I want to search for...
Permit #2024040244
Permit Details
Status: COED
| Parcel Id: 07-11-31-7025-00700-0150 |
| CONDITIONED SPACE: 1800 sqft |
| GARAGE: 410 sqft |
| OPENED PORCH (WITH ROOF) : 36 sqft |
| PATIO/DECK (NO ROOF) : 100 sqft |
| Total Square Footage: 2346 sqft |
| Block: 00700 |
| Subdivision: - |
| Job Phone: 689-250-2429 |
| Location Address: 24 PALERMO LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 04/22/2024 |
| NOC: RECORDED |
| Applicant name: RYAN M COURECH |
| Owner: A AND R-MERIDIAN REAL ESTATE DEVELOPMENT LLC |
|
Address 668 N ORLANDO AVE MAITLAND, FL 32751 |
|
Address 207 MAITLAND, FL 32751 |
| Lot: 0150 |
| Contracted Stated Job Value: ¤208,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
| Original Permit #: 2024010999 |
Contractor
MCH CONSTRUCTION LLC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
668 N ORLANDO AVE, STE 207 MAITLAND, FL 32751 |
CBC1262898 (Exp: 08/31/2026) | 407-602-8257 |
Sub Contractors
DUSTIN ARCHER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
2785 WRIGHTS ROAD SUITE 1133 OVIEDO, FL 32765 |
CMC1251099 (Exp: 08/31/2026) | 407-391-1145 |
DANA SUE COOLEY
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 1718 FLAGLER BEACH, FL 32136 |
CCC1333449 (Exp: 08/31/2026) | 904-535-1680 |
JOSEPH C WRIGHT
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
15 HARGROVE LANE PALM COAST, FL 32137 |
UNIT 3 D PALM COAST, FL 32137 |
EC13003278 (Exp: 08/31/2026) | 386-447-9644 | 386-447-9633 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 02/06/2025 | FINAL APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 2/6/2025 12:57:05 PM *** 2/4/2025 - PREVIOUS INSPECTION NOTES 2/4/25: Previously listed items 8 and 11 remain unresolved. 8). Water heater relief valve discharge tube and pan drain need to terminate 6" above finished grade. FBC-P504.6 Pan drain is still under 6" clearance. Needs to be raised. 11). Top garage door buck bolts are cut off and not replaced. FBC [A]107.4. It is even marked with red Xs were anchors were removed. 1/28/2025 - PREVIOUS INSPECTION NOTES 1/28/25: NOT READY!!!!!! DO NOT RE-SCHEDULE THIS INSPECTION UNTIL THE BUILDER PERSONALLY, VISUALLY VERIFIES THAT ALL ITEMS ON THE LIST ARE RESOLVED AS THIS IS A WASTE OF TIME AND RESOURCES. 10 of 15 Previously listed items not resolved: 4). front main drain cleanout needs to be level with finished grade. FBC-708.1.6 5). ODU: missing locking port cap on capillary tube. FBC - M1411.8 7). Ground rod needs to be protected from damage (and fully sunk into earth). NEC 250-92 8). Water heater relief valve discharge tube and pan drain need to terminate 6" above finished grade. FBC-P504.6 9). Surge protector needs to be located in main service panel. NEC-230.67(A)/(B) 11). Top garage door buck bolts are cut off and not replaced. FBC [A]107.4 12). Hole in garage wall at low voltage wire needs to be sealed. FBC EC TABLE R402.4.1.1 13). Garage door safety eyes are too low. (between 2" and 6" off finished floor). UL 325.6 / 16CFR part 1211 14). Dryer exhaust seal at pipe connection is (now) broken in attic. FBC-M1502.4.2 15). Dryer exhaust is not capped, plugged or taped at end as required. FBC-M1502.4.7 1/22/2025 - PREVIOUS INSPECTION NOTES 1/22/25: Front door locked. Found RSGD unlocked. 1). Portable toilet is still in driveway. FBC [A]107.4 2). Front door missing door seals. FBC EC TABLE R402.4.1.1 3). Interior garage door missing door seals. FBC EC TABLE R402.4.1.1 4). front main drain cleanout needs to be level with finished grade. FBC-708.1.6 5). ODU: missing locking port cap on capillary tube. FBC - M1411.8 6). Missing permanent address. FBCR 319.1 7). Ground rod needs to be protected from damage (and fully sunk into earth). NEC 250-92 8). Water heater relief valve discharge tube and pan drain need to terminate 6" above finished grade. FBC-P504.6 9). Surge protector needs to be located in main service panel. NEC-230.67(A)/(B) 10). Garbage disposal is unplugged. Could not test. FBC [A]107.4 11). Top garage door buck bolts are cut off and not replaced. FBC [A]107.4 12). Hole in garage wall at low voltage wire needs to be sealed. FBC EC TABLE R402.4.1.1 13). Garage door safety eyes are too low. (between 2" and 6" off finished floor). UL 325.6 / 16CFR part 1211 14). Dryer exhaust seal at pipe connection is (now) broken in attic. FBC-M1502.4.2 15). Dryer exhaust is not capped, plugged or taped at end as required. FBC-M1502.4.7 Inspector Notes from Inspection 2320 10/28/24 1. Missing exterior cover on Meter/Main. Please fix ASAP | |||
| BLD - BUILDING FINAL | 02/04/2025 | Disapproved -FEE REQUIRED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 2/4/2025 3:07:55 PM *** 2/4/25: Previously listed items 8 and 11 remain unresolved. 8). Water heater relief valve discharge tube and pan drain need to terminate 6" above finished grade. FBC-P504.6 Pan drain is still under 6" clearance. Needs to be raised. 11). Top garage door buck bolts are cut off and not replaced. FBC [A]107.4. It is even marked with red Xs were anchors were removed. 1/28/2025 - PREVIOUS INSPECTION NOTES 1/28/25: NOT READY!!!!!! DO NOT RE-SCHEDULE THIS INSPECTION UNTIL THE BUILDER PERSONALLY, VISUALLY VERIFIES THAT ALL ITEMS ON THE LIST ARE RESOLVED AS THIS IS A WASTE OF TIME AND RESOURCES. 10 of 15 Previously listed items not resolved: 4). front main drain cleanout needs to be level with finished grade. FBC-708.1.6 5). ODU: missing locking port cap on capillary tube. FBC - M1411.8 7). Ground rod needs to be protected from damage (and fully sunk into earth). NEC 250-92 8). Water heater relief valve discharge tube and pan drain need to terminate 6" above finished grade. FBC-P504.6 9). Surge protector needs to be located in main service panel. NEC-230.67(A)/(B) 11). Top garage door buck bolts are cut off and not replaced. FBC [A]107.4 12). Hole in garage wall at low voltage wire needs to be sealed. FBC EC TABLE R402.4.1.1 13). Garage door safety eyes are too low. (between 2" and 6" off finished floor). UL 325.6 / 16CFR part 1211 14). Dryer exhaust seal at pipe connection is (now) broken in attic. FBC-M1502.4.2 15). Dryer exhaust is not capped, plugged or taped at end as required. FBC-M1502.4.7 1/22/2025 - PREVIOUS INSPECTION NOTES 1/22/25: Front door locked. Found RSGD unlocked. 1). Portable toilet is still in driveway. FBC [A]107.4 2). Front door missing door seals. FBC EC TABLE R402.4.1.1 3). Interior garage door missing door seals. FBC EC TABLE R402.4.1.1 4). front main drain cleanout needs to be level with finished grade. FBC-708.1.6 5). ODU: missing locking port cap on capillary tube. FBC - M1411.8 6). Missing permanent address. FBCR 319.1 7). Ground rod needs to be protected from damage (and fully sunk into earth). NEC 250-92 8). Water heater relief valve discharge tube and pan drain need to terminate 6" above finished grade. FBC-P504.6 9). Surge protector needs to be located in main service panel. NEC-230.67(A)/(B) 10). Garbage disposal is unplugged. Could not test. FBC [A]107.4 11). Top garage door buck bolts are cut off and not replaced. FBC [A]107.4 12). Hole in garage wall at low voltage wire needs to be sealed. FBC EC TABLE R402.4.1.1 13). Garage door safety eyes are too low. (between 2" and 6" off finished floor). UL 325.6 / 16CFR part 1211 14). Dryer exhaust seal at pipe connection is (now) broken in attic. FBC-M1502.4.2 15). Dryer exhaust is not capped, plugged or taped at end as required. FBC-M1502.4.7 Inspector Notes from Inspection 2320 10/28/24 1. Missing exterior cover on Meter/Main. Please fix ASAP | |||
| BLD - BUILDING FINAL | 01/28/2025 | Disapproved -FEE REQUIRED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 1/28/2025 3:04:59 PM *** 1/28/25: NOT READY!!!!!! DO NOT RE-SCHEDULE THIS INSPECTION UNTIL THE BUILDER PERSONALLY, VISUALLY VERIFIES THAT ALL ITEMS ON THE LIST ARE RESOLVED AS THIS IS A WASTE OF TIME AND RESOURCES. 10 of 15 Previously listed items not resolved: 4). front main drain cleanout needs to be level with finished grade. FBC-708.1.6 5). ODU: missing locking port cap on capillary tube. FBC - M1411.8 7). Ground rod needs to be protected from damage (and fully sunk into earth). NEC 250-92 8). Water heater relief valve discharge tube and pan drain need to terminate 6" above finished grade. FBC-P504.6 9). Surge protector needs to be located in main service panel. NEC-230.67(A)/(B) 11). Top garage door buck bolts are cut off and not replaced. FBC [A]107.4 12). Hole in garage wall at low voltage wire needs to be sealed. FBC EC TABLE R402.4.1.1 13). Garage door safety eyes are too low. (between 2" and 6" off finished floor). UL 325.6 / 16CFR part 1211 14). Dryer exhaust seal at pipe connection is (now) broken in attic. FBC-M1502.4.2 15). Dryer exhaust is not capped, plugged or taped at end as required. FBC-M1502.4.7 1/22/2025 - PREVIOUS INSPECTION NOTES 1/22/25: Front door locked. Found RSGD unlocked. 1). Portable toilet is still in driveway. FBC [A]107.4 2). Front door missing door seals. FBC EC TABLE R402.4.1.1 3). Interior garage door missing door seals. FBC EC TABLE R402.4.1.1 4). front main drain cleanout needs to be level with finished grade. FBC-708.1.6 5). ODU: missing locking port cap on capillary tube. FBC - M1411.8 6). Missing permanent address. FBCR 319.1 7). Ground rod needs to be protected from damage (and fully sunk into earth). NEC 250-92 8). Water heater relief valve discharge tube and pan drain need to terminate 6" above finished grade. FBC-P504.6 9). Surge protector needs to be located in main service panel. NEC-230.67(A)/(B) 10). Garbage disposal is unplugged. Could not test. FBC [A]107.4 11). Top garage door buck bolts are cut off and not replaced. FBC [A]107.4 12). Hole in garage wall at low voltage wire needs to be sealed. FBC EC TABLE R402.4.1.1 13). Garage door safety eyes are too low. (between 2" and 6" off finished floor). UL 325.6 / 16CFR part 1211 14). Dryer exhaust seal at pipe connection is (now) broken in attic. FBC-M1502.4.2 15). Dryer exhaust is not capped, plugged or taped at end as required. FBC-M1502.4.7 Inspector Notes from Inspection 2320 10/28/24 1. Missing exterior cover on Meter/Main. Please fix ASAP | |||
| BLD - BUILDING FINAL | 01/22/2025 | Disapproved -FEE REQUIRED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 1/22/2025 4:45:40 PM *** 1/22/25: Front door locked. Found RSGD unlocked. 1). Portable toilet is still in driveway. FBC [A]107.4 2). Front door missing door seals. FBC EC TABLE R402.4.1.1 3). Interior garage door missing door seals. FBC EC TABLE R402.4.1.1 4). front main drain cleanout needs to be level with finished grade. FBC-708.1.6 5). ODU: missing locking port cap on capillary tube. FBC - M1411.8 6). Missing permanent address. FBCR 319.1 7). Ground rod needs to be protected from damage (and fully sunk into earth). NEC 250-92 8). Water heater relief valve discharge tube and pan drain need to terminate 6" above finished grade. FBC-P504.6 9). Surge protector needs to be located in main service panel. NEC-230.67(A)/(B) 10). Garbage disposal is unplugged. Could not test. FBC [A]107.4 11). Top garage door buck bolts are cut off and not replaced. FBC [A]107.4 12). Hole in garage wall at low voltage wire needs to be sealed. FBC EC TABLE R402.4.1.1 13). Garage door safety eyes are too low. (between 2" and 6" off finished floor). UL 325.6 / 16CFR part 1211 14). Dryer exhaust seal at pipe connection is (now) broken in attic. FBC-M1502.4.2 15). Dryer exhaust is not capped, plugged or taped at end as required. FBC-M1502.4.7 Inspector Notes from Inspection 2320 10/28/24 1. Missing exterior cover on Meter/Main. Please fix ASAP | |||
| ROW - FINAL APRON (AFTER POUR) | 01/21/2025 | APPROVED | TPOLACEK |
| Note: PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 01/21/2025 | APPROVED | TPOLACEK |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/21/2025 | APPROVED | TPOLACEK |
| Note: UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW - STORMWATER FINAL | 01/21/2025 | APPROVED - AS NOTED | TPOLACEK |
| Note: 01/21/25 TPOLACEK*** RIGHT SDIE PROPERTY LINE NEEDS A FEW PIECES OF SOD IN SWALE APPROVING AS NOTED. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW- PRE-APRON (PRE-POUR) | 12/12/2024 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. CONTRACTORS WILL BE NOTIFIED WHEN TICKETS WILL BE REQUIRED WITH AN EMAIL BLAST.THE FOLLOWING IS CURRENTLY FOR INFORMATION ONLY: TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR. | |||
| ROW - DRAINAGE | 12/09/2024 | APPROVED | TPOLACEK |
| Note: 12/09/24 TPOLACEK*** SWALE IS OPEN CM MET ME ONSITE AND THEY ARE REMOVING SILT FENCE TO DO GRADING. CORRECTION WERE MADE AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. ** 12/04/24 BUILDER WILL BE REMOVING CULVERT PIPE BY MONDAY AS GETTING READY TO SET NEW CULVERT _____________________________________________________________________________________________________________________ 12/2/2024 - PREVIOUS INSPECTION NOTES 12/2/24 YOU HAVE NOT REESTABLISHED THE SILT FENCE AND AS PREVIOUSLY NOTED YOUR TEMPORARY CULVERT PIPE IS CRUSHED ON ONE END AND ABSOLUTELY FULL OF DIRT AND SEDIMENT. WILL BE BACK 12/3/24 FOR COMPLIANCE REINSPECTION. SEE PHOTO FOR REFERENCE _________________________________________________________________________________________________________________________ 11/27/2024 - PREVIOUS INSPECTION NOTES 11/27/24 TPOLACEK*** PERMIT IS NOW PRIORITY 1 STATUS. IF CORRECTIONS ARE NOT MADE BY NEXT INSPECTION A STOP WORK ORDER WILL BE PLACED ON SITE. NEXT INSPECTION MONDAY DECEMBER 2ND 11/26/2024 - PREVIOUS INSPECTION NOTES YOU HAVE ONE MORE DAY TO CORRECT ALL BELOW BEFORE THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. STILL THE FLOWING NEED TO BE CORRECTED 1) UILDER NEEDS TO OPEN THE ROAD SIDE SWALE AS YOUR TEMPORARY CULVERT IS COMPLETELY PLUGGED RESTRICTING THE FLOW OF STORMWATER 2) RE-ESTABLISH YOUR SILT FENCE AROUND THE ENTIRE PERIMETER OF YOUR JOB SITE ---------------------------------------------------------------------------- 11/25/2024 - PREVIOUS INSPECTION NOTES ** 11/25/24 NO CORRECTIONS HAVE BEE MADE ** BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE AS YOUR TEMPORARY CULVERT IS COMPLETELY PLUGGED RESTRICTING THE FLOW OF STORMWATER ** RE-ESTABLISH YOUR SILT FENCE AROUND THE ENTIRE PERIMETER OF YOUR JOB SITE ** FOLLOW UP INSPECTION 11/26/24 ______________________________________________________________________________________________________________________ 11/19/2024 - PREVIOUS INSPECTION NOTES ** 11/19/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE AS YOUR TEMPORARY CULVERT IS COMPLETELY PLUGGED RESTRICTING THE FLOW OF STORMWATER ** RE-ESTABLISH YOUR SILT FENCE AROUND THE ENTIRE PERIMETER OF YOUR JOB SITE ** FOLLOW UP INSPECTION 11/25/24 | |||
| ROW - DRAINAGE | 12/02/2024 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 12/2/24 YOU HAVE NOT REESTABLISHED THE SILT FENCE AND AS PREVIOUSLY NOTED YOUR TEMPORARY CULVERT PIPE IS CRUSHED ON ONE END AND ABSOLUTELY FULL OF DIRT AND SEDIMENT. WILL BE BACK 12/3/24 FOR COMPLIANCE REINSPECTION. SEE PHOTO FOR REFERENCE _________________________________________________________________________________________________________________________ 11/27/2024 - PREVIOUS INSPECTION NOTES 11/27/24 TPOLACEK*** PERMIT IS NOW PRIORITY 1 STATUS. IF CORRECTIONS ARE NOT MADE BY NEXT INSPECTION A STOP WORK ORDER WILL BE PLACED ON SITE. NEXT INSPECTION MONDAY DECEMBER 2ND 11/26/2024 - PREVIOUS INSPECTION NOTES YOU HAVE ONE MORE DAY TO CORRECT ALL BELOW BEFORE THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. STILL THE FLOWING NEED TO BE CORRECTED 1) UILDER NEEDS TO OPEN THE ROAD SIDE SWALE AS YOUR TEMPORARY CULVERT IS COMPLETELY PLUGGED RESTRICTING THE FLOW OF STORMWATER 2) RE-ESTABLISH YOUR SILT FENCE AROUND THE ENTIRE PERIMETER OF YOUR JOB SITE ---------------------------------------------------------------------------- 11/25/2024 - PREVIOUS INSPECTION NOTES ** 11/25/24 NO CORRECTIONS HAVE BEE MADE ** BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE AS YOUR TEMPORARY CULVERT IS COMPLETELY PLUGGED RESTRICTING THE FLOW OF STORMWATER ** RE-ESTABLISH YOUR SILT FENCE AROUND THE ENTIRE PERIMETER OF YOUR JOB SITE ** FOLLOW UP INSPECTION 11/26/24 ______________________________________________________________________________________________________________________ 11/19/2024 - PREVIOUS INSPECTION NOTES ** 11/19/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE AS YOUR TEMPORARY CULVERT IS COMPLETELY PLUGGED RESTRICTING THE FLOW OF STORMWATER ** RE-ESTABLISH YOUR SILT FENCE AROUND THE ENTIRE PERIMETER OF YOUR JOB SITE ** FOLLOW UP INSPECTION 11/25/24 | |||
| U-CROSS CONNECTION | 12/02/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 12/2/2024 12:29:54 PM *** no irrigation-no cross connection | |||
| U - SEWER TIE IN | 12/02/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| GRAVITY SEWER TEST | 12/02/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| ELECTRIC - EARLY POWER | 12/02/2024 | APPROVED - AS NOTED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 12/2/2024 1:05:12 PM *** 12/2/24: FPL emailed to release power. Romex wire feeding range outlet will need to be protected from damage. Drywall cut out will need to be repaired. Check at Building final. | |||
| ROW - DRAINAGE | 11/27/2024 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 11/27/24 TPOLACEK*** PERMIT IS NOW PRIORITY 1 STATUS. IF CORRECTIONS ARE NOT MADE BY NEXT INSPECTION A STOP WORK ORDER WILL BE PLACED ON SITE. NEXT INSPECTION MONDAY DECEMBER 2ND 11/26/2024 - PREVIOUS INSPECTION NOTES YOU HAVE ONE MORE DAY TO CORRECT ALL BELOW BEFORE THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. STILL THE FLOWING NEED TO BE CORRECTED 1) UILDER NEEDS TO OPEN THE ROAD SIDE SWALE AS YOUR TEMPORARY CULVERT IS COMPLETELY PLUGGED RESTRICTING THE FLOW OF STORMWATER 2) RE-ESTABLISH YOUR SILT FENCE AROUND THE ENTIRE PERIMETER OF YOUR JOB SITE ---------------------------------------------------------------------------- 11/25/2024 - PREVIOUS INSPECTION NOTES ** 11/25/24 NO CORRECTIONS HAVE BEE MADE ** BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE AS YOUR TEMPORARY CULVERT IS COMPLETELY PLUGGED RESTRICTING THE FLOW OF STORMWATER ** RE-ESTABLISH YOUR SILT FENCE AROUND THE ENTIRE PERIMETER OF YOUR JOB SITE ** FOLLOW UP INSPECTION 11/26/24 ______________________________________________________________________________________________________________________ 11/19/2024 - PREVIOUS INSPECTION NOTES ** 11/19/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE AS YOUR TEMPORARY CULVERT IS COMPLETELY PLUGGED RESTRICTING THE FLOW OF STORMWATER ** RE-ESTABLISH YOUR SILT FENCE AROUND THE ENTIRE PERIMETER OF YOUR JOB SITE ** FOLLOW UP INSPECTION 11/25/24 | |||
| ROW - DRAINAGE | 11/26/2024 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: YOU HAVE ONE MORE DAY TO CORRECT ALL BELOW BEFORE THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. STILL THE FLOWING NEED TO BE CORRECTED 1) UILDER NEEDS TO OPEN THE ROAD SIDE SWALE AS YOUR TEMPORARY CULVERT IS COMPLETELY PLUGGED RESTRICTING THE FLOW OF STORMWATER 2) RE-ESTABLISH YOUR SILT FENCE AROUND THE ENTIRE PERIMETER OF YOUR JOB SITE ---------------------------------------------------------------------------- 11/25/2024 - PREVIOUS INSPECTION NOTES ** 11/25/24 NO CORRECTIONS HAVE BEE MADE ** BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE AS YOUR TEMPORARY CULVERT IS COMPLETELY PLUGGED RESTRICTING THE FLOW OF STORMWATER ** RE-ESTABLISH YOUR SILT FENCE AROUND THE ENTIRE PERIMETER OF YOUR JOB SITE ** FOLLOW UP INSPECTION 11/26/24 ______________________________________________________________________________________________________________________ 11/19/2024 - PREVIOUS INSPECTION NOTES ** 11/19/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE AS YOUR TEMPORARY CULVERT IS COMPLETELY PLUGGED RESTRICTING THE FLOW OF STORMWATER ** RE-ESTABLISH YOUR SILT FENCE AROUND THE ENTIRE PERIMETER OF YOUR JOB SITE ** FOLLOW UP INSPECTION 11/25/24 | |||
| ROW - DRAINAGE | 11/25/2024 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 11/25/24 NO CORRECTIONS HAVE BEE MADE ** BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE AS YOUR TEMPORARY CULVERT IS COMPLETELY PLUGGED RESTRICTING THE FLOW OF STORMWATER ** RE-ESTABLISH YOUR SILT FENCE AROUND THE ENTIRE PERIMETER OF YOUR JOB SITE ** FOLLOW UP INSPECTION 11/26/24 ______________________________________________________________________________________________________________________ 11/19/2024 - PREVIOUS INSPECTION NOTES ** 11/19/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE AS YOUR TEMPORARY CULVERT IS COMPLETELY PLUGGED RESTRICTING THE FLOW OF STORMWATER ** RE-ESTABLISH YOUR SILT FENCE AROUND THE ENTIRE PERIMETER OF YOUR JOB SITE ** FOLLOW UP INSPECTION 11/25/24 | |||
| ROW - DRAINAGE | 11/19/2024 | Disapproved - NO FEE | EMADISON |
| Note: ** 11/19/24 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE AS YOUR TEMPORARY CULVERT IS COMPLETELY PLUGGED RESTRICTING THE FLOW OF STORMWATER ** RE-ESTABLISH YOUR SILT FENCE AROUND THE ENTIRE PERIMETER OF YOUR JOB SITE ** FOLLOW UP INSPECTION 11/25/24 | |||
| LATH/BRICK/ WATER BARRIER | 10/28/2024 | APPROVED - AS NOTED | MCONTRYMAN |
| Note: 10/28/24 1. Missing exterior cover on Meter/Main. Please fix ASAP | |||
| INSULATION | 09/30/2024 | APPROVED | MKRASKI |
| Note: Inspector Notes from Inspection 2420 *** NOTES ADDED BY RSIMS 9/24/2024 1:10:02 PM *** 9/24/24: Approved as noted to keep project moving. ALL MUST BE COMPLETE PRIOR TO NEXT INSPECTION. Check at next inspection. 1). Wires in Breaker panel are not phased out. NEC 215.12(C) 2). Master Bathroom: Plumbing water lines require nailplate protection. Back side of stud marked with NP. (FBC- P2603.2.1). | |||
| ALL ROUGH | 09/24/2024 | APPROVED - AS NOTED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 9/24/2024 1:10:02 PM *** 9/24/24: Approved as noted to keep project moving. ALL MUST BE COMPLETE PRIOR TO NEXT INSPECTION. Check at next inspection. 1). Wires in Breaker panel are not phased out. NEC 215.12(C) 2). Master Bathroom: Plumbing water lines require nailplate protection. Back side of stud marked with NP. (FBC- P2603.2.1). | |||
| ROOF VALLEY & METAL | 09/17/2024 | APPROVED | RSIMS |
| Note: New inspection due to canceled inspection Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 9/3/2024 2:52:37 PM *** 9/3/24: 1). Please repair the silt fence as required. FBC 3307.1 2). Please clean up trash and debris on site per Land Development requirements. NOTE: Please remember to stagger nail patterns on 2-Ply trusses as required on MiTek. Such as CG1 & CG2. | |||
| ROOF VALLEY & METAL | 09/12/2024 | CANCELLED BY APPLICANT | WEB |
| Note: Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 9/3/2024 2:52:37 PM *** 9/3/24: 1). Please repair the silt fence as required. FBC 3307.1 2). Please clean up trash and debris on site per Land Development requirements. NOTE: Please remember to stagger nail patterns on 2-Ply trusses as required on MiTek. Such as CG1 & CG2. | |||
| WALL SHEATHING | 09/03/2024 | APPROVED | RSIMS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/03/2024 | APPROVED - AS NOTED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 9/3/2024 2:52:37 PM *** 9/3/24: 1). Please repair the silt fence as required. FBC 3307.1 2). Please clean up trash and debris on site per Land Development requirements. NOTE: Please remember to stagger nail patterns on 2-Ply trusses as required on MiTek. Such as CG1 & CG2. | |||
| TIE BEAM / LINTEL | 08/21/2024 | APPROVED | RSIMS |
| Note: 8/20/2024 - PREVIOUS INSPECTION NOTES 8/15/24 - SILT FENCING (FBC3307.1) STILL NOT REPAIRED AND TOILET NOT REMOVED OUT OF THE SWALE (FBC3303.5) AS WAS REQUESTED ON 8/15 INSPECTION. 8/15/2024 - PREVIOUS INSPECTION NOTES 8/15/24: 1). Previously marked dowels at front entry are still missing. 2). Silt fence needs repair. FBC 3307.1 3). Please move the portable toilet out of the swale area and onto site area to allow water to flow freely through the swale. This will need to be complete before any further inspections will be approved. (This is also part of the Storm Water - Illicit Discharge Prevention Regulations so it will need to remain on site property out of swale). 8/13/2024 - PREVIOUS INSPECTION NOTES 8-13-24 1. Missing rebar dowels. Circled on plans. | |||
| TIE BEAM / LINTEL | 08/20/2024 | Disapproved -FEE REQUIRED | FWILLIS |
| Note: 8/15/24 - SILT FENCING (FBC3307.1) STILL NOT REPAIRED AND TOILET NOT REMOVED OUT OF THE SWALE (FBC3303.5) AS WAS REQUESTED ON 8/15 INSPECTION. 8/15/2024 - PREVIOUS INSPECTION NOTES 8/15/24: 1). Previously marked dowels at front entry are still missing. 2). Silt fence needs repair. FBC 3307.1 3). Please move the portable toilet out of the swale area and onto site area to allow water to flow freely through the swale. This will need to be complete before any further inspections will be approved. (This is also part of the Storm Water - Illicit Discharge Prevention Regulations so it will need to remain on site property out of swale). 8/13/2024 - PREVIOUS INSPECTION NOTES 8-13-24 1. Missing rebar dowels. Circled on plans. | |||
| TIE BEAM / LINTEL | 08/15/2024 | Disapproved -FEE REQUIRED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 8/15/2024 1:58:07 PM *** 8/15/24: 1). Previously marked dowels at front entry are still missing. 2). Silt fence needs repair. FBC 3307.1 3). Please move the portable toilet out of the swale area and onto site area to allow water to flow freely through the swale. This will need to be complete before any further inspections will be approved. (This is also part of the Storm Water - Illicit Discharge Prevention Regulations so it will need to remain on site property out of swale). 8/13/2024 - PREVIOUS INSPECTION NOTES 8-13-24 1. Missing rebar dowels. Circled on plans. | |||
| TIE BEAM / LINTEL | 08/13/2024 | Disapproved - NO FEE | BTAYLOR |
| Note: 8-13-24 1. Missing rebar dowels. Circled on plans. | |||
| FOUND SURVEY APPROVED (OFFICE) | 08/06/2024 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 07/22/2024 | APPROVED | AGAETANO |
| PLUMBING 1ST ROUGH UNDERGROUND | 07/08/2024 | APPROVED | MGIBSON |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 06/13/2024 | APPROVED | CPISCITELLI |
| WATER METER INSTALLATION REQUEST | 05/29/2024 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 11/19/2024 | 11/22/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/19/2024 | 11/19/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/05/2024 | 08/06/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/05/2024 | 08/05/2024 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/13/2024 | 06/13/2024 |
| Note: Released By: LEE MILLER - (386)986-3783 - WMILLER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/21/2024 | 05/28/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/17/2024 | 04/17/2024 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 04/17/2024 | 04/19/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 04/04/2024 | 07/01/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 04/03/2024 | 04/10/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 04/03/2024 | 04/05/2024 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/03/2024 | 04/04/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 04/03/2024 | 04/09/2024 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 04/03/2024 | 04/04/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | HOLD | 04/03/2024 | 04/05/2024 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| MECH | HOLD | 04/03/2024 | 04/08/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Direction house faces on Heatload does not match the site plan. Revise to match per R403.7 FBC Energy Conservation 2023 8Th Edition 2. Provide heatload only. remove Energy calc and duct layout from file |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/07/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/07/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/07/2025 |
| PLAN REVIEW - REVISION | ¤32.50 | 12/11/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 12/11/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 12/11/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 12/11/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 12/11/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 12/11/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 12/11/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 09/11/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 09/11/2024 |
| WATER- TURN ON | ¤25.00 | 04/22/2024 |
| ADJUSTMENT 50% | (¤541.05) | 04/22/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 04/22/2024 |
| INSPECTION - RESIDENTIAL | ¤918.50 | 04/22/2024 |
| PLAN REVIEW - APPROVED MASTER | ¤133.60 | 04/22/2024 |
| CONNECTION FEES | ¤1,187.26 | 04/22/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 04/22/2024 |
| IMPACT FEE FIRE | ¤428.09 | 04/22/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 04/22/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 04/22/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 04/22/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 04/22/2024 |
| IMPACT FEE TRANSPORTATION | ¤1,862.00 | 04/22/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 04/22/2024 |
| SURCHARGE FS 533.721 | ¤5.41 | 04/22/2024 |
| SURCHARGE - FS 468.631 | ¤8.12 | 04/22/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 04/22/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 04/22/2024 |
| SW ENG PRE APRON | ¤30.00 | 04/22/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 04/22/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 04/22/2024 |
| SEWER CREDIT | (¤2,189.77) | 04/22/2024 |
| SEWER INSPECTION | ¤25.00 | 04/22/2024 |
| SEWER CAPITAL FACILITY | ¤5,441.03 | 04/22/2024 |
| WATER CREDIT | (¤883.75) | 04/22/2024 |
| WATER CAPITAL FACILITY FEE | ¤3,994.51 | 04/22/2024 |
| SITE PLAN 30 | ¤30.00 | 04/22/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤19,000.44 |