I want to search for...

Permit #2024040244

Permit Details

Status: COED

Parcel Id: 07-11-31-7025-00700-0150
CONDITIONED SPACE: 1800 sqft
GARAGE: 410 sqft
OPENED PORCH (WITH ROOF) : 36 sqft
PATIO/DECK (NO ROOF) : 100 sqft
Total Square Footage: 2346 sqft
Block: 00700
Subdivision: -
Job Phone: 689-250-2429
Location Address: 24 PALERMO LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 04/22/2024
NOC: RECORDED
Applicant name: RYAN M COURECH
Owner: A AND R-MERIDIAN REAL ESTATE DEVELOPMENT LLC

Address

668 N ORLANDO AVE

MAITLAND, FL 32751

Address

207

MAITLAND, FL 32751

Lot: 0150
Contracted Stated Job Value: ¤208,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN
Original Permit #: 2024010999

Contractor

MCH CONSTRUCTION LLC
Status Location Address State License Number Phone
INACTIVE

668 N ORLANDO AVE, STE 207

MAITLAND, FL 32751

CBC1262898 (Exp: 08/31/2026) 407-602-8257

Sub Contractors

DUSTIN ARCHER
Status Location Address State License Number Phone
ACTIVE

2785 WRIGHTS ROAD SUITE 1133

OVIEDO, FL 32765

CMC1251099 (Exp: 08/31/2026) 407-391-1145
DANA SUE COOLEY
Status Location Address State License Number Phone
INACTIVE

PO BOX 1718

FLAGLER BEACH, FL 32136

CCC1333449 (Exp: 08/31/2026) 904-535-1680
JOSEPH C WRIGHT
Status Location Address Mailing Address State License Number Phone Fax
ACTIVE

15 HARGROVE LANE

PALM COAST, FL 32137

UNIT 3 D

PALM COAST, FL 32137

EC13003278 (Exp: 08/31/2026) 386-447-9644 386-447-9633
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 02/06/2025 FINAL APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 2/6/2025 12:57:05 PM *** 2/4/2025 - PREVIOUS INSPECTION NOTES 2/4/25: Previously listed items 8 and 11 remain unresolved. 8). Water heater relief valve discharge tube and pan drain need to terminate 6" above finished grade. FBC-P504.6 Pan drain is still under 6" clearance. Needs to be raised. 11). Top garage door buck bolts are cut off and not replaced. FBC [A]107.4. It is even marked with red Xs were anchors were removed. 1/28/2025 - PREVIOUS INSPECTION NOTES 1/28/25: NOT READY!!!!!! DO NOT RE-SCHEDULE THIS INSPECTION UNTIL THE BUILDER PERSONALLY, VISUALLY VERIFIES THAT ALL ITEMS ON THE LIST ARE RESOLVED AS THIS IS A WASTE OF TIME AND RESOURCES. 10 of 15 Previously listed items not resolved: 4). front main drain cleanout needs to be level with finished grade. FBC-708.1.6 5). ODU: missing locking port cap on capillary tube. FBC - M1411.8 7). Ground rod needs to be protected from damage (and fully sunk into earth). NEC 250-92 8). Water heater relief valve discharge tube and pan drain need to terminate 6" above finished grade. FBC-P504.6 9). Surge protector needs to be located in main service panel. NEC-230.67(A)/(B) 11). Top garage door buck bolts are cut off and not replaced. FBC [A]107.4 12). Hole in garage wall at low voltage wire needs to be sealed. FBC EC TABLE R402.4.1.1 13). Garage door safety eyes are too low. (between 2" and 6" off finished floor). UL 325.6 / 16CFR part 1211 14). Dryer exhaust seal at pipe connection is (now) broken in attic. FBC-M1502.4.2 15). Dryer exhaust is not capped, plugged or taped at end as required. FBC-M1502.4.7 1/22/2025 - PREVIOUS INSPECTION NOTES 1/22/25: Front door locked. Found RSGD unlocked. 1). Portable toilet is still in driveway. FBC [A]107.4 2). Front door missing door seals. FBC EC TABLE R402.4.1.1 3). Interior garage door missing door seals. FBC EC TABLE R402.4.1.1 4). front main drain cleanout needs to be level with finished grade. FBC-708.1.6 5). ODU: missing locking port cap on capillary tube. FBC - M1411.8 6). Missing permanent address. FBCR 319.1 7). Ground rod needs to be protected from damage (and fully sunk into earth). NEC 250-92 8). Water heater relief valve discharge tube and pan drain need to terminate 6" above finished grade. FBC-P504.6 9). Surge protector needs to be located in main service panel. NEC-230.67(A)/(B) 10). Garbage disposal is unplugged. Could not test. FBC [A]107.4 11). Top garage door buck bolts are cut off and not replaced. FBC [A]107.4 12). Hole in garage wall at low voltage wire needs to be sealed. FBC EC TABLE R402.4.1.1 13). Garage door safety eyes are too low. (between 2" and 6" off finished floor). UL 325.6 / 16CFR part 1211 14). Dryer exhaust seal at pipe connection is (now) broken in attic. FBC-M1502.4.2 15). Dryer exhaust is not capped, plugged or taped at end as required. FBC-M1502.4.7 Inspector Notes from Inspection 2320 10/28/24 1. Missing exterior cover on Meter/Main. Please fix ASAP
BLD - BUILDING FINAL 02/04/2025 Disapproved -FEE REQUIRED RSIMS
Note: *** NOTES ADDED BY RSIMS 2/4/2025 3:07:55 PM *** 2/4/25: Previously listed items 8 and 11 remain unresolved. 8). Water heater relief valve discharge tube and pan drain need to terminate 6" above finished grade. FBC-P504.6 Pan drain is still under 6" clearance. Needs to be raised. 11). Top garage door buck bolts are cut off and not replaced. FBC [A]107.4. It is even marked with red Xs were anchors were removed. 1/28/2025 - PREVIOUS INSPECTION NOTES 1/28/25: NOT READY!!!!!! DO NOT RE-SCHEDULE THIS INSPECTION UNTIL THE BUILDER PERSONALLY, VISUALLY VERIFIES THAT ALL ITEMS ON THE LIST ARE RESOLVED AS THIS IS A WASTE OF TIME AND RESOURCES. 10 of 15 Previously listed items not resolved: 4). front main drain cleanout needs to be level with finished grade. FBC-708.1.6 5). ODU: missing locking port cap on capillary tube. FBC - M1411.8 7). Ground rod needs to be protected from damage (and fully sunk into earth). NEC 250-92 8). Water heater relief valve discharge tube and pan drain need to terminate 6" above finished grade. FBC-P504.6 9). Surge protector needs to be located in main service panel. NEC-230.67(A)/(B) 11). Top garage door buck bolts are cut off and not replaced. FBC [A]107.4 12). Hole in garage wall at low voltage wire needs to be sealed. FBC EC TABLE R402.4.1.1 13). Garage door safety eyes are too low. (between 2" and 6" off finished floor). UL 325.6 / 16CFR part 1211 14). Dryer exhaust seal at pipe connection is (now) broken in attic. FBC-M1502.4.2 15). Dryer exhaust is not capped, plugged or taped at end as required. FBC-M1502.4.7 1/22/2025 - PREVIOUS INSPECTION NOTES 1/22/25: Front door locked. Found RSGD unlocked. 1). Portable toilet is still in driveway. FBC [A]107.4 2). Front door missing door seals. FBC EC TABLE R402.4.1.1 3). Interior garage door missing door seals. FBC EC TABLE R402.4.1.1 4). front main drain cleanout needs to be level with finished grade. FBC-708.1.6 5). ODU: missing locking port cap on capillary tube. FBC - M1411.8 6). Missing permanent address. FBCR 319.1 7). Ground rod needs to be protected from damage (and fully sunk into earth). NEC 250-92 8). Water heater relief valve discharge tube and pan drain need to terminate 6" above finished grade. FBC-P504.6 9). Surge protector needs to be located in main service panel. NEC-230.67(A)/(B) 10). Garbage disposal is unplugged. Could not test. FBC [A]107.4 11). Top garage door buck bolts are cut off and not replaced. FBC [A]107.4 12). Hole in garage wall at low voltage wire needs to be sealed. FBC EC TABLE R402.4.1.1 13). Garage door safety eyes are too low. (between 2" and 6" off finished floor). UL 325.6 / 16CFR part 1211 14). Dryer exhaust seal at pipe connection is (now) broken in attic. FBC-M1502.4.2 15). Dryer exhaust is not capped, plugged or taped at end as required. FBC-M1502.4.7 Inspector Notes from Inspection 2320 10/28/24 1. Missing exterior cover on Meter/Main. Please fix ASAP
BLD - BUILDING FINAL 01/28/2025 Disapproved -FEE REQUIRED RSIMS
Note: *** NOTES ADDED BY RSIMS 1/28/2025 3:04:59 PM *** 1/28/25: NOT READY!!!!!! DO NOT RE-SCHEDULE THIS INSPECTION UNTIL THE BUILDER PERSONALLY, VISUALLY VERIFIES THAT ALL ITEMS ON THE LIST ARE RESOLVED AS THIS IS A WASTE OF TIME AND RESOURCES. 10 of 15 Previously listed items not resolved: 4). front main drain cleanout needs to be level with finished grade. FBC-708.1.6 5). ODU: missing locking port cap on capillary tube. FBC - M1411.8 7). Ground rod needs to be protected from damage (and fully sunk into earth). NEC 250-92 8). Water heater relief valve discharge tube and pan drain need to terminate 6" above finished grade. FBC-P504.6 9). Surge protector needs to be located in main service panel. NEC-230.67(A)/(B) 11). Top garage door buck bolts are cut off and not replaced. FBC [A]107.4 12). Hole in garage wall at low voltage wire needs to be sealed. FBC EC TABLE R402.4.1.1 13). Garage door safety eyes are too low. (between 2" and 6" off finished floor). UL 325.6 / 16CFR part 1211 14). Dryer exhaust seal at pipe connection is (now) broken in attic. FBC-M1502.4.2 15). Dryer exhaust is not capped, plugged or taped at end as required. FBC-M1502.4.7 1/22/2025 - PREVIOUS INSPECTION NOTES 1/22/25: Front door locked. Found RSGD unlocked. 1). Portable toilet is still in driveway. FBC [A]107.4 2). Front door missing door seals. FBC EC TABLE R402.4.1.1 3). Interior garage door missing door seals. FBC EC TABLE R402.4.1.1 4). front main drain cleanout needs to be level with finished grade. FBC-708.1.6 5). ODU: missing locking port cap on capillary tube. FBC - M1411.8 6). Missing permanent address. FBCR 319.1 7). Ground rod needs to be protected from damage (and fully sunk into earth). NEC 250-92 8). Water heater relief valve discharge tube and pan drain need to terminate 6" above finished grade. FBC-P504.6 9). Surge protector needs to be located in main service panel. NEC-230.67(A)/(B) 10). Garbage disposal is unplugged. Could not test. FBC [A]107.4 11). Top garage door buck bolts are cut off and not replaced. FBC [A]107.4 12). Hole in garage wall at low voltage wire needs to be sealed. FBC EC TABLE R402.4.1.1 13). Garage door safety eyes are too low. (between 2" and 6" off finished floor). UL 325.6 / 16CFR part 1211 14). Dryer exhaust seal at pipe connection is (now) broken in attic. FBC-M1502.4.2 15). Dryer exhaust is not capped, plugged or taped at end as required. FBC-M1502.4.7 Inspector Notes from Inspection 2320 10/28/24 1. Missing exterior cover on Meter/Main. Please fix ASAP
BLD - BUILDING FINAL 01/22/2025 Disapproved -FEE REQUIRED RSIMS
Note: *** NOTES ADDED BY RSIMS 1/22/2025 4:45:40 PM *** 1/22/25: Front door locked. Found RSGD unlocked. 1). Portable toilet is still in driveway. FBC [A]107.4 2). Front door missing door seals. FBC EC TABLE R402.4.1.1 3). Interior garage door missing door seals. FBC EC TABLE R402.4.1.1 4). front main drain cleanout needs to be level with finished grade. FBC-708.1.6 5). ODU: missing locking port cap on capillary tube. FBC - M1411.8 6). Missing permanent address. FBCR 319.1 7). Ground rod needs to be protected from damage (and fully sunk into earth). NEC 250-92 8). Water heater relief valve discharge tube and pan drain need to terminate 6" above finished grade. FBC-P504.6 9). Surge protector needs to be located in main service panel. NEC-230.67(A)/(B) 10). Garbage disposal is unplugged. Could not test. FBC [A]107.4 11). Top garage door buck bolts are cut off and not replaced. FBC [A]107.4 12). Hole in garage wall at low voltage wire needs to be sealed. FBC EC TABLE R402.4.1.1 13). Garage door safety eyes are too low. (between 2" and 6" off finished floor). UL 325.6 / 16CFR part 1211 14). Dryer exhaust seal at pipe connection is (now) broken in attic. FBC-M1502.4.2 15). Dryer exhaust is not capped, plugged or taped at end as required. FBC-M1502.4.7 Inspector Notes from Inspection 2320 10/28/24 1. Missing exterior cover on Meter/Main. Please fix ASAP
ROW - FINAL APRON (AFTER POUR) 01/21/2025 APPROVED TPOLACEK
Note: PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
ROW- FINAL SURVEY/GRADING CERTIFICATION 01/21/2025 APPROVED TPOLACEK
ROW FIELD SURVEY /GRADING CERTIFICATION 01/21/2025 APPROVED TPOLACEK
Note: UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
ROW - STORMWATER FINAL 01/21/2025 APPROVED - AS NOTED TPOLACEK
Note: 01/21/25 TPOLACEK*** RIGHT SDIE PROPERTY LINE NEEDS A FEW PIECES OF SOD IN SWALE APPROVING AS NOTED. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW- PRE-APRON (PRE-POUR) 12/12/2024 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. CONTRACTORS WILL BE NOTIFIED WHEN TICKETS WILL BE REQUIRED WITH AN EMAIL BLAST.THE FOLLOWING IS CURRENTLY FOR INFORMATION ONLY: TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR.
ROW - DRAINAGE 12/09/2024 APPROVED TPOLACEK
Note: 12/09/24 TPOLACEK*** SWALE IS OPEN CM MET ME ONSITE AND THEY ARE REMOVING SILT FENCE TO DO GRADING. CORRECTION WERE MADE AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. ** 12/04/24 BUILDER WILL BE REMOVING CULVERT PIPE BY MONDAY AS GETTING READY TO SET NEW CULVERT _____________________________________________________________________________________________________________________ 12/2/2024 - PREVIOUS INSPECTION NOTES 12/2/24 YOU HAVE NOT REESTABLISHED THE SILT FENCE AND AS PREVIOUSLY NOTED YOUR TEMPORARY CULVERT PIPE IS CRUSHED ON ONE END AND ABSOLUTELY FULL OF DIRT AND SEDIMENT. WILL BE BACK 12/3/24 FOR COMPLIANCE REINSPECTION. SEE PHOTO FOR REFERENCE _________________________________________________________________________________________________________________________ 11/27/2024 - PREVIOUS INSPECTION NOTES 11/27/24 TPOLACEK*** PERMIT IS NOW PRIORITY 1 STATUS. IF CORRECTIONS ARE NOT MADE BY NEXT INSPECTION A STOP WORK ORDER WILL BE PLACED ON SITE. NEXT INSPECTION MONDAY DECEMBER 2ND 11/26/2024 - PREVIOUS INSPECTION NOTES YOU HAVE ONE MORE DAY TO CORRECT ALL BELOW BEFORE THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. STILL THE FLOWING NEED TO BE CORRECTED 1) UILDER NEEDS TO OPEN THE ROAD SIDE SWALE AS YOUR TEMPORARY CULVERT IS COMPLETELY PLUGGED RESTRICTING THE FLOW OF STORMWATER 2) RE-ESTABLISH YOUR SILT FENCE AROUND THE ENTIRE PERIMETER OF YOUR JOB SITE ---------------------------------------------------------------------------- 11/25/2024 - PREVIOUS INSPECTION NOTES ** 11/25/24 NO CORRECTIONS HAVE BEE MADE ** BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE AS YOUR TEMPORARY CULVERT IS COMPLETELY PLUGGED RESTRICTING THE FLOW OF STORMWATER ** RE-ESTABLISH YOUR SILT FENCE AROUND THE ENTIRE PERIMETER OF YOUR JOB SITE ** FOLLOW UP INSPECTION 11/26/24 ______________________________________________________________________________________________________________________ 11/19/2024 - PREVIOUS INSPECTION NOTES ** 11/19/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE AS YOUR TEMPORARY CULVERT IS COMPLETELY PLUGGED RESTRICTING THE FLOW OF STORMWATER ** RE-ESTABLISH YOUR SILT FENCE AROUND THE ENTIRE PERIMETER OF YOUR JOB SITE ** FOLLOW UP INSPECTION 11/25/24
ROW - DRAINAGE 12/02/2024 Disapproved -FEE REQUIRED FSLADISH
Note: 12/2/24 YOU HAVE NOT REESTABLISHED THE SILT FENCE AND AS PREVIOUSLY NOTED YOUR TEMPORARY CULVERT PIPE IS CRUSHED ON ONE END AND ABSOLUTELY FULL OF DIRT AND SEDIMENT. WILL BE BACK 12/3/24 FOR COMPLIANCE REINSPECTION. SEE PHOTO FOR REFERENCE _________________________________________________________________________________________________________________________ 11/27/2024 - PREVIOUS INSPECTION NOTES 11/27/24 TPOLACEK*** PERMIT IS NOW PRIORITY 1 STATUS. IF CORRECTIONS ARE NOT MADE BY NEXT INSPECTION A STOP WORK ORDER WILL BE PLACED ON SITE. NEXT INSPECTION MONDAY DECEMBER 2ND 11/26/2024 - PREVIOUS INSPECTION NOTES YOU HAVE ONE MORE DAY TO CORRECT ALL BELOW BEFORE THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. STILL THE FLOWING NEED TO BE CORRECTED 1) UILDER NEEDS TO OPEN THE ROAD SIDE SWALE AS YOUR TEMPORARY CULVERT IS COMPLETELY PLUGGED RESTRICTING THE FLOW OF STORMWATER 2) RE-ESTABLISH YOUR SILT FENCE AROUND THE ENTIRE PERIMETER OF YOUR JOB SITE ---------------------------------------------------------------------------- 11/25/2024 - PREVIOUS INSPECTION NOTES ** 11/25/24 NO CORRECTIONS HAVE BEE MADE ** BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE AS YOUR TEMPORARY CULVERT IS COMPLETELY PLUGGED RESTRICTING THE FLOW OF STORMWATER ** RE-ESTABLISH YOUR SILT FENCE AROUND THE ENTIRE PERIMETER OF YOUR JOB SITE ** FOLLOW UP INSPECTION 11/26/24 ______________________________________________________________________________________________________________________ 11/19/2024 - PREVIOUS INSPECTION NOTES ** 11/19/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE AS YOUR TEMPORARY CULVERT IS COMPLETELY PLUGGED RESTRICTING THE FLOW OF STORMWATER ** RE-ESTABLISH YOUR SILT FENCE AROUND THE ENTIRE PERIMETER OF YOUR JOB SITE ** FOLLOW UP INSPECTION 11/25/24
U-CROSS CONNECTION 12/02/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 12/2/2024 12:29:54 PM *** no irrigation-no cross connection
U - SEWER TIE IN 12/02/2024 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
GRAVITY SEWER TEST 12/02/2024 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
ELECTRIC - EARLY POWER 12/02/2024 APPROVED - AS NOTED RSIMS
Note: *** NOTES ADDED BY RSIMS 12/2/2024 1:05:12 PM *** 12/2/24: FPL emailed to release power. Romex wire feeding range outlet will need to be protected from damage. Drywall cut out will need to be repaired. Check at Building final.
ROW - DRAINAGE 11/27/2024 Disapproved -FEE REQUIRED TPOLACEK
Note: 11/27/24 TPOLACEK*** PERMIT IS NOW PRIORITY 1 STATUS. IF CORRECTIONS ARE NOT MADE BY NEXT INSPECTION A STOP WORK ORDER WILL BE PLACED ON SITE. NEXT INSPECTION MONDAY DECEMBER 2ND 11/26/2024 - PREVIOUS INSPECTION NOTES YOU HAVE ONE MORE DAY TO CORRECT ALL BELOW BEFORE THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. STILL THE FLOWING NEED TO BE CORRECTED 1) UILDER NEEDS TO OPEN THE ROAD SIDE SWALE AS YOUR TEMPORARY CULVERT IS COMPLETELY PLUGGED RESTRICTING THE FLOW OF STORMWATER 2) RE-ESTABLISH YOUR SILT FENCE AROUND THE ENTIRE PERIMETER OF YOUR JOB SITE ---------------------------------------------------------------------------- 11/25/2024 - PREVIOUS INSPECTION NOTES ** 11/25/24 NO CORRECTIONS HAVE BEE MADE ** BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE AS YOUR TEMPORARY CULVERT IS COMPLETELY PLUGGED RESTRICTING THE FLOW OF STORMWATER ** RE-ESTABLISH YOUR SILT FENCE AROUND THE ENTIRE PERIMETER OF YOUR JOB SITE ** FOLLOW UP INSPECTION 11/26/24 ______________________________________________________________________________________________________________________ 11/19/2024 - PREVIOUS INSPECTION NOTES ** 11/19/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE AS YOUR TEMPORARY CULVERT IS COMPLETELY PLUGGED RESTRICTING THE FLOW OF STORMWATER ** RE-ESTABLISH YOUR SILT FENCE AROUND THE ENTIRE PERIMETER OF YOUR JOB SITE ** FOLLOW UP INSPECTION 11/25/24
ROW - DRAINAGE 11/26/2024 Disapproved -FEE REQUIRED PFLANAGAN
Note: YOU HAVE ONE MORE DAY TO CORRECT ALL BELOW BEFORE THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. STILL THE FLOWING NEED TO BE CORRECTED 1) UILDER NEEDS TO OPEN THE ROAD SIDE SWALE AS YOUR TEMPORARY CULVERT IS COMPLETELY PLUGGED RESTRICTING THE FLOW OF STORMWATER 2) RE-ESTABLISH YOUR SILT FENCE AROUND THE ENTIRE PERIMETER OF YOUR JOB SITE ---------------------------------------------------------------------------- 11/25/2024 - PREVIOUS INSPECTION NOTES ** 11/25/24 NO CORRECTIONS HAVE BEE MADE ** BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE AS YOUR TEMPORARY CULVERT IS COMPLETELY PLUGGED RESTRICTING THE FLOW OF STORMWATER ** RE-ESTABLISH YOUR SILT FENCE AROUND THE ENTIRE PERIMETER OF YOUR JOB SITE ** FOLLOW UP INSPECTION 11/26/24 ______________________________________________________________________________________________________________________ 11/19/2024 - PREVIOUS INSPECTION NOTES ** 11/19/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE AS YOUR TEMPORARY CULVERT IS COMPLETELY PLUGGED RESTRICTING THE FLOW OF STORMWATER ** RE-ESTABLISH YOUR SILT FENCE AROUND THE ENTIRE PERIMETER OF YOUR JOB SITE ** FOLLOW UP INSPECTION 11/25/24
ROW - DRAINAGE 11/25/2024 Disapproved -FEE REQUIRED EMADISON
Note: ** 11/25/24 NO CORRECTIONS HAVE BEE MADE ** BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE AS YOUR TEMPORARY CULVERT IS COMPLETELY PLUGGED RESTRICTING THE FLOW OF STORMWATER ** RE-ESTABLISH YOUR SILT FENCE AROUND THE ENTIRE PERIMETER OF YOUR JOB SITE ** FOLLOW UP INSPECTION 11/26/24 ______________________________________________________________________________________________________________________ 11/19/2024 - PREVIOUS INSPECTION NOTES ** 11/19/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE AS YOUR TEMPORARY CULVERT IS COMPLETELY PLUGGED RESTRICTING THE FLOW OF STORMWATER ** RE-ESTABLISH YOUR SILT FENCE AROUND THE ENTIRE PERIMETER OF YOUR JOB SITE ** FOLLOW UP INSPECTION 11/25/24
ROW - DRAINAGE 11/19/2024 Disapproved - NO FEE EMADISON
Note: ** 11/19/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE AS YOUR TEMPORARY CULVERT IS COMPLETELY PLUGGED RESTRICTING THE FLOW OF STORMWATER ** RE-ESTABLISH YOUR SILT FENCE AROUND THE ENTIRE PERIMETER OF YOUR JOB SITE ** FOLLOW UP INSPECTION 11/25/24
LATH/BRICK/ WATER BARRIER 10/28/2024 APPROVED - AS NOTED MCONTRYMAN
Note: 10/28/24 1. Missing exterior cover on Meter/Main. Please fix ASAP
INSULATION 09/30/2024 APPROVED MKRASKI
Note: Inspector Notes from Inspection 2420 *** NOTES ADDED BY RSIMS 9/24/2024 1:10:02 PM *** 9/24/24: Approved as noted to keep project moving. ALL MUST BE COMPLETE PRIOR TO NEXT INSPECTION. Check at next inspection. 1). Wires in Breaker panel are not phased out. NEC 215.12(C) 2). Master Bathroom: Plumbing water lines require nailplate protection. Back side of stud marked with NP. (FBC- P2603.2.1).
ALL ROUGH 09/24/2024 APPROVED - AS NOTED RSIMS
Note: *** NOTES ADDED BY RSIMS 9/24/2024 1:10:02 PM *** 9/24/24: Approved as noted to keep project moving. ALL MUST BE COMPLETE PRIOR TO NEXT INSPECTION. Check at next inspection. 1). Wires in Breaker panel are not phased out. NEC 215.12(C) 2). Master Bathroom: Plumbing water lines require nailplate protection. Back side of stud marked with NP. (FBC- P2603.2.1).
ROOF VALLEY & METAL 09/17/2024 APPROVED RSIMS
Note: New inspection due to canceled inspection Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 9/3/2024 2:52:37 PM *** 9/3/24: 1). Please repair the silt fence as required. FBC 3307.1 2). Please clean up trash and debris on site per Land Development requirements. NOTE: Please remember to stagger nail patterns on 2-Ply trusses as required on MiTek. Such as CG1 & CG2.
ROOF VALLEY & METAL 09/12/2024 CANCELLED BY APPLICANT WEB
Note: Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 9/3/2024 2:52:37 PM *** 9/3/24: 1). Please repair the silt fence as required. FBC 3307.1 2). Please clean up trash and debris on site per Land Development requirements. NOTE: Please remember to stagger nail patterns on 2-Ply trusses as required on MiTek. Such as CG1 & CG2.
WALL SHEATHING 09/03/2024 APPROVED RSIMS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/03/2024 APPROVED - AS NOTED RSIMS
Note: *** NOTES ADDED BY RSIMS 9/3/2024 2:52:37 PM *** 9/3/24: 1). Please repair the silt fence as required. FBC 3307.1 2). Please clean up trash and debris on site per Land Development requirements. NOTE: Please remember to stagger nail patterns on 2-Ply trusses as required on MiTek. Such as CG1 & CG2.
TIE BEAM / LINTEL 08/21/2024 APPROVED RSIMS
Note: 8/20/2024 - PREVIOUS INSPECTION NOTES 8/15/24 - SILT FENCING (FBC3307.1) STILL NOT REPAIRED AND TOILET NOT REMOVED OUT OF THE SWALE (FBC3303.5) AS WAS REQUESTED ON 8/15 INSPECTION. 8/15/2024 - PREVIOUS INSPECTION NOTES 8/15/24: 1). Previously marked dowels at front entry are still missing. 2). Silt fence needs repair. FBC 3307.1 3). Please move the portable toilet out of the swale area and onto site area to allow water to flow freely through the swale. This will need to be complete before any further inspections will be approved. (This is also part of the Storm Water - Illicit Discharge Prevention Regulations so it will need to remain on site property out of swale). 8/13/2024 - PREVIOUS INSPECTION NOTES 8-13-24 1. Missing rebar dowels. Circled on plans.
TIE BEAM / LINTEL 08/20/2024 Disapproved -FEE REQUIRED FWILLIS
Note: 8/15/24 - SILT FENCING (FBC3307.1) STILL NOT REPAIRED AND TOILET NOT REMOVED OUT OF THE SWALE (FBC3303.5) AS WAS REQUESTED ON 8/15 INSPECTION. 8/15/2024 - PREVIOUS INSPECTION NOTES 8/15/24: 1). Previously marked dowels at front entry are still missing. 2). Silt fence needs repair. FBC 3307.1 3). Please move the portable toilet out of the swale area and onto site area to allow water to flow freely through the swale. This will need to be complete before any further inspections will be approved. (This is also part of the Storm Water - Illicit Discharge Prevention Regulations so it will need to remain on site property out of swale). 8/13/2024 - PREVIOUS INSPECTION NOTES 8-13-24 1. Missing rebar dowels. Circled on plans.
TIE BEAM / LINTEL 08/15/2024 Disapproved -FEE REQUIRED RSIMS
Note: *** NOTES ADDED BY RSIMS 8/15/2024 1:58:07 PM *** 8/15/24: 1). Previously marked dowels at front entry are still missing. 2). Silt fence needs repair. FBC 3307.1 3). Please move the portable toilet out of the swale area and onto site area to allow water to flow freely through the swale. This will need to be complete before any further inspections will be approved. (This is also part of the Storm Water - Illicit Discharge Prevention Regulations so it will need to remain on site property out of swale). 8/13/2024 - PREVIOUS INSPECTION NOTES 8-13-24 1. Missing rebar dowels. Circled on plans.
TIE BEAM / LINTEL 08/13/2024 Disapproved - NO FEE BTAYLOR
Note: 8-13-24 1. Missing rebar dowels. Circled on plans.
FOUND SURVEY APPROVED (OFFICE) 08/06/2024 APPROVED TBAKER
MONOLITHIC SLAB 07/22/2024 APPROVED AGAETANO
PLUMBING 1ST ROUGH UNDERGROUND 07/08/2024 APPROVED MGIBSON
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 06/13/2024 APPROVED CPISCITELLI
WATER METER INSTALLATION REQUEST 05/29/2024 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
MECH COMPLETE 11/19/2024 11/22/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ZON COMPLETE 11/19/2024 11/19/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ENGIN1 COMPLETE 08/05/2024 08/06/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 08/05/2024 08/05/2024
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
BLD COMPLETE 06/13/2024 06/13/2024
Note: Released By: LEE MILLER - (386)986-3783 - WMILLER@PALMCOASTGOV.COM
BLD COMPLETE 05/21/2024 05/28/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ZON COMPLETE 04/17/2024 04/17/2024
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
MECH COMPLETE 04/17/2024 04/19/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SWALE COMPLETE 04/04/2024 07/01/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BADMIN COMPLETE 04/03/2024 04/10/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
CUSVC COMPLETE 04/03/2024 04/05/2024
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ENGIN1 COMPLETE 04/03/2024 04/04/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 04/03/2024 04/09/2024
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
SW1 COMPLETE 04/03/2024 04/04/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON HOLD 04/03/2024 04/05/2024
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
MECH HOLD 04/03/2024 04/08/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Direction house faces on Heatload does not match the site plan. Revise to match per R403.7 FBC Energy Conservation 2023 8Th Edition 2. Provide heatload only. remove Energy calc and duct layout from file

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 02/07/2025
REINSPECTION RESIDENTIAL ¤40.00 02/07/2025
REINSPECTION RESIDENTIAL ¤40.00 02/07/2025
PLAN REVIEW - REVISION ¤32.50 12/11/2024
SW ENG - INSPECTION 20 ¤20.00 12/11/2024
SW ENG - INSPECTION 20 ¤20.00 12/11/2024
SW ENG - INSPECTION 20 ¤20.00 12/11/2024
SW ENG - INSPECTION 20 ¤20.00 12/11/2024
SW ENG - INSPECTION 20 ¤20.00 12/11/2024
SW ENG - INSPECTION 20 ¤20.00 12/11/2024
REINSPECTION RESIDENTIAL ¤40.00 09/11/2024
REINSPECTION RESIDENTIAL ¤40.00 09/11/2024
WATER- TURN ON ¤25.00 04/22/2024
ADJUSTMENT 50% (¤541.05) 04/22/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 04/22/2024
INSPECTION - RESIDENTIAL ¤918.50 04/22/2024
PLAN REVIEW - APPROVED MASTER ¤133.60 04/22/2024
CONNECTION FEES ¤1,187.26 04/22/2024
FC IMPACT FEE EMS ¤62.00 04/22/2024
IMPACT FEE FIRE ¤428.09 04/22/2024
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 04/22/2024
FC IMPACT FEE LIBRARY ¤268.00 04/22/2024
IMPACT FEE PARKS ¤1,800.99 04/22/2024
IMPACT FEE SCHOOL ¤5,450.00 04/22/2024
IMPACT FEE TRANSPORTATION ¤1,862.00 04/22/2024
WATER -IRRIGATION INSPECTION ¤25.00 04/22/2024
SURCHARGE FS 533.721 ¤5.41 04/22/2024
SURCHARGE - FS 468.631 ¤8.12 04/22/2024
SW ENG - FOUNDATION SURVEY ¤20.00 04/22/2024
SW ENG INSPECTION 80 ¤80.00 04/22/2024
SW ENG PRE APRON ¤30.00 04/22/2024
SW ENG - REVIEW 20 ¤20.00 04/22/2024
SW ENG RES REVIEW 200 ¤200.00 04/22/2024
SEWER CREDIT (¤2,189.77) 04/22/2024
SEWER INSPECTION ¤25.00 04/22/2024
SEWER CAPITAL FACILITY ¤5,441.03 04/22/2024
WATER CREDIT (¤883.75) 04/22/2024
WATER CAPITAL FACILITY FEE ¤3,994.51 04/22/2024
SITE PLAN 30 ¤30.00 04/22/2024
Fees Total Due: ¤0.00 Total Paid: ¤19,000.44