Permit #2024030679
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7035-00950-0140 |
| Block: 00950 |
| Subdivision: 7035 - |
| Job Phone: 386-999-1042 |
| Location Address: 27 BUD FIELD DR |
| Type: PO - POOL |
| Issue Date: 03/25/2024 |
| NOC: RECORDED |
| Applicant name: RYDER N BRAY |
| Owner: LICARI BRITTANY |
|
Address 27 BUD FIELD DRIVE PALM COAST, FL 32137 |
| Lot: 0140 |
| Contracted Stated Job Value: ¤40,000.00 |
| Job Description: POOL WITH EXISTING FENCE |
| Type: CN |
Contractor
HAVEN POOLS LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
25 PUTTER LANE PALM COAST, FL 32164 |
CPC1460243 (Exp: 08/31/2026) | 386-999-1042 |
Sub Contractors
JOHN EDWARD GAMBONE
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
15 HARGROVE LN PALM COAST, FL 32137 |
1G PALM COAST, FL 32137 |
EC13006037 (Exp: 08/31/2026) | 386-586-9144 |
Inspection History
| Type | Request Date | Result | Inspector |
| POOL FINAL | 07/25/2024 | FINAL APPROVED | JSTEWART |
| Note: 7/18/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 7/18/2024 10:58:42 AM *** Right side Gate needs adjustment or replaced, does not latch (lock) without manually latching. Needs to latch in self closing operation. FBC R4501.17.1.8 Inspector Notes from Inspection 2610 4/17/24- No footer installed At time of Pool install, Note: If a future enclosure is applied for a engineering footer will need to be Addressed at that time. (Fence as Barrier). 4/9/2024 - PREVIOUS INSPECTION NOTES No ready no footing have been dug, | |||
| POOL FINAL | 07/18/2024 | Disapproved -FEE REQUIRED | JSTEWART |
| Note: *** NOTES ADDED BY JSTEWART 7/18/2024 10:58:42 AM *** Right side Gate needs adjustment or replaced, does not latch (lock) without manually latching. Needs to latch in self closing operation. FBC R4501.17.1.8 Inspector Notes from Inspection 2610 4/17/24- No footer installed At time of Pool install, Note: If a future enclosure is applied for a engineering footer will need to be Addressed at that time. (Fence as Barrier). 4/9/2024 - PREVIOUS INSPECTION NOTES No ready no footing have been dug, | |||
| U -UTILITY RESIDENTIAL FINAL | 07/17/2024 | FINAL APPROVED | BWRIGHT |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/16/2024 | APPROVED | TPOLACEK |
| Note: 07/16/24 TPOLACEK*** CORRECTIONS HAVE BEEN MADE WATER SHOULD FLOW INTO RESERVE DRIANAGE DITCH IN THE REAR. 5/30/2024 - PREVIOUS INSPECTION NOTES ** 05.30/24 BUILDER NEEDS TO OPEN DRAINAGE THAT WILL FLOW FROM THE PROPERTY OUT TO THE DRAINAGE EASEMENT AS WATER WILL COLLECT AND POND IN THE LEFT REAR CORNER | |||
| ROW - FINAL INSPECTION | 07/16/2024 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 05/30/2024 | APPROVED | EMADISON |
| Note: | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 05/30/2024 | Disapproved - NO FEE | EMADISON |
| Note: ** 05.30/24 BUILDER NEEDS TO OPEN DRAINAGE THAT WILL FLOW FROM THE PROPERTY OUT TO THE DRAINAGE EASEMENT AS WATER WILL COLLECT AND POND IN THE LEFT REAR CORNER | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 05/24/2024 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 05/25/24 BUILDERS PROPOSED DRAINAGE WAS TO THE REAR THERE ARE INSUFFICIENT ELEVATION SHOTS ALONG THE LEFT SHOWING THE DRAINAGE WILL FLOW TO THE FRONT YOUR SHOT OF 32.52 THEN GOES TO A 33.09 THE WATER WILL NOT FLOW AS SHOWN THERE ARE NO SHOTS ALONG PROPERTY LINE. ** IF BUILDER CHANGED HIS PROPOSED DRAINAGE BEFORE THE WORK WAS EXECUTED THE REVISED SITE PLAN NEEDS TO BE SUBMITTED PRIOR TO YOUR WORK ** BUILDER TAKE NOTE OF THE FOLLOWING ** CONTRACTOR NEWS FLASH** CONTRACTORS NEWSFLASH Grading and Final Surveys April 9, 2024 The Stormwater Division would like to remind contractors the importance of adhering to the approved site plan throughout the entire construction process unless revisions have been submitted and approved in accordance with COPC permitting procedures. Recently we have received several Final Surveys with significant and unapproved departures from the original site plan. We understand that sometimes site conditions and circumstances arise during construction which require alterations to the original plan. In such cases, the contractor is required to submit a revised site plan for review and approval PRIOR to the execution of work. Alterations to grading and drainage shall not be made without prior approval from the Stormwater Division. Updated requirements for grading and finished floor elevations in the February 2024 updated Technical Manual. https://www.palmcoast.gov/community-development Please contact the Stormwater Division at 386-986-4750 with any questions/concerns. ____________________________________________________________________________________________________________________ 5/10/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY TPOLACEK 5/10/2024 7:31:49 AM *** There are insufficiant shots along the property line. Site plan indicated all drainage would go to the rear reserve parcel. Final survey shows arrows moving water to the front. The elevation shots along left side indicate water will not flow uphill 32.26 to a 32.52 Please submit a new survey with proper elevation shots. CONTRACTORS NEWSFLASH Grading and Final Surveys April 9, 2024 The Stormwater Division would like to remind contractors the importance of adhering to the approved site plan throughout the entire construction process unless revisions have been submitted and approved in accordance with COPC permitting procedures. Recently we have received several Final Surveys with significant and unapproved departures from the original site plan. We understand that sometimes site conditions and circumstances arise during construction which require alterations to the original plan. In such cases, the contractor is required to submit a revised site plan for review and approval PRIOR to the execution of work. Alterations to grading and drainage shall not be made without prior approval from the Stormwater Division. Updated requirements for grading and finished floor elevations in the February 2024 updated Technical Manual. https://www.palmcoast.gov/community-development Please contact the Stormwater Division at 386-986-4750 with any questions/concerns. ________________________________________ For more information about Building Services, visit http://www.palmcoastgov.com/government/building. Links of Interest • Schedule an inspection or pay for permit fees at : http://www.palmcoastgov.com/eplanreview • Search permits by permit number or address at http://www.palmcoastgov.com/eplanreview • Search permits by date, type, contractor at http://www.palmcoastgov.com/search/permits • Provide feedback at http://www.palmcoastgov.com/government/building/permit-feedback | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 05/10/2024 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: *** NOTES ADDED BY TPOLACEK 5/10/2024 7:31:49 AM *** There are insufficiant shots along the property line. Site plan indicated all drainage would go to the rear reserve parcel. Final survey shows arrows moving water to the front. The elevation shots along left side indicate water will not flow uphill 32.26 to a 32.52 Please submit a new survey with proper elevation shots. CONTRACTORS NEWSFLASH Grading and Final Surveys April 9, 2024 The Stormwater Division would like to remind contractors the importance of adhering to the approved site plan throughout the entire construction process unless revisions have been submitted and approved in accordance with COPC permitting procedures. Recently we have received several Final Surveys with significant and unapproved departures from the original site plan. We understand that sometimes site conditions and circumstances arise during construction which require alterations to the original plan. In such cases, the contractor is required to submit a revised site plan for review and approval PRIOR to the execution of work. Alterations to grading and drainage shall not be made without prior approval from the Stormwater Division. Updated requirements for grading and finished floor elevations in the February 2024 updated Technical Manual. https://www.palmcoast.gov/community-development Please contact the Stormwater Division at 386-986-4750 with any questions/concerns. ________________________________________ For more information about Building Services, visit http://www.palmcoastgov.com/government/building. Links of Interest • Schedule an inspection or pay for permit fees at : http://www.palmcoastgov.com/eplanreview • Search permits by permit number or address at http://www.palmcoastgov.com/eplanreview • Search permits by date, type, contractor at http://www.palmcoastgov.com/search/permits • Provide feedback at http://www.palmcoastgov.com/government/building/permit-feedback | |||
| ELECTRIC AND ALARM | 04/30/2024 | APPROVED | JSTEWART |
| POOL DECK | 04/17/2024 | APPROVED - AS NOTED | JSTEWART |
| Note: 4/17/24- No footer installed At time of Pool install, Note: If a future enclosure is applied for a engineering footer will need to be Addressed at that time. (Fence as Barrier). 4/9/2024 - PREVIOUS INSPECTION NOTES No ready no footing have been dug, | |||
| POOL DECK | 04/09/2024 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: No ready no footing have been dug, | |||
| STEEL AND GROUND | 04/01/2024 | APPROVED | FWILLIS |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 04/15/2024 | 04/16/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/15/2024 | 04/16/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | HOLD | 04/10/2024 | 04/15/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Plan sheets need to be digitally signed sealed and verifiable per F.S. 471.025 | |||
| ZON | COMPLETE | 04/10/2024 | 04/10/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/20/2024 | 03/21/2024 |
| Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/20/2024 | 03/25/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | HOLD | 03/14/2024 | 03/19/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Provide detail or note on plans showing existing fence complies with R4501.17.1.8. Show door swing and latch height. | |||
| ELEC | COMPLETE | 03/14/2024 | 03/19/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 03/14/2024 | 03/19/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 03/14/2024 | 03/18/2024 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 03/14/2024 | 03/15/2024 |
| Note: Held By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM Site plan missing pool deck dimensions. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/18/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/17/2024 |
| PLAN REVIEW - REVISION | ¤32.50 | 07/17/2024 |
| SURCHARGE FS 533.721 | ¤2.00 | 03/25/2024 |
| SURCHARGE - FS 468.631 | ¤2.00 | 03/25/2024 |
| SW ENG INSPECTION 40 | ¤40.00 | 03/25/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 03/25/2024 |
| SITE PLAN 30 | ¤30.00 | 03/25/2024 |
| ADJUSTMENT 50% | (¤127.50) | 03/25/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 03/25/2024 |
| INSPECTION- POOL | ¤160.00 | 03/25/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤65.00 | 03/25/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤334.00 |