I want to search for...
Permit #2024021189
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7024-00460-0030 |
| Block: 00460 |
| Subdivision: 2167 - SECTION 24-PINE GROVE |
| Job Phone: 904-268-7730 |
| Location Address: 111 PRITCHARD DR |
| Type: DR - DRIVEWAY |
| Issue Date: 03/01/2024 |
| NOC: Unknown |
| Applicant name: SCOTT CHRISTIAN HOWARD |
| Owner: FOCUS HOMES LLC OF FLORIDA |
|
Address 5220 SHAD ROAD JACKSONVILLE, FL 32257 |
| Lot: 0030 |
| Contracted Stated Job Value: ¤2,500.00 |
| Job Description: Driveway |
| Type: CN |
Contractor
FOCUS HOMES LLC OF FLORIDA
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
5220 SHAD RD JACKSONVILLE, FL 32257 |
# 202 JACKSONVILLE, FL 32257 |
CRC1332443 (Exp: 08/31/2026) | 904-268-7730 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - FINAL APRON (AFTER POUR) | 03/26/2024 | APPROVED - AS NOTED | PFLANAGAN |
| Note: ASPHALT PATCH IS SUPER SOFT AND WHEN JUST PUTTING PROB ON IT GOES IN SUPPER EASY. PASSING AS NOTED THAT IF ASPHALT PATCH BREAKES APART AFTER THIS INSPECTION ITS THE BUILDERS RESPONSIBILITY TO FIX ANY ISSUES. ----------------------------------------------------------------------------------------- 3/25/2024 - PREVIOUS INSPECTION NOTES 03/25/24 THERE IS STILL NO HOT PATCH 3/22/2024 - PREVIOUS INSPECTION NOTES 03/22/24 I RECIEVED A TEXT FROM DOYLE ASKING TO CANCEL INSPECTION DUE TO CONTRACTOR NOT ABLE TO COMPLETE HOT PATCH TODAY. CM WILL SCHEDULE NEW INSPECTION AFTER HOT PATCH IN COMPLETED. | |||
| ROW - FINAL INSPECTION | 03/26/2024 | APPROVED | PFLANAGAN |
| Note: CORRECTION MADE ---------------------------------------------------------------------------- 3/25/2024 - PREVIOUS INSPECTION NOTES 03/25/24 THERE IS STILL NO HOT PATCH INSTALLED. ------------------------------------------------------------------------------------------------------------------------ 3/22/2024 - PREVIOUS INSPECTION NOTES 03/22/24 I RECIEVED A TEXT FROM DOYLE ASKING TO CANCEL INSPECTION DUE TO CONTRACTOR NOT ABLE TO COMPLETE HOT PATCH TODAY. CM WILL SCHEDULE NEW INSPECTION AFTER HOT PATCH IN COMPLETED. | |||
| ROW - FINAL APRON (AFTER POUR) | 03/25/2024 | Disapproved - NO FEE | TPOLACEK |
| Note: 03/25/24 THERE IS STILL NO HOT PATCH 3/22/2024 - PREVIOUS INSPECTION NOTES 03/22/24 I RECIEVED A TEXT FROM DOYLE ASKING TO CANCEL INSPECTION DUE TO CONTRACTOR NOT ABLE TO COMPLETE HOT PATCH TODAY. CM WILL SCHEDULE NEW INSPECTION AFTER HOT PATCH IN COMPLETED. | |||
| ROW - FINAL INSPECTION | 03/25/2024 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 03/25/24 THERE IS STILL NO HOT PATCH INSTALLED. ------------------------------------------------------------------------------------------------------------------------ 3/22/2024 - PREVIOUS INSPECTION NOTES 03/22/24 I RECIEVED A TEXT FROM DOYLE ASKING TO CANCEL INSPECTION DUE TO CONTRACTOR NOT ABLE TO COMPLETE HOT PATCH TODAY. CM WILL SCHEDULE NEW INSPECTION AFTER HOT PATCH IN COMPLETED. | |||
| ROW - FINAL APRON (AFTER POUR) | 03/22/2024 | CANCELLED BY APPLICANT | TPOLACEK |
| Note: 03/22/24 I RECIEVED A TEXT FROM DOYLE ASKING TO CANCEL INSPECTION DUE TO CONTRACTOR NOT ABLE TO COMPLETE HOT PATCH TODAY. CM WILL SCHEDULE NEW INSPECTION AFTER HOT PATCH IN COMPLETED. | |||
| U -UTILITY RESIDENTIAL FINAL | 03/22/2024 | FINAL APPROVED | LFITZGERALD |
| ROW - FINAL INSPECTION | 03/22/2024 | CANCELLED BY APPLICANT | TPOLACEK |
| Note: 03/22/24 I RECIEVED A TEXT FROM DOYLE ASKING TO CANCEL INSPECTION DUE TO CONTRACTOR NOT ABLE TO COMPLETE HOT PATCH TODAY. CM WILL SCHEDULE NEW INSPECTION AFTER HOT PATCH IN COMPLETED. | |||
| ROW- PRE-APRON (PRE-POUR) | 03/14/2024 | CANCELLED BY APPLICANT | WEB |
| ROW- PRE-APRON (PRE-POUR) | 03/13/2024 | APPROVED | PFLANAGAN |
| Note: IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 02/27/2024 | 03/01/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| UTL | COMPLETE | 02/27/2024 | 02/27/2024 |
| Note: Released By: LARRY FITZGERALD - (386)286-2041 - LFITZGERALD@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/27/2024 | 02/27/2024 |
| Note: Released By: LIBBY MUSGROVE - (386)986-3780 - LMUSGROVE@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG REINSPECTION 20 | ¤20.00 | 03/26/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 03/01/2024 |
| SITE PLAN 15 | ¤15.00 | 03/01/2024 |
| ADJUSTMENT 50% | (¤15.00) | 03/01/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 03/01/2024 |
| SW ENG INSPECTION 40 | ¤40.00 | 03/01/2024 |
| SW ENG PRE APRON | ¤30.00 | 03/01/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤320.00 |