I want to search for...
Permit #2024030039
Permit Details
Status: COED
| Parcel Id: 42-10-30-3210-00000-2010 |
| CONDITIONED SPACE: 3359 sqft |
| GARAGE: 540 sqft |
| ENCLOSE EXISTING PORCH TO LIVING : 46 sqft |
| OPENED PORCH (WITH ROOF) : 609 sqft |
| Total Square Footage: 4554 sqft |
| Block: 00000 |
| Subdivision: - |
| Job Phone: 386-236-4133 |
| Location Address: 102 MASTERS CIR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/20/2024 |
| NOC: RECORDED |
| Applicant name: LEONARDO CIRO SANCLEMENTE |
| Owner: VOLUSIA RESIDENTIAL CONSTRUCTION LLC |
|
Address 2379 BEVILLE ROAD DAYTONA BEACH, FL 32119 |
| Lot: 2010 |
| Contracted Stated Job Value: ¤335,472.00 |
| Job Description: single family residence |
| Type: CN |
Contractor
VOLUSIA RESIDENTIAL CONSTRUCTION, LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
2379 BEVILLE RD DAYTONA BEACH, FL 32119 |
CBC1262114 (Exp: 08/31/2026) | 386-236-4133 |
Sub Contractors
STEPHEN COURTEAUX
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
85 North Yonge Street Ormond Beach, FL 32174 |
EC13001748 (Exp: 08/31/2026) | (386) 672-4900 | 386-676-7472 |
EDWARD DOUGLAS TENNANT
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
3370 AGRICULTURAL CENTER DRIVE ST. AUGUSTINE , FL 32092 |
CAC1813372 (Exp: 08/31/2026) | (904)829-8898 | (904)829-6587 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
HARLEY M BRYAN JR
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
5225 EDGEWOOD COURT PALM COAST, FL 32054 |
CRC1331244 (Exp: 08/31/2026) | 904-389-2700 | 904-389-0722 |
HUGH MACDONALD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
10825 TOM FOLSOM ROAD, SUITE A THONOTOSASSA, FL 33592 |
CCC1329562 (Exp: 08/31/2026) | 813-986-4968 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 11/20/2024 | FINAL APPROVED | HCAMACHO |
| ROW - STORMWATER FINAL | 11/20/2024 | APPROVED - AS NOTED | PFLANAGAN |
| Note: TALKED WITH CM THE AND THEY HAVE IT READY FOR SOD IN THE ADJACENT LOT. PASSING AS NOTED THAT HE IS GOING TO FIX THE AREA --------------------------------------------------------------------- 11/7/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO REMOVE DUMPSTER FROM VACANT LOT ACROSS THE STREET. 2) NEED TO PICK UP ALL TRASH AND CONSTRUCTION DEBRIS FROM VACANT ACROSS THE STREET. 3) NEED TO REPAIR ALL RUTS BARE AREAS THAT WAS DAMAGED DURING THE CONSTRUCTION. 4) NEED TO REPAIR THE ADJACENT LOTS BARE AREAS IN THE BACK RIGHT CORNER . 5) NEED TO PRESSURE WASH ALL OIL SPILL IN THE STREET. Sec 300.03 F4 The Stormwater Final Inspection will include visual inspection of the site and adjacent properties for debris, proper clean up and repair to damaged terrain. | |||
| GAS FINAL | 11/15/2024 | APPROVED | MGIBSON |
| GAS ROUGH | 11/14/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: 8/13/2024 - PREVIOUS INSPECTION NOTES ANOTHER GAS ROUGH INSPECTION IS NEEDED WHEN A/G OR U/G TANK IS SET AND RAN FROM HOUSE TO STUBB OUT WITH PRESSURE ON IT AS WELL. PER ''HOA'' AGREEMENT A BURID TANK IS THE ONLY APPROVAL ALLOWED. ANOTHER GAS PERMIT IS REQUIRED FOR APPROVAL OF BUILDING AND ZONING BEFORE WORK CAN BE STARTED. C/M TO SCHEDUAL GAS FINAL ONCE EXHAUST VENT IS CAPED ON BACK LANI. | |||
| U -UTILITY RESIDENTIAL FINAL | 11/07/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 11/7/2024 11:11:55 AM *** watermeter box crushed in on one side-either order new box from utility or if you remove soils from that side and then use 2x4 to force back to original shape that might work in order to secure id on box | |||
| ROW - FINAL APRON (AFTER POUR) | 11/07/2024 | APPROVED | PFLANAGAN |
| U-CROSS CONNECTION | 11/07/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 11/7/2024 11:09:45 AM *** master backfloe reclaim-no cross connection | |||
| ROW - STORMWATER FINAL | 11/07/2024 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) NEED TO REMOVE DUMPSTER FROM VACANT LOT ACROSS THE STREET. 2) NEED TO PICK UP ALL TRASH AND CONSTRUCTION DEBRIS FROM VACANT ACROSS THE STREET. 3) NEED TO REPAIR ALL RUTS BARE AREAS THAT WAS DAMAGED DURING THE CONSTRUCTION. 4) NEED TO REPAIR THE ADJACENT LOTS BARE AREAS IN THE BACK RIGHT CORNER . 5) NEED TO PRESSURE WASH ALL OIL SPILL IN THE STREET. Sec 300.03 F4 The Stormwater Final Inspection will include visual inspection of the site and adjacent properties for debris, proper clean up and repair to damaged terrain. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 11/06/2024 | APPROVED | PFLANAGAN |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/06/2024 | APPROVED | PFLANAGAN |
| ELECTRIC - EARLY POWER | 10/17/2024 | APPROVED | HCAMACHO |
| Note: Inspector Notes from Inspection 2200 *** NOTES ADDED BY JSTEWART 8/12/2024 11:00:22 AM *** Authorize release of email to FPL | |||
| ROW- PRE-APRON (PRE-POUR) | 09/11/2024 | APPROVED - AS NOTED | EMADISON |
| Note: ** 09/11/24 READY TO SET PAVERS | |||
| ROW- PAVER RESTRAINTS | 09/05/2024 | APPROVED | EMADISON |
| Note: Inspector Notes from Inspection 9270 ** 09/05/24 READY TO POUR APRON AND PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE | |||
| ROW- PRE-APRON (PRE-POUR) | 09/05/2024 | APPROVED - AS NOTED | EMADISON |
| Note: ** 09/05/24 READY TO POUR APRON AND PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE | |||
| INSULATION | 08/14/2024 | APPROVED | FWILLIS |
| Note: Inspector Notes from Inspection 2420 *** NOTES ADDED BY JSTEWART 8/12/2024 11:03:04 AM *** Romex outside of wall and holding box (metal needs bonding), in half bath for vanity light. please install, fasten, bond. Will check at insulation. | |||
| GAS ROUGH | 08/13/2024 | PARTIALLY APPROVED | MGIBSON |
| Note: ANOTHER GAS ROUGH INSPECTION IS NEEDED WHEN A/G OR U/G TANK IS SET AND RAN FROM HOUSE TO STUBB OUT WITH PRESSURE ON IT AS WELL | |||
| ELECTRIC-TUG | 08/12/2024 | APPROVED - AS NOTED | JSTEWART |
| Note: *** NOTES ADDED BY JSTEWART 8/12/2024 11:00:22 AM *** Authorize release of email to FPL | |||
| LATH/BRICK/ WATER BARRIER | 08/12/2024 | APPROVED | JSTEWART |
| ALL ROUGH | 08/12/2024 | APPROVED - AS NOTED | JSTEWART |
| Note: *** NOTES ADDED BY JSTEWART 8/12/2024 11:03:04 AM *** Romex outside of wall and holding box (metal needs bonding), in half bath for vanity light. please install, fasten, bond. Will check at insulation. | |||
| GRAVITY SEWER TEST | 08/01/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 NEED ADDRESS POSTED ON PERMIT BOARD OR POST FOR ''911'' PURPOSE BEFORE NEXT INSPECTION THIS WAS A VIRTUAL INSPECTION | |||
| SEWER TIE IN | 08/01/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 NEED ADDRESS POSTED ON PERMIT BOARD OR POST FOR ''911'' PURPOSE BEFORE NEXT INSPECTION THIS WAS A VIRTUAL INSPECTION | |||
| WALL SHEATHING | 07/31/2024 | APPROVED | FWILLIS |
| Note: 7/26/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LMILLER 7/26/2024 2:20:00 PM *** Need to expose connections at collumn posts on frnt right and left side of house for inspection of connections per FBC R 110.1 (need to recall once the sheathing has been replaced after removal for inspection listed above) Inspector Notes from Inspection 2467 *** NOTES ADDED BY JSTEWART 7/11/2024 9:11:17 AM *** 3307.1 Protection required. …Provisions shall be made to control water runoff and erosion during construction or demolition activities. Please repair silt fence prior to calling in inspections to avoid future fees. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/31/2024 | APPROVED | FWILLIS |
| Note: 7/31/24 - ITEMS CORRECTED 7/26/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LMILLER 7/26/2024 2:18:41 PM *** 1. Missing LTT20B at base of stud pack under girder Per Plans FBC 107 2. Missing SPH at top and bottom of kings at openings per plans FBC 107 3. Max OC spacing for SDWC15600's exceeded per plans FBC 107 4. Need to expose connections at collumn posts on frnt right and left side of house for inspection of connections per FBC R 110.1 5. Missing .131x3" nails at ledger per plans FBC 107 6. Wrong connections used at stud packs per plans FBC 107 Inspector Notes from Inspection 2467 *** NOTES ADDED BY JSTEWART 7/11/2024 9:11:17 AM *** 3307.1 Protection required. …Provisions shall be made to control water runoff and erosion during construction or demolition activities. Please repair silt fence prior to calling in inspections to avoid future fees. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/26/2024 | Disapproved -FEE REQUIRED | LMILLER |
| Note: *** NOTES ADDED BY LMILLER 7/26/2024 2:18:41 PM *** 1. Missing LTT20B at base of stud pack under girder Per Plans FBC 107 2. Missing SPH at top and bottom of kings at openings per plans FBC 107 3. Max OC spacing for SDWC15600's exceeded per plans FBC 107 4. Need to expose connections at collumn posts on frnt right and left side of house for inspection of connections per FBC R 110.1 5. Missing .131x3" nails at ledger per plans FBC 107 6. Wrong connections used at stud packs per plans FBC 107 Inspector Notes from Inspection 2467 *** NOTES ADDED BY JSTEWART 7/11/2024 9:11:17 AM *** 3307.1 Protection required. …Provisions shall be made to control water runoff and erosion during construction or demolition activities. Please repair silt fence prior to calling in inspections to avoid future fees. | |||
| WALL SHEATHING | 07/26/2024 | Disapproved - NO FEE | LMILLER |
| Note: *** NOTES ADDED BY LMILLER 7/26/2024 2:20:00 PM *** Need to expose connections at collumn posts on frnt right and left side of house for inspection of connections per FBC R 110.1 (need to recall once the sheathing has been replaced after removal for inspection listed above) Inspector Notes from Inspection 2467 *** NOTES ADDED BY JSTEWART 7/11/2024 9:11:17 AM *** 3307.1 Protection required. …Provisions shall be made to control water runoff and erosion during construction or demolition activities. Please repair silt fence prior to calling in inspections to avoid future fees. | |||
| ROOF VALLEY & METAL | 07/11/2024 | APPROVED - AS NOTED | JSTEWART |
| Note: *** NOTES ADDED BY JSTEWART 7/11/2024 9:11:17 AM *** 3307.1 Protection required. …Provisions shall be made to control water runoff and erosion during construction or demolition activities. Please repair silt fence prior to calling in inspections to avoid future fees. | |||
| ROOF SHEATHING | 07/08/2024 | APPROVED | JWALKER |
| TIE BEAM / LINTEL | 06/20/2024 | APPROVED | FWILLIS |
| Note: 6/18/2024 - PREVIOUS INSPECTION NOTES 4 areas have missed dowels. Circled the locations on the approved FD1 plan page. | |||
| TIE BEAM / LINTEL | 06/18/2024 | Disapproved - NO FEE | JWALKER |
| Note: 4 areas have missed dowels. Circled the locations on the approved FD1 plan page. | |||
| FOUND SURVEY APPROVED (OFFICE) | 06/17/2024 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 06/06/2024 | APPROVED | BTAYLOR |
| Note: 6/5/2024 - PREVIOUS INSPECTION NOTES 6-5-24 1. Concealment walls are not built per detail A. | |||
| MONOLITHIC SLAB | 06/05/2024 | Disapproved - NO FEE | BTAYLOR |
| Note: 6-5-24 1. Concealment walls are not built per detail A. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 05/29/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: NEED ADDRESS POSTED ON PERMIT BOARD OR POST FOR ''911'' PURPOSE BEFORE NEXT INSPECTION | |||
| WATER METER INSTALLATION REQUEST | 05/06/2024 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 06/14/2024 | 06/17/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/14/2024 | 06/14/2024 |
| Note: Released By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/21/2024 | 05/21/2024 |
| Note: Released By: JEFF CREWS - - JCREWS@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/21/2024 | 05/21/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/21/2024 | 05/21/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/15/2024 | 05/15/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 05/15/2024 | 05/20/2024 |
| Note: Held By: JEFF CREWS - - JCREWS@PALMCOASTGOV.COM Please add proposed elv's at 20' intervals along property lines and entire yard to show positive drainage away from house. Show Garage FF elevation Adjacent grade at house is 1.6' lower than FF and lower than back of curb near front left house corner show how this will drain | |||
| ZON | COMPLETE | 05/15/2024 | 05/15/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/12/2024 | 03/13/2024 |
| Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 03/12/2024 | 03/15/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| GAS | COMPLETE | 03/12/2024 | 03/13/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 03/12/2024 | 03/15/2024 |
| Note: Released By: SINA VEDADI MOGHADAM - (386)986-2569 - SVEDADIMOGHADAM@PALMCOASTGOV.COM | |||
| URB | COMPLETE | 03/04/2024 | 03/04/2024 |
| Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 03/01/2024 | 03/04/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/01/2024 | 03/05/2024 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 03/01/2024 | 03/08/2024 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 03/01/2024 | 03/04/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. DW outlet can not be located behind the DW. NEC 2020 422.16 2. Electrical riser diagram needs to include the surge protector. NEC 2020 230.67 | |||
| ENGIN1 | COMPLETE | 03/01/2024 | 03/01/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | HOLD | 03/01/2024 | 03/04/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM list gas subcontractor | |||
| LOCATE | COMPLETE | 03/01/2024 | 03/06/2024 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 03/01/2024 | 03/04/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 03/01/2024 | 03/11/2024 |
| Note: Held By: SINA VEDADI MOGHADAM - (386)986-2569 - SVEDADIMOGHADAM@PALMCOASTGOV.COM Please show drainage from the rear of the structure with a minimum slope of 6 inches for the first 10 feet. | |||
| ZON | HOLD | 03/01/2024 | 03/04/2024 |
| Note: Held By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM 1. CORRECT NAME ADDRESS ON SITE PLAN (MASTERS COURT) 2. MISSING LOT TOTAL SQUARE FOOTAGE |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 11/20/2024 |
| SW ENG REINSPECTION 20 | ¤20.00 | 11/20/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 11/20/2024 |
| CONNECTION FEES | ¤25.00 | 03/20/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 03/20/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 03/20/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 03/20/2024 |
| SEWER INSPECTION | ¤25.00 | 03/20/2024 |
| SITE PLAN 30 | ¤30.00 | 03/20/2024 |
| WATER-METER | ¤514.49 | 03/20/2024 |
| ADJUSTMENT 50% | (¤1,134.01) | 03/20/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 03/20/2024 |
| INSPECTION - RESIDENTIAL | ¤1,743.50 | 03/20/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤494.52 | 03/20/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 03/20/2024 |
| IMPACT FEE FIRE | ¤428.09 | 03/20/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 03/20/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 03/20/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 03/20/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 03/20/2024 |
| IMPACT FEE TRANSPORTATION | ¤3,404.00 | 03/20/2024 |
| SURCHARGE FS 533.721 | ¤11.34 | 03/20/2024 |
| SURCHARGE - FS 468.631 | ¤17.01 | 03/20/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 03/20/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 03/20/2024 |
| SW ENG PRE APRON | ¤30.00 | 03/20/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤13,837.93 |