Permit #2024030695
Permit Details
Status: COED
| Parcel Id: 07-11-31-7023-00350-0440 |
| CONDITIONED SPACE: 1800 sqft |
| GARAGE: 434 sqft |
| OPENED PORCH (WITH ROOF) : 132 sqft |
| OPENED PORCH (WITH ROOF) : 108 sqft |
| Total Square Footage: 2474 sqft |
| Block: 00350 |
| Subdivision: - |
| Job Phone: 832-726-2202 |
| Location Address: 3 WHITE HAWK PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 04/01/2024 |
| NOC: RECORDED |
| Applicant name: JONATHON AMBAR |
| Owner: CASPIAN INVESTMENTS 1 LLC |
|
Address 1802 N ALAFAYA TRAIL ORLANDO, FL 32826 |
|
Address 164 ORLANDO, FL 32826 |
| Lot: 0440 |
| Contracted Stated Job Value: ¤131,500.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
CASPIAN HOMES, LLC
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
1802 N ALAFAYA TRAIL ORLANDO, FL 32826 |
SUITE 162 ORLANDO, FL 32826 |
CBC1264918 (Exp: 08/31/2026) | 832-726-2202 |
Sub Contractors
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
DAVID SCOTT MORRIS
| Status | Location Address | State License Number | Phone |
| INACTIVE |
63 LEIDEL DR PALM COAST, FL 32137 |
ER13015750 (Exp: 08/31/2026) | 386-569-7262 |
ROBERT MICHAEL RENNER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
531 CODISCO WAY SANFORD, FL 32771 |
CAC051477 (Exp: 08/31/2026) | 407-333-2665 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 12/31/2024 | FINAL APPROVED | MKRASKI |
| BLD - BUILDING FINAL | 12/26/2024 | Disapproved - NO FEE | MKRASKI |
| Note: 12/26/24 1. Item 3 still not repaired a 45a breaker is installed on AHU FBCR M1303.1 12/23/2024 - PREVIOUS INSPECTION NOTES 12/23/24 1. Whole home surge required to be @ meter main NEC 230.67(B) 2. Seal all exterior penitrations (pep tank) FBC R402.4.1.1 3. AHU breaker undersized per heater sticker, sticker calls for 50a @240v a 45a breaker is installed on AHU for disconnect FBCR M1303.1 12/19/2024 - PREVIOUS INSPECTION NOTES 1. Whole home surge required to be @ meter main NEC 230.67(B) 2. ODU requires 4 hold downs FBC M1401.1 3. Seal all exterior penitrations (pep tank) FBC R402.4.1.1 4. Gutter down spouts must be a min of 12'' off home FBCR 318.5 5. Fridge outlet not working 6. AHU breaker undersized per heater sticker 7. Anchor for garage door opener buck is missing 1 of 2 per plans 8. Seal arond J boxes in garage feeding outside garage lights (exposed romex) 9. ODU required to be a min of 3'' off grade FBCR M1305.1.4.1 10. Front bedroom smoke not interconnected with other smokes FBCR 314 & 315 | |||
| BLD - BUILDING FINAL | 12/23/2024 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 12/23/24 1. Whole home surge required to be @ meter main NEC 230.67(B) 2. Seal all exterior penitrations (pep tank) FBC R402.4.1.1 3. AHU breaker undersized per heater sticker, sticker calls for 50a @240v a 45a breaker is installed on AHU for disconnect FBCR M1303.1 12/19/2024 - PREVIOUS INSPECTION NOTES 1. Whole home surge required to be @ meter main NEC 230.67(B) 2. ODU requires 4 hold downs FBC M1401.1 3. Seal all exterior penitrations (pep tank) FBC R402.4.1.1 4. Gutter down spouts must be a min of 12'' off home FBCR 318.5 5. Fridge outlet not working 6. AHU breaker undersized per heater sticker 7. Anchor for garage door opener buck is missing 1 of 2 per plans 8. Seal arond J boxes in garage feeding outside garage lights (exposed romex) 9. ODU required to be a min of 3'' off grade FBCR M1305.1.4.1 10. Front bedroom smoke not interconnected with other smokes FBCR 314 & 315 | |||
| BLD - BUILDING FINAL | 12/19/2024 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 1. Whole home surge required to be @ meter main NEC 230.67(B) 2. ODU requires 4 hold downs FBC M1401.1 3. Seal all exterior penitrations (RG6 and pep tank) FBC R402.4.1.1 4. Gutter down spouts must be a min of 12'' off home FBCR 318.5 5. Fridge outlet not working 6. AHU breaker undersized per heater sticker 7. Anchor for garage door opener buck is missing 1 of 2 per plans 8. Seal arond J boxes in garage feeding outside garage lights (exposed romex) 9. ODU required to be a min of 3'' off grade FBCR M1305.1.4.1 10. Front bedroom smoke not interconnected with other smokes FBCR 314 & 315 | |||
| ROW - FINAL APRON (AFTER POUR) | 12/17/2024 | APPROVED | TPOLACEK |
| Note: PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. 10/03/24 TPOLACEK***NOTE*** SPOKE WITH FRED DRIVEWAY APRON SLOPE EXCEEDED 8% HE WILL HAVE CONTRATOR MAKE SURE IT IS BELOW 8% BEFORE THEY POUR | |||
| ROW - STORMWATER FINAL | 12/17/2024 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| U -UTILITY RESIDENTIAL FINAL | 12/17/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 12/17/2024 11:52:11 AM *** re-align(turn sideways) the check valve in water metrr pit so can access pet cock screws/lower sewer clean out at tap so flush with sod Inspector Notes from Inspection 9035 *** NOTES ADDED BY LFITZGERALD 10/23/2024 12:13:26 PM *** no irrigation-no cross connection | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 12/12/2024 | APPROVED | TPOLACEK |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 12/12/2024 | APPROVED | TPOLACEK |
| Note: UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ELECTRIC - EARLY POWER | 11/21/2024 | APPROVED - AS NOTED | MKRASKI |
| Note: Emailed FPL @ 1:30am | |||
| ELECTRIC - EARLY POWER | 11/20/2024 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: Door locked need access for inspection FBC[A] 110.5 | |||
| SEWER TIE IN | 10/23/2024 | APPROVED | MGIBSON |
| Note: New inspection due to canceled inspection 5/9/2024 - PREVIOUS INSPECTION NOTES pep tqnk area | |||
| GRAVITY SEWER TEST | 10/23/2024 | APPROVED | MGIBSON |
| Note: New inspection due to canceled inspection 5/9/2024 - PREVIOUS INSPECTION NOTES sewer not ran | |||
| U-CROSS CONNECTION | 10/23/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 10/23/2024 12:13:26 PM *** no irrigation-no cross connection | |||
| ROW- PRE-APRON (PRE-POUR) | 10/03/2024 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR 10/1/2024 - PREVIOUS INSPECTION NOTES 10/01/24 TPOLACEK** RECEIVED TEXT FROM FRED ASKING TO CANCEL INSPECTION FOR TODAY. | |||
| ROW- PRE-APRON (PRE-POUR) | 10/01/2024 | CANCELLED BY APPLICANT | TPOLACEK |
| Note: 10/01/24 TPOLACEK** RECEIVED TEXT FROM FRED ASKING TO CANCEL INSPECTION FOR TODAY. | |||
| GRAVITY SEWER TEST | 08/30/2024 | CANCELLED BY APPLICANT | WEB |
| Note: 5/9/2024 - PREVIOUS INSPECTION NOTES sewer not ran | |||
| SEWER TIE IN | 08/30/2024 | CANCELLED BY APPLICANT | WEB |
| Note: 5/9/2024 - PREVIOUS INSPECTION NOTES pep tqnk area | |||
| ELECTRIC-TUG | 08/29/2024 | APPROVED | AGAETANO |
| Note: 7/18/2024 - PREVIOUS INSPECTION NOTES 7-18-24 1. Protection pipe for SER is not glued. | |||
| PEP TANK INSTALLATION REQUEST | 07/26/2024 | APPROVED | CBOWERMASTER |
| INSULATION | 07/18/2024 | APPROVED | BTAYLOR |
| Note: Inspector Notes from Inspection 2420 7/12/24: Approved as noted to keep project moving. ALL MUST BE COMPLETE PRIOR TO NEXT INSPECTION. Check at next inspection. 1). Bedroom 3 window is missing an anchor left side bottom. | |||
| ELECTRIC-TUG | 07/18/2024 | Disapproved - NO FEE | BTAYLOR |
| Note: 7-18-24 1. Protection pipe for SER is not glued. | |||
| ALL ROUGH | 07/12/2024 | APPROVED - AS NOTED | RSIMS |
| Note: 7/12/24: Approved as noted to keep project moving. ALL MUST BE COMPLETE PRIOR TO NEXT INSPECTION. Check at next inspection. 1). Bedroom 3 window is missing an anchor left side bottom. | |||
| LATH/BRICK/ WATER BARRIER | 07/10/2024 | APPROVED | FWILLIS |
| Note: Inspector Notes from Inspection 2467 Inspector Notes from Inspection 2460 1. Leger detail on A-5 requires (2) 2x8 legger boards (bedroom) Check on next inspection 06-24-2024 Above issue has not been resolved. Ledger detail on A-5 requires (2) 2x8 ledger boards and 1/2" CDX plywood. Installper plans or submit a revision to the building department and have on site. Check at next inspection. 1/2" CDX not installed. | |||
| ROOF VALLEY & METAL | 06/24/2024 | APPROVED - AS NOTED | AGAETANO |
| Note: Inspector Notes from Inspection 2460 1. Leger detail on A-5 requires (2) 2x8 legger boards (bedroom) Check on next inspection 06-24-2024 Above issue has not been resolved. Ledger detail on A-5 requires (2) 2x8 ledger boards and 1/2" CDX plywood. Installper plans or submit a revision to the building department and have on site. Check at next inspection. 1/2" CDX not installed. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/20/2024 | APPROVED - AS NOTED | MKRASKI |
| Note: 1. Leger detail on A-5 requires (2) 2x8 legger boards (bedroom) Check on next inspection | |||
| WALL SHEATHING | 06/13/2024 | APPROVED | MKRASKI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/13/2024 | Disapproved - NO FEE | MKRASKI |
| Note: 1. Leger detail on A-5 requires (2) 2x8 legger boards (bedroom) 2. Leger board missing anchors per detail on A-5 (bedroom) 3. Lead bearing openings require CS-16 42'' long Roof sheathing good to dry in | |||
| TIE BEAM / LINTEL | 05/31/2024 | APPROVED | MKRASKI |
| FOUND SURVEY APPROVED (OFFICE) | 05/31/2024 | APPROVED | AMOBLEY |
| TIE BEAM / LINTEL | 05/29/2024 | Disapproved - NO FEE | MKRASKI |
| Note: Window sill bed joints exceed 3/8''Per FBC 606.3. Check all marked on print | |||
| MONOLITHIC SLAB | 05/16/2024 | APPROVED | MKRASKI |
| PLUMBING 1ST ROUGH UNDERGROUND | 05/09/2024 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 05/09/2024 | Disapproved - NO FEE | MGIBSON |
| Note: sewer not ran | |||
| SEWER TIE IN | 05/09/2024 | Disapproved - NO FEE | MGIBSON |
| Note: pep tqnk area | |||
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 05/08/2024 | APPROVED | JMUNSON |
| WATER METER INSTALLATION REQUEST | 04/30/2024 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 05/30/2024 | 05/31/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/30/2024 | 05/31/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/07/2024 | 05/08/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | HOLD | 05/02/2024 | 05/06/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Letter must be accompanied by a signed and sealed inspection and certification letter by the geotechnical engineer of record. Engineer’s letter to confirm the following: Site clearing / over excavation was completed and inspected by engineer prior to the placement of fill and engineer confirms clearing and over excavation work is acceptable. Engineer to confirm fill materials were suitable and within specifications. Engineer to confirm the required number and location of field density tests were completed. Engineer to include certification statement in accordance with Florida Administrative Code 61G15-18.011 (4) Field dentisty Test Must be digiutally signed and sealed. | |||
| SW1 | COMPLETE | 04/24/2024 | 04/24/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/24/2024 | 04/24/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/24/2024 | 04/24/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/09/2024 | 04/14/2024 |
| Note: Released By: JIM WALKER - (386)529-4112 - JWALKER@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 04/09/2024 | 04/15/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/28/2024 | 03/28/2024 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| ZON | HOLD | 03/25/2024 | 03/25/2024 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM No landscape submitted to address the comment Held By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM Repeat comment. Landscape plan missing trees. One tree for every 2500 square feet. | |||
| BLD | COMPLETE | 03/25/2024 | 03/27/2024 |
| Note: Released By: JPI | |||
| ELEC | COMPLETE | 03/25/2024 | 03/26/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | HOLD | 03/18/2024 | 03/18/2024 |
| Note: Held By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM Repeat comment. Landscape plan missing trees. One tree for every 2500 square feet. | |||
| SWALE | COMPLETE | 03/18/2024 | 05/22/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 03/15/2024 | 03/21/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | HOLD | 03/15/2024 | 03/19/2024 |
| Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet. | |||
| CUSVC | COMPLETE | 03/15/2024 | 03/18/2024 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ELEC | HOLD | 03/15/2024 | 03/21/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Electrical riser diagram needs to include the surge protector. NEC 2020 230.67 | |||
| ENGIN1 | COMPLETE | 03/15/2024 | 03/18/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 03/15/2024 | 03/20/2024 |
| LOCATE | COMPLETE | 03/15/2024 | 03/19/2024 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 03/15/2024 | 03/20/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 03/15/2024 | 03/18/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | HOLD | 03/15/2024 | 03/15/2024 |
| Note: Held By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM Landscape plan missing trees. One tree for every 2500 square feet |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 09/05/2025 |
| CONNECTION FEES | ¤1,187.26 | 04/01/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 04/01/2024 |
| IMPACT FEE FIRE | ¤428.09 | 04/01/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 04/01/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 04/01/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 04/01/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 04/01/2024 |
| IMPACT FEE TRANSPORTATION | ¤1,862.00 | 04/01/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 04/01/2024 |
| SURCHARGE FS 533.721 | ¤6.19 | 04/01/2024 |
| SURCHARGE - FS 468.631 | ¤9.28 | 04/01/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 04/01/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 04/01/2024 |
| SW ENG PRE APRON | ¤30.00 | 04/01/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 04/01/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 04/01/2024 |
| SEWER CREDIT | (¤1,466.00) | 04/01/2024 |
| SEWER INSPECTION | ¤25.00 | 04/01/2024 |
| SEWER CAPITAL FACILITY | ¤5,441.03 | 04/01/2024 |
| WATER CAPITAL FACILITY FEE | ¤3,994.51 | 04/01/2024 |
| SITE PLAN 30 | ¤30.00 | 04/01/2024 |
| WATER- TURN ON | ¤25.00 | 04/01/2024 |
| ADJUSTMENT 50% | (¤618.63) | 04/01/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 04/01/2024 |
| INSPECTION - RESIDENTIAL | ¤940.50 | 04/01/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤266.76 | 04/01/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤20,374.98 |