Permit #2024030166

Permit Details

Status: COED

Parcel Id: 07-11-31-7035-00490-0010
GARAGE: 396 sqft
OPENED PORCH (WITH ROOF) : 112 sqft
CONDITIONED SPACE: 1650 sqft
Total Square Footage: 2158 sqft
Block: 00490
Subdivision: -
Job Phone: 202-494-2019
Location Address: 10 BUNKER VIEW DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 04/08/2024
NOC: RECORDED
Applicant name: GARY ANDREW FISCHER
Owner: INB BFR FUND 1 LLC

Address

3670 MAGUIRE BOULEVARD

ORLANDO, FL 32803

Address

SUITE 220

ORLANDO, FL 32803

Lot: 0010
Contracted Stated Job Value: ¤150,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

INB HOMES
Status Location Address Mailing Address State License Number Phone
ACTIVE

3670 MAGUIRE BLVD

ORLANDO, FL 32803

SUITE 210

ORLANDO, FL 32803

CGC048746 (Exp: 08/31/2026) 407-476-8195

Sub Contractors

HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823
ROBERT MICHAEL RENNER
Status Location Address State License Number Phone
ACTIVE

531 CODISCO WAY

SANFORD, FL 32771

CAC051477 (Exp: 08/31/2026) 407-333-2665
JOSEPH C WRIGHT
Status Location Address Mailing Address State License Number Phone Fax
ACTIVE

15 HARGROVE LANE

PALM COAST, FL 32137

UNIT 3 D

PALM COAST, FL 32137

EC13003278 (Exp: 08/31/2026) 386-447-9644 386-447-9633
DUSTIN L ESTEP
Status Location Address State License Number Phone Fax
ACTIVE

2041 N HIAWASSEE RD

APOPKA, FL 32703

CCC1330971 (Exp: 08/31/2026) 407-702-0206 352-988-6629

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 09/30/2024 FINAL APPROVED MCONTRYMAN
Note: 9/27/2024 - PREVIOUS INSPECTION NOTES FBCR M1303.1 HEAT STRIPS NOT MARKED NEC 440.14 A/C DISCONNECT NEEDED WHEN BREAKER NOT IN VIEW
ROW - STORMWATER FINAL 09/30/2024 APPROVED PFLANAGAN
Note: CORRECTIONS --------------------------------------------------------- 9/27/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN ALL TRASH AND CONSTRUCTION DEBRIS FROM LOT AND THE LOT TO THE RIGHT BEHIND THE FENCE 2) NEED TO CLEAN ALL DIRT OUT OF CULVERT
U -UTILITY RESIDENTIAL FINAL 09/27/2024 FINAL APPROVED DHANEY
Note: Inspector Notes from Inspection 9035 *** NOTES ADDED BY LFITZGERALD 9/11/2024 11:03:57 AM *** no irr-no cross connection
ROW - STORMWATER FINAL 09/27/2024 Disapproved -FEE REQUIRED PFLANAGAN
Note: 1) NEED TO CLEAN ALL TRASH AND CONSTRUCTION DEBRIS FROM LOT AND THE LOT TO THE RIGHT BEHIND THE FENCE 2) NEED TO CLEAN ALL DIRT OUT OF CULVERT
BLD - BUILDING FINAL 09/27/2024 Disapproved - NO FEE HCAMACHO
Note: FBCR M1303.1 HEAT STRIPS NOT MARKED NEC 440.14 A/C DISCONNECT NEEDED WHEN BREAKER NOT IN VIEW
ROW - FINAL APRON (AFTER POUR) 09/27/2024 APPROVED PFLANAGAN
ROW- FINAL SURVEY/GRADING CERTIFICATION 09/25/2024 APPROVED PFLANAGAN
Note: CORRECTIONS MADE -------------------------------------------------- 9/10/2024 - PREVIOUS INSPECTION NOTES ** 09/10/24 NEED TO REGRADE YOUR SWALE ON THE LEFT SIDE AND LOWER TO THE ELEVATION INDICATED ON YOUR SWALE PLAN FROM YOUR CULVERT TO THE OUTFALL SPILLWAY ACCORDING TO YOUR SURVEY YOUR ELEVATION WAS GRADED TO HIGH ( YOUR SITE IS THE LAST SWALE BEFORE THE OUTFALL) "The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus 0.10 feet and must demonstrate a positive fall in the direction described in the swale plan. Sec.300.01 C1"
ROW FIELD SURVEY /GRADING CERTIFICATION 09/25/2024 APPROVED PFLANAGAN
U-CROSS CONNECTION 09/11/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 9/11/2024 11:03:57 AM *** no irr-no cross connection
ROW- FINAL SURVEY/GRADING CERTIFICATION 09/10/2024 Disapproved - NO FEE EMADISON
Note: ** 09/10/24 NEED TO REGRADE YOUR SWALE ON THE LEFT SIDE AND LOWER TO THE ELEVATION INDICATED ON YOUR SWALE PLAN FROM YOUR CULVERT TO THE OUTFALL SPILLWAY ACCORDING TO YOUR SURVEY YOUR ELEVATION WAS GRADED TO HIGH ( YOUR SITE IS THE LAST SWALE BEFORE THE OUTFALL) "The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus 0.10 feet and must demonstrate a positive fall in the direction described in the swale plan. Sec.300.01 C1"
ROW- PRE-APRON (PRE-POUR) 08/14/2024 APPROVED - AS NOTED EMADISON
Note: ** 08/14/24 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ______________________________________________________________________________________________________________________ 8/13/2024 - PREVIOUS INSPECTION NOTES **08/13/24 CULVERT PIPE IS OUT OF TOLERANCE AND PITCHED IN THE WRONG DIRECTION THE FLOW OF THE STORMWATER IS FROM RIGHT TO LEFT IN ACCORDANCE WITH THE CITY OF PAM COASTS PROVIDED SWALE PLAN DIAGRAM ** Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place
ROW- PRE-APRON (PRE-POUR) 08/13/2024 Disapproved -FEE REQUIRED EMADISON
Note: **08/13/24 CULVERT PIPE IS OUT OF TOLERANCE AND PITCHED IN THE WRONG DIRECTION THE FLOW OF THE STORMWATER IS FROM RIGHT TO LEFT IN ACCORDANCE WITH THE CITY OF PAM COASTS PROVIDED SWALE PLAN DIAGRAM ** Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place
ELECTRIC - EARLY POWER 08/13/2024 APPROVED RMARTIN
Note: 8/12/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 8/12/2024 9:06:32 AM *** Previous Note not rectified....NEC 230.67 SURGE PROTECTOR NOT INSTALLED 8/9/2024 - PREVIOUS INSPECTION NOTES 8/7/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 8/7/2024 10:48:16 AM *** Previous notes not rectified....NEC 230.67 SURGE PROTECTOR NOT INSTALLED 8/2/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 8/2/2024 9:53:27 AM *** Previous Note not rectified....NEC 230.67 Inspector Notes from Inspection 2200 *** NOTES ADDED BY RMARTIN 6/20/2024 11:08:13 AM *** ned surge protector by early power
ELECTRIC - EARLY POWER 08/12/2024 Disapproved -FEE REQUIRED JSTEWART
Note: *** NOTES ADDED BY JSTEWART 8/12/2024 9:06:32 AM *** Previous Note not rectified....NEC 230.67 SURGE PROTECTOR NOT INSTALLED 8/9/2024 - PREVIOUS INSPECTION NOTES 8/7/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 8/7/2024 10:48:16 AM *** Previous notes not rectified....NEC 230.67 SURGE PROTECTOR NOT INSTALLED 8/2/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 8/2/2024 9:53:27 AM *** Previous Note not rectified....NEC 230.67 Inspector Notes from Inspection 2200 *** NOTES ADDED BY RMARTIN 6/20/2024 11:08:13 AM *** ned surge protector by early power
ELECTRIC - EARLY POWER 08/09/2024 CANCELLED BY APPLICANT KSANDOE
Note: 8/7/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 8/7/2024 10:48:16 AM *** Previous notes not rectified....NEC 230.67 SURGE PROTECTOR NOT INSTALLED 8/2/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 8/2/2024 9:53:27 AM *** Previous Note not rectified....NEC 230.67 Inspector Notes from Inspection 2200 *** NOTES ADDED BY RMARTIN 6/20/2024 11:08:13 AM *** ned surge protector by early power
ELECTRIC - EARLY POWER 08/07/2024 Disapproved -FEE REQUIRED JSTEWART
Note: *** NOTES ADDED BY JSTEWART 8/7/2024 10:48:16 AM *** Previous notes not rectified....NEC 230.67 SURGE PROTECTOR NOT INSTALLED 8/2/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 8/2/2024 9:53:27 AM *** Previous Note not rectified....NEC 230.67 Inspector Notes from Inspection 2200 *** NOTES ADDED BY RMARTIN 6/20/2024 11:08:13 AM *** ned surge protector by early power
GRAVITY SEWER TEST 08/07/2024 APPROVED MGIBSON
SEWER TIE IN 08/07/2024 APPROVED MGIBSON
ELECTRIC - EARLY POWER 08/02/2024 Disapproved -FEE REQUIRED JSTEWART
Note: *** NOTES ADDED BY JSTEWART 8/2/2024 9:53:27 AM *** Previous Note not rectified....NEC 230.67 Inspector Notes from Inspection 2200 *** NOTES ADDED BY RMARTIN 6/20/2024 11:08:13 AM *** ned surge protector by early power
PEP TANK INSTALLATION REQUEST 07/09/2024 APPROVED CBOWERMASTER
Note: 7/8/2024 7:08:25 AM- PREVIOUS INSPECTION NOTES dumpster
PEP TANK INSTALLATION REQUEST 07/02/2024 Disapproved -FEE REQUIRED CBOWERMASTER
Note: dumpster
LATH/BRICK/ WATER BARRIER 07/02/2024 APPROVED KSANDOE
Note: 6/24/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 6/24/2024 1:48:01 PM *** 1. Please install ater barrier flashing at the margins of the front entry door. 2. Please seal the bottom sill of all windows Per plans A4.0 detail 7 wich dictates a continuous sealant. R703.4….All flashing shall be applied in a manner to prevent the entry of water into the wall cavity or penetration of water to the building structural framing components. Selfadhered membranes used as flashing shall comply with AAMA 711...........(1) Flashing Exterior window and door openings. Flashing at exteriorwindow and door openings shall extend to the surface of the exterior wall finish or to the water-resistive barrier
INSULATION 06/27/2024 APPROVED FWILLIS
ALL ROUGH 06/25/2024 APPROVED FWILLIS
Note: 6/24/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 6/24/2024 1:51:58 PM *** 1. Middle bedroom SD romex sheathing needs to enter holding box Min of 1/4". 2 all romex runs for SD need to be fastened within 12" of entering holding box. 3. Missing wire run for Carbon Monoxide/smoke detector on the Outside of the rear bedroom door (within 10ft of bedroom door) 4. Please pad the Margins of the front entry door to 1/4" shim space.
ALL ROUGH 06/25/2024 APPROVED JSTEWART
LATH/BRICK/ WATER BARRIER 06/24/2024 Disapproved - NO FEE JSTEWART
Note: *** NOTES ADDED BY JSTEWART 6/24/2024 1:48:01 PM *** 1. Please install ater barrier flashing at the margins of the front entry door. 2. Please seal the bottom sill of all windows Per plans A4.0 detail 7 wich dictates a continuous sealant. R703.4….All flashing shall be applied in a manner to prevent the entry of water into the wall cavity or penetration of water to the building structural framing components. Selfadhered membranes used as flashing shall comply with AAMA 711...........(1) Flashing Exterior window and door openings. Flashing at exteriorwindow and door openings shall extend to the surface of the exterior wall finish or to the water-resistive barrier
ALL ROUGH 06/24/2024 Disapproved -FEE REQUIRED JSTEWART
Note: *** NOTES ADDED BY JSTEWART 6/24/2024 1:51:58 PM *** 1. Middle bedroom SD romex sheathing needs to enter holding box Min of 1/4". 2 all romex runs for SD need to be fastened within 12" of entering holding box. 3. Missing wire run for Carbon Monoxide/smoke detector on the Outside of the rear bedroom door (within 10ft of bedroom door) 4. Please pad the Margins of the front entry door to 1/4" shim space.
ELECTRIC-TUG 06/20/2024 APPROVED - AS NOTED RMARTIN
Note: *** NOTES ADDED BY RMARTIN 6/20/2024 11:08:13 AM *** ned surge protector by early power
ROOF VALLEY & METAL 06/10/2024 APPROVED FWILLIS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 06/05/2024 APPROVED FWILLIS
ROW - DRAINAGE 06/05/2024 APPROVED - AS NOTED EMADISON
Note: ** 06/05/24 ALL CORRECTIONS MADE IT IS BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE AND EROSION AND SEDIMENT CONTROL OF THE JOB SITE ____________________________________________________________________________________________________________________ 6/4/2024 - PREVIOUS INSPECTION NOTES 06/04/24 **EXTENSION GRANTED TO BUILDER TO CORRECT THE DRAINAGE CONCERNS WITH INSTALLING A NEW TEMPORARY CULVERT ** FOLLOW UP INSPECTION ON 06/05/24 _____________________________________________________________________________________________________________________ 5/30/2024 - PREVIOUS INSPECTION NOTES ** 05/30/24 EXTENSION GRANTED TO BUILDER TO CORRECT THE DRAINAGE CONCERNS WITH INSTALLING A NEW TEMPORARY CULVERT ** FOLLOW UP INSPECTION ON 06/04/24 _______________________________________________________________________________________________________________________ 5/29/2024 - PREVIOUS INSPECTION NOTES ** 05/29/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE AND REMOVE REMAINING MOUND OF DIRT AND DEBRIS ON RIGHT SIDE ** NEED TO OPEN TEMPORARY CULVERT TO ALLOW FOR THE FLOW OF STORMWATER TO THE OUTFALL OR REMOVE TEMPORARY CULVERT AND MAINTAIN ROAD SIDE SWALE ON A DAILY BASIS ** NEED TO REPAIR RUT IN SWALE LEFT SIDE WHERE THAT WILL HOLD AND COLLECT WATER ** NEED TO EXTEND SILT FENCE ACROSS ROAD SIDE SWALE TO AID IN EROSION AND SEDIMENT CONTROL ON THE LEFT SIDE BEFORE THE OUTFALL INTO THE DRAINAGE DITCH ** FOLLOW UP INSPECTION ON 05/30/24 _____________________________________________________________________________________________________________________ 5/28/2024 - PREVIOUS INSPECTION NOTES ** 05/24/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE AND REMOVE REMAINING CONCRETE PIECES ** NEED TO OPEN TEMPORARY CULVERT TO ALLOW FOR THE FLOW OF STORMWATER TO THE OUTFALL ** NEED TO REPAIR RUT IN SWALE LEFT SIDE WHERE THAT WILL HOLD AND COLLECT WATER ** NEED TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ON SITE ** NEED TO EXTEND SILT FENCE ACROSS ROAD SIDE SWALE TO AID IN EROSION AND SEDIMENT CONTROL ON THE LEFT SIDE BEFORE THE OUTFALL INTO THE DRAINAGE DITCH ** FOLLOW UP INSPECTION ON 05/29/24 _____________________________________________________________________________________________________________________ 5/24/2024 - PREVIOUS INSPECTION NOTES ** 05/24/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE AND REMOVE REMAINING CONCRETE PIECES ** NEED TO OPEN TEMPORARY CULVERT TO ALLOW FOR THE FLOW OF STORMWATER TO THE OUTFALL ** NEED TO REPAIR RUT IN SWALE LEFT SIDE WHERE THAT WILL HOLD AND COLLECT WATER ** NEED TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ON SITE ** NEED TO EXTEND SILT FENCE ACROSS ROAD SIDE SWALE TO AID IN EROSION AND SEDIMENT CONTROL ON THE LEFT SIDE BEFORE THE OUTFALL INTO THE DRAINAGE DITCH ** FOLLOW UP INSPECTION ON 05/28/24 ** SEE ATTACHED PHOTOS ____________________________________________________________________________________________________________________ 5/21/2024 - PREVIOUS INSPECTION NOTES ** 05/21/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE REMOVE ALL CONCRETE THAT HAS ILLICITLY BEEN DISCHARGED INTO THE STORMWATER DRAINAGE SYSTEM ALONG WITH ANY OTHER DEBRIS. ** NEED TO OPEN TEMPORARY CULVERT TO ALLOW FOR THE FLOW OF STORMWATER TO THE OUTFALL ** NEED TO REPAIR RUT IN SWALE LEFT SIDE WHERE THAT WILL HOLD AND COLLECT WATER ** NEED TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ON SITE ** NEED TO REMOVE EQUIPMENT FROM ROAD SIDE SWALE ** NEED TO EXTEND SILT FENCE ACROSS ROAD SIDE SWALE TO AID IN EROSION AND SEDIMENT CONTROL ON THE LEFT SIDE BEFORE THE OUTFALL INTO THE DRAINAGE DITCH ** FOLLOW UP INSPECTION ON 05/24/24 IF AFTER (7) SEVEN DAYS CORRECTIONS HAVE NOT BEEN MADE THIS INSPECTION WILL BECOME A PRIORITY (1) MEANING NO OTHER INSPECTIONS CAN BE COMPLETED UNTIL ALL CORRECTIONS HAVE BEEN MADE ** SEE ATTACHED PHOTOS
ROW - DRAINAGE 06/04/2024 Disapproved - NO FEE EMADISON
Note: 06/04/24 **EXTENSION GRANTED TO BUILDER TO CORRECT THE DRAINAGE CONCERNS WITH INSTALLING A NEW TEMPORARY CULVERT ** FOLLOW UP INSPECTION ON 06/05/24 _____________________________________________________________________________________________________________________ 5/30/2024 - PREVIOUS INSPECTION NOTES ** 05/30/24 EXTENSION GRANTED TO BUILDER TO CORRECT THE DRAINAGE CONCERNS WITH INSTALLING A NEW TEMPORARY CULVERT ** FOLLOW UP INSPECTION ON 06/04/24 _______________________________________________________________________________________________________________________ 5/29/2024 - PREVIOUS INSPECTION NOTES ** 05/29/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE AND REMOVE REMAINING MOUND OF DIRT AND DEBRIS ON RIGHT SIDE ** NEED TO OPEN TEMPORARY CULVERT TO ALLOW FOR THE FLOW OF STORMWATER TO THE OUTFALL OR REMOVE TEMPORARY CULVERT AND MAINTAIN ROAD SIDE SWALE ON A DAILY BASIS ** NEED TO REPAIR RUT IN SWALE LEFT SIDE WHERE THAT WILL HOLD AND COLLECT WATER ** NEED TO EXTEND SILT FENCE ACROSS ROAD SIDE SWALE TO AID IN EROSION AND SEDIMENT CONTROL ON THE LEFT SIDE BEFORE THE OUTFALL INTO THE DRAINAGE DITCH ** FOLLOW UP INSPECTION ON 05/30/24 _____________________________________________________________________________________________________________________ 5/28/2024 - PREVIOUS INSPECTION NOTES ** 05/24/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE AND REMOVE REMAINING CONCRETE PIECES ** NEED TO OPEN TEMPORARY CULVERT TO ALLOW FOR THE FLOW OF STORMWATER TO THE OUTFALL ** NEED TO REPAIR RUT IN SWALE LEFT SIDE WHERE THAT WILL HOLD AND COLLECT WATER ** NEED TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ON SITE ** NEED TO EXTEND SILT FENCE ACROSS ROAD SIDE SWALE TO AID IN EROSION AND SEDIMENT CONTROL ON THE LEFT SIDE BEFORE THE OUTFALL INTO THE DRAINAGE DITCH ** FOLLOW UP INSPECTION ON 05/29/24 _____________________________________________________________________________________________________________________ 5/24/2024 - PREVIOUS INSPECTION NOTES ** 05/24/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE AND REMOVE REMAINING CONCRETE PIECES ** NEED TO OPEN TEMPORARY CULVERT TO ALLOW FOR THE FLOW OF STORMWATER TO THE OUTFALL ** NEED TO REPAIR RUT IN SWALE LEFT SIDE WHERE THAT WILL HOLD AND COLLECT WATER ** NEED TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ON SITE ** NEED TO EXTEND SILT FENCE ACROSS ROAD SIDE SWALE TO AID IN EROSION AND SEDIMENT CONTROL ON THE LEFT SIDE BEFORE THE OUTFALL INTO THE DRAINAGE DITCH ** FOLLOW UP INSPECTION ON 05/28/24 ** SEE ATTACHED PHOTOS ____________________________________________________________________________________________________________________ 5/21/2024 - PREVIOUS INSPECTION NOTES ** 05/21/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE REMOVE ALL CONCRETE THAT HAS ILLICITLY BEEN DISCHARGED INTO THE STORMWATER DRAINAGE SYSTEM ALONG WITH ANY OTHER DEBRIS. ** NEED TO OPEN TEMPORARY CULVERT TO ALLOW FOR THE FLOW OF STORMWATER TO THE OUTFALL ** NEED TO REPAIR RUT IN SWALE LEFT SIDE WHERE THAT WILL HOLD AND COLLECT WATER ** NEED TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ON SITE ** NEED TO REMOVE EQUIPMENT FROM ROAD SIDE SWALE ** NEED TO EXTEND SILT FENCE ACROSS ROAD SIDE SWALE TO AID IN EROSION AND SEDIMENT CONTROL ON THE LEFT SIDE BEFORE THE OUTFALL INTO THE DRAINAGE DITCH ** FOLLOW UP INSPECTION ON 05/24/24 IF AFTER (7) SEVEN DAYS CORRECTIONS HAVE NOT BEEN MADE THIS INSPECTION WILL BECOME A PRIORITY (1) MEANING NO OTHER INSPECTIONS CAN BE COMPLETED UNTIL ALL CORRECTIONS HAVE BEEN MADE ** SEE ATTACHED PHOTOS
ROOF SHEATHING 06/04/2024 APPROVED FWILLIS
WALL SHEATHING 06/04/2024 APPROVED FWILLIS
ROW - DRAINAGE 05/30/2024 Disapproved - NO FEE EMADISON
Note: ** 05/30/24 EXTENSION GRANTED TO BUILDER TO CORRECT THE DRAINAGE CONCERNS WITH INSTALLING A NEW TEMPORARY CULVERT ** FOLLOW UP INSPECTION ON 06/04/24 _______________________________________________________________________________________________________________________ 5/29/2024 - PREVIOUS INSPECTION NOTES ** 05/29/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE AND REMOVE REMAINING MOUND OF DIRT AND DEBRIS ON RIGHT SIDE ** NEED TO OPEN TEMPORARY CULVERT TO ALLOW FOR THE FLOW OF STORMWATER TO THE OUTFALL OR REMOVE TEMPORARY CULVERT AND MAINTAIN ROAD SIDE SWALE ON A DAILY BASIS ** NEED TO REPAIR RUT IN SWALE LEFT SIDE WHERE THAT WILL HOLD AND COLLECT WATER ** NEED TO EXTEND SILT FENCE ACROSS ROAD SIDE SWALE TO AID IN EROSION AND SEDIMENT CONTROL ON THE LEFT SIDE BEFORE THE OUTFALL INTO THE DRAINAGE DITCH ** FOLLOW UP INSPECTION ON 05/30/24 _____________________________________________________________________________________________________________________ 5/28/2024 - PREVIOUS INSPECTION NOTES ** 05/24/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE AND REMOVE REMAINING CONCRETE PIECES ** NEED TO OPEN TEMPORARY CULVERT TO ALLOW FOR THE FLOW OF STORMWATER TO THE OUTFALL ** NEED TO REPAIR RUT IN SWALE LEFT SIDE WHERE THAT WILL HOLD AND COLLECT WATER ** NEED TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ON SITE ** NEED TO EXTEND SILT FENCE ACROSS ROAD SIDE SWALE TO AID IN EROSION AND SEDIMENT CONTROL ON THE LEFT SIDE BEFORE THE OUTFALL INTO THE DRAINAGE DITCH ** FOLLOW UP INSPECTION ON 05/29/24 _____________________________________________________________________________________________________________________ 5/24/2024 - PREVIOUS INSPECTION NOTES ** 05/24/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE AND REMOVE REMAINING CONCRETE PIECES ** NEED TO OPEN TEMPORARY CULVERT TO ALLOW FOR THE FLOW OF STORMWATER TO THE OUTFALL ** NEED TO REPAIR RUT IN SWALE LEFT SIDE WHERE THAT WILL HOLD AND COLLECT WATER ** NEED TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ON SITE ** NEED TO EXTEND SILT FENCE ACROSS ROAD SIDE SWALE TO AID IN EROSION AND SEDIMENT CONTROL ON THE LEFT SIDE BEFORE THE OUTFALL INTO THE DRAINAGE DITCH ** FOLLOW UP INSPECTION ON 05/28/24 ** SEE ATTACHED PHOTOS ____________________________________________________________________________________________________________________ 5/21/2024 - PREVIOUS INSPECTION NOTES ** 05/21/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE REMOVE ALL CONCRETE THAT HAS ILLICITLY BEEN DISCHARGED INTO THE STORMWATER DRAINAGE SYSTEM ALONG WITH ANY OTHER DEBRIS. ** NEED TO OPEN TEMPORARY CULVERT TO ALLOW FOR THE FLOW OF STORMWATER TO THE OUTFALL ** NEED TO REPAIR RUT IN SWALE LEFT SIDE WHERE THAT WILL HOLD AND COLLECT WATER ** NEED TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ON SITE ** NEED TO REMOVE EQUIPMENT FROM ROAD SIDE SWALE ** NEED TO EXTEND SILT FENCE ACROSS ROAD SIDE SWALE TO AID IN EROSION AND SEDIMENT CONTROL ON THE LEFT SIDE BEFORE THE OUTFALL INTO THE DRAINAGE DITCH ** FOLLOW UP INSPECTION ON 05/24/24 IF AFTER (7) SEVEN DAYS CORRECTIONS HAVE NOT BEEN MADE THIS INSPECTION WILL BECOME A PRIORITY (1) MEANING NO OTHER INSPECTIONS CAN BE COMPLETED UNTIL ALL CORRECTIONS HAVE BEEN MADE ** SEE ATTACHED PHOTOS
ROW - DRAINAGE 05/29/2024 Disapproved -FEE REQUIRED EMADISON
Note: ** 05/29/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE AND REMOVE REMAINING MOUND OF DIRT AND DEBRIS ON RIGHT SIDE ** NEED TO OPEN TEMPORARY CULVERT TO ALLOW FOR THE FLOW OF STORMWATER TO THE OUTFALL OR REMOVE TEMPORARY CULVERT AND MAINTAIN ROAD SIDE SWALE ON A DAILY BASIS ** NEED TO REPAIR RUT IN SWALE LEFT SIDE WHERE THAT WILL HOLD AND COLLECT WATER ** NEED TO EXTEND SILT FENCE ACROSS ROAD SIDE SWALE TO AID IN EROSION AND SEDIMENT CONTROL ON THE LEFT SIDE BEFORE THE OUTFALL INTO THE DRAINAGE DITCH ** FOLLOW UP INSPECTION ON 05/30/24 _____________________________________________________________________________________________________________________ 5/28/2024 - PREVIOUS INSPECTION NOTES ** 05/24/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE AND REMOVE REMAINING CONCRETE PIECES ** NEED TO OPEN TEMPORARY CULVERT TO ALLOW FOR THE FLOW OF STORMWATER TO THE OUTFALL ** NEED TO REPAIR RUT IN SWALE LEFT SIDE WHERE THAT WILL HOLD AND COLLECT WATER ** NEED TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ON SITE ** NEED TO EXTEND SILT FENCE ACROSS ROAD SIDE SWALE TO AID IN EROSION AND SEDIMENT CONTROL ON THE LEFT SIDE BEFORE THE OUTFALL INTO THE DRAINAGE DITCH ** FOLLOW UP INSPECTION ON 05/29/24 _____________________________________________________________________________________________________________________ 5/24/2024 - PREVIOUS INSPECTION NOTES ** 05/24/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE AND REMOVE REMAINING CONCRETE PIECES ** NEED TO OPEN TEMPORARY CULVERT TO ALLOW FOR THE FLOW OF STORMWATER TO THE OUTFALL ** NEED TO REPAIR RUT IN SWALE LEFT SIDE WHERE THAT WILL HOLD AND COLLECT WATER ** NEED TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ON SITE ** NEED TO EXTEND SILT FENCE ACROSS ROAD SIDE SWALE TO AID IN EROSION AND SEDIMENT CONTROL ON THE LEFT SIDE BEFORE THE OUTFALL INTO THE DRAINAGE DITCH ** FOLLOW UP INSPECTION ON 05/28/24 ** SEE ATTACHED PHOTOS ____________________________________________________________________________________________________________________ 5/21/2024 - PREVIOUS INSPECTION NOTES ** 05/21/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE REMOVE ALL CONCRETE THAT HAS ILLICITLY BEEN DISCHARGED INTO THE STORMWATER DRAINAGE SYSTEM ALONG WITH ANY OTHER DEBRIS. ** NEED TO OPEN TEMPORARY CULVERT TO ALLOW FOR THE FLOW OF STORMWATER TO THE OUTFALL ** NEED TO REPAIR RUT IN SWALE LEFT SIDE WHERE THAT WILL HOLD AND COLLECT WATER ** NEED TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ON SITE ** NEED TO REMOVE EQUIPMENT FROM ROAD SIDE SWALE ** NEED TO EXTEND SILT FENCE ACROSS ROAD SIDE SWALE TO AID IN EROSION AND SEDIMENT CONTROL ON THE LEFT SIDE BEFORE THE OUTFALL INTO THE DRAINAGE DITCH ** FOLLOW UP INSPECTION ON 05/24/24 IF AFTER (7) SEVEN DAYS CORRECTIONS HAVE NOT BEEN MADE THIS INSPECTION WILL BECOME A PRIORITY (1) MEANING NO OTHER INSPECTIONS CAN BE COMPLETED UNTIL ALL CORRECTIONS HAVE BEEN MADE ** SEE ATTACHED PHOTOS
ROW - DRAINAGE 05/28/2024 Disapproved -FEE REQUIRED EMADISON
Note: ** 05/24/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE AND REMOVE REMAINING CONCRETE PIECES ** NEED TO OPEN TEMPORARY CULVERT TO ALLOW FOR THE FLOW OF STORMWATER TO THE OUTFALL ** NEED TO REPAIR RUT IN SWALE LEFT SIDE WHERE THAT WILL HOLD AND COLLECT WATER ** NEED TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ON SITE ** NEED TO EXTEND SILT FENCE ACROSS ROAD SIDE SWALE TO AID IN EROSION AND SEDIMENT CONTROL ON THE LEFT SIDE BEFORE THE OUTFALL INTO THE DRAINAGE DITCH ** FOLLOW UP INSPECTION ON 05/29/24 _____________________________________________________________________________________________________________________ 5/24/2024 - PREVIOUS INSPECTION NOTES ** 05/24/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE AND REMOVE REMAINING CONCRETE PIECES ** NEED TO OPEN TEMPORARY CULVERT TO ALLOW FOR THE FLOW OF STORMWATER TO THE OUTFALL ** NEED TO REPAIR RUT IN SWALE LEFT SIDE WHERE THAT WILL HOLD AND COLLECT WATER ** NEED TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ON SITE ** NEED TO EXTEND SILT FENCE ACROSS ROAD SIDE SWALE TO AID IN EROSION AND SEDIMENT CONTROL ON THE LEFT SIDE BEFORE THE OUTFALL INTO THE DRAINAGE DITCH ** FOLLOW UP INSPECTION ON 05/28/24 ** SEE ATTACHED PHOTOS ____________________________________________________________________________________________________________________ 5/21/2024 - PREVIOUS INSPECTION NOTES ** 05/21/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE REMOVE ALL CONCRETE THAT HAS ILLICITLY BEEN DISCHARGED INTO THE STORMWATER DRAINAGE SYSTEM ALONG WITH ANY OTHER DEBRIS. ** NEED TO OPEN TEMPORARY CULVERT TO ALLOW FOR THE FLOW OF STORMWATER TO THE OUTFALL ** NEED TO REPAIR RUT IN SWALE LEFT SIDE WHERE THAT WILL HOLD AND COLLECT WATER ** NEED TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ON SITE ** NEED TO REMOVE EQUIPMENT FROM ROAD SIDE SWALE ** NEED TO EXTEND SILT FENCE ACROSS ROAD SIDE SWALE TO AID IN EROSION AND SEDIMENT CONTROL ON THE LEFT SIDE BEFORE THE OUTFALL INTO THE DRAINAGE DITCH ** FOLLOW UP INSPECTION ON 05/24/24 IF AFTER (7) SEVEN DAYS CORRECTIONS HAVE NOT BEEN MADE THIS INSPECTION WILL BECOME A PRIORITY (1) MEANING NO OTHER INSPECTIONS CAN BE COMPLETED UNTIL ALL CORRECTIONS HAVE BEEN MADE ** SEE ATTACHED PHOTOS
ROW - DRAINAGE 05/24/2024 Disapproved -FEE REQUIRED EMADISON
Note: ** 05/24/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE AND REMOVE REMAINING CONCRETE PIECES ** NEED TO OPEN TEMPORARY CULVERT TO ALLOW FOR THE FLOW OF STORMWATER TO THE OUTFALL ** NEED TO REPAIR RUT IN SWALE LEFT SIDE WHERE THAT WILL HOLD AND COLLECT WATER ** NEED TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ON SITE ** NEED TO EXTEND SILT FENCE ACROSS ROAD SIDE SWALE TO AID IN EROSION AND SEDIMENT CONTROL ON THE LEFT SIDE BEFORE THE OUTFALL INTO THE DRAINAGE DITCH ** FOLLOW UP INSPECTION ON 05/28/24 ** SEE ATTACHED PHOTOS 5/21/2024 - PREVIOUS INSPECTION NOTES ** 05/21/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE REMOVE ALL CONCRETE THAT HAS ILLICITLY BEEN DISCHARGED INTO THE STORMWATER DRAINAGE SYSTEM ALONG WITH ANY OTHER DEBRIS. ** NEED TO OPEN TEMPORARY CULVERT TO ALLOW FOR THE FLOW OF STORMWATER TO THE OUTFALL ** NEED TO REPAIR RUT IN SWALE LEFT SIDE WHERE THAT WILL HOLD AND COLLECT WATER ** NEED TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ON SITE ** NEED TO REMOVE EQUIPMENT FROM ROAD SIDE SWALE ** NEED TO EXTEND SILT FENCE ACROSS ROAD SIDE SWALE TO AID IN EROSION AND SEDIMENT CONTROL ON THE LEFT SIDE BEFORE THE OUTFALL INTO THE DRAINAGE DITCH ** FOLLOW UP INSPECTION ON 05/24/24 IF AFTER (7) SEVEN DAYS CORRECTIONS HAVE NOT BEEN MADE THIS INSPECTION WILL BECOME A PRIORITY (1) MEANING NO OTHER INSPECTIONS CAN BE COMPLETED UNTIL ALL CORRECTIONS HAVE BEEN MADE ** SEE ATTACHED PHOTOS
TIE BEAM / LINTEL 05/23/2024 APPROVED FWILLIS
FOUND SURVEY APPROVED (OFFICE) 05/21/2024 APPROVED TBAKER
ROW - DRAINAGE 05/21/2024 Disapproved -FEE REQUIRED EMADISON
Note: ** 05/21/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE REMOVE ALL CONCRETE THAT HAS ILLICITLY BEEN DISCHARGED INTO THE STORMWATER DRAINAGE SYSTEM ALONG WITH ANY OTHER DEBRIS. ** NEED TO OPEN TEMPORARY CULVERT TO ALLOW FOR THE FLOW OF STORMWATER TO THE OUTFALL ** NEED TO REPAIR RUT IN SWALE LEFT SIDE WHERE THAT WILL HOLD AND COLLECT WATER ** NEED TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE AND PUT ON SITE ** NEED TO REMOVE EQUIPMENT FROM ROAD SIDE SWALE ** NEED TO EXTEND SILT FENCE ACROSS ROAD SIDE SWALE TO AID IN EROSION AND SEDIMENT CONTROL ON THE LEFT SIDE BEFORE THE OUTFALL INTO THE DRAINAGE DITCH ** FOLLOW UP INSPECTION ON 05/24/24 IF AFTER (7) SEVEN DAYS CORRECTIONS HAVE NOT BEEN MADE THIS INSPECTION WILL BECOME A PRIORITY (1) MEANING NO OTHER INSPECTIONS CAN BE COMPLETED UNTIL ALL CORRECTIONS HAVE BEEN MADE ** SEE ATTACHED PHOTOS
MONOLITHIC SLAB 05/16/2024 APPROVED LMILLER
PLUMBING 1ST ROUGH UNDERGROUND 05/14/2024 APPROVED MGIBSON
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 05/13/2024 APPROVED JMUNSON
WATER METER INSTALLATION REQUEST 04/18/2024 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
MECH COMPLETE 08/27/2024 08/29/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 05/21/2024 05/21/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 05/21/2024 05/21/2024
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
ZON COMPLETE 05/15/2024 05/15/2024
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
BLD COMPLETE 05/08/2024 05/13/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD HOLD 05/02/2024 05/07/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Letter must be accompanied by a signed and sealed inspection and certification letter by the geotechnical engineer of record. Engineer’s letter to confirm the following: Site clearing / over excavation was completed and inspected by engineer prior to the placement of fill and engineer confirms clearing and over excavation work is acceptable. Engineer to confirm fill materials were suitable and within specifications. Engineer to confirm the required number and location of field density tests were completed. Engineer to include certification statement in accordance with Florida Administrative Code 61G15-18.011 (4) Field dentisty Test Must be digiutally signed and sealed.
ELEC COMPLETE 03/21/2024 03/25/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 03/21/2024 03/21/2024
Note: Released By: JPI
SWALE COMPLETE 03/06/2024 05/03/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BADMIN COMPLETE 03/05/2024 03/08/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 03/05/2024 03/06/2024
Note: Released By: JPI
CUSVC COMPLETE 03/05/2024 03/07/2024
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC HOLD 03/05/2024 03/08/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. All outlets in kitchen need to be GFCI protected. NEC 2020 210.8
ENGIN1 COMPLETE 03/05/2024 03/06/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 03/05/2024 03/06/2024
LOCATE COMPLETE 03/05/2024 03/07/2024
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 03/05/2024 03/06/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 03/05/2024 03/06/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 03/05/2024 03/06/2024
Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 09/30/2024
REINSPECTION RESIDENTIAL ¤40.00 09/30/2024
REINSPECTION RESIDENTIAL ¤40.00 09/30/2024
REINSPECTION RESIDENTIAL ¤40.00 09/30/2024
REINSPECTION RESIDENTIAL ¤40.00 09/30/2024
SW ENG - INSPECTION 20 ¤20.00 09/30/2024
SW ENG - INSPECTION 20 ¤20.00 09/30/2024
SW ENG - INSPECTION 20 ¤20.00 09/30/2024
SW ENG - INSPECTION 20 ¤20.00 09/30/2024
SW ENG - INSPECTION 20 ¤20.00 09/30/2024
SW ENG - INSPECTION 20 ¤20.00 09/30/2024
SW ENG - INSPECTION 20 ¤20.00 09/30/2024
SW ENG REINSPECTION 20 ¤20.00 09/30/2024
SW ENG REINSPECTION 30 ¤30.00 09/30/2024
UTILITY PEP REINSPECTION ¤40.00 09/30/2024
SEWER CREDIT (¤850.00) 04/08/2024
SEWER INSPECTION ¤25.00 04/08/2024
SEWER CAPITAL FACILITY ¤5,441.03 04/08/2024
WATER CAPITAL FACILITY FEE ¤3,994.51 04/08/2024
SITE PLAN 30 ¤30.00 04/08/2024
SW ENG - REVIEW 20 ¤20.00 04/08/2024
SW ENG RES REVIEW 200 ¤200.00 04/08/2024
WATER- TURN ON ¤25.00 04/08/2024
ADJUSTMENT 50% (¤555.09) 04/08/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 04/08/2024
INSPECTION - RESIDENTIAL ¤841.50 04/08/2024
PLAN REVIEW - RESIDENTIAL ¤238.68 04/08/2024
SW ENG INSPECTION 80 ¤80.00 04/08/2024
SW ENG PRE APRON ¤30.00 04/08/2024
CONNECTION FEES ¤1,187.26 04/08/2024
CONTRACTOR CHANGE ¤20.00 04/08/2024
FC IMPACT FEE EMS ¤62.00 04/08/2024
IMPACT FEE FIRE ¤428.09 04/08/2024
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 04/08/2024
FC IMPACT FEE LIBRARY ¤268.00 04/08/2024
IMPACT FEE PARKS ¤1,800.99 04/08/2024
IMPACT FEE SCHOOL ¤5,450.00 04/08/2024
IMPACT FEE TRANSPORTATION ¤1,862.00 04/08/2024
WATER -IRRIGATION INSPECTION ¤25.00 04/08/2024
SURCHARGE FS 533.721 ¤5.55 04/08/2024
SURCHARGE - FS 468.631 ¤8.33 04/08/2024
SW ENG - FOUNDATION SURVEY ¤20.00 04/08/2024
Fees Total Due: ¤0.00 Total Paid: ¤21,328.35