Permit #2024030220

Permit Details

Status: COED

Parcel Id: 07-11-31-7059-00530-0050
CONDITIONED SPACE: 1650 sqft
GARAGE: 396 sqft
OPENED PORCH (WITH ROOF) : 112 sqft
Total Square Footage: 2158 sqft
Block: 00530
Subdivision: -
Job Phone: 202-494-2019
Location Address: 84 SMITH TRL
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 05/06/2024
NOC: RECORDED
Applicant name: GARY ANDREW FISCHER
Owner: FELDMAN PAUL PA TRUSTEE C/O FELDMAN LAW

Address

2750 NE 184TH STREET

AVENTURA, FL 33180

Address

SUITE 203

AVENTURA, FL 33180

Lot: 0050
Contracted Stated Job Value: ¤150,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

INB HOMES
Status Location Address Mailing Address State License Number Phone
ACTIVE

3670 MAGUIRE BLVD

ORLANDO, FL 32803

SUITE 210

ORLANDO, FL 32803

CGC048746 (Exp: 08/31/2026) 407-476-8195

Sub Contractors

HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823
ROBERT MICHAEL RENNER
Status Location Address State License Number Phone
ACTIVE

531 CODISCO WAY

SANFORD, FL 32771

CAC051477 (Exp: 08/31/2026) 407-333-2665
JOSEPH C WRIGHT
Status Location Address Mailing Address State License Number Phone Fax
ACTIVE

15 HARGROVE LANE

PALM COAST, FL 32137

UNIT 3 D

PALM COAST, FL 32137

EC13003278 (Exp: 08/31/2026) 386-447-9644 386-447-9633
TERRY BRICE DICKERSON
Status Location Address State License Number Phone
ACTIVE

4300 ST JOHN'S PARKWAY

ALPHARETTA, GA 30009

CCC1326209 (Exp: 08/31/2026) 407-548-6733

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 12/10/2024 FINAL APPROVED BTAYLOR
Note: New inspection due to canceled inspection 11/27/2024 - PREVIOUS INSPECTION NOTES in person
BLD - BUILDING FINAL 12/05/2024 CANCELLED BY APPLICANT WEB
Note: 11/27/2024 - PREVIOUS INSPECTION NOTES in person
U -UTILITY RESIDENTIAL FINAL 12/05/2024 FINAL APPROVED BWRIGHT
Note: 11/27/2024 - PREVIOUS INSPECTION NOTES PEP Tank needs pump.
ROW - STORMWATER FINAL 11/27/2024 APPROVED FSLADISH
Note: 11/27/24 AT THE TIME OF THIS INSPECTIONS ALL COPC REQUIREMENTS WERE MET, NEITHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
U -UTILITY RESIDENTIAL FINAL 11/27/2024 Disapproved - NO FEE BWRIGHT
Note: PEP Tank needs pump.
BLD - BUILDING FINAL 11/27/2024 CANCELLED BY APPLICANT PKNAPIK
Note: in person
U-CROSS CONNECTION 11/27/2024 APPROVED - AS NOTED BWRIGHT
Note: No IRR. No CC
ROW - FINAL APRON (AFTER POUR) 11/27/2024 APPROVED FSLADISH
Note: 11/27/24 PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
ROW- FINAL SURVEY/GRADING CERTIFICATION 11/25/2024 APPROVED FSLADISH
Note: Inspector Notes from Inspection 9270 10/29/24 PIPE ELEVATION GOOD AT THE TIME OF THIS INSPECTION. READY TO POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING 10/25/2024 - PREVIOUS INSPECTION NOTES 10/25/24 UNFORTUNATELY YOU CULVERT PIPE IS OUT OF TOLERANCE (HIGH) ON THE UPSTREAM SIDE, NOT BY MUCH BUT IT IS OUT OF OF TOLERANCE TO THE SWALE PLAN DIAGRAM. Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place
ROW FIELD SURVEY /GRADING CERTIFICATION 11/25/2024 APPROVED FSLADISH
Note: 11/25/24 UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
GRAVITY SEWER TEST 11/07/2024 APPROVED - AS NOTED MGIBSON
Note: 9/12/2024 - PREVIOUS INSPECTION NOTES SEWER NOT RAN YET. THIS WAS A BVIRTUAL INSPECTION
SEWER TIE IN 11/07/2024 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
ROW- PRE-APRON (PRE-POUR) 10/29/2024 APPROVED - AS NOTED FSLADISH
Note: 10/29/24 PIPE ELEVATION GOOD AT THE TIME OF THIS INSPECTION. READY TO POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING 10/25/2024 - PREVIOUS INSPECTION NOTES 10/25/24 UNFORTUNATELY YOU CULVERT PIPE IS OUT OF TOLERANCE (HIGH) ON THE UPSTREAM SIDE, NOT BY MUCH BUT IT IS OUT OF OF TOLERANCE TO THE SWALE PLAN DIAGRAM. Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place
ROW- PRE-APRON (PRE-POUR) 10/25/2024 Disapproved - NO FEE FSLADISH
Note: 10/25/24 UNFORTUNATELY YOU CULVERT PIPE IS OUT OF TOLERANCE (HIGH) ON THE UPSTREAM SIDE, NOT BY MUCH BUT IT IS OUT OF OF TOLERANCE TO THE SWALE PLAN DIAGRAM. Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place
PEP TANK INSTALLATION REQUEST 10/18/2024 APPROVED CBOWERMASTER
Note: 10/4/2024 7:42:25 AM- PREVIOUS INSPECTION NOTES dumpster in the way
ELECTRIC - EARLY POWER 10/18/2024 APPROVED - AS NOTED BTAYLOR
Note: Inspector Notes from Inspection 2200 9-5-24 1. Emailed FPL at 2:22. 10-18-24 1. Emailed FPL at 1:57.
PEP TANK INSTALLATION REQUEST 10/03/2024 Disapproved -FEE REQUIRED CBOWERMASTER
Note: dumpster in the way
LATH/BRICK/ WATER BARRIER 09/23/2024 APPROVED KSANDOE
INSULATION 09/18/2024 APPROVED KSANDOE
Note: Dryer vent needs to be sealed at roof sheathing Inspector Notes from Inspection 2420 9-12-24 1. Need two forms of connection at the bathroom exhaust fans.
ALL ROUGH 09/13/2024 APPROVED - AS NOTED BTAYLOR
Note: 9-12-24 1. Need two forms of connection at the bathroom exhaust fans.
GRAVITY SEWER TEST 09/12/2024 Disapproved -FEE REQUIRED MGIBSON
Note: SEWER NOT RAN YET
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/10/2024 APPROVED BTAYLOR
Note: 9/6/2024 - PREVIOUS INSPECTION NOTES 9/4/2024 - PREVIOUS INSPECTION NOTES 8/30/2024 - PREVIOUS INSPECTION NOTES 8/27/2024 - PREVIOUS INSPECTION NOTES 8-27-24 1. Not ready. 8-30-24 1. No plans or mitek in box. 9-4-24 1. Missing engineering. Circled in book. 2. Front entry is not strapped. 3. Over framing is not strapped at ridge board. 4. Trusses sitting over door not strapped. 9-6-24 1. Trusses at front entry and door way have wrong straps. Circled in plans proper straps and locations.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/06/2024 Disapproved - NO FEE BTAYLOR
Note: 9/4/2024 - PREVIOUS INSPECTION NOTES 8/30/2024 - PREVIOUS INSPECTION NOTES 8/27/2024 - PREVIOUS INSPECTION NOTES 8-27-24 1. Not ready. 8-30-24 1. No plans or mitek in box. 9-4-24 1. Missing engineering. Circled in book. 2. Front entry is not strapped. 3. Over framing is not strapped at ridge board. 4. Trusses sitting over door not strapped. 9-6-24 1. Trusses at front entry and door way have wrong straps. Circled in plans proper straps and locations.
ELECTRIC-TUG 09/05/2024 APPROVED - AS NOTED BTAYLOR
Note: 9-5-24 1. Emailed FPL at 2:22.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/04/2024 Disapproved - NO FEE BTAYLOR
Note: 8/30/2024 - PREVIOUS INSPECTION NOTES 8/27/2024 - PREVIOUS INSPECTION NOTES 8-27-24 1. Not ready. 8-30-24 1. No plans or mitek in box. 9-4-24 1. Missing engineering. Circled in book. 2. Front entry is not strapped. 3. Over framing is not strapped at ridge board. 4. Trusses sitting over door not strapped.
ROOF VALLEY & METAL 09/03/2024 APPROVED FWILLIS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 08/30/2024 Disapproved - NO FEE BTAYLOR
Note: 8/27/2024 - PREVIOUS INSPECTION NOTES 8-27-24 1. Not ready. 8-30-24 1. No plans or mitek in box.
WALL SHEATHING 08/30/2024 APPROVED BTAYLOR
ROOF SHEATHING / BRACES/TIES/DOWN CELL 08/27/2024 Disapproved - NO FEE BTAYLOR
Note: 8-27-24 1. Not ready.
WALL SHEATHING 08/27/2024 CANCELLED BY APPLICANT WEB
TIE BEAM / LINTEL 08/16/2024 APPROVED BTAYLOR
MONOLITHIC SLAB 08/02/2024 APPROVED BTAYLOR
PLUMBING 1ST ROUGH UNDERGROUND 07/29/2024 APPROVED MGIBSON
FOUND SURVEY APPROVED (OFFICE) 07/02/2024 APPROVED TBAKER
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 07/02/2024 APPROVED JMUNSON
WATER METER INSTALLATION REQUEST 06/07/2024 APPROVED CBOWERMASTER
WILDLIFE CHECK - ENVIRONMENTAL 04/02/2024 APPROVED DRODRIGUEZ

Review History

Department Status Date In Date Out
MECH COMPLETE 12/04/2024 12/09/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 08/12/2024 08/12/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ENGIN1 COMPLETE 08/12/2024 08/12/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 08/12/2024 08/12/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BADMIN INFORMATION 07/17/2024 07/17/2024
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Documents/Files named incorrectly o Please rename your files in accordance with the naming convention outlined in our ‘document requirements’ located on the permit portal page http://docs.palmcoastgov.com/departments/building/online/document-requirements.pdf o It is important that all submittals follow the guidelines for efficient plan review and record retention accuracy. o You may add to your file name AFTER the above naming convention has been met. Examples Document type: Plans File name : Given sheet name A.1 / Plans Document type: Foundation Survey File name: Foundation Survey Document type: Manufactures Specifications File Name: Pool Alarm Document type: Manufactures Specifications File Name: Generator
ENGIN1 HOLD 07/17/2024 07/17/2024
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Formboard survey is unacceptable as foundation survey. Please submit foundation survey showing location, dimensions and elevation of finished concrete foundation/slab.
ZON COMPLETE 07/17/2024 07/17/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
SW1 COMPLETE 07/02/2024 07/12/2024
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD
ZON COMPLETE 07/02/2024 07/02/2024
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
ENGIN1 COMPLETE 07/02/2024 07/02/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD COMPLETE 07/01/2024 07/02/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
SWALE COMPLETE 03/27/2024 05/06/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 03/27/2024 03/27/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD COMPLETE 03/27/2024 03/30/2024
Note: Released By: JPI
PLENV COMPLETE 03/27/2024 04/02/2024
Note: Released By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM After action report was submitted and accepted by FWC meeting the requirements for 10.04.01 of the LDC. Staff suggests placing silt fence as soon as possible to prevent tortoise from moving into the lot. If any gopher tortoises are located in the future further coordination may be necessary.
ELEC COMPLETE 03/27/2024 04/02/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
PLENV HOLD 03/08/2024 03/08/2024
Note: Held By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM Staff conduced a site visit on 03/08/2024 and found potentially occupied Gopher Tortoise burrow. Please either provide a Gopher Tortoise survey by a QEP that shows the burrow is not within 25ft of construction activities or an approved After Action Report from FWC after relocation activities have been completed.
BADMIN COMPLETE 03/06/2024 03/12/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD HOLD 03/06/2024 03/08/2024
Note: Held By: JPI 1. Please provide current revision numbers for product approval numbers. 107.2.4
CUSVC COMPLETE 03/06/2024 03/08/2024
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC HOLD 03/06/2024 03/12/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM All outlets in kitchen need to be GFCI protected. NEC 2020 210.8
ENGIN1 COMPLETE 03/06/2024 03/06/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 03/06/2024 03/11/2024
LOCATE COMPLETE 03/06/2024 03/07/2024
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 03/06/2024 03/11/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 03/06/2024 03/06/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON HOLD 03/06/2024 03/07/2024
Note: Held By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM SUBMIT LANDSCAPE PLAN

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 12/10/2024
UTILITY PEP REINSPECTION ¤40.00 12/10/2024
SEWER INSPECTION ¤25.00 05/06/2024
SEWER CAPITAL FACILITY ¤5,441.03 05/06/2024
WATER CAPITAL FACILITY FEE ¤3,994.51 05/06/2024
SITE PLAN 30 ¤30.00 05/06/2024
WATER- TURN ON ¤25.00 05/06/2024
ADJUSTMENT 50% (¤555.09) 05/06/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 05/06/2024
INSPECTION - RESIDENTIAL ¤841.50 05/06/2024
PLAN REVIEW - RESIDENTIAL ¤238.68 05/06/2024
CONNECTION FEES ¤1,187.26 05/06/2024
FC IMPACT FEE EMS ¤62.00 05/06/2024
IMPACT FEE FIRE ¤428.09 05/06/2024
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 05/06/2024
FC IMPACT FEE LIBRARY ¤268.00 05/06/2024
IMPACT FEE PARKS ¤1,800.99 05/06/2024
IMPACT FEE SCHOOL ¤5,450.00 05/06/2024
IMPACT FEE TRANSPORTATION ¤1,862.00 05/06/2024
WATER -IRRIGATION INSPECTION ¤25.00 05/06/2024
SURCHARGE FS 533.721 ¤5.55 05/06/2024
SURCHARGE - FS 468.631 ¤8.33 05/06/2024
SW ENG - FOUNDATION SURVEY ¤20.00 05/06/2024
SW ENG INSPECTION 80 ¤80.00 05/06/2024
SW ENG PRE APRON ¤30.00 05/06/2024
SW ENG - REVIEW 20 ¤20.00 05/06/2024
SW ENG RES REVIEW 200 ¤200.00 05/06/2024
Fees Total Due: ¤0.00 Total Paid: ¤21,815.85