Permit #2024030826
Permit Details
Status: COED
| Parcel Id: 07-11-31-7026-00480-0380 |
| GARAGE: 592 sqft |
| OPENED PORCH (WITH ROOF) : 235 sqft |
| CONDITIONED SPACE: 1707 sqft |
| OPENED PORCH (WITH ROOF) : 42 sqft |
| Total Square Footage: 2576 sqft |
| Block: 00480 |
| Subdivision: - |
| Job Phone: 386-931-4289 |
| Location Address: 16 PIERCE LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 05/10/2024 |
| NOC: RECORDED |
| Applicant name: RICHARD M. ANDERSON |
| Owner: ANDERSON THOMAS R |
|
Address 8 CARLOS COURT PALM COAST, FL 32137 |
| Lot: 0380 |
| Contracted Stated Job Value: ¤300,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
PALM WEST HOME BUILDERS, INC.
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2 Florida Park Drive North Palm Coast, FL 32137 |
CRC054633 (Exp: 08/31/2026) | (386) 445-7001 | (386)446-5941 |
Sub Contractors
JOSEPH C WRIGHT
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
15 HARGROVE LANE PALM COAST, FL 32137 |
UNIT 3 D PALM COAST, FL 32137 |
EC13003278 (Exp: 08/31/2026) | 386-447-9644 | 386-447-9633 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
CHRISTOPHER DANIEL FULTON
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
2 MARKET PLACE PALM COAST, FL 32137 |
UNIT D PALM COAST, FL 32137 |
CCC1331939 (Exp: 08/31/2026) | 386-445-7945 |
GLEN WILLIAM KEHLE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
P. O. Box 353511 BUNNELL, FL 32110 |
CFC057241 (Exp: 08/31/2026) | (386) 447-4249 | (386) 437-8488 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 12/19/2025 | FINAL APPROVED | KSANDOE |
| Note: 12/17/2025 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1-Attic access need to be accesible ( lenum box and duct work bloking access )FBCR 807.1 #2-FBC [A] 107.4-MECHANICAL EQUIPMENT DOES NOT MATCH ENERGY CALCS #3-Missing light in attic ( house area ) #4-Missing hose bib backflow ( by meter electrical panel ) #5- all interior door need to be installed ( share bedroom closet ) #6-seall all penetration on garage walls ( Pipe by water heater )( water lines ) #7-Please removed one piece of sotfit for inspection R316.5.12 Sheathing. Foam plastic insulation used as sheathing shall comply with Section R316.3 and Section R316.4. Where the foam plastic sheathing is exposed to the attic space at a gable or kneewall, the provisions of Section R316.5.3 shall apply. Where foam plastic insulation is used as exterior wall sheathing on framed wa R316.5.3 Attics. The thermal barrier specified in Section R316.4 is not required where all of the following apply: 1. Attic access is required by Section R807.1. 2. The space is entered only for purposes of repairs or maintenance. 3. The foam plastic insulation has been tested in accordance with Section R316.6 or the foam plastic insulation is protected against ignition using one of the following ignition barrier materials: 3.1. 11/2-inch-thick (38 mm) mineral fiber insulation. 3.2. 1/4-inch-thick (6.4 mm) wood structural panels. 3.3. 3/8-inch (9.5 mm) particleboard. 3.4. 1/4-inch (6.4 mm) hardboard. 3.5. 3/8-inch (9.5 mm) gypsum board. 3.6. Corrosion-resistant steel having a base metal thickness of 0.016 inch (0.406 mm). 3.7. 11/2-inch-thick (38 mm) cellulose insulation; or 3.8. 1/4-inch (6.4 mm) fiber-cement panel, soffit or backer board. The ignition barrier is not required where the foam plastic insulation has been tested in accordance with 5/5/25: Entire Roof Deck is covered with Foam insulation. The required coating has been applied where required. Visually verified during inspection 2490 - Insulation. | |||
| WATER METER INSTALLATION REQUEST | 12/19/2025 | APPROVED | CBOWERMASTER |
| U -UTILITY RESIDENTIAL FINAL | 12/18/2025 | FINAL APPROVED | BHAINES |
| Note: Inspector Notes from Inspection 9035 No CC, No IRR | |||
| BLD - BUILDING FINAL | 12/17/2025 | Disapproved -FEE REQUIRED | CVANSTRAHLEN |
| Note: Please fix items before next inspection #1-Attic access need to be accesible ( lenum box and duct work bloking access )FBCR 807.1 #2-FBC [A] 107.4-MECHANICAL EQUIPMENT DOES NOT MATCH ENERGY CALCS #3-Missing light in attic ( house area ) #4-Missing hose bib backflow ( by meter electrical panel ) #5- all interior door need to be installed ( share bedroom closet ) #6-seall all penetration on garage walls ( Pipe by water heater )( water lines ) #7-Please removed one piece of sotfit for inspection R316.5.12 Sheathing. Foam plastic insulation used as sheathing shall comply with Section R316.3 and Section R316.4. Where the foam plastic sheathing is exposed to the attic space at a gable or kneewall, the provisions of Section R316.5.3 shall apply. Where foam plastic insulation is used as exterior wall sheathing on framed wa R316.5.3 Attics. The thermal barrier specified in Section R316.4 is not required where all of the following apply: 1. Attic access is required by Section R807.1. 2. The space is entered only for purposes of repairs or maintenance. 3. The foam plastic insulation has been tested in accordance with Section R316.6 or the foam plastic insulation is protected against ignition using one of the following ignition barrier materials: 3.1. 11/2-inch-thick (38 mm) mineral fiber insulation. 3.2. 1/4-inch-thick (6.4 mm) wood structural panels. 3.3. 3/8-inch (9.5 mm) particleboard. 3.4. 1/4-inch (6.4 mm) hardboard. 3.5. 3/8-inch (9.5 mm) gypsum board. 3.6. Corrosion-resistant steel having a base metal thickness of 0.016 inch (0.406 mm). 3.7. 11/2-inch-thick (38 mm) cellulose insulation; or 3.8. 1/4-inch (6.4 mm) fiber-cement panel, soffit or backer board. The ignition barrier is not required where the foam plastic insulation has been tested in accordance with 5/5/25: Entire Roof Deck is covered with Foam insulation. The required coating has been applied where required. Visually verified during inspection 2490 - Insulation. | |||
| ROW - FINAL APRON (AFTER POUR) | 12/17/2025 | APPROVED | FSLADISH |
| Note: 12/17/25 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 12/17/2025 | APPROVED | FSLADISH |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 12/17/2025 | APPROVED | FSLADISH |
| Note: 12/17/25 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW - STORMWATER FINAL | 12/17/2025 | APPROVED | FSLADISH |
| Note: 12/17/25 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW- PRE-APRON (PRE-POUR) | 11/19/2025 | APPROVED | FSLADISH |
| Note: 11/19/25 PIPE INVERT IS GOOD AT THIS INSPECTION. BUILDER REFER TO CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. . IF FIBERGLASS OPTION IS USED, BUILDER REQUIRED TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR AT THE TIME OF THE INSPECTION READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK SITE FOR ANY STANDING WATER. ALSO VERIFY PIPE ELEVATION HAS NOT CHANGED. NO EXPANSION JOINTS ALLOWED, AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIREMENTS ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. AT THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. | |||
| GRAVITY SEWER TEST | 11/13/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION 11/12/2025 - PREVIOUS INSPECTION NOTES NEED TO HAVE C/O 18 '' OFF THE FOUNDATION WALL | |||
| SEWER TIE IN | 11/13/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS APPROVED ON 11/12/25 | |||
| GRAVITY SEWER TEST | 11/12/2025 | Disapproved - NO FEE | MGIBSON |
| Note: NEED TO HAVE C/O 18 '' OFF THE FOUNDATION WALL | |||
| U-CROSS CONNECTION | 11/12/2025 | APPROVED - AS NOTED | BHAINES |
| Note: No CC, No IRR | |||
| ELECTRIC - EARLY POWER | 10/23/2025 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 10/23/2025 8:55:59 AM *** 10/23/25: FPL emailed to release power. Inspector Notes from Inspection 2170 7/23/24: FPL notified > approved for Temp Pole at @ 14:00. | |||
| PEP TANK INSTALLATION REQUEST | 10/10/2025 | APPROVED | CBOWERMASTER |
| LATH/BRICK/ WATER BARRIER | 05/14/2025 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 5/14/2025 2:12:16 PM *** 5/12/2025 - PREVIOUS INSPECTION NOTES 5/12/25: 1). All holes in CMU at left side of house need lath installed over holes. FBC [A]107.4 2). Silt fence on right side needs to be repaired and maintained throughout build. FBC 3307.1 3). Temporary culvert pipe needs to be repaired/cleared on right side to allow free flow of water through the swale. FBC 3303.5 | |||
| LATH/BRICK/ WATER BARRIER | 05/12/2025 | Disapproved - NO FEE | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 5/12/2025 11:49:58 AM *** 5/12/25: 1). All holes in CMU at left side of house need lath installed over holes. FBC [A]107.4 2). Silt fence on right side needs to be repaired and maintained throughout build. FBC 3307.1 3). Temporary culvert pipe needs to be repaired/cleared on right side to allow free flow of water through the swale. FBC 3303.5 | |||
| WALL SHEATHING | 05/12/2025 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 5/12/2025 11:46:43 AM *** | |||
| INSULATION | 05/05/2025 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 5/5/2025 1:59:10 PM *** Inspector Notes from Inspection 2420 4/22/25 1. Need to have Product approvals and Duct layout changed to show what is installed and approved by final 4/16/2025 - PREVIOUS INSPECTION NOTES 4/16/25: Incomplete inspection due to missing plans/documents. 1). Incomplete plans in box/on site. Missing plan pages, Florida product approval and Energy Calcs. FBC [A]107.3.1 2). Missing fireblocking at top of electrical breaker box framing. 2" x 4" at the top needs to be installed horizontally with all wires drilled through. FBC-R302.11. Per Manufacturer fire foam annular space cannot exceed 1/2" (FBC [A]107.4) 3). 5ft head pressure not holding. Please have stand pipe filled to the top. FBCR P2503.7 4). Please have slab at guest bathroom repaired with cement product level with slab to meet the original slab requirements listed on plans. FBC [A]107.4 5). Please have the temporary swale pipe cleared and repaired on the right side to allow free flow of water through the swale as required. FBC 3303.5 Inspector Notes from Inspection 2467 *** NOTES ADDED BY RSIMS 3/19/2025 11:06:05 AM *** 3/19/25: Please have you silt fence repaired on the rigt isde as soon as possible. FBC 3307.1 | |||
| ALL ROUGH | 04/22/2025 | APPROVED - AS NOTED | MCONTRYMAN |
| Note: 4/22/25 1. Need to have Product approvals and Duct layout changed to show what is installed and approved by final 4/16/2025 - PREVIOUS INSPECTION NOTES 4/16/25: Incomplete inspection due to missing plans/documents. 1). Incomplete plans in box/on site. Missing plan pages, Florida product approval and Energy Calcs. FBC [A]107.3.1 2). Missing fireblocking at top of electrical breaker box framing. 2" x 4" at the top needs to be installed horizontally with all wires drilled through. FBC-R302.11. Per Manufacturer fire foam annular space cannot exceed 1/2" (FBC [A]107.4) 3). 5ft head pressure not holding. Please have stand pipe filled to the top. FBCR P2503.7 4). Please have slab at guest bathroom repaired with cement product level with slab to meet the original slab requirements listed on plans. FBC [A]107.4 5). Please have the temporary swale pipe cleared and repaired on the right side to allow free flow of water through the swale as required. FBC 3303.5 Inspector Notes from Inspection 2467 *** NOTES ADDED BY RSIMS 3/19/2025 11:06:05 AM *** 3/19/25: Please have you silt fence repaired on the rigt isde as soon as possible. FBC 3307.1 | |||
| ALL ROUGH | 04/16/2025 | Disapproved - NO FEE | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 4/16/2025 10:45:38 AM *** 4/16/25: Incomplete inspection due to missing plans/documents. 1). Incomplete plans in box/on site. Missing plan pages, Florida product approval and Energy Calcs. FBC [A]107.3.1 2). Missing fireblocking at top of electrical breaker box framing. 2" x 4" at the top needs to be installed horizontally with all wires drilled through. FBC-R302.11. Per Manufacturer fire foam annular space cannot exceed 1/2" (FBC [A]107.4) 3). 5ft head pressure not holding. Please have stand pipe filled to the top. FBCR P2503.7 4). Please have slab at guest bathroom repaired with cement product level with slab to meet the original slab requirements listed on plans. FBC [A]107.4 5). Please have the temporary swale pipe cleared and repaired on the right side to allow free flow of water through the swale as required. FBC 3303.5 Inspector Notes from Inspection 2467 *** NOTES ADDED BY RSIMS 3/19/2025 11:06:05 AM *** 3/19/25: Please have you silt fence repaired on the rigt isde as soon as possible. FBC 3307.1 | |||
| ROOF VALLEY & METAL | 03/19/2025 | APPROVED - AS NOTED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 3/19/2025 11:06:05 AM *** 3/19/25: Please have you silt fence repaired on the rigt isde as soon as possible. FBC 3307.1 | |||
| WALL SHEATHING | 03/04/2025 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 3/4/2025 12:32:55 PM *** Inspector Notes from Inspection 2340 *** NOTES ADDED BY RSIMS 2/4/2025 11:39:02 AM *** 2/4/25: Approved as noted to keep project moving. ALL MUST BE COMPLETE PRIOR TO NEXT INSPECTION. Check at next inspection. 1). Window Sill mortar beds and/or Concrete Block joints exceed the maximum thickness (sills - 1/2" / CMU joints - 3/8") per FBC-R606.3.1 Marked with orange spray paint. Inspector Notes from Inspection 2250 1/13/25 Noting that there are a few dowels placed that are not in the plans, to keep with the proper spacing. They are noted on the plans | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/04/2025 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 3/4/2025 12:30:53 PM *** Inspector Notes from Inspection 2340 *** NOTES ADDED BY RSIMS 2/4/2025 11:39:02 AM *** 2/4/25: Approved as noted to keep project moving. ALL MUST BE COMPLETE PRIOR TO NEXT INSPECTION. Check at next inspection. 1). Window Sill mortar beds and/or Concrete Block joints exceed the maximum thickness (sills - 1/2" / CMU joints - 3/8") per FBC-R606.3.1 Marked with orange spray paint. Inspector Notes from Inspection 2250 1/13/25 Noting that there are a few dowels placed that are not in the plans, to keep with the proper spacing. They are noted on the plans | |||
| TIE BEAM / LINTEL | 02/04/2025 | APPROVED - AS NOTED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 2/4/2025 11:39:02 AM *** 2/4/25: Approved as noted to keep project moving. ALL MUST BE COMPLETE PRIOR TO NEXT INSPECTION. Check at next inspection. 1). Window Sill mortar beds and/or Concrete Block joints exceed the maximum thickness (sills - 1/2" / CMU joints - 3/8") per FBC-R606.3.1 Marked with orange spray paint. Inspector Notes from Inspection 2250 1/13/25 Noting that there are a few dowels placed that are not in the plans, to keep with the proper spacing. They are noted on the plans | |||
| FOUND SURVEY APPROVED (OFFICE) | 01/22/2025 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 01/13/2025 | APPROVED - AS NOTED | MCONTRYMAN |
| Note: 1/13/25 Noting that there are a few dowels placed that are not in the plans, to keep with the proper spacing. They are noted on the plans | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 12/23/2024 | APPROVED | MGIBSON |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 12/20/2024 | APPROVED | CPISCITELLI |
| ELECTRIC TEMP POLE | 07/23/2024 | APPROVED - AS NOTED | RSIMS |
| Note: 7/23/24: FPL notified > approved for Temp Pole at @ 14:00. |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 12/18/2025 | 12/18/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/21/2025 | 10/21/2025 |
| Note: Released By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 10/21/2025 | 10/21/2025 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| UTL | COMPLETE | 10/21/2025 | 10/21/2025 |
| Note: Released By: LARRY FITZGERALD - (386)286-2041 - LFITZGERALD@PALMCOASTGOV.COM | |||
| BLD | HOLD | 08/14/2025 | 08/18/2025 |
| Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM 1. FL# 15576.4 not a casement window | |||
| MECH | COMPLETE | 08/14/2025 | 08/15/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 02/24/2025 | 02/27/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 01/21/2025 | 01/22/2025 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM FYI foundation survey was uploaded as "survey". | |||
| ZON | COMPLETE | 01/21/2025 | 01/21/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 12/20/2024 | 12/31/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 11/12/2024 | 11/18/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | HOLD | 10/31/2024 | 11/05/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need shop drawing approval stamp by EOR on truss packet or truss layout. | |||
| MECH | COMPLETE | 10/31/2024 | 11/05/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/28/2024 | 10/31/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 10/28/2024 | 10/29/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any deviation from the approved site plan with significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD | |||
| ZON | COMPLETE | 10/28/2024 | 10/28/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 10/22/2024 | 10/22/2024 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Please indicate what the change/ update is. If this is a change to the proposed site plan, please upload as a site plan. | |||
| MECH | COMPLETE | 05/06/2024 | 05/08/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/16/2024 | 04/16/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| MECH | HOLD | 04/16/2024 | 04/17/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide duct layout. Missing from new energy calc set | |||
| ELEC | COMPLETE | 04/16/2024 | 04/19/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 04/16/2024 | 04/16/2024 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Documents/Files named incorrectly o Please rename your files in accordance with the naming convention outlined in our ‘document requirements’ located on the permit portal page http://docs.palmcoastgov.com/departments/building/online/document-requirements.pdf o It is important that all submittals follow the guidelines for efficient plan review and record retention accuracy. o You may add to your file name AFTER the above naming convention has been met. Examples Document type: Plans File name : Given sheet name A.1 / Plans Document type: Foundation Survey File name: Foundation Survey Document type: Manufactures Specifications File Name: Pool Alarm Document type: Manufactures Specifications File Name: Generator Revisions and corrections should follow the same criteria and should use the same name as the original originally identified. (no – new, revised, second submittal, updated) We recently sent an email requiring plans sheets to include a description when the design professional does not use industry standards when naming their sheets. typically, the sheet name will identify the type of sheet it is (A - architectural, M -mechanical, E - electrical, etc.) Please look at the document submittal requirements and add the description to your plan file names. | |||
| BLD | COMPLETE | 04/16/2024 | 04/22/2024 |
| Note: Released By: JPI | |||
| BADMIN | COMPLETE | 04/16/2024 | 04/19/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| DSD | CANCEL | 04/16/2024 | 04/22/2024 |
| SW1 | COMPLETE | 04/16/2024 | 04/16/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/16/2024 | 04/16/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 03/20/2024 | 03/21/2024 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Survey elevations are off by 1' and site benchmark elevation reads 00.00 | |||
| BADMIN | HOLD | 03/19/2024 | 03/25/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Geo Tech report needs to be digitally signed and sealed. | |||
| BLD | HOLD | 03/19/2024 | 03/25/2024 |
| Note: Held By: JPI 1) Signature appears invalid, Document is altered ([A]107) 2) Back porch column is shown in different locations on Floor plan & Foundation Plans. ([A]107.2.1) 3) Please add Emergency Escape Openings to plans. (R311) 4) Garage Opening Reinforcement does not match detail on sheet 5. Needs the horizontal member between front door & transom specified. ([A]107.2.1) 5) Foundation Plan- Footers appear to be missing under block walls. ([A]107.2.1) 6) Roof Underlayment could not be found in the database. ([A]107.2.1) 7) Add note. Smoke alarms shall be installed not less than 3 feet (914 mm) horizontally from the door or opening of a bathroom that contains a bathtub or shower unless this would prevent placement of a smoke alarm required by Section (R314.3). | |||
| CUSVC | COMPLETE | 03/19/2024 | 03/19/2024 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 03/19/2024 | 03/25/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. All outlets in laundry need to be GFCI protected. NEC 2020 210.8 2. DW outlet can not be located behind the DW. NEC 2020 422.16 3. Need correct outlet spacing in bed 2. NEC 2020 210.52 4. Electric load calcs do not match the living space of the home. | |||
| ENGIN1 | COMPLETE | 03/19/2024 | 03/19/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 03/19/2024 | 03/22/2024 |
| LOCATE | COMPLETE | 03/19/2024 | 03/21/2024 |
| Note: Released By: TONI CHURCHILL - - TCHURCHILL@PALMCOASTGOV.COM | |||
| MECH | HOLD | 03/19/2024 | 03/22/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Energy Calcs need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2023 8Th edition | |||
| SW1 | COMPLETE | 03/19/2024 | 03/19/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/19/2024 | 03/21/2024 |
| Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 03/19/2024 | 06/04/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 12/18/2025 |
| CONNECTION FEES | ¤1,187.26 | 05/10/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 05/10/2024 |
| IMPACT FEE FIRE | ¤428.09 | 05/10/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 05/10/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 05/10/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 05/10/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 05/10/2024 |
| IMPACT FEE TRANSPORTATION | ¤1,862.00 | 05/10/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 05/10/2024 |
| SURCHARGE FS 533.721 | ¤6.13 | 05/10/2024 |
| SURCHARGE - FS 468.631 | ¤9.20 | 05/10/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 05/10/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 05/10/2024 |
| SW ENG PRE APRON | ¤30.00 | 05/10/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 05/10/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 05/10/2024 |
| SEWER CREDIT | (¤1,342.00) | 05/10/2024 |
| SEWER INSPECTION | ¤25.00 | 05/10/2024 |
| SEWER CAPITAL FACILITY | ¤5,441.03 | 05/10/2024 |
| WATER CAPITAL FACILITY FEE | ¤3,994.51 | 05/10/2024 |
| SITE PLAN 30 | ¤30.00 | 05/10/2024 |
| WATER- TURN ON | ¤25.00 | 05/10/2024 |
| ADJUSTMENT 50% | (¤613.34) | 05/10/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 05/10/2024 |
| INSPECTION - RESIDENTIAL | ¤932.25 | 05/10/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤264.42 | 05/10/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤20,493.54 |