I want to search for...
Permit #2024030788
Permit Details
Status: COED
| Parcel Id: 42-10-30-3210-00000-2950 |
| CONDITIONED SPACE: 3726 sqft |
| GARAGE: 759 sqft |
| OPENED PORCH (WITH ROOF) : 817 sqft |
| PATIO/DECK (NO ROOF) : 180 sqft |
| Total Square Footage: 5482 sqft |
| Block: 00000 |
| Subdivision: - |
| Job Phone: (386)566-3290 |
| Location Address: 446 SWEETGUM LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 04/11/2024 |
| NOC: RECORDED |
| Applicant name: ERIC CHRISTOPHER OLSEN |
| Owner: MASSOURAS ANDREW |
|
Address 9 BUFFALO GROVE PLACE PALM COAST, FL 32137 |
| Lot: 2950 |
| Contracted Stated Job Value: ¤650,000.00 |
| Job Description: Single family residence. |
| Type: CN |
Contractor
OLSEN CUSTOM HOMES AND CONSULTING INC
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
131 MAGNOLIA AVE DAYTONA BEACH, FL 32114 |
CGC1508852 (Exp: 08/31/2026) | 386-947-4481 | (386)947-4484 |
Sub Contractors
BERT S MCLAUGHLIN
| Status | Location Address | State License Number | Phone |
| ACTIVE |
131 MAGNOLIA AVE DAYTONA BEACH, FL 32114 |
EC13006455 (Exp: 08/31/2026) | 386-265-2687 |
RICHARD VENTURINI
| Status | Location Address | State License Number | Phone |
| INACTIVE |
408 LAST TREE DRIVE DELAND, FL 32720 |
CFC1431341 (Exp: 08/31/2026) | 386-748-4114 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
PEDRO DANIEL CHINCHILLA
| Status | Location Address | State License Number | Phone |
| ACTIVE |
324 COVENT GARDENS PL DELTONA, FL 32725 |
CCC1333997 (Exp: 08/31/2026) | 386-679-6228 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 03/26/2025 | Approval - Private Provider | PPROVIDER |
| ROW - STORMWATER FINAL | 03/26/2025 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection, all minimum city requirements were met. The builder's responsible for ensuring that nothing changes after this Inspection is approved. | |||
| U -UTILITY RESIDENTIAL FINAL | 03/26/2025 | FINAL APPROVED | DHANEY |
| Note: Inspector Notes from Inspection 9035 master rerclaim backflow-no cross connection | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 03/19/2025 | APPROVED - AS NOTED | PFLANAGAN |
| Note: SEE NOTES ON FINAL SURVEY INSPECTION | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 03/19/2025 | APPROVED - AS NOTED | PFLANAGAN |
| Note: FINAL SURVEY STILL DOESN'T SHOW THE LITTLE SWALE ALONG RIGHT SIDE OF HOUSE TO THE AC PAD PASSING AS NOTED THAT IN THE FIELD THE SWALE IS THERE AND IF ANY THING HAPPEN IN THE FUTURE IT WILL BE ON THE BUILDER AND THE HOMEOWNER TO CORRECT ANY ISSUES AFTER CO OF THE HOUSE. ----------------------------------------------------------------------- 3/18/2025 - PREVIOUS INSPECTION NOTES THE FINAL SURVEY DOESN'T SHOW THE BERM ALONG THE PROPERTY LINE FROM RIGHT FRONT TO AC PAD. NEED TO CAPTURE BERM. ------------------------------------------------------------------------------------ 2/27/2025 - PREVIOUS INSPECTION NOTES THE NEW FINAL SURVEY DOESN'T HAVE 10' OFF ELEVATIONS ON THE ADJACENT LOT TO THE RIGHT AND THE COMMON AREA TO THE LEFT NEED TO HAVE THESE ELEVATIONS SO WE CAN TELL IF WATER WILL IMPACT THE ADJACENT PROPERTYS. The elevations on all adjacent properties at a minimum of 20-foot intervals on a 10-foot offset outside the property lines. Section 300.01 B(3) V-15 --------------------------------------------------------------------------------------- 1/15/2025 1:13:15 PM- PREVIOUS INSPECTION NOTES CORRECTIONS MADE TO FINAL SURVEY THE FINAL SURVEY WILL CLEARLY SHOW HOW YOUR STORMWATER WATER WILL IMPACT THE HOMEOWNER ON THE RIGHT SIDE. AFTER WALKING ON THE PROPERTY, I CONCLUDED THAT THE FINAL SURVEY SHOULD NOT HAVE BEEN APPROVED, AND I FAILED THE INSPECTION. IN ORDER TO PASS THE INSPECTION, YOU WILL NEED TO EFFECTIVELY MANAGE THE STORMWATER ON YOUR PROPERTY. ---------------------------------------------------------------- 1/10/2025 - PREVIOUS INSPECTION NOTES ** 01/10/25 Sec 300.01D1 The elevations along all property lines must be at a minimum of 20 foot intervals. (REAR PROPERTY LINE NEED ELEVATION SHOTS ALL (4) CORNERS OF PROPERTY NEED ELEVATION SHOTS) ** Sec300.01 (A)(1)(C)(6) .Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for wood frame structures. ** Sec 300.01 D2 The elevations on all adjacent identified (e.g. vacant or improved etc.) properties at a minimum of 20 foot intervals on a 10 foot offset outside the property lines. All undeveloped properties must be properly identified on the site plan and Final Survey. There must be sufficient elevation shots to indicate the intended drainage pattern. ( RIGHT AND LEFT SIDES 10 FT OFF SET SHOTS REQUIRED) ( RIGHT SIDE NEED TO IDENTIFY THE IMPROVED LOT AND FINISHED FFE) | |||
| ROW - FINAL APRON (AFTER POUR) | 03/19/2025 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection, all minimum city requirements were met. The builder's responsible for ensuring that nothing changes after this Inspection is approved. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 03/18/2025 | Disapproved - NO FEE | PFLANAGAN |
| Note: THE FINAL SURVEY DOESN'T SHOW THE BERM ALONG THE PROPERTY LINE FROM RIGHT FRONT TO AC PAD. NEED TO CAPTURE BERM. ------------------------------------------------------------------------------------ 2/27/2025 - PREVIOUS INSPECTION NOTES THE NEW FINAL SURVEY DOESN'T HAVE 10' OFF ELEVATIONS ON THE ADJACENT LOT TO THE RIGHT AND THE COMMON AREA TO THE LEFT NEED TO HAVE THESE ELEVATIONS SO WE CAN TELL IF WATER WILL IMPACT THE ADJACENT PROPERTYS. The elevations on all adjacent properties at a minimum of 20-foot intervals on a 10-foot offset outside the property lines. Section 300.01 B(3) V-15 --------------------------------------------------------------------------------------- 1/15/2025 1:13:15 PM- PREVIOUS INSPECTION NOTES CORRECTIONS MADE TO FINAL SURVEY THE FINAL SURVEY WILL CLEARLY SHOW HOW YOUR STORMWATER WATER WILL IMPACT THE HOMEOWNER ON THE RIGHT SIDE. AFTER WALKING ON THE PROPERTY, I CONCLUDED THAT THE FINAL SURVEY SHOULD NOT HAVE BEEN APPROVED, AND I FAILED THE INSPECTION. IN ORDER TO PASS THE INSPECTION, YOU WILL NEED TO EFFECTIVELY MANAGE THE STORMWATER ON YOUR PROPERTY. ---------------------------------------------------------------- 1/10/2025 - PREVIOUS INSPECTION NOTES ** 01/10/25 Sec 300.01D1 The elevations along all property lines must be at a minimum of 20 foot intervals. (REAR PROPERTY LINE NEED ELEVATION SHOTS ALL (4) CORNERS OF PROPERTY NEED ELEVATION SHOTS) ** Sec300.01 (A)(1)(C)(6) .Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for wood frame structures. ** Sec 300.01 D2 The elevations on all adjacent identified (e.g. vacant or improved etc.) properties at a minimum of 20 foot intervals on a 10 foot offset outside the property lines. All undeveloped properties must be properly identified on the site plan and Final Survey. There must be sufficient elevation shots to indicate the intended drainage pattern. ( RIGHT AND LEFT SIDES 10 FT OFF SET SHOTS REQUIRED) ( RIGHT SIDE NEED TO IDENTIFY THE IMPROVED LOT AND FINISHED FFE) | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 02/27/2025 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: THE NEW FINAL SURVEY DOESN'T HAVE 10' OFF ELEVATIONS ON THE ADJACENT LOT TO THE RIGHT AND THE COMMON AREA TO THE LEFT NEED TO HAVE THESE ELEVATIONS SO WE CAN TELL IF WATER WILL IMPACT THE ADJACENT PROPERTYS. The elevations on all adjacent properties at a minimum of 20-foot intervals on a 10-foot offset outside the property lines. Section 300.01 B(3) V-15 --------------------------------------------------------------------------------------- 1/15/2025 1:13:15 PM- PREVIOUS INSPECTION NOTES CORRECTIONS MADE TO FINAL SURVEY THE FINAL SURVEY WILL CLEARLY SHOW HOW YOUR STORMWATER WATER WILL IMPACT THE HOMEOWNER ON THE RIGHT SIDE. AFTER WALKING ON THE PROPERTY, I CONCLUDED THAT THE FINAL SURVEY SHOULD NOT HAVE BEEN APPROVED, AND I FAILED THE INSPECTION. IN ORDER TO PASS THE INSPECTION, YOU WILL NEED TO EFFECTIVELY MANAGE THE STORMWATER ON YOUR PROPERTY. ---------------------------------------------------------------- 1/10/2025 - PREVIOUS INSPECTION NOTES ** 01/10/25 Sec 300.01D1 The elevations along all property lines must be at a minimum of 20 foot intervals. (REAR PROPERTY LINE NEED ELEVATION SHOTS ALL (4) CORNERS OF PROPERTY NEED ELEVATION SHOTS) ** Sec300.01 (A)(1)(C)(6) .Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for wood frame structures. ** Sec 300.01 D2 The elevations on all adjacent identified (e.g. vacant or improved etc.) properties at a minimum of 20 foot intervals on a 10 foot offset outside the property lines. All undeveloped properties must be properly identified on the site plan and Final Survey. There must be sufficient elevation shots to indicate the intended drainage pattern. ( RIGHT AND LEFT SIDES 10 FT OFF SET SHOTS REQUIRED) ( RIGHT SIDE NEED TO IDENTIFY THE IMPROVED LOT AND FINISHED FFE) | |||
| U-CROSS CONNECTION | 02/11/2025 | APPROVED - AS NOTED | LFITZGERALD |
| Note: master rerclaim backflow-no cross connection | |||
| ROW- PROJECT STATUS | 01/22/2025 | Status Check | EMADISON |
| Note: ** 01/22/25 MET ON SITE TO DISCUSS DRAINAGE ON RIGHT SIDE OF STRUCTURE. BUILDER WILL REVISE SITE PLAN AND INSTALL A SWALE ALONG RIGHT SIDE PROPERTY LINE SPLIT DRAINAGE (G. BERTOLA / E. MADISON) | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 01/15/2025 | Disapproved - NO FEE | GBERTOLA |
| Note: CORRECTIONS MADE TO FINAL SURVEY THE FINAL SURVEY WILL CLEARLY SHOW HOW YOUR STORMWATER WATER WILL IMPACTS THE HOMEOWNER ON THE RIGHT SIDE. AFTER WALKING ON THE PROPERTY, I CONCLUDED THAT THE FINAL SURVEY SHOULD NOT HAVE BEEN APPROVED, AND I FAILED THE INSPECTION. IN ORDER TO PASS THE INSPECTION, YOU WILL NEED TO EFFECTIVELY MANAGE THE STORMWATER ON YOUR PROPERTY. ---------------------------------------------------------------- 1/10/2025 - PREVIOUS INSPECTION NOTES ** 01/10/25 Sec 300.01D1 The elevations along all property lines must be at a minimum of 20 foot intervals. (REAR PROPERTY LINE NEED ELEVATION SHOTS ALL (4) CORNERS OF PROPERTY NEED ELEVATION SHOTS) ** Sec300.01 (A)(1)(C)(6) .Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for wood frame structures. ** Sec 300.01 D2 The elevations on all adjacent identified (e.g. vacant or improved etc.) properties at a minimum of 20 foot intervals on a 10 foot offset outside the property lines. All undeveloped properties must be properly identified on the site plan and Final Survey. There must be sufficient elevation shots to indicate the intended drainage pattern. ( RIGHT AND LEFT SIDES 10 FT OFF SET SHOTS REQUIRED) ( RIGHT SIDE NEED TO IDENTIFY THE IMPROVED LOT AND FINISHED FFE) | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/15/2025 | Disapproved - NO FEE | EMADISON |
| Note: ** 01/15/25 YOUR PROPERTY IS NEGATIVELY IMPACTING THE ADJACENT IMPROVED PROPERTY ON THE RIGHT BUILDER NEEDS TO MAKE ALL NECESSARY CORRECTIONS TO CORRECT DRAINAGE ISSUE THE FINAL SURVEY WILL CLEARLY SHOW HOW YOUR STORMWATER WATER WILL IMPACTS THE HOMEOWNER ON THE RIGHT SIDE. AFTER WALKING ON THE PROPERTY, I CONCLUDED THAT THE FINAL SURVEY SHOULD NOT HAVE BEEN APPROVED, AND I FAILED THE INSPECTION. IN ORDER TO PASS THE INSPECTION, YOU WILL NEED TO EFFECTIVELY MANAGE THE STORMWATER ON YOUR PROPERTY. ---------------------------------------------------------------- | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 01/10/2025 | Disapproved - NO FEE | EMADISON |
| Note: ** 01/10/25 Sec 300.01D1 The elevations along all property lines must be at a minimum of 20 foot intervals. (REAR PROPERTY LINE NEED ELEVATION SHOTS ALL (4) CORNERS OF PROPERTY NEED ELEVATION SHOTS) ** Sec300.01 (A)(1)(C)(6) .Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for wood frame structures. ** Sec 300.01 D2 The elevations on all adjacent identified (e.g. vacant or improved etc.) properties at a minimum of 20 foot intervals on a 10 foot offset outside the property lines. All undeveloped properties must be properly identified on the site plan and Final Survey. There must be sufficient elevation shots to indicate the intended drainage pattern. ( RIGHT AND LEFT SIDES 10 FT OFF SET SHOTS REQUIRED) ( RIGHT SIDE NEED TO IDENTIFY THE IMPROVED LOT AND FINISHED FFE) | |||
| ROW- PRE-APRON (PRE-POUR) | 12/03/2024 | APPROVED - AS NOTED | EMADISON |
| Note: ** 12/03/24 READY TO SET PAVERS ______________________________________________________________________________________________________ 11/7/2024 - PREVIOUS INSPECTION NOTES CORRECTION MADE READY TO POUR APRON AND PAVER RESTRAINTS ONLY. BEFORE NEXT PRE POUR ALL PAVER BASE NEEDS TO SPREAD AND COMPACTED TO CITY'S STANDARDS WITH NO PAVERS LAID AT THE TIME OF THE INSPECTION. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. ------------------------------------------------------------------------------- 11/6/2024 - PREVIOUS INSPECTION NOTES THE FOOTERS NEED TO EXTEND ALONG FRONT OF HOUSE TO THE GARAGE AREA IS PAINTED IN PINK PAINT. | |||
| ROW- PRE-APRON (PRE-POUR) | 11/07/2024 | PARTIALLY APPROVED | PFLANAGAN |
| Note: CORRECTION MADE READY TO POUR APRON AND PAVER RESTRAINTS ONLY. BEFORE NEXT PRE POUR ALL PAVER BASE NEEDS TO SPREAD AND COMPACTED TO CITY'S STANDARDS WITH NO PAVERS LAID AT THE TIME OF THE INSPECTION. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. ------------------------------------------------------------------------------- 11/6/2024 - PREVIOUS INSPECTION NOTES THE FOOTERS NEED TO EXTEND ALONG FRONT OF HOUSE TO THE GARAGE AREA IS PAINTED IN PINK PAINT. | |||
| ROW- PAVER RESTRAINTS | 11/07/2024 | APPROVED | PFLANAGAN |
| Note: ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. ------------------------------------------------------------------------- 11/6/2024 - PREVIOUS INSPECTION NOTES THE FOOTERS NEED TO EXTEND ALONG FRONT OF HOUSE TO THE GARAGE AREA IS PAINTED IN PINK PAINT. | |||
| ROW- PAVER RESTRAINTS | 11/06/2024 | Disapproved - NO FEE | PFLANAGAN |
| Note: THE FOOTERS NEED TO EXTEND ALONG FRONT OF HOUSE TO THE GARAGE AREA IS PAINTED IN PINK PAINT. | |||
| ROW- PRE-APRON (PRE-POUR) | 11/06/2024 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: THE FOOTERS NEED TO EXTEND ALONG FRONT OF HOUSE TO THE GARAGE AREA IS PAINTED IN PINK PAINT. | |||
| ELECTRIC - EARLY POWER | 10/24/2024 | Approval - Private Provider | PPROVIDER |
| GRAVITY SEWER TEST | 09/04/2024 | Approval - Private Provider | PPROVIDER |
| Note: Inspector Notes from Inspection 2095 THIS WAS A VIRTUAL INSPECTION | |||
| SEWER TIE IN | 09/04/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| LATH/BRICK/ WATER BARRIER | 07/29/2024 | Approval - Private Provider | PPROVIDER |
| INSULATION | 07/24/2024 | Approval - Private Provider | PPROVIDER |
| ALL ROUGH | 07/24/2024 | Approval - Private Provider | PPROVIDER |
| Note: 7/19/2024 4:36:57 PM- PREVIOUS INSPECTION NOTES | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/19/2024 | Approval - Private Provider | PPROVIDER |
| ALL ROUGH | 07/19/2024 | Disapproved- Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 06/28/2024 | Approval - Private Provider | PPROVIDER |
| WALL SHEATHING | 06/24/2024 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/18/2024 | Approval - Private Provider | PPROVIDER |
| FOUND SURVEY APPROVED (OFFICE) | 06/04/2024 | APPROVED | TBAKER |
| ELECTRIC-TUG | 06/03/2024 | Approval - Private Provider | PPROVIDER |
| TIE BEAM / LINTEL | 05/23/2024 | Approval - Private Provider | PPROVIDER |
| MONOLITHIC SLAB | 05/07/2024 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH UNDERGROUND | 05/06/2024 | Approval - Private Provider | PPROVIDER |
| WATER METER INSTALLATION REQUEST | 04/16/2024 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 07/23/2024 | 07/23/2024 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM ALL ROUGH NOT SCHEDULED | |||
| ENGIN1 | COMPLETE | 06/04/2024 | 06/04/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/04/2024 | 06/04/2024 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 05/31/2024 | 05/31/2024 |
| Note: Marked INFORMATION By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM Please rename your file name to foundation no names or numbers. | |||
| ENGIN1 | COMPLETE | 05/31/2024 | 06/03/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | HOLD | 05/31/2024 | 05/31/2024 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM please provide setback from patio to property line side and rear | |||
| ZON | COMPLETE | 04/10/2024 | 04/11/2024 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| ZON | HOLD | 04/04/2024 | 04/04/2024 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Plans still dont match please look at the floor plan and site plan then look at the landscape . The landscape is missing the ac pad on the right of the home | |||
| BADMIN | COMPLETE | 04/04/2024 | 04/09/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 04/04/2024 | 04/10/2024 |
| Note: Released By: CARMELO MORALES - (386)986-4758 - CMORALES@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/04/2024 | 04/04/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| URB | COMPLETE | 03/19/2024 | 03/21/2024 |
| Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM | |||
| BADMIN | HOLD | 03/18/2024 | 03/22/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Complete truss plan packet cover sheet or first page to include the design professional of record (building design engineer or architect) approval stamp indicating acceptance and approval of truss design (Not wet seal) | |||
| CUSVC | COMPLETE | 03/18/2024 | 03/19/2024 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/18/2024 | 03/19/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 03/18/2024 | 03/21/2024 |
| Note: Released By: TONI CHURCHILL - - TCHURCHILL@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 03/18/2024 | 04/03/2024 |
| Note: Held By: CARMELO MORALES - (386)986-4758 - CMORALES@PALMCOASTGOV.COM Lot grading needed to be revised per email and telephone conversations. | |||
| ZON | HOLD | 03/18/2024 | 03/19/2024 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Site plan / Door pads in lanai area, show the pads and provide the setbacks from pad to property line. Floor plan and Elevation plan both show several ac areas one on left and right side of home. This does not match site plan. All plans must match. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG REINSPECTION 30 | ¤30.00 | 03/27/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 04/11/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 04/11/2024 |
| SEWER INSPECTION | ¤25.00 | 04/11/2024 |
| SITE PLAN 30 | ¤30.00 | 04/11/2024 |
| WATER-METER | ¤514.49 | 04/11/2024 |
| ADJUSTMENT 50% | (¤15.00) | 04/11/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 04/11/2024 |
| ADMINISTRATIVE - RESID PP | ¤225.00 | 04/11/2024 |
| CONNECTION FEES | ¤25.00 | 04/11/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 04/11/2024 |
| IMPACT FEE FIRE | ¤428.09 | 04/11/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 04/11/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 04/11/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 04/11/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 04/11/2024 |
| IMPACT FEE TRANSPORTATION | ¤3,404.00 | 04/11/2024 |
| SURCHARGE FS 533.721 | ¤2.40 | 04/11/2024 |
| SURCHARGE - FS 468.631 | ¤3.60 | 04/11/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 04/11/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 04/11/2024 |
| SW ENG PRE APRON | ¤30.00 | 04/11/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤12,851.57 |