AS NOTED PFLANAGAN
Note: PAVER BASE IS PASSED POURED PAVER RESTRAINT FOOTERS YOU CAN NOT GO PASSED THE PAVER RESTRAINTS WITH PAVERS DUE TO YOU NEED TO GLUE PAVERS TO FOOTERS. READY FOR PAVERS BUT BE AWARE THAT YOU CAN NOT EXTEND PAVERS PASSED PAVER RESTRAINTS. IF PAVERS ARE FUTHER THE WILL BE REMOVED --------------------------------------------------------------------------------- 12/20/2024 - PREVIOUS INSPECTION NOTES ** 12/20/24 READY TO POUR APRON PAVER RESTRAINTS AND CURB AND GUTTER ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED
ROW- PAVER RESTRAINTS 12/20/2024 APPROVED EMADISON
Note: ** READY TO POUR PAVER RESTRAINTS APRON AD CURB AND GUTTER ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE
ROW- PRE-APRON (PRE-POUR) 12/20/2024 PARTIALLY APPROVED EMADISON
Note: ** 12/20/24 READY TO POUR APRON PAVER RESTRAINTS AND CURB AND GUTTER ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED
GRAVITY SEWER TEST 12/04/2024 Approval - Private Provider PPROVIDER
Note: Inspector Notes from Inspection 2095 THIS WAS A VIRTUAL INSPECTION
SEWER TIE IN 12/04/2024 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
ELECTRIC - EARLY POWER 08/22/2024 Approval - Private Provider PPROVIDER
LATH/BRICK/ WATER BARRIER 07/22/2024 Approval - Private Provider PPROVIDER
INSULATION 07/22/2024 Approval - Private Provider PPROVIDER
ALL ROUGH 07/15/2024 Approval - Private Provider PPROVIDER
WALL SHEATHING 07/12/2024 Approval - Private Provider PPROVIDER
ROOF VALLEY & METAL 06/14/2024 Approval - Private Provider PPROVIDER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 06/12/2024 Approval - Private Provider PPROVIDER
ELECTRIC-TUG 06/05/2024 Approval - Private Provider PPROVIDER
TIE BEAM / LINTEL 05/20/2024 APPROVED STHOMAS
FOUND SURVEY APPROVED (OFFICE) 05/14/2024 APPROVED TBAKER
MONOLITHIC SLAB 04/29/2024 Approval - Private Provider PPROVIDER
PLUMBING 1ST ROUGH UNDERGROUND 04/24/2024 Approval - Private Provider PPROVIDER
WATER METER INSTALLATION REQUEST 04/09/2024 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
BADMIN INFORMATION 02/06/2025 02/06/2025
Note: Marked INFORMATION By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM Need to use 2023 blower door form.
ENGIN1 COMPLETE 05/13/2024 05/14/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 05/13/2024 05/13/2024
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
ENGIN1 COMPLETE 05/08/2024 05/08/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 05/08/2024 05/10/2024
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM
ZON COMPLETE 05/08/2024 05/08/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 04/11/2024 04/15/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD HOLD 04/03/2024 04/05/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Complete truss plan packet cover sheet or first page to include the design professional of record (building design engineer or architect) approval stamp indicating acceptance and approval of truss design (Not wet seal)
ZON COMPLETE 03/19/2024 03/19/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BADMIN COMPLETE 03/19/2024 03/25/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BADMIN COMPLETE 03/04/2024 03/04/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
URB COMPLETE 02/23/2024 02/27/2024
Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM
BADMIN HOLD 02/22/2024 02/27/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Truss packet or truss layout needs to have shop drawing approval stamp by the engineer of record who designed the house.
CUSVC COMPLETE 02/22/2024 02/27/2024
Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM
ENGIN1 COMPLETE 02/22/2024 02/22/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 02/22/2024 02/28/2024
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
SW1 COMPLETE 02/22/2024 02/28/2024
Note: Released By: JEFF CREWS - - JCREWS@PALMCOASTGOV.COM
ZON HOLD 02/22/2024 02/23/2024
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM On elevation page please relabel shutters to decorative louver as these would not meet the definition of shutters in the land development code

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
WATER-METER ¤514.49 03/29/2024
ADJUSTMENT 50% (¤15.00) 03/29/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 03/29/2024
ADMINISTRATIVE - RESID PP ¤225.00 03/29/2024
CONNECTION FEES ¤25.00 03/29/2024
FC IMPACT FEE EMS ¤62.00 03/29/2024
IMPACT FEE FIRE ¤428.09 03/29/2024
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 03/29/2024
FC IMPACT FEE LIBRARY ¤268.00 03/29/2024
IMPACT FEE PARKS ¤1,800.99 03/29/2024
IMPACT FEE SCHOOL ¤5,450.00 03/29/2024
IMPACT FEE TRANSPORTATION ¤3,404.00 03/29/2024
SURCHARGE FS 533.721 ¤2.40 03/29/2024
SURCHARGE - FS 468.631 ¤3.60 03/29/2024
SW ENG - FOUNDATION SURVEY ¤20.00 03/29/2024
SW ENG INSPECTION 80 ¤80.00 03/29/2024
SW ENG PRE APRON ¤30.00 03/29/2024
SW ENG - REVIEW 20 ¤20.00 03/29/2024
SW ENG RES REVIEW 200 ¤200.00 03/29/2024
SEWER INSPECTION ¤25.00 03/29/2024
SITE PLAN 30 ¤30.00 03/29/2024
Fees Total Due: ¤0.00 Total Paid: ¤12,821.57