Permit #2024030594

Permit Details

Status: CANCEL

Subdivision: -
Job Phone: 863-647-5815
Location Address: 123 MASTER PERMIT
Type: MASTRE - MASTER RESIDENTIAL
NOC: NO DOCUMENTATION
Applicant name: MARK ALLAN HULBERT
Owner: MASTER PERMIT ADDRESS RECORD
Contracted Stated Job Value: ¤315,000.00
Job Description: The Opportunity I Duplex
Type: CN

Contractor

HULBERT HOMES INC
Status Location Address State License Number Phone
INACTIVE

PO BOX 6254

LAKELAND, FL 33813

CRC1331304 (Exp: 08/31/2026) 863-647-5815

Sub Contractors

STEPHEN COURTEAUX
Status Location Address State License Number Phone Fax
ACTIVE

85 North Yonge Street

Ormond Beach, FL 32174

EC13001748 (Exp: 08/31/2026) (386) 672-4900 386-676-7472
ANTONIO VINCENZO DAHM
Status Location Address State License Number Phone
ACTIVE

10 RYBAR LANE

PALM COAST, FL 32164

CFC1429951 (Exp: 08/31/2026) 386-237-5692
DUSTIN L ESTEP
Status Location Address State License Number Phone Fax
ACTIVE

2041 N HIAWASSEE RD

APOPKA, FL 32703

CCC1330971 (Exp: 08/31/2026) 407-702-0206 352-988-6629
KYLE RODBOURN
Status Location Address State License Number Phone
ACTIVE

1325 W HWY 100

BUNNELL, FL 32110

CAC1821358 (Exp: 08/31/2026) 386-586-9039

Inspection History

Type Request Date Result Inspector
FOUND SURVEY APPROVED (OFFICE)
PLUMBING 1ST ROUGH UNDERGROUND
GRAVITY SEWER TEST
ELECTRIC - EARLY POWER
MONOLITHIC SLAB
LATH/BRICK/ WATER BARRIER
TIE BEAM / LINTEL
ALL ROUGH
WALL SHEATHING
ROOF SHEATHING / BRACES/TIES/DOWN CELL
ROOF VALLEY & METAL
INSULATION
BLD - BUILDING FINAL
WATER METER INSTALLATION REQUEST
PEP TANK INSTALLATION REQUEST
U-CROSS CONNECTION
ROW- PRE-APRON (PRE-POUR)
ROW - FINAL APRON (AFTER POUR)
U - SEWER TIE IN
ROW- FINAL SURVEY/GRADING CERTIFICATION
ROW FIELD SURVEY /GRADING CERTIFICATION
ROW - STORMWATER FINAL

Review History

Department Status Date In Date Out
BLD HOLD 03/13/2024 03/20/2024
Note: Held By: JIM WALKER - - JWALKER@PALMCOASTGOV.COM 1. Plan sheet 1. Load bearing wall, provide detail location on prints. The bearing wall detail needs to show connection of 2x6, 2x10 headers. number of jack and king studs required, hold down anchors, ect. The 3 - 1/2" Psl post, provide detaild of type of anchor to slab to be installed. and type of post to truss anchor to be used. AHJ 2. Plan sheet 1. The rear exit wall where it shows a 2 x 10 header the wall according to the truss packet engineering is a bearing wall. Please show this wall as a bearing wall on the floor plan. At the bearing walls please show location to find wall details. FBC 107.2.1 3. Plan sheet 1. The exterior walls at the rear exit door are 2x4 shear walls. Provide shear wall details. Include p.t. bottom plate fastening, stud to plate anchoring / nailing. Type of plywood and nailing patterns to be used. type of 2x studs to be used syp etc. FBC- 107.2.4 4. Plan sheet 1. The fire wall finish dimension shows a 4" finish on the floor plan. The detail of the fire wall to the right shows a 2x6" p.t. bottom plate with staggered 2x4.s at 12" o.c. The UL # U309 is not the correct detail for this type of fire wall construction. Please use the UL that matches the construction of the wall. Please list if the fire wall is bearing or non bearing. With the updated fire wall please provide bottom plate to slab connection. Double top plate to truss connection. FBCR - 302 5. Plan sheet 1. Add a wall legend on the floor plan showing the different types of wall. Shear, Cmu, Non Bearing, and bearing. As per AHJ 6. Plan sheet 2. Load bearing footing at the garage missing width, depth and rebar required. Provide depth and width of footing and rebar on sheet 2 or provide a cut showing page and detail number to locate the load bearing footing details. FBC 170.2.1 7. Plan sheet 2. Covered lanai the bearing wall area. Remove the note showing builder option as this footing neds to be a bearing wall footing. due to the wall above. Add detail in this location also as listed in note 6. 8. Truss engineering packet shows the truss bearing points all landing on double top plate 2x construction. Please update the bearing points to the type of wall the trusses are bearing on. Majority of the truss ends bear on a CMU wall. This will ensure truss plates are added at the factory in the correct locations. 9 The product approval page and the roofing worksheet. Update all approval numbers after the decimal point and the current revision year number.
ELEC HOLD 03/13/2024 03/18/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. 300s are not rated for the 400 amp service. NEC 2020 210.12
MECH HOLD 03/13/2024 03/14/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM This is a master file. Upload only energy calcs at worst case. Heatload and duct layout are site specific
MECH CANCEL
ELEC CANCEL
BLD CANCEL