Permit #2024030542

Permit Details

Status: COED

Parcel Id: 29-10-31-5540-00000-1090
CONDITIONED SPACE: 3294 sqft
GARAGE: 880 sqft
OPENED PORCH (WITH ROOF) : 759 sqft
OPENED PORCH (WITH ROOF) : 71 sqft
Total Square Footage: 5004 sqft
Block: 00000
Subdivision: -
Job Phone: (386)445-9393
Location Address: 21 OLD OAK DR N
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 03/27/2024
NOC: RECORDED
Applicant name: ANTONIO JR AMARAL
Owner: ROYAL SABAL 2021 LLC

Address

13 UTILITY DRIVE

PALM COAST, FL 32137

Lot: 1090
Contracted Stated Job Value: ¤350,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

AMARAL HOMES & POOLS, LLC
Status Location Address State License Number Phone
ACTIVE

13 Utility Drive

PALM COAST, FL 32137

CBC058062 (Exp: 08/31/2026) (386)445-9393

Sub Contractors

MICHAEL FRANK MORELLO
Status Location Address State License Number Phone Fax
ACTIVE

2 HARGROVE GRADE

PALM COAST, FL 32164

CAC1819466 (Exp: 08/31/2026) 386-445-5023 386-446-4614
RICHARD H SIMMONS JR
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 1963

BUNNELL, FL 32110

ES12001217 (Exp: 08/31/2026) 386-437-0607 386-437-1847
GLEN WILLIAM KEHLE
Status Location Address State License Number Phone Fax
ACTIVE

P. O. Box 353511

BUNNELL, FL 32110

CFC057241 (Exp: 08/31/2026) (386) 447-4249 (386) 437-8488
ANTONIO AMARAL JR
Status Location Address State License Number
ACTIVE

1370 PALM HARBOR PKWY

PALM COAST, FL 32137

CCC058004 (Exp: 08/31/2026)

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 01/16/2025 FINAL APPROVED HCAMACHO
Note: 1/15/2025 - PREVIOUS INSPECTION NOTES
BLD - BUILDING FINAL 01/15/2025 CANCELLED BY APPLICANT HCAMACHO
ROW - FINAL APRON (AFTER POUR) 12/26/2024 APPROVED PFLANAGAN
ROW - STORMWATER FINAL 12/26/2024 APPROVED PFLANAGAN
U -UTILITY RESIDENTIAL FINAL 12/26/2024 Disapproved - NO FEE BWRIGHT
Note: Inspector Notes from Inspection 9035 *** NOTES ADDED BY LFITZGERALD 12/9/2024 4:03:47 PM *** well irrigation-no cross connection Home is not ready for an Utility Final.
U -UTILITY RESIDENTIAL FINAL 12/26/2024 FINAL APPROVED BWRIGHT
Note: 12/26/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9035 *** NOTES ADDED BY LFITZGERALD 12/9/2024 4:03:47 PM *** well irrigation-no cross connection
U-CROSS CONNECTION 12/09/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 12/9/2024 4:03:47 PM *** well irrigation-no cross connection
ROW- FINAL SURVEY/GRADING CERTIFICATION 11/22/2024 APPROVED EMADISON
Note:
ROW FIELD SURVEY /GRADING CERTIFICATION 11/22/2024 APPROVED EMADISON
ELECTRIC - EARLY POWER 09/05/2024 APPROVED - AS NOTED BTAYLOR
Note: 9-5-24 1. Emailed FPL at 10:05.
SEWER TIE IN 08/08/2024 APPROVED - AS NOTED MGIBSON
Note: Inspector Notes from Inspection 2075 GRAVITY SEWER RAN TO GET UNDER DRIVE WAY, SEWER TIE - IN WILL BE MADE AT A LATER DATE THIS WAS A VIRTUAL INSPECTION
ELECTRIC-TUG 07/30/2024 APPROVED RMARTIN
Note: 7/18/2024 - PREVIOUS INSPECTION NOTES 7/18/2024 - PREVIOUS INSPECTION NOTES The Electrical riser installed does not match the electrical rise shown on the plan page E1. Please submit a revision to the building department for the change. Plans call for 300 amp service. Contractor installed. 400 amp.
ROW- PRE-APRON (PRE-POUR) 07/30/2024 APPROVED - AS NOTED EMADISON
Note: ** 07/30/24 READY TO SET PAVERS __________________________________________________________________________________________________________________ 7/10/2024 - PREVIOUS INSPECTION NOTES ** 07/010/24 ** APRON READY TO POUR WITH PAVER RESTRAINT ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED ____________________________________________________________________________________________________________________ Inspector Notes from Inspection 9271 ** 07/09/24 READY TO POUR PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE ( ** BUILDER NEEDS TO UPDATE AND REVISE SITE PLAN TO SHOW A PAVER DRIVEWAY PRIOR TO SUBMITTING YOUR FINAL SURVEY
LATH/BRICK/ WATER BARRIER 07/22/2024 APPROVED LMILLER
ELECTRIC-TUG 07/18/2024 Disapproved - NO FEE JWALKER
Note: The Electrical riser installed does not match the electrical rise shown on the plan page E1. Please submit a revision to the building department for the change. Plans call for 300 amp service. Contractor installed. 400 amp.
ELECTRIC-TUG 07/18/2024 Disapproved - NO FEE JWALKER
Note: 7/18/2024 - PREVIOUS INSPECTION NOTES The Electrical riser installed does not match the electrical rise shown on the plan page E1. Please submit a revision to the building department for the change. Plans call for 200 amp service. Contractor installed. 400 amp.
INSULATION 07/12/2024 APPROVED JWALKER
Note: 7/11/2024 - PREVIOUS INSPECTION NOTES 7/11/24 1. Left side bath room the chase where the 2" pvc vent runs through needs to be fire blocked. 2. The top of the fire place chase bump out wall needs to be fire blocked. FRBC R-302 7/9/2024 - PREVIOUS INSPECTION NOTES All penetrations through the top plates need to be fire blocked.
INSULATION 07/11/2024 Disapproved - NO FEE JWALKER
Note: 7/11/24 1. Left side bath room the chase where the 2" pvc vent runs through needs to be fire blocked. 2. The top of the fire place chase bump out wall needs to be fire blocked. FRBC R-302 7/9/2024 - PREVIOUS INSPECTION NOTES All penetrations through the top plates need to be fire blocked.
ROW- PRE-APRON (PRE-POUR) 07/10/2024 PARTIALLY APPROVED EMADISON
Note: ** 07/010/24 ** APRON READY TO POUR WITH PAVER RESTRAINT ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED ____________________________________________________________________________________________________________________ Inspector Notes from Inspection 9271 ** 07/09/24 READY TO POUR PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE ( ** BUILDER NEEDS TO UPDATE AND REVISE SITE PLAN TO SHOW A PAVER DRIVEWAY PRIOR TO SUBMITTING YOUR FINAL SURVEY
ROW- PAVER RESTRAINTS 07/09/2024 APPROVED - AS NOTED EMADISON
Note: ** 07/09/24 READY TO POUR PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE ( ** BUILDER NEEDS TO UPDATE AND REVISE SITE PLAN TO SHOW A PAVER DRIVEWAY PRIOR TO SUBMITTING YOUR FINAL SURVEY
INSULATION 07/09/2024 Disapproved -FEE REQUIRED JWALKER
Note: All penetrations through the top plates need to be fire blocked.
ROW- PRE-APRON (PRE-POUR) 07/08/2024 CANCELLED BY APPLICANT EMADISON
Note: ** 07/08/24 CANCELED VIA PHONE CALL FROM NATALIE AT AMARAL
ALL ROUGH 07/03/2024 APPROVED BTAYLOR
Note: 6/20/2024 - PREVIOUS INSPECTION NOTES 6/6/2024 - PREVIOUS INSPECTION NOTES 6-20-24 1. Inspection was for window and doors. All window and doors are good except for the master shower windows. The windows in that shower have to tempered due to their location on the wall.
ALL ROUGH 06/20/2024 PARTIALLY APPROVED BTAYLOR
Note: 6/6/2024 - PREVIOUS INSPECTION NOTES 6-20-24 1. Inspection was for window and doors. All window and doors are good except for the master shower windows. The windows in that shower have to tempered due to their location on the wall.
GRAVITY SEWER TEST 06/20/2024 APPROVED - AS NOTED MGIBSON
Note: GRAVITY SEWER RAN TO GET UNDER DRIVE WAY, SEWER TIE - IN WILL BE MADE AT A LATER DATE
ALL ROUGH 06/06/2024 CANCELLED BY APPLICANT JWALKER
ROOF VALLEY & METAL 06/04/2024 APPROVED JWALKER
WALL SHEATHING 06/04/2024 APPROVED JWALKER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/20/2024 APPROVED JWALKER
TIE BEAM / LINTEL 05/08/2024 APPROVED BTAYLOR
FOUND SURVEY APPROVED (OFFICE) 05/07/2024 APPROVED TBAKER
MONOLITHIC SLAB 04/23/2024 APPROVED JWALKER
PLUMBING 1ST ROUGH UNDERGROUND 04/17/2024 APPROVED LMILLER
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 04/16/2024 APPROVED CPISCITELLI
WATER METER INSTALLATION REQUEST 04/08/2024 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
MECH COMPLETE 09/23/2024 09/25/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH HOLD 09/18/2024 09/20/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Energy Calcs need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2023 8Th edition
ENGIN1 COMPLETE 07/29/2024 07/30/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 07/29/2024 07/30/2024
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM
ZON COMPLETE 07/29/2024 07/30/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ELEC COMPLETE 07/22/2024 07/29/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 05/13/2024 05/17/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM KS
ZON COMPLETE 05/13/2024 05/13/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ENGIN1 COMPLETE 05/07/2024 05/07/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 05/07/2024 05/07/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 04/16/2024 04/16/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BADMIN INFORMATION 04/15/2024 04/15/2024
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM If these are geotech reports or certitifcations, please upload under correct document type and name the file correctly. Documents/Files named incorrectly o Please rename your files in accordance with the naming convention outlined in our ‘document requirements’ located on the permit portal page http://docs.palmcoastgov.com/departments/building/online/document-requirements.pdf o It is important that all submittals follow the guidelines for efficient plan review and record retention accuracy. o You may add to your file name AFTER the above naming convention has been met. Examples Document type: Plans File name : Given sheet name A.1 / Plans Document type: Foundation Survey File name: Foundation Survey Document type: Manufactures Specifications File Name: Pool Alarm Document type: Manufactures Specifications File Name: Generator Revisions and corrections should follow the same criteria and should use the same name as the original originally identified. (no – new, revised, second submittal, updated)
BLD COMPLETE 04/10/2024 04/15/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 03/22/2024 03/22/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
MECH COMPLETE 03/21/2024 03/22/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ZON HOLD 03/21/2024 03/21/2024
Note: Held By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM 1. Color material sheet missing.
ELEC COMPLETE 03/21/2024 03/22/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
SW1 COMPLETE 03/21/2024 03/27/2024
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM
BLD HOLD 03/21/2024 03/22/2024
Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet. 2. Provide product approval numbers on the roofing worksheet. FBC 105
ENGIN1 COMPLETE 03/21/2024 03/21/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 03/21/2024 03/21/2024
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
BADMIN COMPLETE 03/12/2024 03/13/2024
Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM
BLD HOLD 03/12/2024 03/19/2024
Note: Held By: JPI 1. Builder needs to sign and date the Energy Performance Form R405. 2. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet. 3. Provide product approval numbers on the roofing worksheet. FBC 105
CUSVC COMPLETE 03/12/2024 03/14/2024
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC HOLD 03/12/2024 03/18/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Submit electrical load calcs.
ENGIN1 COMPLETE 03/12/2024 03/13/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 03/12/2024 03/13/2024
LOCATE COMPLETE 03/12/2024 03/14/2024
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH HOLD 03/12/2024 03/14/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Energy Calcs need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2023 8Th edition
SW1 HOLD 03/12/2024 03/18/2024
Note: Held By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM 1) FFE of the main dwelling is out of tolerance. Min FFE shall be no less than 12" above the road centerline and Max FFE shall be no more than 22" above the road centerline. Please adjust the FFE accordingly. 2) Please provide the site benchmark on the site plan. If the benchmark is off-site, please provide a reference to the benchmark with location info and elevation. 3) Please adjust lot drainage as to not negatively impact adjoining lots. Please refer to the uploaded Site Plan Review Checklist document for further information/detail.
ZON HOLD 03/12/2024 03/14/2024
Note: Held By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM 1. Color material sheet missing material. Courtesy note on Site Plan -even though we are not reviewing the pool please be aware that the rear setback for the pool doesn't meet the requirement of 15'.
BADMIN INFORMATION 03/12/2024 03/12/2024
Note: Marked INFORMATION By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM SUBMIT GEOTECHNICAL FORM
URB COMPLETE 03/12/2024 03/15/2024
Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 01/16/2025
REINSPECTION RESIDENTIAL ¤40.00 01/16/2025
CONNECTION FEES ¤25.00 03/27/2024
FC IMPACT FEE EMS ¤62.00 03/27/2024
IMPACT FEE FIRE ¤428.09 03/27/2024
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 03/27/2024
FC IMPACT FEE LIBRARY ¤268.00 03/27/2024
IMPACT FEE PARKS ¤1,800.99 03/27/2024
IMPACT FEE SCHOOL ¤5,450.00 03/27/2024
IMPACT FEE TRANSPORTATION ¤3,404.00 03/27/2024
SURCHARGE FS 533.721 ¤11.73 03/27/2024
SURCHARGE - FS 468.631 ¤17.59 03/27/2024
SW ENG - FOUNDATION SURVEY ¤20.00 03/27/2024
SW ENG INSPECTION 80 ¤80.00 03/27/2024
SW ENG PRE APRON ¤30.00 03/27/2024
SW ENG - REVIEW 20 ¤20.00 03/27/2024
SW ENG RES REVIEW 200 ¤200.00 03/27/2024
SEWER INSPECTION ¤25.00 03/27/2024
SEWER CAPITAL FACILITY ¤5,441.03 03/27/2024
WATER CAPITAL FACILITY FEE ¤3,994.51 03/27/2024
SITE PLAN 30 ¤30.00 03/27/2024
WATER-METER ¤514.49 03/27/2024
ADJUSTMENT 50% (¤1,172.84) 03/27/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 03/27/2024
INSPECTION - RESIDENTIAL ¤1,804.00 03/27/2024
PLAN REVIEW - RESIDENTIAL ¤511.68 03/27/2024
Fees Total Due: ¤0.00 Total Paid: ¤23,285.77