Permit #2024040045
Permit Details
Status: COED
| Parcel Id: 07-11-31-7022-00150-0010 |
| CONDITIONED SPACE: 1800 sqft |
| GARAGE: 410 sqft |
| OPENED PORCH (WITH ROOF) : 36 sqft |
| PATIO/DECK (NO ROOF) : 100 sqft |
| Total Square Footage: 2346 sqft |
| Block: 00150 |
| Subdivision: 7022 - |
| Job Phone: 689-250-2429 |
| Location Address: 2 WESTGRILL PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 05/13/2024 |
| NOC: RECORDED |
| Applicant name: RYAN M COURECH |
| Owner: A AND R-MERIDIAN REAL ESTATE DEVELOPMENT LLC |
|
Address 688 N ORLANDO AVENUE MAITLAND, FL 32751 |
|
Address SUITE 207 MAITLAND, FL 32751 |
| Lot: 0010 |
| Contracted Stated Job Value: ¤180,000.00 |
| Job Description: SINGLE FAMILY DWELLING |
| Type: CN |
| Original Permit #: 2023100344 |
Contractor
MCH CONSTRUCTION LLC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
668 N ORLANDO AVE, STE 207 MAITLAND, FL 32751 |
CBC1262898 (Exp: 08/31/2026) | 407-602-8257 |
Sub Contractors
DUSTIN ARCHER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
2785 WRIGHTS ROAD SUITE 1133 OVIEDO, FL 32765 |
CMC1251099 (Exp: 08/31/2026) | 407-391-1145 |
DANA SUE COOLEY
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 1718 FLAGLER BEACH, FL 32136 |
CCC1333449 (Exp: 08/31/2026) | 904-535-1680 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
JOSEPH C WRIGHT
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
15 HARGROVE LANE PALM COAST, FL 32137 |
UNIT 3 D PALM COAST, FL 32137 |
EC13003278 (Exp: 08/31/2026) | 386-447-9644 | 386-447-9633 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 05/07/2025 | FINAL APPROVED | MCONTRYMAN |
| Note: 5/1/2025 - PREVIOUS INSPECTION NOTES 5/1/25 1. E-cals do not match equipment installed please submitt a revision for what was installed and have it approved by the Building Dept. before calling in for re-inspection FBC (A)107.4 2. Cable ground block is not accesible NEC 250.94(A) 3. Patch drywall in laundry room behind water heater FBC R402.4.1.1 4/30/2025 - PREVIOUS INSPECTION NOTES 4/30/25 Make ALL repairs before calling in for re-inspection, Items 1,3,4,5 not repaired. ***E-cals must have Building Dept. stamp of approval as well*** 4/28/25 1. Full set of E-cals must be onsite, E-cals do not show equipment model numbers FBC 107.3.1 2. Microwave is still not GFCI protected NEC 210.8 3. Water heater drain pan is required plumbed outside of home FBCR P2801.6 4. AHU heater sticker not marked to check proper breaker size FBCR M1303.1 5. T-stat wiring going into AHU is required to be sealed FBC (A)107.4 4/24/2025 - PREVIOUS INSPECTION NOTES 4/24/25 1. No permit pack on site, including energy calcs, to verify FBC(A) 107.3.1 2. Dryer vent on roof needs to have screen removed FBCR M1502.3 3. Wall outlet in front of oanty needs to be GFCi protected (less than 6' from sink) NEC 210.8 4. Microwave not GFCi protected/won't trip | |||
| BLD - BUILDING FINAL | 05/01/2025 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 5/1/25 1. E-cals do not match equipment installed please submitt a revision for what was installed and have it approved by the Building Dept. before calling in for re-inspection FBC (A)107.4 2. Cable ground block is not accesible NEC 250.94(A) 3. Patch drywall in laundry room behind water heater FBC R402.4.1.1 4/30/2025 - PREVIOUS INSPECTION NOTES 4/30/25 Make ALL repairs before calling in for re-inspection, Items 1,3,4,5 not repaired. ***E-cals must have Building Dept. stamp of approval as well*** 4/28/25 1. Full set of E-cals must be onsite, E-cals do not show equipment model numbers FBC 107.3.1 2. Microwave is still not GFCI protected NEC 210.8 3. Water heater drain pan is required plumbed outside of home FBCR P2801.6 4. AHU heater sticker not marked to check proper breaker size FBCR M1303.1 5. T-stat wiring going into AHU is required to be sealed FBC (A)107.4 4/24/2025 - PREVIOUS INSPECTION NOTES 4/24/25 1. No permit pack on site, including energy calcs, to verify FBC(A) 107.3.1 2. Dryer vent on roof needs to have screen removed FBCR M1502.3 3. Wall outlet in front of oanty needs to be GFCi protected (less than 6' from sink) NEC 210.8 4. Microwave not GFCi protected/won't trip | |||
| BLD - BUILDING FINAL | 04/30/2025 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 4/30/25 Make ALL repairs before calling in for re-inspection, Items 1,3,4,5 not repaired. ***E-cals must have Building Dept. stamp of approval as well*** 4/28/25 1. Full set of E-cals must be onsite, E-cals do not show equipment model numbers FBC 107.3.1 2. Microwave is still not GFCI protected NEC 210.8 3. Water heater drain pan is required plumbed outside of home FBCR P2801.6 4. AHU heater sticker not marked to check proper breaker size FBCR M1303.1 5. T-stat wiring going into AHU is required to be sealed FBC (A)107.4 4/24/2025 - PREVIOUS INSPECTION NOTES 4/24/25 1. No permit pack on site, including energy calcs, to verify FBC(A) 107.3.1 2. Dryer vent on roof needs to have screen removed FBCR M1502.3 3. Wall outlet in front of oanty needs to be GFCi protected (less than 6' from sink) NEC 210.8 4. Microwave not GFCi protected/won't trip | |||
| ROW - STORMWATER FINAL | 04/30/2025 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 4/24/2025 - PREVIOUS INSPECTION NOTES 04/24/25 TPOLACEK*** AS STATED IN AFTER POUR THERE IS A LARGE CHUNK OF OVER POUR CONCRETE IN MITERED END OF CULVERT. CULVERT SHALL BE FREE AND CLEAR OF DEBRIS AND SEDIMENT BEFORE FINAL ROW WILL BE APPROVED. 4 Concrete extending past the formboards DRAWING 300.G/14 DRAWING 300.G/14. Technical Manual, Drawing 300.E Concrete extending past the formboards, in the swale, must be removed. | |||
| BLD - BUILDING FINAL | 04/28/2025 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 4/28/25 1. Full set of E-cals must be onsite, E-cals do not show equipment model numbers FBC 107.3.1 2. Microwave is still not GFCI protected NEC 210.8 3. Water heater drain pan is required plumbed outside of home FBCR P2801.6 4. AHU heater sticker not marked to check proper breaker size FBCR M1303.1 5. T-stat wiring going into AHU is required to be sealed FBC (A)107.4 4/24/2025 - PREVIOUS INSPECTION NOTES 4/24/25 1. No permit pack on site, including energy calcs, to verify FBC(A) 107.3.1 2. Dryer vent on roof needs to have screen removed FBCR M1502.3 3. Wall outlet in front of oanty needs to be GFCi protected (less than 6' from sink) NEC 210.8 4. Microwave not GFCi protected/won't trip | |||
| BLD - BUILDING FINAL | 04/24/2025 | Disapproved - NO FEE | MCONTRYMAN |
| Note: 4/24/25 1. No permit pack on site, including energy calcs, to verify FBC(A) 107.3.1 2. Dryer vent on roof needs to have screen removed FBCR M1502.3 3. Wall outlet in front of oanty needs to be GFCi protected (less than 6' from sink) NEC 210.8 | |||
| ROW - FINAL APRON (AFTER POUR) | 04/24/2025 | APPROVED - AS NOTED | TPOLACEK |
| Note: 04/24/25 TPOLACEK** LEFT SIDE CULVERT HAS LARGE CHUNK OF CONCRETE THAT MUST BE REMOVED AND CULVERT MUST BE FREE AND CLEAR OF SEDIMENT. I AM APPROVING THE AFTER POUR AND HOLDING THE FINAL ROW AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW - STORMWATER FINAL | 04/24/2025 | Disapproved - NO FEE | TPOLACEK |
| Note: 04/24/25 TPOLACEK*** AS STATED IN AFTER POUR THERE IS A LARGE CHUNK OF OVER POUR CONCRETE IN MITERED END OF CULVERT. CULVERT SHALL BE FREE AND CLEAR OF DEBRIS AND SEDIMENT BEFORE FINAL ROW WILL BE APPROVED. 4 Concrete extending past the formboards DRAWING 300.G/14 DRAWING 300.G/14. Technical Manual, Drawing 300.E Concrete extending past the formboards, in the swale, must be removed. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/23/2025 | APPROVED | TPOLACEK |
| Note: UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 4/22/2025 - PREVIOUS INSPECTION NOTES FINAL SURVEY MUST BE APPROVED BEFORE FIELD SURVEY CAN BE CONDUCTED | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 04/23/2025 | APPROVED | TPOLACEK |
| Note: 4/17/2025 - PREVIOUS INSPECTION NOTES 04/17/25 TPOLACEK** FINAL SURVEY DOES NOT MATCH SITE PLAN. THE LEFT REAR CORNER IS .40 LOWER THAN THE FLOW LINE THAT WILL HOLD WATER. THE ENTIRE BACK YARD IS FLAT Finished Floor Elevations (FFE):REAR YARD DRAINAGE Section 300.01 D(4) V-17 4) Positive fall is considered to be 0.10 of a foot every 20 feet | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/22/2025 | Disapproved - NO FEE | TPOLACEK |
| Note: FINAL SURVEY MUST BE APPROVED BEFORE FIELD SURVEY CAN BE CONDUCTED | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 04/17/2025 | Disapproved - NO FEE | TPOLACEK |
| Note: 04/17/25 TPOLACEK** FINAL SURVEY DOES NOT MATCH SITE PLAN. THE LEFT REAR CORNER IS .40 LOWER THAN THE FLOW LINE THAT WILL HOLD WATER. THE ENTIRE BACK YARD IS FLAT Finished Floor Elevations (FFE):REAR YARD DRAINAGE Section 300.01 D(4) V-17 4) Positive fall is considered to be 0.10 of a foot every 20 feet | |||
| ROW- PRE-APRON (PRE-POUR) | 03/11/2025 | APPROVED - AS NOTED | TPOLACEK |
| Note: 03/11/25 TPOLACEK*** LEFT SIDE APRON WING NEEDS TO BO MOVED TO 36" FROM DRIVEWAY EDGE. STRINGLINE FROM BEHOND MITER CULVERT TO FRONT OF CULVERT AND OUTTO THE ROAD THEN MEASURE 36" TO THE LEFT AND THAT IS WHERE BOARD SHOULD BE PLACED. YOU WILL ALSO NEED TO REESTABLISH FOOTERS AFTER RAIN AS THEY ARE WASHED IN. APPROVING AS NOTED. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. CONTRACTORS WILL BE NOTIFIED WHEN TICKETS WILL BE REQUIRED WITH AN EMAIL BLAST.THE FOLLOWING IS CURRENTLY FOR INFORMATION ONLY: TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR. 2/26/2025 - PREVIOUS INSPECTION NOTES ** 02/26/25 BUILDER ON SITE AT TIME OF INSPECTION CULVERT NEEDS TO BE A STRAIGHT PIPE NOT WITH AN ELBOW SENIOR INSPECTORS P. FLANAGEN AND E. MADISON DETERMINED TO CENTER CULVERT WITHIN THE PROPOSED DRIVEWAY. (LEFT) SIDE CULVERT END WILL BE SET 5 FT FROM EDGE OF ROAD AND THE (RIGHT) SIDE WILL BE SET AT 8 FT FROM EDGE OF ROADWAY. IN INSTANCES WHERE QUESTIONS ARISE AS TO WHERE CULVERT SHOULD BE SET BUILDER SHOULD CONTACT AN INSPECTOR TO ASSIST AND LESSEN THE DELAY IN INSPECTION PROCESS | |||
| ROW- PRE-APRON (PRE-POUR) | 02/26/2025 | CANCELLED BY APPLICANT | EMADISON |
| Note: ** 02/26/25 BUILDER ON SITE AT TIME OF INSPECTION CULVERT NEEDS TO BE A STRAIGHT PIPE NOT WITH AN ELBOW SENIOR INSPECTORS P. FLANAGEN AND E. MADISON DETERMINED TO CENTER CULVERT WITHIN THE PROPOSED DRIVEWAY. (LEFT) SIDE CULVERT END WILL BE SET 5 FT FROM EDGE OF ROAD AND THE (RIGHT) SIDE WILL BE SET AT 8 FT FROM EDGE OF ROADWAY. IN INSTANCES WHERE QUESTIONS ARISE AS TO WHERE CULVERT SHOULD BE SET BUILDER SHOULD CONTACT AN INSPECTOR TO ASSIST AND LESSEN THE DELAY IN INSPECTION PROCESS | |||
| ELECTRIC - EARLY POWER | 02/24/2025 | APPROVED - AS NOTED | MCONTRYMAN |
| Note: 2/24/25 Okay to release e-mail to FPL | |||
| GRAVITY SEWER TEST | 02/21/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| U-CROSS CONNECTION | 02/21/2025 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irrigation-no cross connection | |||
| U - SEWER TIE IN | 02/21/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| INSULATION | 12/23/2024 | APPROVED | MKRASKI |
| Note: 12/20/2024 - PREVIOUS INSPECTION NOTES 12/20/24 1. Multiple unused and used openings missing firestop FBCR 302.11 12/13/2024 - PREVIOUS INSPECTION NOTES 1. E-cals show R5.1 insualtion on CMU walls, 4.1 installed 2. To the right of garage entry door is missing insulation | |||
| INSULATION | 12/20/2024 | Disapproved - NO FEE | MCONTRYMAN |
| Note: 12/20/24 1. Multiple unused and used openings missing firestop FBCR 302.11 12/13/2024 - PREVIOUS INSPECTION NOTES 1. E-cals show R5.1 insualtion on CMU walls, 4.1 installed 2. To the right of garage entry door is missing insulation | |||
| INSULATION | 12/13/2024 | Disapproved - NO FEE | MKRASKI |
| Note: 1. E-cals show R5.1 insualtion on CMU walls, 4.1 installed 2. To the right of garage entry door is missing insulation | |||
| LATH/BRICK/ WATER BARRIER | 12/10/2024 | APPROVED - AS NOTED | MKRASKI |
| Note: 12/4/24 1. Garage entry door exceeds 1/4'' solid blocking is required FBCR 609.1 Check @ insulation | |||
| ALL ROUGH | 12/04/2024 | APPROVED - AS NOTED | MKRASKI |
| Note: 12/4/24 1. Garage entry door exceeds 1/4'' solid blocking is required FBCR 609.1 Check @ insulation 12/3/2024 - PREVIOUS INSPECTION NOTES 12/3/24 1. Missing multiple nail plates NEC 300.4 2. Failed 5' Head test FBC-P2503.5.1 Inspector Notes from Inspection 2450 Inspection not needed | |||
| ALL ROUGH | 12/03/2024 | Disapproved - NO FEE | MCONTRYMAN |
| Note: 12/3/24 1. Missing multiple nail plates NEC 300.4 2. Failed 5' Head test FBC-P2503.5.1 Inspector Notes from Inspection 2450 Inspection not needed | |||
| WALL SHEATHING | 12/02/2024 | APPROVED - AS NOTED | MKRASKI |
| Note: Inspection not needed | |||
| ROOF VALLEY & METAL | 11/07/2024 | APPROVED | MKRASKI |
| ROOF VALLEY & METAL | 11/04/2024 | Disapproved - NO FEE | MKRASKI |
| Note: 1. Drip edge not nailed off per manufacter specks | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/23/2024 | APPROVED - AS NOTED | MCONTRYMAN |
| Note: 12/23/24 Please repair silt fence by next inspection Inspector Notes from Inspection 2340 1. Truss package was delivered on 7/26/24, Trusses will have to have an approved engineered letter and any repairs made, ***Note from mono inspection on 9/16/24*** | |||
| TIE BEAM / LINTEL | 09/30/2024 | APPROVED - AS NOTED | MKRASKI |
| Note: 1. Truss package was delivered on 7/26/24, Trusses will have to have an approved engineered letter and any repairs made, ***Note from mono inspection on 9/16/24*** | |||
| FOUND SURVEY APPROVED (OFFICE) | 09/30/2024 | APPROVED | JMYERS |
| MONOLITHIC SLAB | 09/16/2024 | APPROVED - AS NOTED | MKRASKI |
| Note: 1. Truss package was delivered on 7/26/24, Trusses will have to have an approved engineered letter and any repairs made, ***Note from mono inspection on 9/16/24*** | |||
| MONOLITHIC SLAB | 09/12/2024 | Disapproved - NO FEE | MKRASKI |
| Note: 9/12/24 1. Not ready, footings filled with water FBC R404.1.3.3.7.4 9/10/2024 - PREVIOUS INSPECTION NOTES 9/10/24 Multiple wash outs in footings FBC R404.1.3.3.7.4 9/3/2024 - PREVIOUS INSPECTION NOTES 1. REQUIRES 6 MIL VAPOR BARRIER FBC R506.2.3 ***At this time truss pack has already been delived, delivery date says 8/27/24 Must protect truss pack from weather per MitTek enginneering packet*** | |||
| MONOLITHIC SLAB | 09/10/2024 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 9/10/24 Multiple wash outs in footings FBC R404.1.3.3.7.4 9/3/2024 - PREVIOUS INSPECTION NOTES 1. REQUIRES 6 MIL VAPOR BARRIER FBC R506.2.3 ***At this time truss pack has already been delived, delivery date says 8/27/24 Must protect truss pack from weather per MitTek enginneering packet*** | |||
| MONOLITHIC SLAB | 09/03/2024 | Disapproved - NO FEE | MKRASKI |
| Note: 1. REQUIRES 6 MIL VAPOR BARRIER FBC R506.2.3 ***At this time truss pack has already been delived, delivery date says 8/27/24 Must protect truss pack from weather per MitTek enginneering packet*** | |||
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 08/29/2024 | APPROVED | CPISCITELLI |
| PLUMBING 1ST ROUGH UNDERGROUND | 08/23/2024 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 07/30/2024 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 05/01/2025 | 05/01/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 12/16/2024 | 12/18/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 11/15/2024 | 11/20/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 11/05/2024 | 11/13/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 11/05/2024 | 11/12/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM This is a master permit. Provide only heatload if that is what is changing otherwise if you want to change energy calcs it has to be on the master permit | |||
| BLD | COMPLETE | 10/18/2024 | 10/24/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/27/2024 | 09/30/2024 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/27/2024 | 09/27/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 08/28/2024 | 08/29/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/18/2024 | 07/23/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 07/15/2024 | 07/15/2024 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM rename your file to geotech report | |||
| ZON | COMPLETE | 04/26/2024 | 04/26/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | HOLD | 04/22/2024 | 04/23/2024 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM this is a corner lot the right side should have 6 shrubs (3 gallon) the right side needs banding all around windows | |||
| ZON | HOLD | 04/16/2024 | 04/17/2024 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM landscape plan: each corner should have 4 3 gallon shrubs your only showing three. | |||
| MECH | COMPLETE | 04/16/2024 | 04/17/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/16/2024 | 04/17/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 04/01/2024 | 04/05/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 04/01/2024 | 04/05/2024 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/01/2024 | 04/01/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 04/01/2024 | 04/04/2024 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | HOLD | 04/01/2024 | 04/03/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Direction house faces on Heatload does not match the site plan. Revise to match per R403.7 FBC Energy Conservation 2023 8Th Edition 2. Submit heatload only. remove duct layout and Energy calc pages from file | |||
| SW1 | COMPLETE | 04/01/2024 | 04/01/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | HOLD | 04/01/2024 | 04/02/2024 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM landscape plan: each corner should have 4 3 gallon shrubs your only showing three. A/C requires 7 gallon shrubs. Provide proposed sod Color sheet: please provide the manufacturer of the paint for exterior and garage door please add one more form of articulation. Every Fifity feet requires one form | |||
| SWALE | COMPLETE | 04/01/2024 | 06/18/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 05/08/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 05/08/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 05/08/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 05/08/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 11/25/2024 |
| PLAN REVIEW - REVISION | ¤32.50 | 11/25/2024 |
| WATER- TURN ON | ¤25.00 | 05/13/2024 |
| ADJUSTMENT 50% | (¤604.51) | 05/13/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 05/13/2024 |
| INSPECTION - RESIDENTIAL | ¤918.50 | 05/13/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤260.52 | 05/13/2024 |
| CONNECTION FEES | ¤1,187.26 | 05/13/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 05/13/2024 |
| IMPACT FEE FIRE | ¤428.09 | 05/13/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 05/13/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 05/13/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 05/13/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 05/13/2024 |
| IMPACT FEE TRANSPORTATION | ¤1,862.00 | 05/13/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 05/13/2024 |
| SURCHARGE FS 533.721 | ¤6.05 | 05/13/2024 |
| SURCHARGE - FS 468.631 | ¤9.07 | 05/13/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 05/13/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 05/13/2024 |
| SW ENG PRE APRON | ¤30.00 | 05/13/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 05/13/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 05/13/2024 |
| SEWER CREDIT | (¤957.92) | 05/13/2024 |
| SEWER INSPECTION | ¤25.00 | 05/13/2024 |
| SEWER CAPITAL FACILITY | ¤5,441.03 | 05/13/2024 |
| WATER CAPITAL FACILITY FEE | ¤3,994.51 | 05/13/2024 |
| SITE PLAN 30 | ¤30.00 | 05/13/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤21,053.59 |