I want to search for...
Permit #2024030730
Permit Details
Status: COED
| Parcel Id: 07-11-31-7035-00930-0230 |
| CONDITIONED SPACE: 1555 sqft |
| OPENED PORCH (WITH ROOF) : 100 sqft |
| OPENED PORCH (WITH ROOF) : 112 sqft |
| GARAGE: 434 sqft |
| Total Square Footage: 2201 sqft |
| Block: 00930 |
| Subdivision: - |
| Job Phone: 832-726-2202 |
| Location Address: 20 BUFFALO BILL DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 04/15/2024 |
| NOC: RECORDED |
| Applicant name: JONATHON AMBAR |
| Owner: ZZMZ CASPIAN LLC |
|
Address 1802 N ALAFAYA TRAIL 162 ORLANDO, FL 32826 |
| Lot: 0230 |
| Contracted Stated Job Value: ¤131,500.00 |
| Job Description: Single Family Home |
| Type: CN |
Contractor
CASPIAN HOMES, LLC
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
1802 N ALAFAYA TRAIL ORLANDO, FL 32826 |
SUITE 162 ORLANDO, FL 32826 |
CBC1264918 (Exp: 08/31/2026) | 832-726-2202 |
Sub Contractors
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
ALEKSANDRA LUSHI
| Status | Location Address | Mailing Address | State License Number | Phone |
| INACTIVE |
9360 CRAVEN RD JACKSONVILLE, FL 32257 |
APT 401 JACKSONVILLE, FL 32257 |
CAC1820975 (Exp: 08/31/2026) | 904-338-8522 |
DAVID SCOTT MORRIS
| Status | Location Address | State License Number | Phone |
| INACTIVE |
63 LEIDEL DR PALM COAST, FL 32137 |
ER13015750 (Exp: 08/31/2026) | 386-569-7262 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 12/17/2024 | FINAL APPROVED | JSTEWART |
| Note: 12/12/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 12/12/2024 11:12:49 AM *** 1. Need to install solid soffit at all 3 exhaust terminations, 36"each way from center of exhaust. M1502.3 2. 1 of the exhaust termination points is blocked. All 3 needs to be secured in place. 3. Please raise AC Pad min 3" above surrounding ground. FBCR M1305.1.4.1 4. Missing Fascia (Flashing) at garage overhang terminating at front entry. R402.4.1.1 5. Master shower Hot water direction is backwards. FPBC 607.4 6. Kitchen sink drain vent missing air admittance valve. P3112 7. Missing Nut at anchor for garage door Bucks. per plan 8. Dryer Receptacle requires GFCI Protection. NEC 210.8 12/10/2024 - PREVIOUS INSPECTION NOTES | |||
| BLD - BUILDING FINAL | 12/12/2024 | Disapproved -FEE REQUIRED | JSTEWART |
| Note: *** NOTES ADDED BY JSTEWART 12/12/2024 11:12:49 AM *** 1. Need to install solid soffit at all 3 exhaust terminations, 36"each way from center of exhaust. M1502.3 2. 1 of the exhaust termination points is blocked. All 3 needs to be secured in place. 3. Please raise AC Pad min 3" above surrounding ground. FBCR M1305.1.4.1 4. Missing Fascia (Flashing) at garage overhang terminating at front entry. R402.4.1.1 5. Master shower Hot water direction is backwards. FPBC 607.4 6. Kitchen sink drain vent missing air admittance valve. P3112 7. Missing Nut at anchor for garage door Bucks. per plan 8. Dryer Receptacle requires GFCI Protection. NEC 210.8 12/10/2024 - PREVIOUS INSPECTION NOTES | |||
| U -UTILITY RESIDENTIAL FINAL | 12/10/2024 | FINAL APPROVED | DHANEY |
| BLD - BUILDING FINAL | 12/10/2024 | CANCELLED BY APPLICANT | JSTEWART |
| ROW - STORMWATER FINAL | 12/09/2024 | APPROVED | EMADISON |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 12/09/2024 | APPROVED | EMADISON |
| Note: ** 12/09/24 ON SITE MEETING WITH BUILDER AND SITE DEVELOPMENT CONTRACTOR, THE FINAL WILL PASS AS POSITIVE FALL CONTINUES BEYOND THE 10 FT AREA. ____________________________________________________________________________________________________________ 12/6/2024 10:23:54 AM- PREVIOUS INSPECTION NOTES ** 12/06/24 YOUR FINAL SURVEY WAS INADVERTLY APPROVED WHEN IT SHOULD HAVE BEEN DISAPPROVED DUE TO THERE NOT BEING ADEQUATE FALL OF 6 INCHES IN THE FIRST 10 FT OFF THE REAR OF YOUR HOUSE ** Sec 300, Drawing 300.D, Drainage from the structure is to be a 6 inch (5%) minimum slope for the first 10’ | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 12/09/2024 | APPROVED | EMADISON |
| Note: | |||
| ROW - FINAL APRON (AFTER POUR) | 12/09/2024 | APPROVED | EMADISON |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 12/06/2024 | Disapproved - NO FEE | EMADISON |
| Note: ** 12/06/24 YOUR FINAL SURVEY WAS INADVERTLY APPROVED WHEN IT SHOULD HAVE BEEN DISAPPROVED DUE TO THERE NOT BEING ADEQUATE FALL OF 6 INCHES IN THE FIRST 10 FT OFF THE REAR OF YOUR HOUSE ** Sec 300, Drawing 300.D, Drainage from the structure is to be a 6 inch (5%) minimum slope for the first 10’ | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 12/06/2024 | Disapproved - NO FEE | EMADISON |
| Note: ** 12/06/24 YOUR FINAL SURVEY WAS INADVERTLY APPROVED WHEN IT SHOULD HAVE BEEN DISAPPROVED DUE TO THERE NOT BEING ADEQUATE FALL OF 6 INCHES IN THE FIRST 10 FT OFF THE REAR OF YOUR HOUSE ** Sec 300, Drawing 300.D, Drainage from the structure is to be a 6 inch (5%) minimum slope for the first 10’ | |||
| ROW- PRE-APRON (PRE-POUR) | 11/14/2024 | APPROVED | PFLANAGAN |
| Note: IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. | |||
| U-CROSS CONNECTION | 11/04/2024 | APPROVED | DHANEY |
| GRAVITY SEWER TEST | 11/04/2024 | APPROVED | MGIBSON |
| SEWER TIE IN | 11/04/2024 | APPROVED | MGIBSON |
| ELECTRIC - EARLY POWER | 10/25/2024 | APPROVED | JSTEWART |
| Note: 10/24/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 10/24/2024 11:56:58 AM *** Please install the following into closed holding boxes. AC condensor, AHU, and HW power. NEC 230.62 / 110.27 Live parts guarded against accidental contact. Inspector Notes from Inspection 2200 *** NOTES ADDED BY JSTEWART 8/20/2024 10:44:47 AM *** Authorize release of email to FPL. | |||
| ELECTRIC - EARLY POWER | 10/24/2024 | Disapproved -FEE REQUIRED | JSTEWART |
| Note: *** NOTES ADDED BY JSTEWART 10/24/2024 11:56:58 AM *** Please install the following into closed holding boxes. AC condensor, AHU, and HW power. NEC 230.62 / 110.27 Live parts guarded against accidental contact. Inspector Notes from Inspection 2200 *** NOTES ADDED BY JSTEWART 8/20/2024 10:44:47 AM *** Authorize release of email to FPL. | |||
| PEP TANK INSTALLATION REQUEST | 09/17/2024 | APPROVED | CBOWERMASTER |
| Note: 9/4/2024 7:31:48 AM- PREVIOUS INSPECTION NOTES dumpster | |||
| ROW - DRAINAGE | 09/09/2024 | APPROVED - AS NOTED | EMADISON |
| Note: ** 09/10/24 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE AND SEDIMENT, AND EROSION CONTROL OF THEIR CONSTRUCTION SITE _________________________________________________________________________________________________________________ 9/6/2024 - PREVIOUS INSPECTION NOTES Builder needs to open swale ends to allow drainage to flow through swale, need to reset temp pipe as it is clogged and not functioning. | |||
| ROW - DRAINAGE | 09/06/2024 | Disapproved - NO FEE | TPOLACEK |
| Note: Builder needs to open swale ends to allow drainage to flow through swale, need to reset temp pipe as it is clogged and not functioning. next inspection monday 09/09 | |||
| PEP TANK INSTALLATION REQUEST | 08/29/2024 | Disapproved -FEE REQUIRED | CBOWERMASTER |
| Note: dumpster | |||
| ELECTRIC-TUG | 08/20/2024 | APPROVED - AS NOTED | JSTEWART |
| Note: *** NOTES ADDED BY JSTEWART 8/20/2024 10:44:47 AM *** Authorize release of email to FPL. | |||
| INSULATION | 08/20/2024 | APPROVED | JSTEWART |
| Note: 8/14/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 8/14/2024 9:45:33 AM *** front bedroom where batton insulation is installed, Please install Air Baffles for ventilation of attic space. R402.2.3 Eave baffle......R806.3 Vent and insulation clearance | |||
| INSULATION | 08/14/2024 | Disapproved -FEE REQUIRED | JSTEWART |
| Note: *** NOTES ADDED BY JSTEWART 8/14/2024 9:45:33 AM *** front bedroom where batton insulation is installed, Please install Air Baffles for ventilation of attic space. R402.2.3 Eave baffle......R806.3 Vent and insulation clearance | |||
| ALL ROUGH | 08/09/2024 | APPROVED | JSTEWART |
| Note: 8/6/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 8/6/2024 9:54:34 AM *** 1. No energy clacs, or Product approval onsite, FBC [A]107.3.1 2. Please fasten SER cable within 12" of entrance to panel box. NEC 230.51(A) 3. Master bath exhaust duct not connected to fan Assembly. FBCR M1501.1 4. Please install Mechanical fasteners to all exhaust duct connections to fan assembly. FBCR M1601.4.1 5. Please strap all exhaust duct to the top chord of trusses routing to have no flat spots, for condensation build up and for Insulation coverage. FBCR M1601.4.46. 6. Please install Missing gaskets on multiple register boots. FBC EC TABLE 402.4.1.1 7. Water preassure to Low. FBCR P2503.5 | |||
| ALL ROUGH | 08/06/2024 | Disapproved -FEE REQUIRED | JSTEWART |
| Note: *** NOTES ADDED BY JSTEWART 8/6/2024 9:54:34 AM *** 1. No energy clacs, or Product approval onsite, FBC [A]107.3.1 2. Please fasten SER cable within 12" of entrance to panel box. NEC 230.51(A) 3. Master bath exhaust duct not connected to fan Assembly. FBCR M1501.1 4. Please install Mechanical fasteners to all exhaust duct connections to fan assembly. FBCR M1601.4.1 5. Please strap all exhaust duct to the top chord of trusses routing to have no flat spots, for condensation build up and for Insulation coverage. FBCR M1601.4.46. 6. Please install Missing gaskets on multiple register boots. FBC EC TABLE 402.4.1.1 7. Water preassure to Low. FBCR P2503.5 | |||
| ROOF VALLEY & METAL | 06/28/2024 | APPROVED | FWILLIS |
| LATH/BRICK/ WATER BARRIER | 06/28/2024 | APPROVED | FWILLIS |
| WALL SHEATHING | 06/25/2024 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/25/2024 | APPROVED | FWILLIS |
| FOUND SURVEY APPROVED (OFFICE) | 06/24/2024 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 06/11/2024 | APPROVED | JSTEWART |
| MONOLITHIC SLAB | 05/29/2024 | APPROVED | FWILLIS |
| PLUMBING 1ST ROUGH UNDERGROUND | 05/24/2024 | APPROVED | MGIBSON |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 05/23/2024 | APPROVED | CPISCITELLI |
| WATER METER INSTALLATION REQUEST | 05/03/2024 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 06/20/2024 | 06/24/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/20/2024 | 06/20/2024 |
| Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/16/2024 | 05/23/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | HOLD | 05/02/2024 | 05/07/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Letter must be accompanied by a signed and sealed inspection and certification letter by the geotechnical engineer of record. Engineer’s letter to confirm the following: Site clearing / over excavation was completed and inspected by engineer prior to the placement of fill and engineer confirms clearing and over excavation work is acceptable. Engineer to confirm fill materials were suitable and within specifications. Engineer to confirm the required number and location of field density tests were completed. Engineer to include certification statement in accordance with Florida Administrative Code 61G15-18.011 (4) Field dentisty Test Must be digiutally signed and sealed. | |||
| BLD | COMPLETE | 03/22/2024 | 03/22/2024 |
| Note: Released By: JPI | |||
| SWALE | COMPLETE | 03/18/2024 | 05/29/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 03/15/2024 | 03/21/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | HOLD | 03/15/2024 | 03/19/2024 |
| Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet. | |||
| CUSVC | COMPLETE | 03/15/2024 | 03/18/2024 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ELEC | COMPLETE | 03/15/2024 | 03/21/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/15/2024 | 03/18/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 03/15/2024 | 03/20/2024 |
| LOCATE | COMPLETE | 03/15/2024 | 03/19/2024 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 03/15/2024 | 03/20/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 03/15/2024 | 03/18/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/15/2024 | 03/18/2024 |
| Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/02/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/02/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/02/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/02/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 01/02/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 01/02/2025 |
| UTILITY PEP REINSPECTION | ¤40.00 | 01/02/2025 |
| SEWER CREDIT | (¤850.00) | 04/15/2024 |
| SEWER INSPECTION | ¤25.00 | 04/15/2024 |
| SEWER CAPITAL FACILITY | ¤5,441.03 | 04/15/2024 |
| WATER CAPITAL FACILITY FEE | ¤3,994.51 | 04/15/2024 |
| SITE PLAN 30 | ¤30.00 | 04/15/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 04/15/2024 |
| SW ENG PRE APRON | ¤30.00 | 04/15/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 04/15/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 04/15/2024 |
| WATER- TURN ON | ¤25.00 | 04/15/2024 |
| ADJUSTMENT 50% | (¤544.50) | 04/15/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 04/15/2024 |
| INSPECTION - RESIDENTIAL | ¤825.00 | 04/15/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤234.00 | 04/15/2024 |
| CONNECTION FEES | ¤1,187.26 | 04/15/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 04/15/2024 |
| IMPACT FEE FIRE | ¤428.09 | 04/15/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 04/15/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 04/15/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 04/15/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 04/15/2024 |
| IMPACT FEE TRANSPORTATION | ¤1,862.00 | 04/15/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 04/15/2024 |
| SURCHARGE FS 533.721 | ¤5.45 | 04/15/2024 |
| SURCHARGE - FS 468.631 | ¤8.17 | 04/15/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 04/15/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤21,115.00 |