I want to search for...

Permit #2024030679

Permit Details

Status: FINAL

Parcel Id: 07-11-31-7035-00950-0140
Block: 00950
Subdivision: 7035 -
Job Phone: 386-999-1042
Location Address: 27 BUD FIELD DR
Type: PO - POOL
Issue Date: 03/25/2024
NOC: RECORDED
Applicant name: RYDER N BRAY
Owner: LICARI BRITTANY

Address

27 BUD FIELD DRIVE

PALM COAST, FL 32137

Lot: 0140
Contracted Stated Job Value: ¤40,000.00
Job Description: POOL WITH EXISTING FENCE
Type: CN

Contractor

HAVEN POOLS LLC
Status Location Address State License Number Phone
ACTIVE

25 PUTTER LANE

PALM COAST, FL 32164

CPC1460243 (Exp: 08/31/2026) 386-999-1042

Sub Contractors

JOHN EDWARD GAMBONE
Status Location Address Mailing Address State License Number Phone
ACTIVE

15 HARGROVE LN

PALM COAST, FL 32137

1G

PALM COAST, FL 32137

EC13006037 (Exp: 08/31/2026) 386-586-9144

Inspection History

Type Request Date Result Inspector
POOL FINAL 07/25/2024 FINAL APPROVED JSTEWART
Note: 7/18/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 7/18/2024 10:58:42 AM *** Right side Gate needs adjustment or replaced, does not latch (lock) without manually latching. Needs to latch in self closing operation. FBC R4501.17.1.8 Inspector Notes from Inspection 2610 4/17/24- No footer installed At time of Pool install, Note: If a future enclosure is applied for a engineering footer will need to be Addressed at that time. (Fence as Barrier). 4/9/2024 - PREVIOUS INSPECTION NOTES No ready no footing have been dug,
POOL FINAL 07/18/2024 Disapproved -FEE REQUIRED JSTEWART
Note: *** NOTES ADDED BY JSTEWART 7/18/2024 10:58:42 AM *** Right side Gate needs adjustment or replaced, does not latch (lock) without manually latching. Needs to latch in self closing operation. FBC R4501.17.1.8 Inspector Notes from Inspection 2610 4/17/24- No footer installed At time of Pool install, Note: If a future enclosure is applied for a engineering footer will need to be Addressed at that time. (Fence as Barrier). 4/9/2024 - PREVIOUS INSPECTION NOTES No ready no footing have been dug,
U -UTILITY RESIDENTIAL FINAL 07/17/2024 FINAL APPROVED BWRIGHT
ROW FIELD SURVEY /GRADING CERTIFICATION 07/16/2024 APPROVED TPOLACEK
Note: 07/16/24 TPOLACEK*** CORRECTIONS HAVE BEEN MADE WATER SHOULD FLOW INTO RESERVE DRIANAGE DITCH IN THE REAR. 5/30/2024 - PREVIOUS INSPECTION NOTES ** 05.30/24 BUILDER NEEDS TO OPEN DRAINAGE THAT WILL FLOW FROM THE PROPERTY OUT TO THE DRAINAGE EASEMENT AS WATER WILL COLLECT AND POND IN THE LEFT REAR CORNER
ROW - FINAL INSPECTION 07/16/2024 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW- FINAL SURVEY/GRADING CERTIFICATION 05/30/2024 APPROVED EMADISON
Note:
ROW FIELD SURVEY /GRADING CERTIFICATION 05/30/2024 Disapproved - NO FEE EMADISON
Note: ** 05.30/24 BUILDER NEEDS TO OPEN DRAINAGE THAT WILL FLOW FROM THE PROPERTY OUT TO THE DRAINAGE EASEMENT AS WATER WILL COLLECT AND POND IN THE LEFT REAR CORNER
ROW- FINAL SURVEY/GRADING CERTIFICATION 05/24/2024 Disapproved -FEE REQUIRED EMADISON
Note: ** 05/25/24 BUILDERS PROPOSED DRAINAGE WAS TO THE REAR THERE ARE INSUFFICIENT ELEVATION SHOTS ALONG THE LEFT SHOWING THE DRAINAGE WILL FLOW TO THE FRONT YOUR SHOT OF 32.52 THEN GOES TO A 33.09 THE WATER WILL NOT FLOW AS SHOWN THERE ARE NO SHOTS ALONG PROPERTY LINE. ** IF BUILDER CHANGED HIS PROPOSED DRAINAGE BEFORE THE WORK WAS EXECUTED THE REVISED SITE PLAN NEEDS TO BE SUBMITTED PRIOR TO YOUR WORK ** BUILDER TAKE NOTE OF THE FOLLOWING ** CONTRACTOR NEWS FLASH** CONTRACTORS NEWSFLASH Grading and Final Surveys April 9, 2024 The Stormwater Division would like to remind contractors the importance of adhering to the approved site plan throughout the entire construction process unless revisions have been submitted and approved in accordance with COPC permitting procedures. Recently we have received several Final Surveys with significant and unapproved departures from the original site plan. We understand that sometimes site conditions and circumstances arise during construction which require alterations to the original plan. In such cases, the contractor is required to submit a revised site plan for review and approval PRIOR to the execution of work. Alterations to grading and drainage shall not be made without prior approval from the Stormwater Division. Updated requirements for grading and finished floor elevations in the February 2024 updated Technical Manual. https://www.palmcoast.gov/community-development Please contact the Stormwater Division at 386-986-4750 with any questions/concerns. ____________________________________________________________________________________________________________________ 5/10/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY TPOLACEK 5/10/2024 7:31:49 AM *** There are insufficiant shots along the property line. Site plan indicated all drainage would go to the rear reserve parcel. Final survey shows arrows moving water to the front. The elevation shots along left side indicate water will not flow uphill 32.26 to a 32.52 Please submit a new survey with proper elevation shots. CONTRACTORS NEWSFLASH Grading and Final Surveys April 9, 2024 The Stormwater Division would like to remind contractors the importance of adhering to the approved site plan throughout the entire construction process unless revisions have been submitted and approved in accordance with COPC permitting procedures. Recently we have received several Final Surveys with significant and unapproved departures from the original site plan. We understand that sometimes site conditions and circumstances arise during construction which require alterations to the original plan. In such cases, the contractor is required to submit a revised site plan for review and approval PRIOR to the execution of work. Alterations to grading and drainage shall not be made without prior approval from the Stormwater Division. Updated requirements for grading and finished floor elevations in the February 2024 updated Technical Manual. https://www.palmcoast.gov/community-development Please contact the Stormwater Division at 386-986-4750 with any questions/concerns. ________________________________________ For more information about Building Services, visit http://www.palmcoastgov.com/government/building. Links of Interest • Schedule an inspection or pay for permit fees at : http://www.palmcoastgov.com/eplanreview • Search permits by permit number or address at http://www.palmcoastgov.com/eplanreview • Search permits by date, type, contractor at http://www.palmcoastgov.com/search/permits • Provide feedback at http://www.palmcoastgov.com/government/building/permit-feedback
ROW- FINAL SURVEY/GRADING CERTIFICATION 05/10/2024 Disapproved -FEE REQUIRED TPOLACEK
Note: *** NOTES ADDED BY TPOLACEK 5/10/2024 7:31:49 AM *** There are insufficiant shots along the property line. Site plan indicated all drainage would go to the rear reserve parcel. Final survey shows arrows moving water to the front. The elevation shots along left side indicate water will not flow uphill 32.26 to a 32.52 Please submit a new survey with proper elevation shots. CONTRACTORS NEWSFLASH Grading and Final Surveys April 9, 2024 The Stormwater Division would like to remind contractors the importance of adhering to the approved site plan throughout the entire construction process unless revisions have been submitted and approved in accordance with COPC permitting procedures. Recently we have received several Final Surveys with significant and unapproved departures from the original site plan. We understand that sometimes site conditions and circumstances arise during construction which require alterations to the original plan. In such cases, the contractor is required to submit a revised site plan for review and approval PRIOR to the execution of work. Alterations to grading and drainage shall not be made without prior approval from the Stormwater Division. Updated requirements for grading and finished floor elevations in the February 2024 updated Technical Manual. https://www.palmcoast.gov/community-development Please contact the Stormwater Division at 386-986-4750 with any questions/concerns. ________________________________________ For more information about Building Services, visit http://www.palmcoastgov.com/government/building. Links of Interest • Schedule an inspection or pay for permit fees at : http://www.palmcoastgov.com/eplanreview • Search permits by permit number or address at http://www.palmcoastgov.com/eplanreview • Search permits by date, type, contractor at http://www.palmcoastgov.com/search/permits • Provide feedback at http://www.palmcoastgov.com/government/building/permit-feedback
ELECTRIC AND ALARM 04/30/2024 APPROVED JSTEWART
POOL DECK 04/17/2024 APPROVED - AS NOTED JSTEWART
Note: 4/17/24- No footer installed At time of Pool install, Note: If a future enclosure is applied for a engineering footer will need to be Addressed at that time. (Fence as Barrier). 4/9/2024 - PREVIOUS INSPECTION NOTES No ready no footing have been dug,
POOL DECK 04/09/2024 Disapproved -FEE REQUIRED MKRASKI
Note: No ready no footing have been dug,
STEEL AND GROUND 04/01/2024 APPROVED FWILLIS

Review History

Department Status Date In Date Out
BLD COMPLETE 04/15/2024 04/16/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ZON COMPLETE 04/15/2024 04/16/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD HOLD 04/10/2024 04/15/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Plan sheets need to be digitally signed sealed and verifiable per F.S. 471.025
ZON COMPLETE 04/10/2024 04/10/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ZON COMPLETE 03/20/2024 03/21/2024
Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM
BLD COMPLETE 03/20/2024 03/25/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD HOLD 03/14/2024 03/19/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Provide detail or note on plans showing existing fence complies with R4501.17.1.8. Show door swing and latch height.
ELEC COMPLETE 03/14/2024 03/19/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
MECH COMPLETE 03/14/2024 03/19/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 03/14/2024 03/18/2024
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON HOLD 03/14/2024 03/15/2024
Note: Held By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM Site plan missing pool deck dimensions.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 07/18/2024
REINSPECTION RESIDENTIAL ¤40.00 07/17/2024
PLAN REVIEW - REVISION ¤32.50 07/17/2024
SURCHARGE FS 533.721 ¤2.00 03/25/2024
SURCHARGE - FS 468.631 ¤2.00 03/25/2024
SW ENG INSPECTION 40 ¤40.00 03/25/2024
SW ENG - REVIEW 20 ¤20.00 03/25/2024
SITE PLAN 30 ¤30.00 03/25/2024
ADJUSTMENT 50% (¤127.50) 03/25/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 03/25/2024
INSPECTION- POOL ¤160.00 03/25/2024
PLAN REVIEW - RESIDENTIAL ¤65.00 03/25/2024
Fees Total Due: ¤0.00 Total Paid: ¤334.00