Permit #2024031120
Permit Details
Status: COED
| Parcel Id: 07-11-31-7004-00070-0010 |
| CONDITIONED SPACE: 2453 sqft |
| OPENED PORCH (WITH ROOF) : 467 sqft |
| GARAGE: 574 sqft |
| Total Square Footage: 3494 sqft |
| Block: 00070 |
| Subdivision: - |
| Job Phone: (386) 446-5850 |
| Location Address: 1 CLOVERDALE CT N |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 04/24/2024 |
| NOC: RECORDED |
| Applicant name: CHARLES DALLAS RINEK |
| Owner: GAGNON PAUL H JR & JOHN KORMAN TIC |
|
Address 16A COLLINGWOOD LN PALM COAST, FL 32137 |
| Lot: 0010 |
| Contracted Stated Job Value: ¤650,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
CHARLES RINEK CONSTRUCTION, INC.
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
P. O. Box 352502 Palm Coast, FL 32137 |
CGC046080 (Exp: 08/31/2026) | (386) 446-5850 | (386)445-9992 |
Sub Contractors
PEDRO DANIEL CHINCHILLA
| Status | Location Address | State License Number | Phone |
| ACTIVE |
324 COVENT GARDENS PL DELTONA, FL 32725 |
CCC1333997 (Exp: 08/31/2026) | 386-679-6228 |
SHAWN MICHAEL HISS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1315 LPGA BLVD HOLLY HILL, FL 32117 |
CAC1813585 (Exp: 08/31/2026) | (386)672-8688 |
STEPHEN COURTEAUX
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
85 North Yonge Street Ormond Beach, FL 32174 |
EC13001748 (Exp: 08/31/2026) | (386) 672-4900 | 386-676-7472 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
MARK B SOWERS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
609 FOURTH ST BUNNELL, FL 32110 |
35616 (Exp: 08/31/2026) | 386-225-1753 |
CHARLES K DAVIS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3000 E MOODY BLVD BLDG 2 BUNNELL , FL 32110 |
EC13004270 (Exp: 08/31/2026) | 386-931-6614 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - STORMWATER FINAL | 07/01/2025 | APPROVED | PFLANAGAN |
| Note: CORRECTION MADE TO ROADSIDE SWALE ------------------------------------------------------------------------- 6/30/2025 - PREVIOUS INSPECTION NOTES CANCELED BY CONTRACTOR BY TEXT ------------------------------------------------------------------------ 6/27/2025 - PREVIOUS INSPECTION NOTES 6/27/25= NEEDS TO READ THE INSPECTOR NOTES: RIGHT SIDE OF DRIVEWAY THERE IS A LOW AREA IN THE ROADSIDE SWALE THAT NEEDS TO BE RAISED SO WATER WILL NOT HOLD IN THE SWALE NEEDS TO BE CORRECTED BEFORE THE ROW FINAL INSPECTION. RIGHT SIDE OF DRIVEWAY THERE IS A LOW AREA IN THE ROADSIDE SWALE THAT NEEDS TO BE RAISED SO WATER WILL NOT HOLD IN THE SWALE NEEDS TO BE CORRECTED BEFORE THE ROW FINAL INSPECTION. | |||
| ROW - FINAL APRON (AFTER POUR) | 06/30/2025 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. | |||
| ROW - STORMWATER FINAL | 06/30/2025 | CANCELLED BY APPLICANT | PFLANAGAN |
| Note: CANCELED BY CONTRACTOR BY TEXT ------------------------------------------------------------------------ 6/27/2025 - PREVIOUS INSPECTION NOTES 6/27/25= NEEDS TO READ THE INSPECTOR NOTES: RIGHT SIDE OF DRIVEWAY THERE IS A LOW AREA IN THE ROADSIDE SWALE THAT NEEDS TO BE RAISED SO WATER WILL NOT HOLD IN THE SWALE NEEDS TO BE CORRECTED BEFORE THE ROW FINAL INSPECTION. RIGHT SIDE OF DRIVEWAY THERE IS A LOW AREA IN THE ROADSIDE SWALE THAT NEEDS TO BE RAISED SO WATER WILL NOT HOLD IN THE SWALE NEEDS TO BE CORRECTED BEFORE THE ROW FINAL INSPECTION. | |||
| BLD - BUILDING FINAL | 06/30/2025 | FINAL APPROVED | HCAMACHO |
| BLD - BUILDING FINAL | 06/27/2025 | Disapproved - NO FEE | HCAMACHO |
| Note: 1. Dryer needs GFCI.NEC 210.8 2. 2 outlets in the summer Kit. on the BBQ wall and 1 in the cabinet are not GFCI protected.NEC 210.8 3. Dishwasher drain is not run properly.FBCR P2717.2 4. A/C chase for line set is not sealed outside. | |||
| ROW - FINAL APRON (AFTER POUR) | 06/27/2025 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: 6/27/25= NEEDS TO READ THE INSPECTOR NOTES: RIGHT SIDE OF DRIVEWAY THERE IS A LOW AREA IN THE ROADSIDE SWALE THAT NEEDS TO BE RAISED SO WATER WILL NOT HOLD IN THE SWALE NEEDS TO BE CORRECTED BEFORE THE ROW FINAL INSPECTION. | |||
| ROW - STORMWATER FINAL | 06/27/2025 | Disapproved - NO FEE | GBERTOLA |
| Note: 6/27/25= NEEDS TO READ THE INSPECTOR NOTES: RIGHT SIDE OF DRIVEWAY THERE IS A LOW AREA IN THE ROADSIDE SWALE THAT NEEDS TO BE RAISED SO WATER WILL NOT HOLD IN THE SWALE NEEDS TO BE CORRECTED BEFORE THE ROW FINAL INSPECTION. RIGHT SIDE OF DRIVEWAY THERE IS A LOW AREA IN THE ROADSIDE SWALE THAT NEEDS TO BE RAISED SO WATER WILL NOT HOLD IN THE SWALE NEEDS TO BE CORRECTED BEFORE THE ROW FINAL INSPECTION. | |||
| U -UTILITY RESIDENTIAL FINAL | 06/24/2025 | FINAL APPROVED | DHANEY |
| U-CROSS CONNECTION | 06/24/2025 | APPROVED | DHANEY |
| Note: 2/27/2025 - PREVIOUS INSPECTION NOTES irrigation not yet installed-please schedule when all completed | |||
| GAS ROUGH | 06/24/2025 | APPROVED | MGIBSON |
| Note: 10/22/2024 - PREVIOUS INSPECTION NOTES 10/16/2024 - PREVIOUS INSPECTION NOTES Gas line not bonded. FBCR G2411 BOND GAS PIPING Will check at next inspection. BOND WIRE IS IN PLACE, SPOKE TO DONAL C/M FROM RINICK CONSTRUCTION BOND WIRE IS AT KITCHEN AREA IN CEILING, ANOTHER GAS ROUGH INSPECTION REQUIRED WHEN U/G OR A/G TANK IS RAN FROM TANK TO HOUSE STUB OUT | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 06/16/2025 | APPROVED | PFLANAGAN |
| Note: CORRECTIONS MADE TO FINAL SURVEY ---------------------------------------------------------------------- 6/5/2025 - PREVIOUS INSPECTION NOTES 1) CAN NOT READ THE ELEVATIONS ALONG THE BACK SEAWALL NEED TO BE ABLE TO SEE IF SWALE ALONG SEAWALL MEETS CITY STANDARDS. 2) NEED TO HAVE ELEVATIONS EVERY 20' ALONG FRONT PROPERTY LANE. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/16/2025 | APPROVED - AS NOTED | PFLANAGAN |
| Note: RIGHT SIDE OF DRIVEWAY THERE IS A LOW AREA IN THE ROADSIDE SWALE THAT NEEDS TO BE RAISED SO WATER WILL NOT HOLD IN THE SWALE NEEDS TO BE CORRECTED BEFORE THE ROW FINAL INSPECTION. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 06/05/2025 | Disapproved - NO FEE | PFLANAGAN |
| Note: 1) CAN NOT READ THE ELEVATIONS ALONG THE BACK SEAWALL NEED TO BE ABLE TO SEE IF SWALE ALONG SEAWALL MEETS CITY STANDARDS. 2) NEED TO HAVE ELEVATIONS EVERY 20' ALONG FRONT PROPERTY LANE. | |||
| ROW- PROJECT STATUS | 05/16/2025 | Status Check | PFLANAGAN |
| Note: GRADE FRONT ROADSIDE SWALE DO IT MATCHES DRAWING IN TECH. MANUAL DRAWING 300 C-1 | |||
| ROW- PROJECT STATUS | 04/22/2025 | Status Check | PFLANAGAN |
| Note: MEETING WITH BUILDER FOR GRADE ALONG SIDEWALK AND AT SEAWALL | |||
| ROW- PRE-APRON (PRE-POUR) | 04/02/2025 | CANCELLED BY INSPECTOR | PFLANAGAN |
| Note: canceling this inspection because this was the wrong inspection for a site visit. -------------------------------------------------------------------------------- PLEASE COMPACT BASE ONE MORE TIME READY FOR PAVERS ---------------------------------------------------------------------------------- 3/5/2025 - PREVIOUS INSPECTION NOTES READY TO POUR APRON AND PAVER RESTRAINTS ONLY. BEFORE NEXT PRE POUR ALL PAVER BASE NEEDS TO SPREAD AND COMPACTED TO CITY'S STANDARDS WITH NO PAVERS LAID AT THE TIME OF THE INSPECTION. IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. | |||
| ROW- PROJECT STATUS | 04/02/2025 | Status Check | PFLANAGAN |
| Note: TALKED WITH GRADER ABOUT THE SWALE ALONG SIDEWALK ON THIS PROJECT. HE WILL BE MAKING A SWALE BETWEEN THE PROPERTY LINE AND SIDEWALK AND GRADING SO WATER WILL NOT SIT ON THE SIDEWALK. | |||
| ROW- PRE-APRON (PRE-POUR) | 03/19/2025 | APPROVED - AS NOTED | PFLANAGAN |
| Note: PLEASE COMPACT BASE ONE MORE TIME READY FOR PAVERS ---------------------------------------------------------------------------------- 3/5/2025 - PREVIOUS INSPECTION NOTES READY TO POUR APRON AND PAVER RESTRAINTS ONLY. BEFORE NEXT PRE POUR ALL PAVER BASE NEEDS TO SPREAD AND COMPACTED TO CITY'S STANDARDS WITH NO PAVERS LAID AT THE TIME OF THE INSPECTION. IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. | |||
| ROW- PAVER RESTRAINTS | 03/05/2025 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. | |||
| ROW- PRE-APRON (PRE-POUR) | 03/05/2025 | PARTIALLY APPROVED | PFLANAGAN |
| Note: READY TO POUR APRON AND PAVER RESTRAINTS ONLY. BEFORE NEXT PRE POUR ALL PAVER BASE NEEDS TO SPREAD AND COMPACTED TO CITY'S STANDARDS WITH NO PAVERS LAID AT THE TIME OF THE INSPECTION. IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. | |||
| U-CROSS CONNECTION | 02/27/2025 | Disapproved -FEE REQUIRED | LFITZGERALD |
| Note: irrigation not yet installed-please schedule when all completed | |||
| GRAVITY SEWER TEST | 02/27/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| SEWER TIE IN | 02/27/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| ELECTRIC - EARLY POWER | 02/05/2025 | APPROVED | HCAMACHO |
| LATH/BRICK/ WATER BARRIER | 11/04/2024 | APPROVED | HCAMACHO |
| GAS ROUGH | 10/22/2024 | PARTIALLY APPROVED | MGIBSON |
| Note: 10/16/2024 - PREVIOUS INSPECTION NOTES Gas line not bonded. FBCR G2411 BOND GAS PIPING Will check at next inspection. BOND WIRE IS IN PLACE, SPOKE TO DONAL C/M FROM RINICK CONSTRUCTION BOND WIRE IS AT KITCHEN AREA IN CEILING, ANOTHER GAS ROUGH INSPECTION REQUIRED WHEN U/G OR A/G TANK IS RAN FROM TANK TO HOUSE STUB OUT | |||
| INSULATION | 10/22/2024 | APPROVED | HCAMACHO |
| Note: Inspector Notes from Inspection 2420 1. Nail Plates missing on water lines-Pool bath, Master Bedroom, Laundry Room. Marked on wall 2. All Bath Fans need a mechanical connection on flex to fan. 3. Flex bath fan pipe in guest bath needs to be secured. 4. Exhaust in summer kitchen needs mechanical connection at joints. 5. Gas line not bonded. FBCR G2411 BOND GAS PIPING 6. Kitchen exhaust not installed at this time. 7. Permanent front door not installed, but opening is covered with plywood. 8. House to garage door has frame installed and plastic over. Builder states someone stole door. 9. Silt fence needs to be fixed. Check at insulation. | |||
| ALL ROUGH | 10/16/2024 | APPROVED - AS NOTED | HCAMACHO |
| Note: 1. Nail Plates missing on water lines-Pool bath, Master Bedroom, Laundry Room. Marked on wall 2. All Bath Fans need a mechanical connection on flex to fan. 3. Flex bath fan pipe in guest bath needs to be secured. 4. Exhaust in summer kitchen needs mechanical connection at joints. 5. Gas line not bonded. FBCR G2411 BOND GAS PIPING 6. Kitchen exhaust not installed at this time. 7. Permanent front door not installed, but opening is covered with plywood. 8. House to garage door has frame installed and plastic over. Builder states someone stole door. 9. Silt fence needs to be fixed. Check at insulation. | |||
| GAS ROUGH | 10/16/2024 | PARTIALLY APPROVED | HCAMACHO |
| Note: Gas line not bonded. FBCR G2411 BOND GAS PIPING Will check at next inspection | |||
| ROOF VALLEY & METAL | 10/04/2024 | APPROVED | HCAMACHO |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/05/2024 | APPROVED | FWILLIS |
| Note: 8/23/2024 - PREVIOUS INSPECTION NOTES 8/23/24 - ROOF SHEATHING ONLY.......PARTIAL 8/22/2024 - PREVIOUS INSPECTION NOTES PAGE A2 ON APPROVED DRAWINGS SHOWS BEARING WALL IN GARAGE IS NOT PER PLAN. ALSO BEARING WALLS IN OTHER PLACES, I MARKED ON DRAWINGS, IS NOT PER PLAN. BOXES "A" AND "B", PERTAINING TO THE BEARING WALL SHOWS ANCHOR BOLTS, SDW SCREWS AND MORE. INSPECTION STOPPED AND INCOMPLETE. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/23/2024 | PARTIALLY APPROVED | FWILLIS |
| Note: 8/23/24 - ROOF SHEATHING ONLY.......PARTIAL 8/22/2024 - PREVIOUS INSPECTION NOTES PAGE A2 ON APPROVED DRAWINGS SHOWS BEARING WALL IN GARAGE IS NOT PER PLAN. ALSO BEARING WALLS IN OTHER PLACES, I MARKED ON DRAWINGS, IS NOT PER PLAN. BOXES "A" AND "B", PERTAINING TO THE BEARING WALL SHOWS ANCHOR BOLTS, SDW SCREWS AND MORE. INSPECTION STOPPED AND INCOMPLETE. | |||
| WALL SHEATHING | 08/22/2024 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/22/2024 | Disapproved - NO FEE | FWILLIS |
| Note: PAGE A2 ON APPROVED DRAWINGS SHOWS BEARING WALL IN GARAGE IS NOT PER PLAN. ALSO BEARING WALLS IN OTHER PLACES, I MARKED ON DRAWINGS, IS NOT PER PLAN. BOXES "A" AND "B", PERTAINING TO THE BEARING WALL SHOWS ANCHOR BOLTS, SDW SCREWS AND MORE. INSPECTION STOPPED AND INCOMPLETE. | |||
| ELECTRIC-TUG | 08/13/2024 | APPROVED | RMARTIN |
| WATER METER INSTALLATION REQUEST | 08/13/2024 | APPROVED - AS NOTED | CBOWERMASTER |
| Note: already approved and installed | |||
| TIE BEAM / LINTEL | 07/09/2024 | APPROVED | JWALKER |
| FOUND SURVEY APPROVED (OFFICE) | 07/01/2024 | APPROVED | TBAKER |
| WATER METER INSTALLATION REQUEST | 07/01/2024 | APPROVED | CBOWERMASTER |
| MONOLITHIC SLAB | 06/18/2024 | APPROVED | JWALKER |
| PLUMBING 1ST ROUGH UNDERGROUND | 06/13/2024 | APPROVED | MGIBSON |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 06/03/2024 | APPROVED | JMUNSON |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 06/18/2025 | 06/23/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/13/2025 | 06/18/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 06/04/2025 | 06/04/2025 |
| Note: Marked INFORMATION By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM product sheet missing the address of property | |||
| BLD | COMPLETE | 10/15/2024 | 10/21/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 08/30/2024 | 09/03/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/28/2024 | 07/01/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/28/2024 | 06/28/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/03/2024 | 06/03/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/23/2024 | 04/24/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/23/2024 | 04/23/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 04/23/2024 | 04/23/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | HOLD | 04/16/2024 | 04/17/2024 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Landscape: This property requires 7 trees your currently have 17325 sq ft and for every 2500 we require a tree. please add one more tree Elevation: Elevation plan. banding still missing in front and rear of home as they both face the Right of way. | |||
| MECH | COMPLETE | 04/16/2024 | 04/17/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 04/16/2024 | 04/22/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | HOLD | 04/16/2024 | 04/18/2024 |
| Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet. | |||
| ELEC | HOLD | 04/16/2024 | 04/22/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 2. Submit manufacture specs of generator. 3. Submit riser diagram for generator. 2nd REQUEST | |||
| SW1 | COMPLETE | 04/16/2024 | 04/18/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/16/2024 | 04/16/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BADMIN | HOLD | 03/25/2024 | 03/26/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 3. Geotechnical Report Not Accepted. Report submitted indicates root fibers and silt should be cleared to 24 inches. Provide amended geotechnical report to include the information below. • Specifications for the preparation of the site prior to placement of compacted fill material. • Specifications for material to be used as compacted fill. • Test methods to be used to determine the maximum dry density and optimum moisture content of the material used as compacted fill. • The maximum allowable thickness of each lift of compacted fill material. • Field test method for determining the in-place dry density of the compacted fill. • Minimum acceptable in-place dry density expressed as a percentage of the maximum dry density determine in accordance with the third bullet above. • Number and frequency of field tests required to determine compliance with the sixth bullet above. 2. Letter needs to be digitally signed and sealed. | |||
| BLD | HOLD | 03/25/2024 | 03/30/2024 |
| Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet. 2. Provide product approvals for Exterior Wall and Structural Component items or refer to plan sheets which contain the same. 107.2.4 3. Please update product approval numbers to 2023 Code cycle. Based on an inquiry, for example, 2236.11 is not an approved product. 107.2.4 | |||
| CUSVC | COMPLETE | 03/25/2024 | 03/27/2024 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 03/25/2024 | 04/01/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Submit electrical load calcs 2. Submit manufacture specs of generator. 3. Submit riser diagram for generator. | |||
| ENGIN1 | COMPLETE | 03/25/2024 | 03/25/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | COMPLETE | 03/25/2024 | 03/26/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 03/25/2024 | 03/27/2024 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | HOLD | 03/25/2024 | 03/26/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Direction house faces on Energy Calcs does not match the site plan. Revise to match per R405.4.2.1 FBC Energy Conservation 2023 8Th Edition 2. Design location on Heatload needs to be St. Augustine to match the Energy calcs 107.1 FBC Residential 2023 8th Edition 3. Provide duct layout signed by the AC contractor 107.1 FBC Residential 2023 8th Edition | |||
| SW1 | HOLD | 03/25/2024 | 04/02/2024 |
| Note: Held By: SINA VEDADI MOGHADAM - (386)986-2569 - SVEDADIMOGHADAM@PALMCOASTGOV.COM 1- Please include both inverts of the adjacent property ( currently it only shows one side: 7.99) 2-Please depict the FFE of the adjacent property (Lot 2 Block 7). 3- Please include the culvert materials as well (Typical is CMP). | |||
| ZON | HOLD | 03/25/2024 | 03/26/2024 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Site plan: Driveway and walkway materials missing. Show the tank on the site plan. No need to add the pool or the generator at this point as this a SFR permit only. Please know that generators can not go on the street side. Adjust plan accordingly. Landscape 4 shrubs needed to wrap each corner facing the front of the home for a total of 16 shrubs along the front.*All of these required shrubs shall be planted between two and one half and eight feet of the home’s foundation.* Landscape should match the site plan. the rear has a walkway to the rear of the property from the pool. Elevation plan. All windows and doors facing public right of way must have banding (shutters can substitute for banding). A base course or plinth course: Banding, molding, or stringcourses; quoins; oriels; cornices; arches; balconies; brackets; shutters; keystones; dormers; louvers; as part of the exterior wall construction Color page: The homes walls needs to be one color and in the color sheet you show one accent color. Please know that the accent color can not be more that 20% of the accents They are greyed out areas on the elevation page showing as if they will be colored differently than the home. Please adjust plan accordingly. All plans must match | |||
| SWALE | COMPLETE | 03/25/2024 | 06/10/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG REINSPECTION 20 | ¤20.00 | 07/01/2025 |
| REINSPECTION FEE | ¤40.00 | 06/23/2025 |
| SURCHARGE FS 533.721 | ¤11.62 | 04/24/2024 |
| SURCHARGE - FS 468.631 | ¤17.43 | 04/24/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 04/24/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 04/24/2024 |
| SW ENG PRE APRON | ¤30.00 | 04/24/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 04/24/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 04/24/2024 |
| SEWER INSPECTION | ¤25.00 | 04/24/2024 |
| SEWER CAPITAL FACILITY | ¤5,441.03 | 04/24/2024 |
| WATER CAPITAL FACILITY FEE | ¤3,994.51 | 04/24/2024 |
| SITE PLAN 30 | ¤30.00 | 04/24/2024 |
| WATER-METER | ¤514.49 | 04/24/2024 |
| WATER- TURN ON | ¤25.00 | 04/24/2024 |
| WATER- TURN ON | ¤25.00 | 04/24/2024 |
| ADJUSTMENT 50% | (¤1,162.25) | 04/24/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 04/24/2024 |
| INSPECTION - RESIDENTIAL | ¤1,787.50 | 04/24/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤507.00 | 04/24/2024 |
| CONNECTION FEES | ¤1,187.26 | 04/24/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 04/24/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 04/24/2024 |
| IMPACT FEE FIRE | ¤428.09 | 04/24/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 04/24/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 04/24/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 04/24/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 04/24/2024 |
| IMPACT FEE TRANSPORTATION | ¤1,862.00 | 04/24/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 04/24/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 04/24/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤23,002.67 |