Permit #2024031248
Permit Details
Status: FINAL
| Parcel Id: 41-11-31-0000-01040-0010 |
| Block: 01040 |
| Subdivision: - |
| Job Phone: 386-338-5424 |
| Location Address: 1 FLORIDA PARK DR S |
| Type: CSD - COMMERCIAL SITE DEVELOPMENT |
| Issue Date: 04/18/2024 |
| NOC: Unknown |
| Applicant name: KYLE ROBERT HALL |
| Owner: EQUITY HOLDING CORP OF FLAGLER |
|
Address PO BOX 395 BUNNELL, FL 32110 |
| Lot: 0010 |
| Contracted Stated Job Value: ¤572,661.00 |
| Job Description: SITE WORK: WAWA GAS STATION SITE INTERIOR WORK |
| Type: CN |
Contractor
TOMOKA CONSTRUCTION SERVICES, INC.
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
40 HOLLY STREET HOLLY HILL, FL 32110 |
CUC1225507 (Exp: 08/31/2026) | 386-274-3120 | 386-274-3170 |
Inspection History
| Type | Request Date | Result | Inspector |
| MAINT BOND ACCEPTANCE (OFFICE) | 02/20/2025 | APPROVED | DRAMIREZ |
| LDSC- LANDSCAPE / IRRIGATION AS-BUILT | 11/14/2024 | APPROVED | RPICATAGI |
| LDSC- LANDSCAPE FINAL | 11/14/2024 | APPROVED | RPICATAGI |
| U - UTILITY COMMERCIAL FINAL | 11/14/2024 | FINAL APPROVED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9602 *** NOTES ADDED BY LFITZGERALD 11/14/2024 2:11:45 PM *** Therm striping still tombe completed for all double yellow lines at all 3 entrances and yellow gore along Palm coast pkwy-eastbound just past Florida park drive(noted as 14D) on site plans-Kyle with Tomoka assured this work would be completed in atimely manner. 11/6/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 11/6/2024 11:40:23 AM *** requires TH=hermo for all stiping in city ROW-as discussed wiyh John-Joe on site Inspector Notes from Inspection 9100 *** NOTES ADDED BY LFITZGERALD 10/28/2024 11:41:40 AM *** with don ,ok | |||
| U-ROW FINAL | 11/14/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 11/14/2024 2:09:16 PM *** the DRY RENTENTION POND called out on the approved plans is and has been holding water for several weeks since last rain event and it is supposed to be in ary condition after 72 hours and as such this stagnant water might be probmatic such as fowl smelling,mesquito bredding area and potential water snakes etc. so i will make mention of this to Craig/John -site supervisors But ithis is concerning to the city since the public will be occupying this property via walking/parking etc.. | |||
| UC-TRAF - FINAL (SIGN/PAVEMENT MARKING) | 11/14/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 11/14/2024 2:11:45 PM *** Therm striping still tombe completed for all double yellow lines at all 3 entrances and yellow gore along Palm coast pkwy-eastbound just past Florida park drive(noted as 14D) on site plans-Kyle with Tomoka assured this work would be completed in atimely manner. 11/6/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 11/6/2024 11:40:23 AM *** requires TH=hermo for all stiping in city ROW-as discussed wiyh John-Joe on site Inspector Notes from Inspection 9100 *** NOTES ADDED BY LFITZGERALD 10/28/2024 11:41:40 AM *** with don ,ok | |||
| UC-FINAL SITE INSPECTION | 11/13/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 11/13/2024 2:41:56 PM *** thermo for striping at all 3 entrances set fot 11-14-24 | |||
| CLOSE OUT DOCUMENTS | 11/13/2024 | APPROVED | DRAMIREZ |
| PLANNING - OFFICE USE - FINAL AS-BUILT SURVEY | 11/13/2024 | APPROVED | DRAMIREZ |
| LDSC-PRE-PLANTING TREE QUALITY | 11/12/2024 | APPROVED | RPICATAGI |
| Note: 10/14/2024 2:03:12 PM- PREVIOUS INSPECTION NOTES | |||
| LDSC-IRRIGATION FINAL | 11/12/2024 | APPROVED | RPICATAGI |
| LDSC- LANDSCAPE / IRRIGATION AS-BUILT | 11/12/2024 | Disapproved - NO FEE | RPICATAGI |
| UROW-RETENT/DETENT STABILI | 11/12/2024 | APPROVED | LFITZGERALD |
| UC-SUBSTANTIAL WALK-THRU | 11/12/2024 | APPROVED | LFITZGERALD |
| UC- PRELIMINARY AS-BUILTS | 11/12/2024 | APPROVED | LFITZGERALD |
| UC-TRAF - FINAL (SIGN/PAVEMENT MARKING) | 11/06/2024 | PARTIALLY APPROVED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 11/6/2024 11:40:23 AM *** requires TH=hermo for all stiping in city ROW-as discussed wiyh John-Joe on site Inspector Notes from Inspection 9100 *** NOTES ADDED BY LFITZGERALD 10/28/2024 11:41:40 AM *** with don ,ok | |||
| BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS | 11/06/2024 | FINAL APPROVED | FWILLIS |
| BLD- ADA PARKING | 11/06/2024 | FINAL APPROVED | FWILLIS |
| BLD- ADA SIGNAGECONTROL | 11/06/2024 | FINAL APPROVED | FWILLIS |
| BLD- ADA VEHICULAR WAY | 11/06/2024 | FINAL APPROVED | FWILLIS |
| BLD - ADA SIGNAGE- INFOR/DIRECT | 11/06/2024 | FINAL APPROVED | FWILLIS |
| U-GREASE INTERCEPTOR FLOW/DYE TESTED | 10/28/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 10/28/2024 11:41:40 AM *** with don ,ok | |||
| UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) | 10/24/2024 | APPROVED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9111 *** NOTES ADDED BY LFITZGERALD 9/24/2024 10:22:16 AM *** reviewed all compaction/lbr's 9/24/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 9/24/2024 10:19:51 AM *** sidewalk thru south entrance yet to be installed 7/24/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 7/24/2024 2:07:49 PM *** sidewalks around building-east-west-north | |||
| UROW- CURBING & GUTTER | 10/24/2024 | APPROVED | LFITZGERALD |
| Note: 9/24/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 9/24/2024 10:20:36 AM *** C/G removed at north entrance-redo 7/17/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 7/17/2024 11:20:49 AM *** F curb(revised from D curb) now being installed from south entrance ROW westward 7/16/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 7/16/2024 10:42:55 AM *** rescheduled for 7/17-9am | |||
| ROW - EROSION CONTROL / INLET PROTE/SILT FENCE | 10/24/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 10/24/2024 5:01:19 PM *** landcaping now being installed | |||
| BLD - SITE LIGHTING-CONDUCTORS/CONNECTORS | 10/23/2024 | APPROVED | RMARTIN |
| Note: 6/11/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY RMARTIN 6/11/2024 12:59:30 PM *** SOUTH SIDE CONDUIT TO POLE | |||
| BLD - UNDERGROUND SITE LIGHTING CONDUITS | 10/23/2024 | APPROVED | RMARTIN |
| Note: New inspection due to canceled inspection 6/26/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY RMARTIN 6/26/2024 11:26:23 AM *** marked on print | |||
| BLD - SITE LIGHTING-PLACEMENT/FOUNDATION | 10/23/2024 | APPROVED | RMARTIN |
| BLD - SITE LIGHTING-POLE SET/FIXTURE | 10/23/2024 | APPROVED | RMARTIN |
| LDSC-PRE-PLANTING TREE QUALITY | 10/10/2024 | CANCELLED BY APPLICANT | RPICATAGI |
| U-WATER METER INSTALLATION/VERIFICATION | 09/27/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 9/27/2024 9:45:36 AM *** verified by utility rep.-MIKE 9/24/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 9/24/2024 7:29:28 AM *** need to schedule thiss with my utility dept. to verify water to /in building and make sure meter asembly working fine 6/13/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 6/13/2024 8:12:27 AM *** 1inch meter/backflow now installed | |||
| U-WATER METER INSTALLATION/VERIFICATION | 09/24/2024 | CANCELLED BY APPLICANT | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 9/24/2024 7:29:28 AM *** need to schedule thiss with my utility dept. to verify water to /in building and make sure meter asembly working fine 6/13/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 6/13/2024 8:12:27 AM *** 1inch meter/backflow now installed | |||
| UC-DRAINAGE PIPE PLACEMENT/LAMPING | 09/24/2024 | APPROVED | LFITZGERALD |
| Note: 6/13/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 6/13/2024 1:52:52 PM *** pipe for D16 /and D14-existing adding pipe to fuel tank canopy(roof drains) 5/28/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 5/28/2024 2:30:10 PM *** all parking drainage pipe now installed/currently istalling roof drainage pipes to respective storm structure starting at D2 5/24/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY DHANEY 5/24/2024 10:18:43 AM *** Could not complete Insp. to many constuction vehicles in way . 4/29/2024 - PREVIOUS INSPECTION NOTES ADS pipe now being installed D-9 TO D-8SEE STR. NOTR REGARDING UNSUITABLES | |||
| UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) | 09/24/2024 | PARTIALLY APPROVED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 9/24/2024 10:19:51 AM *** sidewalk thru south entrance yet to be installed 7/24/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 7/24/2024 2:07:49 PM *** sidewalks around building-east-west-north | |||
| UROW- CURBING & GUTTER | 09/24/2024 | PARTIALLY APPROVED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 9/24/2024 10:20:36 AM *** C/G removed at north entrance-redo 7/17/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 7/17/2024 11:20:49 AM *** F curb(revised from D curb) now being installed from south entrance ROW westward 7/16/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 7/16/2024 10:42:55 AM *** rescheduled for 7/17-9am | |||
| U-WATER SERVICE INSTALLATION | 09/24/2024 | APPROVED | LFITZGERALD |
| Note: 6/20/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 6/20/2024 1:47:23 PM *** added 2nd connectiin point -NECorner of bldg. 6/5/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 6/5/2024 11:21:20 AM *** 2in poly now stubbed up to building for connection by plumber/poly installed at proposed meter/backflow connection | |||
| U-GRAVITY SEWER INSTALL/TESTING | 09/24/2024 | APPROVED | LFITZGERALD |
| Note: 6/18/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 6/18/2024 9:52:34 AM *** sewer now tied into grease interceptor and 5ft. from building 5/20/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 5/20/2024 3:03:26 PM *** ON site existing SewerManHole cored and 12x6boot installed | |||
| UC-CONSTRUCTION ENTRANCE | 09/24/2024 | APPROVED | LFITZGERALD |
| Note: 4/29/2024 - PREVIOUS INSPECTION NOTES rock now installed at South and florida park entrances | |||
| UC-ASPHALT PRE PLACEMENT | 09/24/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 9/24/2024 10:22:16 AM *** reviewed all compaction/lbr's | |||
| UC-DRAINAGE STRUCT PLACMNT | 09/24/2024 | APPROVED | LFITZGERALD |
| Note: 6/13/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 6/13/2024 1:50:36 PM *** D16 set 4/29/2024 - PREVIOUS INSPECTION NOTES structures 9and8 now installed-Note unsuitable soils/debris encountered while excavating for str./pipe placement so over excavating and adding good fill and compacting with track hoe bucket then rock added for bedding under structures and good fill ,compacted under ADS pipe | |||
| PLAN - PRE-CON 386-986-3750 | 07/24/2024 | APPROVED | LFITZGERALD |
| UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) | 07/24/2024 | PARTIALLY APPROVED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 7/24/2024 2:21:52 PM *** correctin south west north sidewalks *** NOTES ADDED BY LFITZGERALD 7/24/2024 2:07:49 PM *** sidewalks around building-east-west-north | |||
| UROW- CURBING & GUTTER | 07/17/2024 | PARTIALLY APPROVED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 7/17/2024 11:20:49 AM *** F curb(revised from D curb) now being installed from south entrance ROW westward 7/16/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 7/16/2024 10:42:55 AM *** rescheduled for 7/17-9am | |||
| UROW- CURBING & GUTTER | 07/16/2024 | CANCELLED BY APPLICANT | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 7/16/2024 10:42:55 AM *** rescheduled for 7/17-9am | |||
| BLD - UNDERGROUND SITE LIGHTING CONDUITS | 07/02/2024 | CANCELLED BY APPLICANT | WEB |
| Note: 6/26/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY RMARTIN 6/26/2024 11:26:23 AM *** marked on print | |||
| BLD - UNDERGROUND SITE LIGHTING CONDUITS | 06/26/2024 | PARTIALLY APPROVED | RMARTIN |
| Note: *** NOTES ADDED BY RMARTIN 6/26/2024 11:26:23 AM *** marked on print | |||
| BLD - GREASE INTERCEPTOR PLUMBING & VENTING | 06/25/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: 6/21/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 1451 6/4/2024 - PREVIOUS INSPECTION NOTES 1. Grease interceptor not painted inside or out. 2. No DOH numbers listed on the GI. 3. GI lid not 8" thick per plans. It was 6" thick. 4. NOC not recorded.. BAFFLE IS IN UPSIDE DOWN NEEDS TO BE FLIPPED OVER AND GI LID IS WRONG DEMINTION WILL CHECK AT PLUMBING VENT ROUGH INSPECTION. THIS WAS THE WRONG INSPECTION, THIS WAS A FOR THE APPROVED AS NOTED LAST TIME. THE LID IS THE CORRECT SPEC AND IS COATED TOP AND BOTTOM AND BAFFLE HAS BEEN CORRECTED. ANOTHER GI PLUMBING VENTING INSPECTION WILL NEED TO BE SCHEDUALED. THIS WAS APPROVED AT FIRST ROUGH PLUMBING INSPECTION | |||
| BLD - GREASE INTERCEPTOR PLUMBING & VENTING | 06/21/2024 | Disapproved - NO FEE | MGIBSON |
| Note: Inspector Notes from Inspection 1451 6/4/2024 - PREVIOUS INSPECTION NOTES 1. Grease interceptor not painted inside or out. 2. No DOH numbers listed on the GI. 3. GI lid not 8" thick per plans. It was 6" thick. 4. NOC not recorded.. BAFFLE IS IN UPSIDE DOWN NEEDS TO BE FLIPPED OVER AND GI LID IS WRONG DEMINTION WILL CHECK AT PLUMBING VENT ROUGH INSPECTION. THIS WAS THE WRONG INSPECTION, THIS WAS A FOR THE APPROVED AS NOTED LAST TIME. THE LID IS THE CORRECT SPEC AND IS COATED TOP AND BOTTOM AND BAFFLE HAS BEEN CORRECTED. ANOTHER GI PLUMBING VENTING INSPECTION WILL NEED TO BE SCHEDUALED | |||
| U-WATER SERVICE INSTALLATION | 06/20/2024 | PARTIALLY APPROVED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 6/20/2024 1:47:23 PM *** added 2nd connectiin point -NECorner of bldg. 6/5/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 6/5/2024 11:21:20 AM *** 2in poly now stubbed up to building for connection by plumber/poly installed at proposed meter/backflow connection | |||
| U-GRAVITY SEWER INSTALL/TESTING | 06/18/2024 | PARTIALLY APPROVED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 6/18/2024 9:52:34 AM *** sewer now tied into grease interceptor and 5ft. from building 5/20/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 5/20/2024 3:03:26 PM *** ON site existing SewerManHole cored and 12x6boot installed | |||
| BLD - GREASE INTERCEPTOR PRE-INSTALLATION | 06/17/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: Inspector Notes from Inspection 1451 6/4/2024 - PREVIOUS INSPECTION NOTES 1. Grease interceptor not painted inside or out. 2. No DOH numbers listed on the GI. 3. GI lid not 8" thick per plans. It was 6" thick. 4. NOC not recorded.. BAFFLE IS IN UPSIDE DOWN NEEDS TO BE FLIPPED OVER AND GI LID IS WRONG DIMMETION WILL CHECK AT PLUMBING VENT ROUGH INSPECTION | |||
| U-WATER METER INSTALLATION/VERIFICATION | 06/13/2024 | PARTIALLY APPROVED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 6/13/2024 8:12:27 AM *** 1inch meter/backflow now installed | |||
| UC-DRAINAGE STRUCT PLACMNT | 06/13/2024 | PARTIALLY APPROVED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 6/13/2024 1:50:36 PM *** D16 set 4/29/2024 - PREVIOUS INSPECTION NOTES structures 9and8 now installed-Note unsuitable soils/debris encountered while excavating for str./pipe placement so over excavating and adding good fill and compacting with track hoe bucket then rock added for bedding under structures and good fill ,compacted under ADS pipe | |||
| UC-DRAINAGE PIPE PLACEMENT/LAMPING | 06/13/2024 | PARTIALLY APPROVED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 6/13/2024 1:52:52 PM *** pipe for D16 /and D14-existing adding pipe to fuel tank canopy(roof drains) 5/28/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 5/28/2024 2:30:10 PM *** all parking drainage pipe now installed/currently istalling roof drainage pipes to respective storm structure starting at D2 5/24/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY DHANEY 5/24/2024 10:18:43 AM *** Could not complete Insp. to many constuction vehicles in way . 4/29/2024 - PREVIOUS INSPECTION NOTES ADS pipe now being installed D-9 TO D-8SEE STR. NOTR REGARDING UNSUITABLES | |||
| BLD - SITE LIGHTING-CONDUCTORS/CONNECTORS | 06/11/2024 | PARTIALLY APPROVED | RMARTIN |
| Note: *** NOTES ADDED BY RMARTIN 6/11/2024 12:59:30 PM *** SOUTH SIDE CONDUIT TO POLE | |||
| U-WATER SERVICE INSTALLATION | 06/05/2024 | PARTIALLY APPROVED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 6/5/2024 11:21:20 AM *** 2in poly now stubbed up to building for connection by plumber/poly installed at proposed meter/backflow connection | |||
| BLD - GREASE INTERCEPTOR PRE-INSTALLATION | 06/04/2024 | Disapproved -FEE REQUIRED | AWATERS |
| Note: 1. Grease interceptor not painted inside or out. 2. No DOH numbers listed on the GI. 3. GI lid not 8" thick per plans. It was 6" thick. 4. NOC not recorded. | |||
| UC-DRAINAGE PIPE PLACEMENT/LAMPING | 05/28/2024 | PARTIALLY APPROVED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 5/28/2024 2:30:10 PM *** all parking drainage pipe now installed/currently istalling roof drainage pipes to respective storm structure starting at D2 5/24/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY DHANEY 5/24/2024 10:18:43 AM *** Could not complete Insp. to many constuction vehicles in way . 4/29/2024 - PREVIOUS INSPECTION NOTES ADS pipe now being installed D-9 TO D-8SEE STR. NOTR REGARDING UNSUITABLES | |||
| UC-DRAINAGE PIPE PLACEMENT/LAMPING | 05/24/2024 | PARTIALLY APPROVED | DHANEY |
| Note: *** NOTES ADDED BY DHANEY 5/24/2024 10:18:43 AM *** Could not complete Insp. to many constuction vehicles in way . 4/29/2024 - PREVIOUS INSPECTION NOTES ADS pipe now being installed D-9 TO D-8SEE STR. NOTR REGARDING UNSUITABLES | |||
| U-GRAVITY SEWER INSTALL/TESTING | 05/20/2024 | PARTIALLY APPROVED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 5/20/2024 3:03:26 PM *** ON site existing SewerManHole cored and 12x6boot installed | |||
| UC-DRAINAGE PIPE PLACEMENT/LAMPING | 04/30/2024 | PARTIALLY APPROVED | LFITZGERALD |
| Note: ADS pipe now being installed D-9 TO D-8SEE STR. NOTR REGARDING UNSUITABLES | |||
| UC-DRAINAGE STRUCT PLACMNT | 04/30/2024 | PARTIALLY APPROVED | LFITZGERALD |
| Note: structures 9and8 now installed-Note unsuitable soils/debris encountered while excavating for str./pipe placement so over excavating and adding good fill and compacting with track hoe bucket then rock added for bedding under structures and good fill ,compacted under ADS pipe | |||
| UC-CONSTRUCTION ENTRANCE | 04/29/2024 | PARTIALLY APPROVED | LFITZGERALD |
| Note: rock now installed at South and florida park entrances |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 11/13/2024 | 11/13/2024 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Asbuilts are to be submittted directly to the Planning Division, please contact Damaris Ramirez with any questions- 386-986-3750 | |||
| PLLA | COMPLETE | 04/17/2024 | 04/17/2024 |
| Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/27/2024 | 04/01/2024 |
| Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 03/27/2024 | 03/28/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| PLENG | COMPLETE | 03/27/2024 | 03/28/2024 |
| Note: Released By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM | |||
| PLLA | HOLD | 03/27/2024 | 04/01/2024 |
| Note: Held By: RICHARD PICATAGI - (386)986-3760 - RPICATAGI@PALMCOASTGOV.COM 1. Provide Landscape and Irrigation plans 2. Extend Geogrid reinforcement within an 18 feet radius, outside curb and beneath proposed pavement area in regard to 18",16" dbh tree in southwest portion of site. 3. Applicant must schedule and attend a preconstruction tree preservation meeting in regard to large oaks to be saved, wit COPC Landscape Architect and COPC Arborist. Please coordinate meeting with Richard Picatagi (386) 986- 3760. | |||
| UD1 | COMPLETE | 03/27/2024 | 03/27/2024 |
| Note: Released By: GREG DEGLER - - GDEGLER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 06/04/2024 |
| SITE INSPECTION | ¤960.00 | 04/18/2024 |
| SITE PLAN 30 | ¤30.00 | 04/18/2024 |
| ADJUSTMENT 50% | (¤282.50) | 04/18/2024 |
| ADMINISTRATIVE- SITE DEVELOP | ¤125.00 | 04/18/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤872.50 |