I want to search for...
Permit #2024030166
Permit Details
Status: COED
| Parcel Id: 07-11-31-7035-00490-0010 |
| GARAGE: 396 sqft |
| OPENED PORCH (WITH ROOF) : 112 sqft |
| CONDITIONED SPACE: 1650 sqft |
| Total Square Footage: 2158 sqft |
| Block: 00490 |
| Subdivision: - |
| Job Phone: 202-494-2019 |
| Location Address: 10 BUNKER VIEW DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 04/08/2024 |
| NOC: RECORDED |
| Applicant name: GARY ANDREW FISCHER |
| Owner: INB BFR FUND 1 LLC |
|
Address 3670 MAGUIRE BOULEVARD ORLANDO, FL 32803 |
|
Address SUITE 220 ORLANDO, FL 32803 |
| Lot: 0010 |
| Contracted Stated Job Value: ¤150,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
INB HOMES
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
3670 MAGUIRE BLVD ORLANDO, FL 32803 |
SUITE 210 ORLANDO, FL 32803 |
CGC048746 (Exp: 08/31/2026) | 407-476-8195 |
Sub Contractors
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
ROBERT MICHAEL RENNER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
531 CODISCO WAY SANFORD, FL 32771 |
CAC051477 (Exp: 08/31/2026) | 407-333-2665 |
JOSEPH C WRIGHT
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
15 HARGROVE LANE PALM COAST, FL 32137 |
UNIT 3 D PALM COAST, FL 32137 |
EC13003278 (Exp: 08/31/2026) | 386-447-9644 | 386-447-9633 |
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 09/30/2024 | FINAL APPROVED | MCONTRYMAN |
| Note: 9/27/2024 - PREVIOUS INSPECTION NOTES FBCR M1303.1 HEAT STRIPS NOT MARKED NEC 440.14 A/C DISCONNECT NEEDED WHEN BREAKER NOT IN VIEW | |||
| ROW - STORMWATER FINAL | 09/30/2024 | APPROVED | PFLANAGAN |
| Note: CORRECTIONS --------------------------------------------------------- 9/27/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN ALL TRASH AND CONSTRUCTION DEBRIS FROM LOT AND THE LOT TO THE RIGHT BEHIND THE FENCE 2) NEED TO CLEAN ALL DIRT OUT OF CULVERT | |||
| U -UTILITY RESIDENTIAL FINAL | 09/27/2024 | FINAL APPROVED | DHANEY |
| Note: Inspector Notes from Inspection 9035 *** NOTES ADDED BY LFITZGERALD 9/11/2024 11:03:57 AM *** no irr-no cross connection | |||
| ROW - STORMWATER FINAL | 09/27/2024 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) NEED TO CLEAN ALL TRASH AND CONSTRUCTION DEBRIS FROM LOT AND THE LOT TO THE RIGHT BEHIND THE FENCE 2) NEED TO CLEAN ALL DIRT OUT OF CULVERT | |||
| BLD - BUILDING FINAL | 09/27/2024 | Disapproved - NO FEE | HCAMACHO |
| Note: FBCR M1303.1 HEAT STRIPS NOT MARKED NEC 440.14 A/C DISCONNECT NEEDED WHEN BREAKER NOT IN VIEW | |||
| ROW - FINAL APRON (AFTER POUR) | 09/27/2024 | APPROVED | PFLANAGAN |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 09/25/2024 | APPROVED | PFLANAGAN |
| Note: CORRECTIONS MADE -------------------------------------------------- 9/10/2024 - PREVIOUS INSPECTION NOTES ** 09/10/24 NEED TO REGRADE YOUR SWALE ON THE LEFT SIDE AND LOWER TO THE ELEVATION INDICATED ON YOUR SWALE PLAN FROM YOUR CULVERT TO THE OUTFALL SPILLWAY ACCORDING TO YOUR SURVEY YOUR ELEVATION WAS GRADED TO HIGH ( YOUR SITE IS THE LAST SWALE BEFORE THE OUTFALL) "The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus 0.10 feet and must demonstrate a positive fall in the direction described in the swale plan. Sec.300.01 C1" | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 09/25/2024 | APPROVED | PFLANAGAN |
| U-CROSS CONNECTION | 09/11/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 9/11/2024 11:03:57 AM *** no irr-no cross connection | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 09/10/2024 | Disapproved - NO FEE | EMADISON |
| Note: ** 09/10/24 NEED TO REGRADE YOUR SWALE ON THE LEFT SIDE AND LOWER TO THE ELEVATION INDICATED ON YOUR SWALE PLAN FROM YOUR CULVERT TO THE OUTFALL SPILLWAY ACCORDING TO YOUR SURVEY YOUR ELEVATION WAS GRADED TO HIGH ( YOUR SITE IS THE LAST SWALE BEFORE THE OUTFALL) "The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus 0.10 feet and must demonstrate a positive fall in the direction described in the swale plan. Sec.300.01 C1" | |||
| ROW- PRE-APRON (PRE-POUR) | 08/14/2024 | APPROVED - AS NOTED | EMADISON |
| Note: ** 08/14/24 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ______________________________________________________________________________________________________________________ 8/13/2024 - PREVIOUS INSPECTION NOTES **08/13/24 CULVERT PIPE IS OUT OF TOLERANCE AND PITCHED IN THE WRONG DIRECTION THE FLOW OF THE STORMWATER IS FROM RIGHT TO LEFT IN ACCORDANCE WITH THE CITY OF PAM COASTS PROVIDED SWALE PLAN DIAGRAM ** Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place | |||
| ROW- PRE-APRON (PRE-POUR) | 08/13/2024 | Disapproved -FEE REQUIRED | EMADISON |
| Note: **08/13/24 CULVERT PIPE IS OUT OF TOLERANCE AND PITCHED IN THE WRONG DIRECTION THE FLOW OF THE STORMWATER IS FROM RIGHT TO LEFT IN ACCORDANCE WITH THE CITY OF PAM COASTS PROVIDED SWALE PLAN DIAGRAM ** Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place | |||
| ELECTRIC - EARLY POWER | 08/13/2024 | APPROVED | RMARTIN |
| Note: 8/12/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 8/12/2024 9:06:32 AM *** Previous Note not rectified....NEC 230.67 SURGE PROTECTOR NOT INSTALLED 8/9/2024 - PREVIOUS INSPECTION NOTES 8/7/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 8/7/2024 10:48:16 AM *** Previous notes not rectified....NEC 230.67 SURGE PROTECTOR NOT INSTALLED 8/2/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 8/2/2024 9:53:27 AM *** Previous Note not rectified....NEC 230.67 Inspector Notes from Inspection 2200 *** NOTES ADDED BY RMARTIN 6/20/2024 11:08:13 AM *** ned surge protector by early power | |||
| ELECTRIC - EARLY POWER | 08/12/2024 | Disapproved -FEE REQUIRED | JSTEWART |
| Note: *** NOTES ADDED BY JSTEWART 8/12/2024 9:06:32 AM *** Previous Note not rectified....NEC 230.67 SURGE PROTECTOR NOT INSTALLED 8/9/2024 - PREVIOUS INSPECTION NOTES 8/7/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 8/7/2024 10:48:16 AM *** Previous notes not rectified....NEC 230.67 SURGE PROTECTOR NOT INSTALLED 8/2/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 8/2/2024 9:53:27 AM *** Previous Note not rectified....NEC 230.67 Inspector Notes from Inspection 2200 *** NOTES ADDED BY RMARTIN 6/20/2024 11:08:13 AM *** ned surge protector by early power | |||
| ELECTRIC - EARLY POWER | 08/09/2024 | CANCELLED BY APPLICANT | KSANDOE |
| Note: 8/7/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 8/7/2024 10:48:16 AM *** Previous notes not rectified....NEC 230.67 SURGE PROTECTOR NOT INSTALLED 8/2/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 8/2/2024 9:53:27 AM *** Previous Note not rectified....NEC 230.67 Inspector Notes from Inspection 2200 *** NOTES ADDED BY RMARTIN 6/20/2024 11:08:13 AM *** ned surge protector by early power | |||
| ELECTRIC - EARLY POWER | 08/07/2024 | Disapproved -FEE REQUIRED | JSTEWART |
| Note: *** NOTES ADDED BY JSTEWART 8/7/2024 10:48:16 AM *** Previous notes not rectified....NEC 230.67 SURGE PROTECTOR NOT INSTALLED 8/2/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 8/2/2024 9:53:27 AM *** Previous Note not rectified....NEC 230.67 Inspector Notes from Inspection 2200 *** NOTES ADDED BY RMARTIN 6/20/2024 11:08:13 AM *** ned surge protector by early power | |||
| GRAVITY SEWER TEST | 08/07/2024 | APPROVED | MGIBSON |
| SEWER TIE IN | 08/07/2024 | APPROVED | MGIBSON |
| ELECTRIC - EARLY POWER | 08/02/2024 | Disapproved -FEE REQUIRED | JSTEWART |
| Note: *** NOTES ADDED BY JSTEWART 8/2/2024 9:53:27 AM *** Previous Note not rectified....NEC 230.67 Inspector Notes from Inspection 2200 *** NOTES ADDED BY RMARTIN 6/20/2024 11:08:13 AM *** ned surge protector by early power | |||
| PEP TANK INSTALLATION REQUEST | 07/09/2024 | APPROVED | CBOWERMASTER |
| Note: 7/8/2024 7:08:25 AM- PREVIOUS INSPECTION NOTES dumpster | |||
| PEP TANK INSTALLATION REQUEST | 07/02/2024 | Disapproved -FEE REQUIRED | CBOWERMASTER |
| Note: dumpster | |||
| LATH/BRICK/ WATER BARRIER | 07/02/2024 | APPROVED | KSANDOE |
| Note: 6/24/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 6/24/2024 1:48:01 PM *** 1. Please install ater barrier flashing at the margins of the front entry door. 2. Please seal the bottom sill of all windows Per plans A4.0 detail 7 wich dictates a continuous sealant. R703.4….All flashing shall be applied in a manner to prevent the entry of water into the wall cavity or penetration of water to the building structural framing components. Selfadhered membranes used as flashing shall comply with AAMA 711...........(1) Flashing Exterior window and door openings. Flashing at exteriorwindow and door openings shall extend to the surface of the exterior wall finish or to the water-resistive barrier | |||
| INSULATION | 06/27/2024 | APPROVED | FWILLIS |
| ALL ROUGH | 06/25/2024 | APPROVED | FWILLIS |
| Note: 6/24/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 6/24/2024 1:51:58 PM *** 1. Middle bedroom SD romex sheathing needs to enter holding box Min of 1/4". 2 all romex runs for SD need to be fastened within 12" of entering holding box. 3. Missing wire run for Carbon Monoxide/smoke detector on the Outside of the rear bedroom door (within 10ft of bedroom door) 4. Please pad the Margins of the front entry door to 1/4" shim space. | |||
| ALL ROUGH | 06/25/2024 | APPROVED | JSTEWART |
| LATH/BRICK/ WATER BARRIER | 06/24/2024 | Disapproved - NO FEE | JSTEWART |
| Note: *** NOTES ADDED BY JSTEWART 6/24/2024 1:48:01 PM *** 1. Please install ater barrier flashing at the margins of the front entry door. 2. Please seal the bottom sill of all windows Per plans A4.0 detail 7 wich dictates a continuous sealant. R703.4….All flashing shall be applied in a manner to prevent the entry of water into the wall cavity or penetration of water to the building structural framing components. Selfadhered membranes used as flashing shall comply with AAMA 711...........(1) Flashing Exterior window and door openings. Flashing at exteriorwindow and door openings shall extend to the surface of the exterior wall finish or to the water-resistive barrier | |||
| ALL ROUGH | 06/24/2024 | Disapproved -FEE REQUIRED | JSTEWART |
| Note: *** NOTES ADDED BY JSTEWART 6/24/2024 1:51:58 PM *** 1. Middle bedroom SD romex sheathing needs to enter holding box Min of 1/4". 2 all romex runs for SD need to be fastened within 12" of entering holding box. 3. Missing wire run for Carbon Monoxide/smoke detector on the Outside of the rear bedroom door (within 10ft of bedroom door) 4. Please pad the Margins of the front entry door to 1/4" shim space. | |||
| ELECTRIC-TUG | 06/20/2024 | APPROVED - AS NOTED | RMARTIN |
| Note: *** NOTES ADDED BY RMARTIN 6/20/2024 11:08:13 AM *** ned surge protector by early power | |||
| ROOF VALLEY & METAL | 06/10/2024 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/05/2024 | APPROVED | FWILLIS |
| ROW - DRAINAGE | 06/05/2024 | APPROVED - AS NOTED | EMADISON |
| Note: ** 06/05/24 ALL CORRECTIONS MADE IT IS BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE AND EROSION AND SEDIMENT CONTROL OF THE JOB SITE ____________________________________________________________________________________________________________________ 6/4/2024 - PREVIOUS INSPECTION NOTES 06/04/24 **EXTENSION GRANTED TO BUILDER TO CORRECT THE DRAINAGE CONCERNS WITH INSTALLING A NEW TEMPORARY CULVERT ** FOLLOW UP INSPECTION ON 06/05/24 _____________________________________________________________________________________________________________________ 5/30/2024 - PREVIOUS INSPECTION NOTES ** 05/30/24 EXTENSION GRANTED TO BUILDER TO CORRECT THE DRAINAGE CONCERNS WITH INSTALLING A NEW TEMPORARY CULVERT ** FOLLOW UP INSPECTION ON 06/04/24 _______________________________________________________________________________________________________________________ 5/29/2024 - PREVIOUS INSPECTION NOTES ** 05/29/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE AND REMOVE REMAINING MOUND OF DIRT AND DEBRIS ON RIGHT SIDE ** NEED TO OPEN TEMPORARY CULVERT TO ALLOW FOR THE FLOW OF STORMWATER TO THE OUTFALL OR REMOVE TEMPORARY CULVERT AND MAINTAIN ROAD SIDE SWALE ON A DAILY BASIS ** NEED TO REPAIR RUT IN SWALE LEFT SIDE WHERE THAT WILL HOLD AND COLLECT WATER ** NEED TO EXTEND SILT FENCE ACROSS ROAD SIDE SWALE TO AID IN EROSION AND SEDIMENT CONTROL ON THE LEFT SIDE BEFORE THE OUTFALL INTO THE DRAINAGE DITCH ** FOLLOW UP INSPECTION ON 05/30/24 _____________________________________________________________________________________________________________________ 5/28/2024 - PREVIOUS INSPECTION NOTES ** 05/24/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE AND REMOVE REMAINING CONCRETE PIECES ** NEED TO OPEN TEMPORARY CULVERT TO ALLOW FOR THE FLOW OF STORMWATER TO THE OUTFALL ** NEED TO REPAIR RUT IN SWALE LEFT SIDE WHERE THAT WILL HOLD AND COLLECT WATER ** NEED TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ON SITE ** NEED TO EXTEND SILT FENCE ACROSS ROAD SIDE SWALE TO AID IN EROSION AND SEDIMENT CONTROL ON THE LEFT SIDE BEFORE THE OUTFALL INTO THE DRAINAGE DITCH ** FOLLOW UP INSPECTION ON 05/29/24 _____________________________________________________________________________________________________________________ 5/24/2024 - PREVIOUS INSPECTION NOTES ** 05/24/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE AND REMOVE REMAINING CONCRETE PIECES ** NEED TO OPEN TEMPORARY CULVERT TO ALLOW FOR THE FLOW OF STORMWATER TO THE OUTFALL ** NEED TO REPAIR RUT IN SWALE LEFT SIDE WHERE THAT WILL HOLD AND COLLECT WATER ** NEED TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ON SITE ** NEED TO EXTEND SILT FENCE ACROSS ROAD SIDE SWALE TO AID IN EROSION AND SEDIMENT CONTROL ON THE LEFT SIDE BEFORE THE OUTFALL INTO THE DRAINAGE DITCH ** FOLLOW UP INSPECTION ON 05/28/24 ** SEE ATTACHED PHOTOS ____________________________________________________________________________________________________________________ 5/21/2024 - PREVIOUS INSPECTION NOTES ** 05/21/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE REMOVE ALL CONCRETE THAT HAS ILLICITLY BEEN DISCHARGED INTO THE STORMWATER DRAINAGE SYSTEM ALONG WITH ANY OTHER DEBRIS. ** NEED TO OPEN TEMPORARY CULVERT TO ALLOW FOR THE FLOW OF STORMWATER TO THE OUTFALL ** NEED TO REPAIR RUT IN SWALE LEFT SIDE WHERE THAT WILL HOLD AND COLLECT WATER ** NEED TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ON SITE ** NEED TO REMOVE EQUIPMENT FROM ROAD SIDE SWALE ** NEED TO EXTEND SILT FENCE ACROSS ROAD SIDE SWALE TO AID IN EROSION AND SEDIMENT CONTROL ON THE LEFT SIDE BEFORE THE OUTFALL INTO THE DRAINAGE DITCH ** FOLLOW UP INSPECTION ON 05/24/24 IF AFTER (7) SEVEN DAYS CORRECTIONS HAVE NOT BEEN MADE THIS INSPECTION WILL BECOME A PRIORITY (1) MEANING NO OTHER INSPECTIONS CAN BE COMPLETED UNTIL ALL CORRECTIONS HAVE BEEN MADE ** SEE ATTACHED PHOTOS | |||
| ROW - DRAINAGE | 06/04/2024 | Disapproved - NO FEE | EMADISON |
| Note: 06/04/24 **EXTENSION GRANTED TO BUILDER TO CORRECT THE DRAINAGE CONCERNS WITH INSTALLING A NEW TEMPORARY CULVERT ** FOLLOW UP INSPECTION ON 06/05/24 _____________________________________________________________________________________________________________________ 5/30/2024 - PREVIOUS INSPECTION NOTES ** 05/30/24 EXTENSION GRANTED TO BUILDER TO CORRECT THE DRAINAGE CONCERNS WITH INSTALLING A NEW TEMPORARY CULVERT ** FOLLOW UP INSPECTION ON 06/04/24 _______________________________________________________________________________________________________________________ 5/29/2024 - PREVIOUS INSPECTION NOTES ** 05/29/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE AND REMOVE REMAINING MOUND OF DIRT AND DEBRIS ON RIGHT SIDE ** NEED TO OPEN TEMPORARY CULVERT TO ALLOW FOR THE FLOW OF STORMWATER TO THE OUTFALL OR REMOVE TEMPORARY CULVERT AND MAINTAIN ROAD SIDE SWALE ON A DAILY BASIS ** NEED TO REPAIR RUT IN SWALE LEFT SIDE WHERE THAT WILL HOLD AND COLLECT WATER ** NEED TO EXTEND SILT FENCE ACROSS ROAD SIDE SWALE TO AID IN EROSION AND SEDIMENT CONTROL ON THE LEFT SIDE BEFORE THE OUTFALL INTO THE DRAINAGE DITCH ** FOLLOW UP INSPECTION ON 05/30/24 _____________________________________________________________________________________________________________________ 5/28/2024 - PREVIOUS INSPECTION NOTES ** 05/24/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE AND REMOVE REMAINING CONCRETE PIECES ** NEED TO OPEN TEMPORARY CULVERT TO ALLOW FOR THE FLOW OF STORMWATER TO THE OUTFALL ** NEED TO REPAIR RUT IN SWALE LEFT SIDE WHERE THAT WILL HOLD AND COLLECT WATER ** NEED TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ON SITE ** NEED TO EXTEND SILT FENCE ACROSS ROAD SIDE SWALE TO AID IN EROSION AND SEDIMENT CONTROL ON THE LEFT SIDE BEFORE THE OUTFALL INTO THE DRAINAGE DITCH ** FOLLOW UP INSPECTION ON 05/29/24 _____________________________________________________________________________________________________________________ 5/24/2024 - PREVIOUS INSPECTION NOTES ** 05/24/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE AND REMOVE REMAINING CONCRETE PIECES ** NEED TO OPEN TEMPORARY CULVERT TO ALLOW FOR THE FLOW OF STORMWATER TO THE OUTFALL ** NEED TO REPAIR RUT IN SWALE LEFT SIDE WHERE THAT WILL HOLD AND COLLECT WATER ** NEED TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ON SITE ** NEED TO EXTEND SILT FENCE ACROSS ROAD SIDE SWALE TO AID IN EROSION AND SEDIMENT CONTROL ON THE LEFT SIDE BEFORE THE OUTFALL INTO THE DRAINAGE DITCH ** FOLLOW UP INSPECTION ON 05/28/24 ** SEE ATTACHED PHOTOS ____________________________________________________________________________________________________________________ 5/21/2024 - PREVIOUS INSPECTION NOTES ** 05/21/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE REMOVE ALL CONCRETE THAT HAS ILLICITLY BEEN DISCHARGED INTO THE STORMWATER DRAINAGE SYSTEM ALONG WITH ANY OTHER DEBRIS. ** NEED TO OPEN TEMPORARY CULVERT TO ALLOW FOR THE FLOW OF STORMWATER TO THE OUTFALL ** NEED TO REPAIR RUT IN SWALE LEFT SIDE WHERE THAT WILL HOLD AND COLLECT WATER ** NEED TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ON SITE ** NEED TO REMOVE EQUIPMENT FROM ROAD SIDE SWALE ** NEED TO EXTEND SILT FENCE ACROSS ROAD SIDE SWALE TO AID IN EROSION AND SEDIMENT CONTROL ON THE LEFT SIDE BEFORE THE OUTFALL INTO THE DRAINAGE DITCH ** FOLLOW UP INSPECTION ON 05/24/24 IF AFTER (7) SEVEN DAYS CORRECTIONS HAVE NOT BEEN MADE THIS INSPECTION WILL BECOME A PRIORITY (1) MEANING NO OTHER INSPECTIONS CAN BE COMPLETED UNTIL ALL CORRECTIONS HAVE BEEN MADE ** SEE ATTACHED PHOTOS | |||
| ROOF SHEATHING | 06/04/2024 | APPROVED | FWILLIS |
| WALL SHEATHING | 06/04/2024 | APPROVED | FWILLIS |
| ROW - DRAINAGE | 05/30/2024 | Disapproved - NO FEE | EMADISON |
| Note: ** 05/30/24 EXTENSION GRANTED TO BUILDER TO CORRECT THE DRAINAGE CONCERNS WITH INSTALLING A NEW TEMPORARY CULVERT ** FOLLOW UP INSPECTION ON 06/04/24 _______________________________________________________________________________________________________________________ 5/29/2024 - PREVIOUS INSPECTION NOTES ** 05/29/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE AND REMOVE REMAINING MOUND OF DIRT AND DEBRIS ON RIGHT SIDE ** NEED TO OPEN TEMPORARY CULVERT TO ALLOW FOR THE FLOW OF STORMWATER TO THE OUTFALL OR REMOVE TEMPORARY CULVERT AND MAINTAIN ROAD SIDE SWALE ON A DAILY BASIS ** NEED TO REPAIR RUT IN SWALE LEFT SIDE WHERE THAT WILL HOLD AND COLLECT WATER ** NEED TO EXTEND SILT FENCE ACROSS ROAD SIDE SWALE TO AID IN EROSION AND SEDIMENT CONTROL ON THE LEFT SIDE BEFORE THE OUTFALL INTO THE DRAINAGE DITCH ** FOLLOW UP INSPECTION ON 05/30/24 _____________________________________________________________________________________________________________________ 5/28/2024 - PREVIOUS INSPECTION NOTES ** 05/24/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE AND REMOVE REMAINING CONCRETE PIECES ** NEED TO OPEN TEMPORARY CULVERT TO ALLOW FOR THE FLOW OF STORMWATER TO THE OUTFALL ** NEED TO REPAIR RUT IN SWALE LEFT SIDE WHERE THAT WILL HOLD AND COLLECT WATER ** NEED TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ON SITE ** NEED TO EXTEND SILT FENCE ACROSS ROAD SIDE SWALE TO AID IN EROSION AND SEDIMENT CONTROL ON THE LEFT SIDE BEFORE THE OUTFALL INTO THE DRAINAGE DITCH ** FOLLOW UP INSPECTION ON 05/29/24 _____________________________________________________________________________________________________________________ 5/24/2024 - PREVIOUS INSPECTION NOTES ** 05/24/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE AND REMOVE REMAINING CONCRETE PIECES ** NEED TO OPEN TEMPORARY CULVERT TO ALLOW FOR THE FLOW OF STORMWATER TO THE OUTFALL ** NEED TO REPAIR RUT IN SWALE LEFT SIDE WHERE THAT WILL HOLD AND COLLECT WATER ** NEED TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ON SITE ** NEED TO EXTEND SILT FENCE ACROSS ROAD SIDE SWALE TO AID IN EROSION AND SEDIMENT CONTROL ON THE LEFT SIDE BEFORE THE OUTFALL INTO THE DRAINAGE DITCH ** FOLLOW UP INSPECTION ON 05/28/24 ** SEE ATTACHED PHOTOS ____________________________________________________________________________________________________________________ 5/21/2024 - PREVIOUS INSPECTION NOTES ** 05/21/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE REMOVE ALL CONCRETE THAT HAS ILLICITLY BEEN DISCHARGED INTO THE STORMWATER DRAINAGE SYSTEM ALONG WITH ANY OTHER DEBRIS. ** NEED TO OPEN TEMPORARY CULVERT TO ALLOW FOR THE FLOW OF STORMWATER TO THE OUTFALL ** NEED TO REPAIR RUT IN SWALE LEFT SIDE WHERE THAT WILL HOLD AND COLLECT WATER ** NEED TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ON SITE ** NEED TO REMOVE EQUIPMENT FROM ROAD SIDE SWALE ** NEED TO EXTEND SILT FENCE ACROSS ROAD SIDE SWALE TO AID IN EROSION AND SEDIMENT CONTROL ON THE LEFT SIDE BEFORE THE OUTFALL INTO THE DRAINAGE DITCH ** FOLLOW UP INSPECTION ON 05/24/24 IF AFTER (7) SEVEN DAYS CORRECTIONS HAVE NOT BEEN MADE THIS INSPECTION WILL BECOME A PRIORITY (1) MEANING NO OTHER INSPECTIONS CAN BE COMPLETED UNTIL ALL CORRECTIONS HAVE BEEN MADE ** SEE ATTACHED PHOTOS | |||
| ROW - DRAINAGE | 05/29/2024 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 05/29/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE AND REMOVE REMAINING MOUND OF DIRT AND DEBRIS ON RIGHT SIDE ** NEED TO OPEN TEMPORARY CULVERT TO ALLOW FOR THE FLOW OF STORMWATER TO THE OUTFALL OR REMOVE TEMPORARY CULVERT AND MAINTAIN ROAD SIDE SWALE ON A DAILY BASIS ** NEED TO REPAIR RUT IN SWALE LEFT SIDE WHERE THAT WILL HOLD AND COLLECT WATER ** NEED TO EXTEND SILT FENCE ACROSS ROAD SIDE SWALE TO AID IN EROSION AND SEDIMENT CONTROL ON THE LEFT SIDE BEFORE THE OUTFALL INTO THE DRAINAGE DITCH ** FOLLOW UP INSPECTION ON 05/30/24 _____________________________________________________________________________________________________________________ 5/28/2024 - PREVIOUS INSPECTION NOTES ** 05/24/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE AND REMOVE REMAINING CONCRETE PIECES ** NEED TO OPEN TEMPORARY CULVERT TO ALLOW FOR THE FLOW OF STORMWATER TO THE OUTFALL ** NEED TO REPAIR RUT IN SWALE LEFT SIDE WHERE THAT WILL HOLD AND COLLECT WATER ** NEED TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ON SITE ** NEED TO EXTEND SILT FENCE ACROSS ROAD SIDE SWALE TO AID IN EROSION AND SEDIMENT CONTROL ON THE LEFT SIDE BEFORE THE OUTFALL INTO THE DRAINAGE DITCH ** FOLLOW UP INSPECTION ON 05/29/24 _____________________________________________________________________________________________________________________ 5/24/2024 - PREVIOUS INSPECTION NOTES ** 05/24/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE AND REMOVE REMAINING CONCRETE PIECES ** NEED TO OPEN TEMPORARY CULVERT TO ALLOW FOR THE FLOW OF STORMWATER TO THE OUTFALL ** NEED TO REPAIR RUT IN SWALE LEFT SIDE WHERE THAT WILL HOLD AND COLLECT WATER ** NEED TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ON SITE ** NEED TO EXTEND SILT FENCE ACROSS ROAD SIDE SWALE TO AID IN EROSION AND SEDIMENT CONTROL ON THE LEFT SIDE BEFORE THE OUTFALL INTO THE DRAINAGE DITCH ** FOLLOW UP INSPECTION ON 05/28/24 ** SEE ATTACHED PHOTOS ____________________________________________________________________________________________________________________ 5/21/2024 - PREVIOUS INSPECTION NOTES ** 05/21/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE REMOVE ALL CONCRETE THAT HAS ILLICITLY BEEN DISCHARGED INTO THE STORMWATER DRAINAGE SYSTEM ALONG WITH ANY OTHER DEBRIS. ** NEED TO OPEN TEMPORARY CULVERT TO ALLOW FOR THE FLOW OF STORMWATER TO THE OUTFALL ** NEED TO REPAIR RUT IN SWALE LEFT SIDE WHERE THAT WILL HOLD AND COLLECT WATER ** NEED TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ON SITE ** NEED TO REMOVE EQUIPMENT FROM ROAD SIDE SWALE ** NEED TO EXTEND SILT FENCE ACROSS ROAD SIDE SWALE TO AID IN EROSION AND SEDIMENT CONTROL ON THE LEFT SIDE BEFORE THE OUTFALL INTO THE DRAINAGE DITCH ** FOLLOW UP INSPECTION ON 05/24/24 IF AFTER (7) SEVEN DAYS CORRECTIONS HAVE NOT BEEN MADE THIS INSPECTION WILL BECOME A PRIORITY (1) MEANING NO OTHER INSPECTIONS CAN BE COMPLETED UNTIL ALL CORRECTIONS HAVE BEEN MADE ** SEE ATTACHED PHOTOS | |||
| ROW - DRAINAGE | 05/28/2024 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 05/24/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE AND REMOVE REMAINING CONCRETE PIECES ** NEED TO OPEN TEMPORARY CULVERT TO ALLOW FOR THE FLOW OF STORMWATER TO THE OUTFALL ** NEED TO REPAIR RUT IN SWALE LEFT SIDE WHERE THAT WILL HOLD AND COLLECT WATER ** NEED TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ON SITE ** NEED TO EXTEND SILT FENCE ACROSS ROAD SIDE SWALE TO AID IN EROSION AND SEDIMENT CONTROL ON THE LEFT SIDE BEFORE THE OUTFALL INTO THE DRAINAGE DITCH ** FOLLOW UP INSPECTION ON 05/29/24 _____________________________________________________________________________________________________________________ 5/24/2024 - PREVIOUS INSPECTION NOTES ** 05/24/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE AND REMOVE REMAINING CONCRETE PIECES ** NEED TO OPEN TEMPORARY CULVERT TO ALLOW FOR THE FLOW OF STORMWATER TO THE OUTFALL ** NEED TO REPAIR RUT IN SWALE LEFT SIDE WHERE THAT WILL HOLD AND COLLECT WATER ** NEED TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ON SITE ** NEED TO EXTEND SILT FENCE ACROSS ROAD SIDE SWALE TO AID IN EROSION AND SEDIMENT CONTROL ON THE LEFT SIDE BEFORE THE OUTFALL INTO THE DRAINAGE DITCH ** FOLLOW UP INSPECTION ON 05/28/24 ** SEE ATTACHED PHOTOS ____________________________________________________________________________________________________________________ 5/21/2024 - PREVIOUS INSPECTION NOTES ** 05/21/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE REMOVE ALL CONCRETE THAT HAS ILLICITLY BEEN DISCHARGED INTO THE STORMWATER DRAINAGE SYSTEM ALONG WITH ANY OTHER DEBRIS. ** NEED TO OPEN TEMPORARY CULVERT TO ALLOW FOR THE FLOW OF STORMWATER TO THE OUTFALL ** NEED TO REPAIR RUT IN SWALE LEFT SIDE WHERE THAT WILL HOLD AND COLLECT WATER ** NEED TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ON SITE ** NEED TO REMOVE EQUIPMENT FROM ROAD SIDE SWALE ** NEED TO EXTEND SILT FENCE ACROSS ROAD SIDE SWALE TO AID IN EROSION AND SEDIMENT CONTROL ON THE LEFT SIDE BEFORE THE OUTFALL INTO THE DRAINAGE DITCH ** FOLLOW UP INSPECTION ON 05/24/24 IF AFTER (7) SEVEN DAYS CORRECTIONS HAVE NOT BEEN MADE THIS INSPECTION WILL BECOME A PRIORITY (1) MEANING NO OTHER INSPECTIONS CAN BE COMPLETED UNTIL ALL CORRECTIONS HAVE BEEN MADE ** SEE ATTACHED PHOTOS | |||
| ROW - DRAINAGE | 05/24/2024 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 05/24/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE AND REMOVE REMAINING CONCRETE PIECES ** NEED TO OPEN TEMPORARY CULVERT TO ALLOW FOR THE FLOW OF STORMWATER TO THE OUTFALL ** NEED TO REPAIR RUT IN SWALE LEFT SIDE WHERE THAT WILL HOLD AND COLLECT WATER ** NEED TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ON SITE ** NEED TO EXTEND SILT FENCE ACROSS ROAD SIDE SWALE TO AID IN EROSION AND SEDIMENT CONTROL ON THE LEFT SIDE BEFORE THE OUTFALL INTO THE DRAINAGE DITCH ** FOLLOW UP INSPECTION ON 05/28/24 ** SEE ATTACHED PHOTOS 5/21/2024 - PREVIOUS INSPECTION NOTES ** 05/21/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE REMOVE ALL CONCRETE THAT HAS ILLICITLY BEEN DISCHARGED INTO THE STORMWATER DRAINAGE SYSTEM ALONG WITH ANY OTHER DEBRIS. ** NEED TO OPEN TEMPORARY CULVERT TO ALLOW FOR THE FLOW OF STORMWATER TO THE OUTFALL ** NEED TO REPAIR RUT IN SWALE LEFT SIDE WHERE THAT WILL HOLD AND COLLECT WATER ** NEED TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ON SITE ** NEED TO REMOVE EQUIPMENT FROM ROAD SIDE SWALE ** NEED TO EXTEND SILT FENCE ACROSS ROAD SIDE SWALE TO AID IN EROSION AND SEDIMENT CONTROL ON THE LEFT SIDE BEFORE THE OUTFALL INTO THE DRAINAGE DITCH ** FOLLOW UP INSPECTION ON 05/24/24 IF AFTER (7) SEVEN DAYS CORRECTIONS HAVE NOT BEEN MADE THIS INSPECTION WILL BECOME A PRIORITY (1) MEANING NO OTHER INSPECTIONS CAN BE COMPLETED UNTIL ALL CORRECTIONS HAVE BEEN MADE ** SEE ATTACHED PHOTOS | |||
| TIE BEAM / LINTEL | 05/23/2024 | APPROVED | FWILLIS |
| FOUND SURVEY APPROVED (OFFICE) | 05/21/2024 | APPROVED | TBAKER |
| ROW - DRAINAGE | 05/21/2024 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 05/21/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE REMOVE ALL CONCRETE THAT HAS ILLICITLY BEEN DISCHARGED INTO THE STORMWATER DRAINAGE SYSTEM ALONG WITH ANY OTHER DEBRIS. ** NEED TO OPEN TEMPORARY CULVERT TO ALLOW FOR THE FLOW OF STORMWATER TO THE OUTFALL ** NEED TO REPAIR RUT IN SWALE LEFT SIDE WHERE THAT WILL HOLD AND COLLECT WATER ** NEED TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ON SITE ** NEED TO REMOVE EQUIPMENT FROM ROAD SIDE SWALE ** NEED TO EXTEND SILT FENCE ACROSS ROAD SIDE SWALE TO AID IN EROSION AND SEDIMENT CONTROL ON THE LEFT SIDE BEFORE THE OUTFALL INTO THE DRAINAGE DITCH ** FOLLOW UP INSPECTION ON 05/24/24 IF AFTER (7) SEVEN DAYS CORRECTIONS HAVE NOT BEEN MADE THIS INSPECTION WILL BECOME A PRIORITY (1) MEANING NO OTHER INSPECTIONS CAN BE COMPLETED UNTIL ALL CORRECTIONS HAVE BEEN MADE ** SEE ATTACHED PHOTOS | |||
| MONOLITHIC SLAB | 05/16/2024 | APPROVED | LMILLER |
| PLUMBING 1ST ROUGH UNDERGROUND | 05/14/2024 | APPROVED | MGIBSON |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 05/13/2024 | APPROVED | JMUNSON |
| WATER METER INSTALLATION REQUEST | 04/18/2024 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 08/27/2024 | 08/29/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/21/2024 | 05/21/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/21/2024 | 05/21/2024 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/15/2024 | 05/15/2024 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/08/2024 | 05/13/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | HOLD | 05/02/2024 | 05/07/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Letter must be accompanied by a signed and sealed inspection and certification letter by the geotechnical engineer of record. Engineer’s letter to confirm the following: Site clearing / over excavation was completed and inspected by engineer prior to the placement of fill and engineer confirms clearing and over excavation work is acceptable. Engineer to confirm fill materials were suitable and within specifications. Engineer to confirm the required number and location of field density tests were completed. Engineer to include certification statement in accordance with Florida Administrative Code 61G15-18.011 (4) Field dentisty Test Must be digiutally signed and sealed. | |||
| ELEC | COMPLETE | 03/21/2024 | 03/25/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/21/2024 | 03/21/2024 |
| Note: Released By: JPI | |||
| SWALE | COMPLETE | 03/06/2024 | 05/03/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 03/05/2024 | 03/08/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/05/2024 | 03/06/2024 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 03/05/2024 | 03/07/2024 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 03/05/2024 | 03/08/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. All outlets in kitchen need to be GFCI protected. NEC 2020 210.8 | |||
| ENGIN1 | COMPLETE | 03/05/2024 | 03/06/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 03/05/2024 | 03/06/2024 |
| LOCATE | COMPLETE | 03/05/2024 | 03/07/2024 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 03/05/2024 | 03/06/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 03/05/2024 | 03/06/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/05/2024 | 03/06/2024 |
| Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 09/30/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 09/30/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 09/30/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 09/30/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 09/30/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 09/30/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 09/30/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 09/30/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 09/30/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 09/30/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 09/30/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 09/30/2024 |
| SW ENG REINSPECTION 20 | ¤20.00 | 09/30/2024 |
| SW ENG REINSPECTION 30 | ¤30.00 | 09/30/2024 |
| UTILITY PEP REINSPECTION | ¤40.00 | 09/30/2024 |
| SEWER CREDIT | (¤850.00) | 04/08/2024 |
| SEWER INSPECTION | ¤25.00 | 04/08/2024 |
| SEWER CAPITAL FACILITY | ¤5,441.03 | 04/08/2024 |
| WATER CAPITAL FACILITY FEE | ¤3,994.51 | 04/08/2024 |
| SITE PLAN 30 | ¤30.00 | 04/08/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 04/08/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 04/08/2024 |
| WATER- TURN ON | ¤25.00 | 04/08/2024 |
| ADJUSTMENT 50% | (¤555.09) | 04/08/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 04/08/2024 |
| INSPECTION - RESIDENTIAL | ¤841.50 | 04/08/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤238.68 | 04/08/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 04/08/2024 |
| SW ENG PRE APRON | ¤30.00 | 04/08/2024 |
| CONNECTION FEES | ¤1,187.26 | 04/08/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 04/08/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 04/08/2024 |
| IMPACT FEE FIRE | ¤428.09 | 04/08/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 04/08/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 04/08/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 04/08/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 04/08/2024 |
| IMPACT FEE TRANSPORTATION | ¤1,862.00 | 04/08/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 04/08/2024 |
| SURCHARGE FS 533.721 | ¤5.55 | 04/08/2024 |
| SURCHARGE - FS 468.631 | ¤8.33 | 04/08/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 04/08/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤21,328.35 |