Permit #2024031171

Permit Details

Status: COED

Parcel Id: 07-11-31-7059-00910-0020
CONDITIONED SPACE: 1800 sqft
OPENED PORCH (WITH ROOF) : 108 sqft
OPENED PORCH (WITH ROOF) : 132 sqft
GARAGE: 434 sqft
Total Square Footage: 2474 sqft
Block: 00910
Subdivision: -
Job Phone: 832-726-2202
Location Address: 4 SEABEE CT
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 04/26/2024
NOC: RECORDED
Applicant name: JONATHON AMBAR
Owner: CASPIAN INVESTMENTS 1 LLC

Address

1802 N ALAFAYA TRL

ORLANDO, FL 32826

Address

SUITE 162

ORLANDO, FL 32826

Lot: 0020
Contracted Stated Job Value: ¤131,500.00
Job Description: Single Family Residence
Type: CN

Contractor

CASPIAN HOMES, LLC
Status Location Address Mailing Address State License Number Phone
ACTIVE

1802 N ALAFAYA TRAIL

ORLANDO, FL 32826

SUITE 162

ORLANDO, FL 32826

CBC1264918 (Exp: 08/31/2026) 832-726-2202

Sub Contractors

HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823
MOISES MERINO DIAZ
Status Location Address State License Number Phone
ACTIVE

3104 ORANOLE ROAD

ORLANDO, FL 32810

CAC1820980 (Exp: 08/31/2026) 407-225-3149
TERRY BRICE DICKERSON
Status Location Address State License Number Phone
ACTIVE

4300 ST JOHN'S PARKWAY

ALPHARETTA, GA 30009

CCC1326209 (Exp: 08/31/2026) 407-548-6733
JAMES M GREENSLADE
Status Location Address State License Number Phone Fax
ACTIVE

311 S BAY ST

BUNNELL, FL 32110

EC13006083 (Exp: 08/31/2026) 386-263-2960 386-263-2980

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 03/13/2025 Approval - Private Provider PPROVIDER
ROW - STORMWATER FINAL 03/03/2025 APPROVED FSLADISH
Note: 3/3/25 REQUIRED CORRECTION COMPLETED AT THE TIME OF THIS INSPECTION. AT THE TIME OF THIS INSPECTIONS ALL COPC REQUIREMENTS WERE MET, NEITHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED ________________________________________________________________________________________________________________________ 2/27/2025 - PREVIOUS INSPECTION NOTES INSPECTORS NOTE. ONE SMALL AREA TO STILL SOD WAITING FOR LANDSCAPE SUB. LET CM KNOW THAT I WOULD NOT FEE HIM TODAY.
U -UTILITY RESIDENTIAL FINAL 02/27/2025 FINAL APPROVED BWRIGHT
Note: Inspector Notes from Inspection 9035 NO IRR. NO CC
ROW - STORMWATER FINAL 02/27/2025 Disapproved - NO FEE FSLADISH
Note: INSPECTORS NOTE. ONE SMALL AREA TO STILL SOD WAITING FOR LANDSCAPE SUB. LET CM KNOW THAT I WOULD NOT FEE HIM TODAY.
ROW - FINAL APRON (AFTER POUR) 02/27/2025 APPROVED FSLADISH
Note: 2/27/25 PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW- PROJECT STATUS 02/25/2025 APPROVED FSLADISH
Note: 2/25/25 Met with Rich to discuss required corrections. he understood and we are in agreement to move forward. ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 2/24/25 UPON WALKING PROPERTY DETERMINED THER IS A LOW SPOT IN THE REAR LEFT PROPERTY CORNER. . YOU WILL ALSO NEED TO ADD SOD TO GRADE ON THE LEFT SIDE ADJOINING PROPERTY WHERE THERE IS A SMALL PILE OF DIRT AND IT IS BARE. APPROVING AS NOTED THAT THERE ARE CORRECTIONS REQUIRED BEFORE ROW FINAL PASSAGE. ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9463 2/24/25 EVEN THOUGH WE REQUIRE 3 TENTHS TOE TO HEEL IN W SWALES, ON THE LEFT SIDE REAR PROPERTY LINE IT IS ONLY 2. I WILL VERIFY IN FIELD IF DRAINAGE WILL WORK. APPROVING AS NOTED. _______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 2/3/25 BM LOCATED. PIPE NOW WITHIN SWALE PLAN TOLERANCE. REDY TO POUR AT THE TIME OF THIS INSPECTION. PIPE ELEVATION GOOD. BUILDER TO USE MINIMUM 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. AT THE TIME OF THE INSPECTION READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK ELEVATIONS MAKE SURE CONCRETE IS 3000 PSI BUILDER RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. 1/29/2025 - PREVIOUS INSPECTION NOTES 1/29/25 CANNOT EASILY LOCATE THE BENCHMARK IN ASPHALT. PLEASE LOCATE AND INDICATE BM CLEARLY SO THAT I AM ABLE TO SHOOT CULVERT PIPE ELEVATION. Section 300.01 B(9) V-15 "9) An on-site, easily identifiable benchmark referenced to NAVD 1988 (e.g., fire hydrant, nail in power pole [1 nail per power pole], and manhole covers). Pavement nails will be accepted if the above locations are not available on site. (The benchmark must be maintained throughout the construction cycle and will be used in the swale plan and Final Survey). NAVD 1988 data sheets are available http://www.ngs.noaa.gov"
ROW- FINAL SURVEY/GRADING CERTIFICATION 02/24/2025 APPROVED - AS NOTED FSLADISH
Note: 2/24/25 EVEN THOUGH WE REQUIRE 3 TENTHS TOE TO HEEL IN W SWALES, ON THE LEFT SIDE REAR PROPERTY LINE IT IS ONLY 2. I WILL VERIFY IN FIELD IF DRAINAGE WILL WORK. APPROVING AS NOTED. _______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 2/3/25 BM LOCATED. PIPE NOW WITHIN SWALE PLAN TOLERANCE. REDY TO POUR AT THE TIME OF THIS INSPECTION. PIPE ELEVATION GOOD. BUILDER TO USE MINIMUM 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. AT THE TIME OF THE INSPECTION READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK ELEVATIONS MAKE SURE CONCRETE IS 3000 PSI BUILDER RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. 1/29/2025 - PREVIOUS INSPECTION NOTES 1/29/25 CANNOT EASILY LOCATE THE BENCHMARK IN ASPHALT. PLEASE LOCATE AND INDICATE BM CLEARLY SO THAT I AM ABLE TO SHOOT CULVERT PIPE ELEVATION. Section 300.01 B(9) V-15 "9) An on-site, easily identifiable benchmark referenced to NAVD 1988 (e.g., fire hydrant, nail in power pole [1 nail per power pole], and manhole covers). Pavement nails will be accepted if the above locations are not available on site. (The benchmark must be maintained throughout the construction cycle and will be used in the swale plan and Final Survey). NAVD 1988 data sheets are available http://www.ngs.noaa.gov"
ROW FIELD SURVEY /GRADING CERTIFICATION 02/24/2025 APPROVED - AS NOTED FSLADISH
Note: 2/24/25 UPON WALKING PROPERTY DETERMINED THER IS A LOW SPOT IN THE REAR LEFT PROPERTY CORNER. . YOU WILL ALSO NEED TO ADD SOD TO GRADE ON THE LEFT SIDE ADJOINING PROPERTY WHERE THERE IS A SMALL PILE OF DIRT AND IT IS BARE. APPROVING AS NOTED THAT THERE ARE CORRECTIONS REQUIRED BEFORE ROW FINAL PASSAGE. ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9463 2/24/25 EVEN THOUGH WE REQUIRE 3 TENTHS TOE TO HEEL IN W SWALES, ON THE LEFT SIDE REAR PROPERTY LINE IT IS ONLY 2. I WILL VERIFY IN FIELD IF DRAINAGE WILL WORK. APPROVING AS NOTED. _______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 2/3/25 BM LOCATED. PIPE NOW WITHIN SWALE PLAN TOLERANCE. REDY TO POUR AT THE TIME OF THIS INSPECTION. PIPE ELEVATION GOOD. BUILDER TO USE MINIMUM 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. AT THE TIME OF THE INSPECTION READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK ELEVATIONS MAKE SURE CONCRETE IS 3000 PSI BUILDER RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. 1/29/2025 - PREVIOUS INSPECTION NOTES 1/29/25 CANNOT EASILY LOCATE THE BENCHMARK IN ASPHALT. PLEASE LOCATE AND INDICATE BM CLEARLY SO THAT I AM ABLE TO SHOOT CULVERT PIPE ELEVATION. Section 300.01 B(9) V-15 "9) An on-site, easily identifiable benchmark referenced to NAVD 1988 (e.g., fire hydrant, nail in power pole [1 nail per power pole], and manhole covers). Pavement nails will be accepted if the above locations are not available on site. (The benchmark must be maintained throughout the construction cycle and will be used in the swale plan and Final Survey). NAVD 1988 data sheets are available http://www.ngs.noaa.gov"
ROW- PRE-APRON (PRE-POUR) 02/04/2025 APPROVED - AS NOTED FSLADISH
Note: 2/3/25 BM LOCATED. PIPE NOW WITHIN SWALE PLAN TOLERANCE. REDY TO POUR AT THE TIME OF THIS INSPECTION. PIPE ELEVATION GOOD. BUILDER TO USE MINIMUM 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. AT THE TIME OF THE INSPECTION READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK ELEVATIONS MAKE SURE CONCRETE IS 3000 PSI BUILDER RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. 1/29/2025 - PREVIOUS INSPECTION NOTES 1/29/25 CANNOT EASILY LOCATE THE BENCHMARK IN ASPHALT. PLEASE LOCATE AND INDICATE BM CLEARLY SO THAT I AM ABLE TO SHOOT CULVERT PIPE ELEVATION. Section 300.01 B(9) V-15 "9) An on-site, easily identifiable benchmark referenced to NAVD 1988 (e.g., fire hydrant, nail in power pole [1 nail per power pole], and manhole covers). Pavement nails will be accepted if the above locations are not available on site. (The benchmark must be maintained throughout the construction cycle and will be used in the swale plan and Final Survey). NAVD 1988 data sheets are available http://www.ngs.noaa.gov"
ROW- PROJECT STATUS 01/31/2025 APPROVED FSLADISH
Note: 1/31/25 MET CONCRETE SUB ON SITE TO DETERMINE BM LOCATION. WE HAVE IDENTIFIED IT AND CULVERT PIPE WILL NEED TO BE RESET WITHIN COPC SWALE PLAN DIAGRAM TOLERANCE.
ROW- PRE-APRON (PRE-POUR) 01/29/2025 Disapproved - NO FEE FSLADISH
Note: 1/29/25 CANNOT EASILY LOCATE THE BENCHMARK IN ASPHALT. PLEASE LOCATE AND INDICATE BM CLEARLY SO THAT I AM ABLE TO SHOOT CULVERT PIPE ELEVATION. Section 300.01 B(9) V-15 "9) An on-site, easily identifiable benchmark referenced to NAVD 1988 (e.g., fire hydrant, nail in power pole [1 nail per power pole], and manhole covers). Pavement nails will be accepted if the above locations are not available on site. (The benchmark must be maintained throughout the construction cycle and will be used in the swale plan and Final Survey). NAVD 1988 data sheets are available http://www.ngs.noaa.gov"
ELECTRIC - EARLY POWER 01/13/2025 Approval - Private Provider PPROVIDER
GRAVITY SEWER TEST 01/10/2025 Approval - Private Provider PPROVIDER
Note: 11/25/2024 12:10:01 PM- PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 8/23/2024 4:29:29 PM- PREVIOUS INSPECTION NOTES
SEWER TIE IN 01/10/2025 APPROVED MGIBSON
U-CROSS CONNECTION 01/10/2025 APPROVED - AS NOTED BWRIGHT
Note: NO IRR. NO CC
PEP TANK INSTALLATION REQUEST 12/02/2024 APPROVED BVITALE
LATH/BRICK/ WATER BARRIER 11/26/2024 Approval - Private Provider PPROVIDER
INSULATION 11/22/2024 Approval - Private Provider PPROVIDER
ELECTRIC-TUG 11/19/2024 Approval - Private Provider PPROVIDER
Note: 11/18/2024 12:00:28 PM- PREVIOUS INSPECTION NOTES
TUB SET 11/19/2024 Approval - Private Provider PPROVIDER
ALL ROUGH 11/15/2024 Approval - Private Provider PPROVIDER
ELECTRIC-TUG 11/13/2024 CANCELLED BY APPLICANT PPROVIDER
ROOF VALLEY & METAL 11/06/2024 Approval - Private Provider PPROVIDER
WALL SHEATHING 11/01/2024 Approval - Private Provider PPROVIDER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/01/2024 Approval - Private Provider PPROVIDER
FOUND SURVEY APPROVED (OFFICE) 10/31/2024 APPROVED JMYERS
WATER METER INSTALLATION REQUEST 10/25/2024 APPROVED CBOWERMASTER
GRAVITY SEWER TEST 10/22/2024 CANCELLED BY APPLICANT PPROVIDER
Note: New inspection due to canceled inspection 8/23/2024 4:29:29 PM- PREVIOUS INSPECTION NOTES
GRAVITY SEWER TEST 10/21/2024 CANCELLED BY APPLICANT WEB
Note: 8/23/2024 4:29:29 PM- PREVIOUS INSPECTION NOTES
TIE BEAM / LINTEL 09/17/2024 Approval - Private Provider PPROVIDER
MONOLITHIC SLAB 08/29/2024 Approval - Private Provider PPROVIDER
PLUMBING 1ST ROUGH UNDERGROUND 08/26/2024 Approval - Private Provider PPROVIDER
GRAVITY SEWER TEST 08/23/2024 CANCELLED BY APPLICANT PPROVIDER
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 08/23/2024 APPROVED CPISCITELLI

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 10/23/2024 10/31/2024
Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM
ZON COMPLETE 10/23/2024 10/23/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ZON COMPLETE 09/04/2024 09/04/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD COMPLETE 07/29/2024 08/01/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
PLENV COMPLETE 06/27/2024 06/28/2024
Note: Released By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM After action report was submitted and accepted by FWC meeting the requirements for 10.04.01 of the LDC. Staff suggests placing silt fence as soon as possible to prevent tortoise from moving into the lot. If any gopher tortoises are located in the future further coordination may be necessary.
ELEC COMPLETE 04/08/2024 04/12/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
MECH COMPLETE 04/08/2024 04/11/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 04/08/2024 04/12/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BADMIN COMPLETE 03/26/2024 04/01/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD HOLD 03/26/2024 04/02/2024
Note: Held By: JPI 1. Please provide the revision numbers on the product approval table. 19321 for example has a R3. 107.2.4
CUSVC COMPLETE 03/26/2024 03/27/2024
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC HOLD 03/26/2024 04/01/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Electrical riser diagram needs to include the surge protector. NEC 2020 230.67 2. Electrical load calcs are done by contractor not listed on your permit.
ENGIN1 COMPLETE 03/26/2024 03/26/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 03/26/2024 04/02/2024
LOCATE COMPLETE 03/26/2024 03/28/2024
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH HOLD 03/26/2024 04/02/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Energy Calcs need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2023 8Th edition
SW1 COMPLETE 03/26/2024 03/26/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 03/26/2024 03/27/2024
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
SWALE COMPLETE 03/26/2024 06/12/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤20.00 06/24/2025
ADMINISTRATIVE - RESID PP ¤225.00 06/24/2025
INSPECTION - RESIDENTIAL ¤940.50 04/26/2024
PLAN REVIEW - RESIDENTIAL ¤266.76 04/26/2024
CONNECTION FEES ¤1,187.26 04/26/2024
WATER- TURN ON ¤25.00 04/26/2024
ADJUSTMENT 50% (¤618.63) 04/26/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 04/26/2024
FC IMPACT FEE EMS ¤62.00 04/26/2024
IMPACT FEE FIRE ¤428.09 04/26/2024
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 04/26/2024
FC IMPACT FEE LIBRARY ¤268.00 04/26/2024
IMPACT FEE PARKS ¤1,800.99 04/26/2024
IMPACT FEE SCHOOL ¤5,450.00 04/26/2024
IMPACT FEE TRANSPORTATION ¤1,862.00 04/26/2024
WATER -IRRIGATION INSPECTION ¤25.00 04/26/2024
SURCHARGE FS 533.721 ¤6.19 04/26/2024
SURCHARGE - FS 468.631 ¤9.28 04/26/2024
SW ENG - FOUNDATION SURVEY ¤20.00 04/26/2024
SW ENG INSPECTION 80 ¤80.00 04/26/2024
SW ENG PRE APRON ¤30.00 04/26/2024
SW ENG - REVIEW 20 ¤20.00 04/26/2024
SW ENG RES REVIEW 200 ¤200.00 04/26/2024
SEWER INSPECTION ¤25.00 04/26/2024
SEWER CAPITAL FACILITY ¤5,441.03 04/26/2024
WATER CAPITAL FACILITY FEE ¤3,994.51 04/26/2024
SITE PLAN 30 ¤30.00 04/26/2024
Fees Total Due: ¤0.00 Total Paid: ¤22,045.98