I want to search for...
Permit #2024040037
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7035-00330-0050 |
| Block: 00330 |
| Subdivision: - |
| Job Phone: 386-503-0666 |
| Location Address: 2 BUTTERCUP PL |
| Type: DR - DRIVEWAY |
| Issue Date: 04/26/2024 |
| NOC: Unknown |
| Applicant name: ANTONIO M PAIVA |
| Owner: BRUCE BILLY G & ADELAIDE A H&W |
|
Address 2 BUTTERCUP PLACE PALM COAST, FL 32137 |
| Lot: 0050 |
| Contracted Stated Job Value: ¤2,000.00 |
| Job Description: DRIVEWAY EXTENSION RIGHT |
| Type: CN |
Contractor
AVANTI CONCRETE PUMPING INC
| Status | Location Address | Phone | Fax |
| ACTIVE |
PO BOX 351743 SATSUMA, FL 32189 |
386-503-0666 | 386-586-7687 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - FINAL APRON (AFTER POUR) | 05/20/2024 | APPROVED | EMADISON |
| Note: ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. | |||
| ROW - FINAL INSPECTION | 05/20/2024 | APPROVED | EMADISON |
| Note: ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. | |||
| U -UTILITY RESIDENTIAL FINAL | 05/20/2024 | FINAL APPROVED | DHANEY |
| ROW- PRE-APRON (PRE-POUR) | 05/08/2024 | APPROVED | EMADISON |
| Note: *** NOTES ADDED BY EMADISON 5/8/2024 11:48:50 AM *** ** 05/08/24 READY TO POUR ** 05/08/24 ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 04/01/2024 | 04/01/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| UTL | COMPLETE | 04/01/2024 | 04/08/2024 |
| Note: Released By: LARRY FITZGERALD - (386)286-2041 - LFITZGERALD@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/01/2024 | 04/01/2024 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADJUSTMENT 50% | (¤15.00) | 04/26/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 04/26/2024 |
| SW ENG INSPECTION 40 | ¤40.00 | 04/26/2024 |
| SW ENG PRE APRON | ¤30.00 | 04/26/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 04/26/2024 |
| SITE PLAN 15 | ¤15.00 | 04/26/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤300.00 |