I want to search for...

Permit #2024030203

Permit Details

Status: COED

Parcel Id: 42-10-30-3210-00000-0690
CONDITIONED SPACE: 3138 sqft
GARAGE: 717 sqft
ENCLOSE EXISTING PORCH TO LIVING : 96 sqft
OPENED PORCH (WITH ROOF) : 508 sqft
Total Square Footage: 4459 sqft
Block: 00000
Subdivision: -
Job Phone: 386-236-4133
Location Address: 122 MARSH ELDER SQ
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 04/01/2024
NOC: RECORDED
Applicant name: LEONARDO CIRO SANCLEMENTE
Owner: VOLUSIA RESIDENTIAL CONSTRUCTION LLC

Address

2379 BEVILLE ROAD

DAYTONA BEACH, FL 32119

Lot: 0690
Contracted Stated Job Value: ¤340,772.00
Job Description: single family residence
Type: CN

Contractor

VOLUSIA RESIDENTIAL CONSTRUCTION, LLC
Status Location Address State License Number Phone
ACTIVE

2379 BEVILLE RD

DAYTONA BEACH, FL 32119

CBC1262114 (Exp: 08/31/2026) 386-236-4133

Sub Contractors

EDWARD DOUGLAS TENNANT
Status Location Address State License Number Phone Fax
INACTIVE

3370 AGRICULTURAL CENTER DRIVE

ST. AUGUSTINE , FL 32092

CAC1813372 (Exp: 08/31/2026) (904)829-8898 (904)829-6587
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
STEPHEN COURTEAUX
Status Location Address State License Number Phone Fax
ACTIVE

85 North Yonge Street

Ormond Beach, FL 32174

EC13001748 (Exp: 08/31/2026) (386) 672-4900 386-676-7472
HARLEY M BRYAN JR
Status Location Address State License Number Phone Fax
INACTIVE

5225 EDGEWOOD COURT

PALM COAST, FL 32054

CRC1331244 (Exp: 08/31/2026) 904-389-2700 904-389-0722
HUGH MACDONALD
Status Location Address State License Number Phone
ACTIVE

10825 TOM FOLSOM ROAD, SUITE A

THONOTOSASSA, FL 33592

CCC1329562 (Exp: 08/31/2026) 813-986-4968

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 10/25/2024 FINAL APPROVED AWATERS
Note: 10/24/2024 - PREVIOUS INSPECTION NOTES 1. Missing attic acces in closet. FBC [A} 107.4 2. Seal hole in ceiling in garage at garage door FBC & Garage door opener EC TABLE R402.4.1.1 3. Drain behind AC#2 must extend 12"om foundation per FBC R318.5 4. Loose outlet over fire place NEC 406.5
U-CROSS CONNECTION 10/24/2024 APPROVED DHANEY
BLD - BUILDING FINAL 10/24/2024 Disapproved - NO FEE AWATERS
Note: 1. Missing attic acces in closet. FBC [A} 107.4 2. Seal hole in ceiling in garage at garage door FBC & Garage door opener EC TABLE R402.4.1.1 3. Drain behind AC#2 must extend 12"om foundation per FBC R318.5 4. Loose outlet over fire place NEC 406.5
U -UTILITY RESIDENTIAL FINAL 10/24/2024 FINAL APPROVED DHANEY
GAS FINAL 10/24/2024 APPROVED MGIBSON
ROW - FINAL APRON (AFTER POUR) 10/23/2024 APPROVED EMADISON
ROW- FINAL SURVEY/GRADING CERTIFICATION 10/23/2024 APPROVED EMADISON
Note:
ROW FIELD SURVEY /GRADING CERTIFICATION 10/23/2024 APPROVED EMADISON
ROW - STORMWATER FINAL 10/23/2024 APPROVED EMADISON
ELECTRIC - EARLY POWER 09/27/2024 APPROVED HCAMACHO
ROW- PRE-APRON (PRE-POUR) 09/10/2024 APPROVED - AS NOTED EMADISON
Note: ** 09/10/24 READY TO SET PAVERS __________________________________________________________________________________________________________________ Inspector Notes from Inspection 9271 ** 08/16/24 APRON READY TO POUR WITH PAVER RESTRAINT ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (
ROW- PAVER RESTRAINTS 08/16/2024 APPROVED - AS NOTED EMADISON
Note: ** 08/16/24 APRON READY TO POUR WITH PAVER RESTRAINT ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (
ROW- PRE-APRON (PRE-POUR) 08/16/2024 PARTIALLY APPROVED EMADISON
Note: ** 08/16/24 *APRON READY TO POUR WITH PAVER RESTRAINT ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED
LATH/BRICK/ WATER BARRIER 08/02/2024 APPROVED FWILLIS
ALL ROUGH 08/01/2024 APPROVED - AS NOTED AWATERS
Note: Load revision to portal (Anchor PT to CMU) 7/26/2024 - PREVIOUS INSPECTION NOTES Per Superintendent- Framer has not yet had a chance to return. Plumbing test okay. Required corrections below. 1. Load revision to portal (Anchor PT to CMU) 2. Please address missing anchors at Detail D 3. Fire block at 10 ft (kitchen, master suite) Fire block concealed space pool bath. Foam top plate 4. Mullion attachment BR2 5. Foam transom over slider. Missing foam at sole plate garage/residence. 6. Still missing SP1 at BR3. Check load path. May need to revise truss hold down. *All Rough must pass before insulation inspection can pass. Ensure energy cals in packet for insulation inspection. 7/23/2024 - PREVIOUS INSPECTION NOTES 1. Anchor PT to CMU per detail (toe nailed) 2. Revise detail D anchors at sole plate (missings) 3. Fire block at 10 ft (interior walls) 4. Still missing SP1 (circled on floor in blue) 5. Strap bath exhaust ducts off ceiling. Slope to drain condensation. 6. Test DWV (5 ft above washer box) 7. Mullion attachment not per detail (fastener shank exposed) 8. Check load path at interior bearing wall that is missing SP1 Okay to insulate. Will check remaining items at added insulation inspection after all rough passes. 7/19/2024 - PREVIOUS INSPECTION NOTES 1. Anchor PT to CMU per detail 2. Revise detail D anchors at sole plate 3. Strap concentional framing 3. Fire block at 10 ft 4. Still missing SP1 5. Frame around electric panel 6. Bond outlet at LV panel 7. Strap bath exhaust ducts 8. Test DWV 9. Insulate water lines in attic 10. Mullion attachment not per detail 11. Needs soffit at pool bath vent 12. Check load path at interior bearing wall that is missing SP1
INSULATION 08/01/2024 APPROVED AWATERS
Note: Inspector Notes from Inspection 2420 Load revision to portal (Anchor PT to CMU) 7/26/2024 - PREVIOUS INSPECTION NOTES Per Superintendent- Framer has not yet had a chance to return. Plumbing test okay. Required corrections below. 1. Load revision to portal (Anchor PT to CMU) 2. Please address missing anchors at Detail D 3. Fire block at 10 ft (kitchen, master suite) Fire block concealed space pool bath. Foam top plate 4. Mullion attachment BR2 5. Foam transom over slider. Missing foam at sole plate garage/residence. 6. Still missing SP1 at BR3. Check load path. May need to revise truss hold down. *All Rough must pass before insulation inspection can pass. Ensure energy cals in packet for insulation inspection. 7/23/2024 - PREVIOUS INSPECTION NOTES 1. Anchor PT to CMU per detail (toe nailed) 2. Revise detail D anchors at sole plate (missings) 3. Fire block at 10 ft (interior walls) 4. Still missing SP1 (circled on floor in blue) 5. Strap bath exhaust ducts off ceiling. Slope to drain condensation. 6. Test DWV (5 ft above washer box) 7. Mullion attachment not per detail (fastener shank exposed) 8. Check load path at interior bearing wall that is missing SP1 Okay to insulate. Will check remaining items at added insulation inspection after all rough passes. 7/19/2024 - PREVIOUS INSPECTION NOTES 1. Anchor PT to CMU per detail 2. Revise detail D anchors at sole plate 3. Strap concentional framing 3. Fire block at 10 ft 4. Still missing SP1 5. Frame around electric panel 6. Bond outlet at LV panel 7. Strap bath exhaust ducts 8. Test DWV 9. Insulate water lines in attic 10. Mullion attachment not per detail 11. Needs soffit at pool bath vent 12. Check load path at interior bearing wall that is missing SP1
ALL ROUGH 07/26/2024 Disapproved -FEE REQUIRED AWATERS
Note: Per Superintendent- Framer has not yet had a chance to return. Plumbing test okay. Required corrections below. 1. Load revision to portal (Anchor PT to CMU) 2. Please address missing anchors at Detail D 3. Fire block at 10 ft (kitchen, master suite) Fire block concealed space pool bath. Foam top plate 4. Mullion attachment BR2 5. Foam transom over slider. Missing foam at sole plate garage/residence. 6. Still missing SP1 at BR3. Check load path. May need to revise truss hold down. *All Rough must pass before insulation inspection can pass. Ensure energy cals in packet for insulation inspection. 7/23/2024 - PREVIOUS INSPECTION NOTES 1. Anchor PT to CMU per detail (toe nailed) 2. Revise detail D anchors at sole plate (missings) 3. Fire block at 10 ft (interior walls) 4. Still missing SP1 (circled on floor in blue) 5. Strap bath exhaust ducts off ceiling. Slope to drain condensation. 6. Test DWV (5 ft above washer box) 7. Mullion attachment not per detail (fastener shank exposed) 8. Check load path at interior bearing wall that is missing SP1 Okay to insulate. Will check remaining items at added insulation inspection after all rough passes. 7/19/2024 - PREVIOUS INSPECTION NOTES 1. Anchor PT to CMU per detail 2. Revise detail D anchors at sole plate 3. Strap concentional framing 3. Fire block at 10 ft 4. Still missing SP1 5. Frame around electric panel 6. Bond outlet at LV panel 7. Strap bath exhaust ducts 8. Test DWV 9. Insulate water lines in attic 10. Mullion attachment not per detail 11. Needs soffit at pool bath vent 12. Check load path at interior bearing wall that is missing SP1
ALL ROUGH 07/23/2024 Disapproved -FEE REQUIRED AWATERS
Note: 1. Anchor PT to CMU per detail (toe nailed) 2. Revise detail D anchors at sole plate (missings) 3. Fire block at 10 ft (interior walls) 4. Still missing SP1 (circled on floor in blue) 5. Strap bath exhaust ducts off ceiling. Slope to drain condensation. 6. Test DWV (5 ft above washer box) 7. Mullion attachment not per detail (fastener shank exposed) 8. Check load path at interior bearing wall that is missing SP1 Okay to insulate. Will check remaining items at added insulation inspection after all rough passes. 7/19/2024 - PREVIOUS INSPECTION NOTES 1. Anchor PT to CMU per detail 2. Revise detail D anchors at sole plate 3. Strap concentional framing 3. Fire block at 10 ft 4. Still missing SP1 5. Frame around electric panel 6. Bond outlet at LV panel 7. Strap bath exhaust ducts 8. Test DWV 9. Insulate water lines in attic 10. Mullion attachment not per detail 11. Needs soffit at pool bath vent 12. Check load path at interior bearing wall that is missing SP1
ALL ROUGH 07/19/2024 Disapproved -FEE REQUIRED AWATERS
Note: 1. Anchor PT to CMU per detail 2. Revise detail D anchors at sole plate 3. Strap concentional framing 3. Fire block at 10 ft 4. Still missing SP1 5. Frame around electric panel 6. Bond outlet at LV panel 7. Strap bath exhaust ducts 8. Test DWV 9. Insulate water lines in attic 10. Mullion attachment not per detail 11. Needs soffit at pool bath vent 12. Check load path at interior bearing wall that is missing SP1
ELECTRIC-TUG 07/19/2024 APPROVED AWATERS
GAS ROUGH 07/19/2024 APPROVED AWATERS
WALL SHEATHING 07/15/2024 APPROVED JWALKER
Note: Inspector Notes from Inspection 2460 Inspector Notes from Inspection 2460 Inspector Notes from Inspection 2460 1. MISSING SOLE PLATE ANCHOR SW3 LEFT OF PIPE 2. MISSING SP1 BOTTOM OF STUD 3. CUT OVERFRAMING ABOVE GARAGE ENTRY 4. MISSING NAILS IN SHED ROOF FRAMING 5. MISSING ANCHORS PER 2/TDD CHECK AT FRAMING 7/1/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LMILLER 7/1/2024 10:45:21 AM *** No plans on site (checked the box and walked the hous). 107.3
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/02/2024 APPROVED - AS NOTED AWATERS
Note: Inspector Notes from Inspection 2460 Inspector Notes from Inspection 2460 1. MISSING SOLE PLATE ANCHOR SW3 LEFT OF PIPE 2. MISSING SP1 BOTTOM OF STUD 3. CUT OVERFRAMING ABOVE GARAGE ENTRY 4. MISSING NAILS IN SHED ROOF FRAMING 5. MISSING ANCHORS PER 2/TDD CHECK AT FRAMING 7/1/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LMILLER 7/1/2024 10:45:21 AM *** No plans on site (checked the box and walked the hous). 107.3
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/01/2024 Disapproved -FEE REQUIRED LMILLER
Note: *** NOTES ADDED BY LMILLER 7/1/2024 10:45:21 AM *** No plans on site (checked the box and walked the hous). 107.3
ROOF VALLEY & METAL 06/28/2024 APPROVED FWILLIS
GRAVITY SEWER TEST 06/27/2024 APPROVED - AS NOTED MGIBSON
Note: Inspector Notes from Inspection 2060 water service not ran yet, THIS WAS A VIRTUAL INSPECTION
SEWER TIE IN 06/27/2024 APPROVED - AS NOTED MGIBSON
Note: Inspector Notes from Inspection 2060 water service not ran yet. THIS WAS A VIRTUAL INSPECTION
ROOF SHEATHING 06/20/2024 APPROVED LMILLER
TIE BEAM / LINTEL 06/11/2024 APPROVED JWALKER
FOUND SURVEY APPROVED (OFFICE) 06/07/2024 APPROVED TBAKER
MONOLITHIC SLAB 05/24/2024 APPROVED FWILLIS
Note: 5/23/2024 - PREVIOUS INSPECTION NOTES 5-23-24 1. Exterior concealment wall is not built to detail A FD1.
MONOLITHIC SLAB 05/23/2024 Disapproved - NO FEE BTAYLOR
Note: 5-23-24 1. Exterior concealment wall is not built to detail A FD1.
PLUMBING 1ST ROUGH UNDERGROUND 05/15/2024 APPROVED - AS NOTED MGIBSON
Note: water service not ran yet
WATER METER INSTALLATION REQUEST 04/30/2024 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
BLD COMPLETE 10/04/2024 10/08/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 08/01/2024 08/01/2024
Note: Released By: ALPHANETTE WATERS - (386)986-2624 - AWATERS@PALMCOASTGOV.COM
BADMIN INFORMATION 07/29/2024 07/29/2024
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM engineers sealed submitted electronically must be digitally signed and sealed. The file names should include a brief description of what the engineer letter is for. (example Engineer letter - trusses engineer letter - lintel)
ENGIN1 COMPLETE 06/06/2024 06/07/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 06/06/2024 06/07/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
GAS COMPLETE 03/18/2024 03/20/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH COMPLETE 03/18/2024 03/20/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ELEC COMPLETE 03/18/2024 03/21/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
SW1 COMPLETE 03/18/2024 03/25/2024
Note: Released By: SINA VEDADI MOGHADAM - (386)986-2569 - SVEDADIMOGHADAM@PALMCOASTGOV.COM
ENGIN1 COMPLETE 03/18/2024 03/18/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 03/18/2024 03/18/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ZON COMPLETE 03/08/2024 03/08/2024
Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM
BADMIN COMPLETE 03/06/2024 03/12/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 03/06/2024 03/11/2024
Note: Released By: JPI
CUSVC COMPLETE 03/06/2024 03/08/2024
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC HOLD 03/06/2024 03/12/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. All outlets in laundry need to be GFCI protected. NEC 2020 210.8 2. DW outlet can not be located behind the DW. NEC 2020 422.16 3. Electrical riser diagram needs to include the surge protector and outside disconnect. NEC 2020 230.67, 230.85 4. bathrooms need to have correct outlets by sink. NEC 2020 210.52 (D)
ENGIN1 COMPLETE 03/06/2024 03/06/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS HOLD 03/06/2024 03/08/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide material type for all gas piping on riser diagram
LOCATE COMPLETE 03/06/2024 03/07/2024
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH HOLD 03/06/2024 03/08/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Design location on heatload needs to be Daytona Beach
SW1 HOLD 03/06/2024 03/14/2024
Note: Held By: SINA VEDADI MOGHADAM - (386)986-2569 - SVEDADIMOGHADAM@PALMCOASTGOV.COM 1- On the eastern side of the property, the flow arrow direction from points with existing elevations of 22.4 to 22.7 is incorrect. Please either revise the flow direction or depict the proposed elevations. 2- Please depict a few proposed elevations on the property boundaries.
ZON HOLD 03/06/2024 03/06/2024
Note: Held By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM 1. INCLUDE BANDING FRONT WINDOW
URB COMPLETE 03/06/2024 03/07/2024
Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤20.00 10/22/2024
REINSPECTION RESIDENTIAL ¤40.00 10/22/2024
REINSPECTION RESIDENTIAL ¤40.00 10/22/2024
REINSPECTION RESIDENTIAL ¤40.00 10/22/2024
REINSPECTION RESIDENTIAL ¤40.00 10/22/2024
CONNECTION FEES ¤25.00 04/01/2024
WATER-METER ¤514.49 04/01/2024
ADJUSTMENT 50% (¤1,084.59) 04/01/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 04/01/2024
INSPECTION - RESIDENTIAL ¤1,666.50 04/01/2024
PLAN REVIEW - RESIDENTIAL ¤472.68 04/01/2024
FC IMPACT FEE EMS ¤62.00 04/01/2024
IMPACT FEE FIRE ¤428.09 04/01/2024
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 04/01/2024
FC IMPACT FEE LIBRARY ¤268.00 04/01/2024
IMPACT FEE PARKS ¤1,800.99 04/01/2024
IMPACT FEE SCHOOL ¤5,450.00 04/01/2024
IMPACT FEE TRANSPORTATION ¤3,404.00 04/01/2024
SURCHARGE FS 533.721 ¤10.85 04/01/2024
SURCHARGE - FS 468.631 ¤16.27 04/01/2024
SW ENG - FOUNDATION SURVEY ¤20.00 04/01/2024
SW ENG INSPECTION 80 ¤80.00 04/01/2024
SW ENG PRE APRON ¤30.00 04/01/2024
SW ENG - REVIEW 20 ¤20.00 04/01/2024
SW ENG RES REVIEW 200 ¤200.00 04/01/2024
SEWER INSPECTION ¤25.00 04/01/2024
SITE PLAN 30 ¤30.00 04/01/2024
Fees Total Due: ¤0.00 Total Paid: ¤13,867.28