I want to search for...
Permit #2024040051
Permit Details
Status: COED
| Parcel Id: 07-11-31-7024-00100-0050 |
| GARAGE: 398 sqft |
| OPENED PORCH (WITH ROOF) : 42 sqft |
| CONDITIONED SPACE: 1461 sqft |
| Total Square Footage: 1901 sqft |
| Block: 00100 |
| Subdivision: 7024 - |
| Job Phone: 844-885-8913 |
| Location Address: 5 PRINCE MANFRED PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 04/16/2024 |
| NOC: RECORDED |
| Applicant name: SIMON DALE VANWAGENEN |
| Owner: LGI HOMES-FLORIDA LLC |
|
Address 1450 LAKE ROBBINS DRIVE THE WOODLANDS, TX 77380 |
|
Address STE 430 THE WOODLANDS, TX 77380 |
| Lot: 0050 |
| Contracted Stated Job Value: ¤210,765.37 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
LGI HOMES-FLORIDA LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
2304 SPRING HILL CT TAMPA, FL 33602 |
CBC1257972 (Exp: 08/31/2026) | 904-451-8258 |
Sub Contractors
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
BRETT CHRISTIAN GIBSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
250 SEGOVIA RD ST AUGUSTINE, FL 32086 |
CAC1818423 (Exp: 08/31/2026) | 904-229-8131 |
CHRISTOPHER DENNIS O'CONNER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
240 N LAKE CUNNINGHAM AVE JACKSONVILLE, FL 32257 |
ER13015361 (Exp: 08/31/2026) | 904-540-0858 |
PAUL ERIC FORSTER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
6114 GOODMAN RD JACKSONVILLE, FL 32244 |
CFC1429261 (Exp: 08/31/2026) | 904-647-1820 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 09/27/2024 | Disapproved - NO FEE | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 9/26/2024 1:51:23 PM *** 9/26/24: 1). Outlet on the back of the kitchen counter is not permitted per NEC-210.52(C)(3)(3). 2). Alarm box enclosure has an unused opening into the pull sleeve that is not capped/plugged off or firestopped (NEC 408.7). 3). Dryer exhaust needs to be closed off as required by FBC-M1502.4.7 -- Where space for a clothes dryer is provided, an exhaust duct system shall be installed. Where the clothes dryer is not installed at the time of occupancy the exhaust duct shall be capped or plugged in the space in which it originates and identified and marked "future use" | |||
| BLD - BUILDING FINAL | 09/27/2024 | FINAL APPROVED | KSANDOE |
| Note: 9/26/2024 - PREVIOUS INSPECTION NOTES 9/26/24: 1). Outlet on the back of the kitchen counter is not permitted per NEC-210.52(C)(3)(3). 2). Alarm box enclosure has an unused opening into the pull sleeve that is not capped/plugged off or firestopped (NEC 408.7). 3). Dryer exhaust needs to be closed off as required by FBC-M1502.4.7 -- Where space for a clothes dryer is provided, an exhaust duct system shall be installed. Where the clothes dryer is not installed at the time of occupancy the exhaust duct shall be capped or plugged in the space in which it originates and identified and marked "future use" | |||
| U-CROSS CONNECTION | 09/27/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 9/26/2024 2:25:17 PM *** has irr meter with PVB-no cross connection | |||
| ROW - FINAL APRON (AFTER POUR) | 09/27/2024 | APPROVED | TPOLACEK |
| Note: PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. Inspector Notes from Inspection 9465 9/26/24 UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. YOU ARE REQUIRED TO LAY SIDE IN THE REAR ON ALL BARE AREAS TO THE BOTTOM OF THE DITCH LINE BEFORE ROW FINAL PASSAGE. APPROVING AS NOTED THAT YOU WILL NEED TO SOD AND STABILIZE BARE AREA AT THE REAR OF PROPERTY. | |||
| ROW - STORMWATER FINAL | 09/27/2024 | APPROVED | TPOLACEK |
| Note: 09/27/24 TPOLACEK*** FRONT SWALE IS NOT MATCHING GRADE AND HOLDING BACK DRAINAGE FROM UPSTREAM. SPOKE WITH CM AND EXPLAINED THEY NEED TO LOWER ELEVATION TO MATCH GRADE OF LEFT AND RIGHT PROPERTIEA TO ALLOW PROPER FLOW. LANDSCAPERS ON SITE DOING WORK NOW WILL APPROVE AS NOTED. Inspector Notes from Inspection 9465 9/26/24 UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. YOU ARE REQUIRED TO LAY SIDE IN THE REAR ON ALL BARE AREAS TO THE BOTTOM OF THE DITCH LINE BEFORE ROW FINAL PASSAGE. APPROVING AS NOTED THAT YOU WILL NEED TO SOD AND STABILIZE BARE AREA AT THE REAR OF PROPERTY. | |||
| U -UTILITY RESIDENTIAL FINAL | 09/27/2024 | FINAL APPROVED | LFITZGERALD |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 09/26/2024 | APPROVED | FSLADISH |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 09/26/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 9/26/24 UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. YOU ARE REQUIRED TO LAY SIDE IN THE REAR ON ALL BARE AREAS TO THE BOTTOM OF THE DITCH LINE BEFORE ROW FINAL PASSAGE. APPROVING AS NOTED THAT YOU WILL NEED TO SOD AND STABILIZE BARE AREA AT THE REAR OF PROPERTY. | |||
| ROW- PRE-APRON (PRE-POUR) | 09/10/2024 | APPROVED | TPOLACEK |
| Note: 09/10/24 TPOLACEK** BUILDER ADDED STONE TO POUR AREA. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR. 9/9/2024 - PREVIOUS INSPECTION NOTES 9/6/2024 - PREVIOUS INSPECTION NOTES THE LEFT INVERT ELEVATION ON THE CULVERT PIPE IS OUT OF TOLERANCE WITH THE PLAN DETAIL. Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan | |||
| ROW- PRE-APRON (PRE-POUR) | 09/09/2024 | CANCELLED BY APPLICANT | FSLADISH |
| Note: 9/6/2024 - PREVIOUS INSPECTION NOTES THE LEFT INVERT ELEVATION ON THE CULVERT PIPE IS OUT OF TOLERANCE WITH THE PLAN DETAIL. Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan | |||
| ROW- PRE-APRON (PRE-POUR) | 09/06/2024 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: THE LEFT INVERT ELEVATION ON THE CULVERT PIPE IS OUT OF TOLERANCE WITH THE PLAN DETAIL. Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan | |||
| ELECTRIC - EARLY POWER | 09/03/2024 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 9/3/2024 11:57:02 AM *** 9/3/24: FPL emailerd to release power. | |||
| GRAVITY SEWER TEST | 08/28/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| SEWER TIE IN | 08/28/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| ROW- PROJECT STATUS | 08/23/2024 | APPROVED - AS NOTED | TPOLACEK |
| Note: 08/26/24 TPOLACEK*** SPOT GRDE REQUEST HAS BEEN SUBMITTED FOR PRINCE MANFRED PL BUILDER WILL NEED TO OPEN SWALE TO PREVENT HOLDING UP SWALE DRAINAGE. NEIGHBOR AT 3 SAYS THE NEW HOME BEING CONSTRUCTED IS OBSTRUCTING WATER FROM MOVING IN THE SWALE. NEW HOME WAS ALSO RECENTLY BUILT AT 1. PLS PERFORM SWALE INSPECTION WHILE YOU ARE THERE MH | |||
| INSULATION | 08/02/2024 | APPROVED | RSIMS |
| Note: Inspector Notes from Inspection 2420 7/30/24: Approved as noted to keep project moving. ALL MUST BE COMPLETE PRIOR TO NEXT INSPECTION. Check at next inspection. 1). All supply & return boots are missing the perimeter seals. 2). Bathroom exhausts are missing the second connection point at fan/duct connection. | |||
| LATH/BRICK/ WATER BARRIER | 07/30/2024 | APPROVED | RSIMS |
| ALL ROUGH | 07/30/2024 | APPROVED - AS NOTED | RSIMS |
| Note: 7/30/24: Approved as noted to keep project moving. ALL MUST BE COMPLETE PRIOR TO NEXT INSPECTION. Check at next inspection. 1). All supply & return boots are missing the perimeter seals. 2). Bathroom exhausts are missing the second connection point at fan/duct connection. | |||
| ELECTRIC-TUG | 07/15/2024 | APPROVED | RMARTIN |
| WALL SHEATHING | 07/08/2024 | APPROVED | LMILLER |
| Note: *** NOTES ADDED BY LMILLER 7/8/2024 10:38:52 AM *** prior note resolved 7/3/2024 - PREVIOUS INSPECTION NOTES 7/3/24: 1). Need to remove the many shiners and re-nail as required. Nails are required to be fully embedded into studs. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/08/2024 | APPROVED - AS NOTED | LMILLER |
| Note: *** NOTES ADDED BY LMILLER 7/8/2024 10:40:42 AM *** Gables not braced as per detail on sheet SD-9 (called out on plans) | |||
| ROOF VALLEY & METAL | 07/08/2024 | APPROVED | LMILLER |
| WALL SHEATHING | 07/03/2024 | Disapproved - NO FEE | RSIMS |
| Note: 7/3/24: 1). Need to remove the many shiners and re-nail as required. Nails are required to be fully embedded into studs. | |||
| FOUND SURVEY APPROVED (OFFICE) | 07/02/2024 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 06/17/2024 | APPROVED | KSANDOE |
| PLUMBING 1ST ROUGH UNDERGROUND | 06/13/2024 | APPROVED | MGIBSON |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 06/11/2024 | APPROVED | JMUNSON |
| WATER METER INSTALLATION REQUEST | 05/20/2024 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 06/24/2024 | 07/02/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/24/2024 | 06/24/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/11/2024 | 06/17/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/06/2024 | 06/11/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/15/2024 | 04/15/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/15/2024 | 04/15/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 04/15/2024 | 04/15/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | HOLD | 04/10/2024 | 04/10/2024 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM REPEAT COMMENT: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Flood panel number missing on site plan/survey | |||
| MECH | COMPLETE | 04/10/2024 | 04/15/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 04/10/2024 | 04/15/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 04/10/2024 | 04/10/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/10/2024 | 04/10/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/10/2024 | 04/15/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | HOLD | 04/01/2024 | 04/05/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide geotechnical investigation report in accordance with Section 1803.2. Report to be conducted per Sections 1803.3 through 1803.5. Completed report shall comply with Section 1803.6. Report shall be signed and sealed by a Florida licensed professional engineer in accordance with F.S. 471.025 and Florida Administrative Code Sections 61G15-30.001 and 61G15-23.001 through .005. If report determines unsuitable sub-surface conditions or unsuitable soil conditions, then engineer shall provide a soils mitigation plan in order to ensure soils are suitable to receive the building's foundation. Report to include fill and compaction specifications and engineering inspection requirements. At conclusion of any soils mitigation work, engineer will be required to certify work was performed according to plans. | |||
| BLD | COMPLETE | 04/01/2024 | 04/05/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 04/01/2024 | 04/04/2024 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 04/01/2024 | 04/05/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/01/2024 | 04/01/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 04/01/2024 | 04/05/2024 |
| LOCATE | COMPLETE | 04/01/2024 | 04/04/2024 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | HOLD | 04/01/2024 | 04/05/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Duct layout needs to be signed by the AC contractor | |||
| SW1 | COMPLETE | 04/01/2024 | 04/01/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | HOLD | 04/01/2024 | 04/02/2024 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Flood panel number missing on site plan/survey Please show front setback from left side of garage to front property line | |||
| SWALE | COMPLETE | 04/01/2024 | 06/26/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG REINSPECTION 20 | ¤20.00 | 09/24/2024 |
| SW ENG REINSPECTION 30 | ¤30.00 | 09/24/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 04/16/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 04/16/2024 |
| SEWER CREDIT | (¤1,147.00) | 04/16/2024 |
| SEWER INSPECTION | ¤25.00 | 04/16/2024 |
| SEWER CAPITAL FACILITY | ¤5,441.03 | 04/16/2024 |
| WATER CAPITAL FACILITY FEE | ¤3,994.51 | 04/16/2024 |
| SITE PLAN 30 | ¤30.00 | 04/16/2024 |
| WATER-METER | ¤514.49 | 04/16/2024 |
| WATER- TURN ON | ¤25.00 | 04/16/2024 |
| WATER- TURN ON | ¤25.00 | 04/16/2024 |
| ADJUSTMENT 50% | (¤493.32) | 04/16/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 04/16/2024 |
| INSPECTION - RESIDENTIAL | ¤745.25 | 04/16/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤211.38 | 04/16/2024 |
| CONNECTION FEES | ¤1,187.26 | 04/16/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 04/16/2024 |
| IMPACT FEE FIRE | ¤428.09 | 04/16/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 04/16/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 04/16/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 04/16/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 04/16/2024 |
| IMPACT FEE TRANSPORTATION | ¤1,862.00 | 04/16/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 04/16/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 04/16/2024 |
| SURCHARGE FS 533.721 | ¤4.93 | 04/16/2024 |
| SURCHARGE - FS 468.631 | ¤7.40 | 04/16/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 04/16/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 04/16/2024 |
| SW ENG PRE APRON | ¤30.00 | 04/16/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤21,140.01 |