I want to search for...
Permit #2024030203
Permit Details
Status: COED
| Parcel Id: 42-10-30-3210-00000-0690 |
| CONDITIONED SPACE: 3138 sqft |
| GARAGE: 717 sqft |
| ENCLOSE EXISTING PORCH TO LIVING : 96 sqft |
| OPENED PORCH (WITH ROOF) : 508 sqft |
| Total Square Footage: 4459 sqft |
| Block: 00000 |
| Subdivision: - |
| Job Phone: 386-236-4133 |
| Location Address: 122 MARSH ELDER SQ |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 04/01/2024 |
| NOC: RECORDED |
| Applicant name: LEONARDO CIRO SANCLEMENTE |
| Owner: VOLUSIA RESIDENTIAL CONSTRUCTION LLC |
|
Address 2379 BEVILLE ROAD DAYTONA BEACH, FL 32119 |
| Lot: 0690 |
| Contracted Stated Job Value: ¤340,772.00 |
| Job Description: single family residence |
| Type: CN |
Contractor
VOLUSIA RESIDENTIAL CONSTRUCTION, LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
2379 BEVILLE RD DAYTONA BEACH, FL 32119 |
CBC1262114 (Exp: 08/31/2026) | 386-236-4133 |
Sub Contractors
EDWARD DOUGLAS TENNANT
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
3370 AGRICULTURAL CENTER DRIVE ST. AUGUSTINE , FL 32092 |
CAC1813372 (Exp: 08/31/2026) | (904)829-8898 | (904)829-6587 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
STEPHEN COURTEAUX
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
85 North Yonge Street Ormond Beach, FL 32174 |
EC13001748 (Exp: 08/31/2026) | (386) 672-4900 | 386-676-7472 |
HARLEY M BRYAN JR
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
5225 EDGEWOOD COURT PALM COAST, FL 32054 |
CRC1331244 (Exp: 08/31/2026) | 904-389-2700 | 904-389-0722 |
HUGH MACDONALD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
10825 TOM FOLSOM ROAD, SUITE A THONOTOSASSA, FL 33592 |
CCC1329562 (Exp: 08/31/2026) | 813-986-4968 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 10/25/2024 | FINAL APPROVED | AWATERS |
| Note: 10/24/2024 - PREVIOUS INSPECTION NOTES 1. Missing attic acces in closet. FBC [A} 107.4 2. Seal hole in ceiling in garage at garage door FBC & Garage door opener EC TABLE R402.4.1.1 3. Drain behind AC#2 must extend 12"om foundation per FBC R318.5 4. Loose outlet over fire place NEC 406.5 | |||
| U-CROSS CONNECTION | 10/24/2024 | APPROVED | DHANEY |
| BLD - BUILDING FINAL | 10/24/2024 | Disapproved - NO FEE | AWATERS |
| Note: 1. Missing attic acces in closet. FBC [A} 107.4 2. Seal hole in ceiling in garage at garage door FBC & Garage door opener EC TABLE R402.4.1.1 3. Drain behind AC#2 must extend 12"om foundation per FBC R318.5 4. Loose outlet over fire place NEC 406.5 | |||
| U -UTILITY RESIDENTIAL FINAL | 10/24/2024 | FINAL APPROVED | DHANEY |
| GAS FINAL | 10/24/2024 | APPROVED | MGIBSON |
| ROW - FINAL APRON (AFTER POUR) | 10/23/2024 | APPROVED | EMADISON |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 10/23/2024 | APPROVED | EMADISON |
| Note: | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 10/23/2024 | APPROVED | EMADISON |
| ROW - STORMWATER FINAL | 10/23/2024 | APPROVED | EMADISON |
| ELECTRIC - EARLY POWER | 09/27/2024 | APPROVED | HCAMACHO |
| ROW- PRE-APRON (PRE-POUR) | 09/10/2024 | APPROVED - AS NOTED | EMADISON |
| Note: ** 09/10/24 READY TO SET PAVERS __________________________________________________________________________________________________________________ Inspector Notes from Inspection 9271 ** 08/16/24 APRON READY TO POUR WITH PAVER RESTRAINT ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE ( | |||
| ROW- PAVER RESTRAINTS | 08/16/2024 | APPROVED - AS NOTED | EMADISON |
| Note: ** 08/16/24 APRON READY TO POUR WITH PAVER RESTRAINT ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE ( | |||
| ROW- PRE-APRON (PRE-POUR) | 08/16/2024 | PARTIALLY APPROVED | EMADISON |
| Note: ** 08/16/24 *APRON READY TO POUR WITH PAVER RESTRAINT ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED | |||
| LATH/BRICK/ WATER BARRIER | 08/02/2024 | APPROVED | FWILLIS |
| ALL ROUGH | 08/01/2024 | APPROVED - AS NOTED | AWATERS |
| Note: Load revision to portal (Anchor PT to CMU) 7/26/2024 - PREVIOUS INSPECTION NOTES Per Superintendent- Framer has not yet had a chance to return. Plumbing test okay. Required corrections below. 1. Load revision to portal (Anchor PT to CMU) 2. Please address missing anchors at Detail D 3. Fire block at 10 ft (kitchen, master suite) Fire block concealed space pool bath. Foam top plate 4. Mullion attachment BR2 5. Foam transom over slider. Missing foam at sole plate garage/residence. 6. Still missing SP1 at BR3. Check load path. May need to revise truss hold down. *All Rough must pass before insulation inspection can pass. Ensure energy cals in packet for insulation inspection. 7/23/2024 - PREVIOUS INSPECTION NOTES 1. Anchor PT to CMU per detail (toe nailed) 2. Revise detail D anchors at sole plate (missings) 3. Fire block at 10 ft (interior walls) 4. Still missing SP1 (circled on floor in blue) 5. Strap bath exhaust ducts off ceiling. Slope to drain condensation. 6. Test DWV (5 ft above washer box) 7. Mullion attachment not per detail (fastener shank exposed) 8. Check load path at interior bearing wall that is missing SP1 Okay to insulate. Will check remaining items at added insulation inspection after all rough passes. 7/19/2024 - PREVIOUS INSPECTION NOTES 1. Anchor PT to CMU per detail 2. Revise detail D anchors at sole plate 3. Strap concentional framing 3. Fire block at 10 ft 4. Still missing SP1 5. Frame around electric panel 6. Bond outlet at LV panel 7. Strap bath exhaust ducts 8. Test DWV 9. Insulate water lines in attic 10. Mullion attachment not per detail 11. Needs soffit at pool bath vent 12. Check load path at interior bearing wall that is missing SP1 | |||
| INSULATION | 08/01/2024 | APPROVED | AWATERS |
| Note: Inspector Notes from Inspection 2420 Load revision to portal (Anchor PT to CMU) 7/26/2024 - PREVIOUS INSPECTION NOTES Per Superintendent- Framer has not yet had a chance to return. Plumbing test okay. Required corrections below. 1. Load revision to portal (Anchor PT to CMU) 2. Please address missing anchors at Detail D 3. Fire block at 10 ft (kitchen, master suite) Fire block concealed space pool bath. Foam top plate 4. Mullion attachment BR2 5. Foam transom over slider. Missing foam at sole plate garage/residence. 6. Still missing SP1 at BR3. Check load path. May need to revise truss hold down. *All Rough must pass before insulation inspection can pass. Ensure energy cals in packet for insulation inspection. 7/23/2024 - PREVIOUS INSPECTION NOTES 1. Anchor PT to CMU per detail (toe nailed) 2. Revise detail D anchors at sole plate (missings) 3. Fire block at 10 ft (interior walls) 4. Still missing SP1 (circled on floor in blue) 5. Strap bath exhaust ducts off ceiling. Slope to drain condensation. 6. Test DWV (5 ft above washer box) 7. Mullion attachment not per detail (fastener shank exposed) 8. Check load path at interior bearing wall that is missing SP1 Okay to insulate. Will check remaining items at added insulation inspection after all rough passes. 7/19/2024 - PREVIOUS INSPECTION NOTES 1. Anchor PT to CMU per detail 2. Revise detail D anchors at sole plate 3. Strap concentional framing 3. Fire block at 10 ft 4. Still missing SP1 5. Frame around electric panel 6. Bond outlet at LV panel 7. Strap bath exhaust ducts 8. Test DWV 9. Insulate water lines in attic 10. Mullion attachment not per detail 11. Needs soffit at pool bath vent 12. Check load path at interior bearing wall that is missing SP1 | |||
| ALL ROUGH | 07/26/2024 | Disapproved -FEE REQUIRED | AWATERS |
| Note: Per Superintendent- Framer has not yet had a chance to return. Plumbing test okay. Required corrections below. 1. Load revision to portal (Anchor PT to CMU) 2. Please address missing anchors at Detail D 3. Fire block at 10 ft (kitchen, master suite) Fire block concealed space pool bath. Foam top plate 4. Mullion attachment BR2 5. Foam transom over slider. Missing foam at sole plate garage/residence. 6. Still missing SP1 at BR3. Check load path. May need to revise truss hold down. *All Rough must pass before insulation inspection can pass. Ensure energy cals in packet for insulation inspection. 7/23/2024 - PREVIOUS INSPECTION NOTES 1. Anchor PT to CMU per detail (toe nailed) 2. Revise detail D anchors at sole plate (missings) 3. Fire block at 10 ft (interior walls) 4. Still missing SP1 (circled on floor in blue) 5. Strap bath exhaust ducts off ceiling. Slope to drain condensation. 6. Test DWV (5 ft above washer box) 7. Mullion attachment not per detail (fastener shank exposed) 8. Check load path at interior bearing wall that is missing SP1 Okay to insulate. Will check remaining items at added insulation inspection after all rough passes. 7/19/2024 - PREVIOUS INSPECTION NOTES 1. Anchor PT to CMU per detail 2. Revise detail D anchors at sole plate 3. Strap concentional framing 3. Fire block at 10 ft 4. Still missing SP1 5. Frame around electric panel 6. Bond outlet at LV panel 7. Strap bath exhaust ducts 8. Test DWV 9. Insulate water lines in attic 10. Mullion attachment not per detail 11. Needs soffit at pool bath vent 12. Check load path at interior bearing wall that is missing SP1 | |||
| ALL ROUGH | 07/23/2024 | Disapproved -FEE REQUIRED | AWATERS |
| Note: 1. Anchor PT to CMU per detail (toe nailed) 2. Revise detail D anchors at sole plate (missings) 3. Fire block at 10 ft (interior walls) 4. Still missing SP1 (circled on floor in blue) 5. Strap bath exhaust ducts off ceiling. Slope to drain condensation. 6. Test DWV (5 ft above washer box) 7. Mullion attachment not per detail (fastener shank exposed) 8. Check load path at interior bearing wall that is missing SP1 Okay to insulate. Will check remaining items at added insulation inspection after all rough passes. 7/19/2024 - PREVIOUS INSPECTION NOTES 1. Anchor PT to CMU per detail 2. Revise detail D anchors at sole plate 3. Strap concentional framing 3. Fire block at 10 ft 4. Still missing SP1 5. Frame around electric panel 6. Bond outlet at LV panel 7. Strap bath exhaust ducts 8. Test DWV 9. Insulate water lines in attic 10. Mullion attachment not per detail 11. Needs soffit at pool bath vent 12. Check load path at interior bearing wall that is missing SP1 | |||
| ALL ROUGH | 07/19/2024 | Disapproved -FEE REQUIRED | AWATERS |
| Note: 1. Anchor PT to CMU per detail 2. Revise detail D anchors at sole plate 3. Strap concentional framing 3. Fire block at 10 ft 4. Still missing SP1 5. Frame around electric panel 6. Bond outlet at LV panel 7. Strap bath exhaust ducts 8. Test DWV 9. Insulate water lines in attic 10. Mullion attachment not per detail 11. Needs soffit at pool bath vent 12. Check load path at interior bearing wall that is missing SP1 | |||
| ELECTRIC-TUG | 07/19/2024 | APPROVED | AWATERS |
| GAS ROUGH | 07/19/2024 | APPROVED | AWATERS |
| WALL SHEATHING | 07/15/2024 | APPROVED | JWALKER |
| Note: Inspector Notes from Inspection 2460 Inspector Notes from Inspection 2460 Inspector Notes from Inspection 2460 1. MISSING SOLE PLATE ANCHOR SW3 LEFT OF PIPE 2. MISSING SP1 BOTTOM OF STUD 3. CUT OVERFRAMING ABOVE GARAGE ENTRY 4. MISSING NAILS IN SHED ROOF FRAMING 5. MISSING ANCHORS PER 2/TDD CHECK AT FRAMING 7/1/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LMILLER 7/1/2024 10:45:21 AM *** No plans on site (checked the box and walked the hous). 107.3 | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/02/2024 | APPROVED - AS NOTED | AWATERS |
| Note: Inspector Notes from Inspection 2460 Inspector Notes from Inspection 2460 1. MISSING SOLE PLATE ANCHOR SW3 LEFT OF PIPE 2. MISSING SP1 BOTTOM OF STUD 3. CUT OVERFRAMING ABOVE GARAGE ENTRY 4. MISSING NAILS IN SHED ROOF FRAMING 5. MISSING ANCHORS PER 2/TDD CHECK AT FRAMING 7/1/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LMILLER 7/1/2024 10:45:21 AM *** No plans on site (checked the box and walked the hous). 107.3 | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/01/2024 | Disapproved -FEE REQUIRED | LMILLER |
| Note: *** NOTES ADDED BY LMILLER 7/1/2024 10:45:21 AM *** No plans on site (checked the box and walked the hous). 107.3 | |||
| ROOF VALLEY & METAL | 06/28/2024 | APPROVED | FWILLIS |
| GRAVITY SEWER TEST | 06/27/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 water service not ran yet, THIS WAS A VIRTUAL INSPECTION | |||
| SEWER TIE IN | 06/27/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 water service not ran yet. THIS WAS A VIRTUAL INSPECTION | |||
| ROOF SHEATHING | 06/20/2024 | APPROVED | LMILLER |
| TIE BEAM / LINTEL | 06/11/2024 | APPROVED | JWALKER |
| FOUND SURVEY APPROVED (OFFICE) | 06/07/2024 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 05/24/2024 | APPROVED | FWILLIS |
| Note: 5/23/2024 - PREVIOUS INSPECTION NOTES 5-23-24 1. Exterior concealment wall is not built to detail A FD1. | |||
| MONOLITHIC SLAB | 05/23/2024 | Disapproved - NO FEE | BTAYLOR |
| Note: 5-23-24 1. Exterior concealment wall is not built to detail A FD1. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 05/15/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: water service not ran yet | |||
| WATER METER INSTALLATION REQUEST | 04/30/2024 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 10/04/2024 | 10/08/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 08/01/2024 | 08/01/2024 |
| Note: Released By: ALPHANETTE WATERS - (386)986-2624 - AWATERS@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 07/29/2024 | 07/29/2024 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM engineers sealed submitted electronically must be digitally signed and sealed. The file names should include a brief description of what the engineer letter is for. (example Engineer letter - trusses engineer letter - lintel) | |||
| ENGIN1 | COMPLETE | 06/06/2024 | 06/07/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/06/2024 | 06/07/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| GAS | COMPLETE | 03/18/2024 | 03/20/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 03/18/2024 | 03/20/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 03/18/2024 | 03/21/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 03/18/2024 | 03/25/2024 |
| Note: Released By: SINA VEDADI MOGHADAM - (386)986-2569 - SVEDADIMOGHADAM@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/18/2024 | 03/18/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/18/2024 | 03/18/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/08/2024 | 03/08/2024 |
| Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 03/06/2024 | 03/12/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/06/2024 | 03/11/2024 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 03/06/2024 | 03/08/2024 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 03/06/2024 | 03/12/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. All outlets in laundry need to be GFCI protected. NEC 2020 210.8 2. DW outlet can not be located behind the DW. NEC 2020 422.16 3. Electrical riser diagram needs to include the surge protector and outside disconnect. NEC 2020 230.67, 230.85 4. bathrooms need to have correct outlets by sink. NEC 2020 210.52 (D) | |||
| ENGIN1 | COMPLETE | 03/06/2024 | 03/06/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | HOLD | 03/06/2024 | 03/08/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide material type for all gas piping on riser diagram | |||
| LOCATE | COMPLETE | 03/06/2024 | 03/07/2024 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | HOLD | 03/06/2024 | 03/08/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Design location on heatload needs to be Daytona Beach | |||
| SW1 | HOLD | 03/06/2024 | 03/14/2024 |
| Note: Held By: SINA VEDADI MOGHADAM - (386)986-2569 - SVEDADIMOGHADAM@PALMCOASTGOV.COM 1- On the eastern side of the property, the flow arrow direction from points with existing elevations of 22.4 to 22.7 is incorrect. Please either revise the flow direction or depict the proposed elevations. 2- Please depict a few proposed elevations on the property boundaries. | |||
| ZON | HOLD | 03/06/2024 | 03/06/2024 |
| Note: Held By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM 1. INCLUDE BANDING FRONT WINDOW | |||
| URB | COMPLETE | 03/06/2024 | 03/07/2024 |
| Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 10/22/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 10/22/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 10/22/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 10/22/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 10/22/2024 |
| CONNECTION FEES | ¤25.00 | 04/01/2024 |
| WATER-METER | ¤514.49 | 04/01/2024 |
| ADJUSTMENT 50% | (¤1,084.59) | 04/01/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 04/01/2024 |
| INSPECTION - RESIDENTIAL | ¤1,666.50 | 04/01/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤472.68 | 04/01/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 04/01/2024 |
| IMPACT FEE FIRE | ¤428.09 | 04/01/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 04/01/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 04/01/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 04/01/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 04/01/2024 |
| IMPACT FEE TRANSPORTATION | ¤3,404.00 | 04/01/2024 |
| SURCHARGE FS 533.721 | ¤10.85 | 04/01/2024 |
| SURCHARGE - FS 468.631 | ¤16.27 | 04/01/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 04/01/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 04/01/2024 |
| SW ENG PRE APRON | ¤30.00 | 04/01/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 04/01/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 04/01/2024 |
| SEWER INSPECTION | ¤25.00 | 04/01/2024 |
| SITE PLAN 30 | ¤30.00 | 04/01/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤13,867.28 |