Permit #2024040511
Permit Details
Status: FINAL
| Parcel Id: 05-11-31-5918-00000-1180 |
| CONDITIONED SPACE: 2586 sqft |
| GARAGE: 420 sqft |
| OPENED PORCH (WITH ROOF) : 382 sqft |
| OPENED PORCH (WITH ROOF) : 64 sqft |
| Total Square Footage: 3452 sqft |
| Block: 00000 |
| Subdivision: 2244 - VILLAGE AT PALM COAST PH 1 |
| Job Phone: 386-931-6577 |
| Location Address: 70 LONGVIEW WAY N |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 04/09/2024 |
| NOC: RECORDED |
| Applicant name: LUIS JORGE MEDEIROS |
| Owner: REGO ALICE TRUSTEE |
|
Address 6 PRINCESS KIM DR PALM COAST, FL 32137 |
| Lot: 1180 |
| Contracted Stated Job Value: ¤239,280.00 |
| Job Description: SINGLE FAMILY RESIDENCE REF 2022030963 |
| Type: CN |
| Original Permit #: 2022030963 |
Contractor
A PLUS HOME IMPROVEMENTS LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
306 S RAILROAD ST BUNNELL, FL 32110 |
CRC1327024 (Exp: 08/31/2026) | 386-263-2167 |
Sub Contractors
JOSEPH MOUAG
| Status | Location Address | State License Number | Phone |
| ACTIVE |
842 BANBURY DRIVE PORT ORANGE, FL 32129 |
EC13006957 (Exp: 08/31/2026) | 386-547-3722 |
GLEN WILLIAM KEHLE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
P. O. Box 353511 BUNNELL, FL 32110 |
CFC057241 (Exp: 08/31/2026) | (386) 447-4249 | (386) 437-8488 |
MIGUEL ANGEL GALLARDO
| Status | Location Address | State License Number | Phone |
| INACTIVE |
315 PACER CT SANFORD, FL 32773 |
CAC1813826 (Exp: 08/31/2026) | 407-202-0953 |
LUIS JORGE MEDEIROS
| Status | Location Address | State License Number | Phone |
| INACTIVE |
306 S RAILROAD ST BUNNELL, FL 32110 |
CCC1335446 (Exp: 08/31/2026) | 386-931-6577 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 01/23/2026 | FINAL APPROVED | HCAMACHO |
| Note: 1/22/2026 - PREVIOUS INSPECTION NOTES 1. Outlet in kitchen counter needs GFCI 2. Dryer needs GFCI 3. Breaker for CU is too big. It needs to be 30 amp max. | |||
| U-CROSS CONNECTION | 01/22/2026 | APPROVED - AS NOTED | BHAINES |
| Note: No CC. | |||
| BLD - BUILDING FINAL | 01/22/2026 | Disapproved - NO FEE | HCAMACHO |
| Note: 1. Outlet in kitchen counter needs GFCI 2. Dryer needs GFCI 3. Breaker for CU is too big. It needs to be 30 amp max. | |||
| U -UTILITY RESIDENTIAL FINAL | 01/22/2026 | FINAL APPROVED | BHAINES |
| ROW - STORMWATER FINAL | 01/08/2026 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW - FINAL APRON (AFTER POUR) | 01/08/2026 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| WINDOW NAILING | 01/07/2026 | APPROVED | HCAMACHO |
| FINAL SURVEY (OFFICE USE ONLY) | 07/09/2025 | APPROVED | PFLANAGAN |
| Note: FINAL SURVEY MEETS CITY STANDARDS | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/09/2025 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. | |||
| ELECTRIC - EARLY POWER | 03/10/2025 | APPROVED | HCAMACHO |
| ROW- PRE-APRON (PRE-POUR) | 02/14/2025 | APPROVED - AS NOTED | EMADISON |
| Note: ** 02/14/25 READY TO SET PAVERS ____________________________________________________________________________________________________________ 12/12/2024 - PREVIOUS INSPECTION NOTES ** 12/12/24 READY TO POUR APRON AND PVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED ______________________________________________________________________________________________________________________ 12/10/2024 - PREVIOUS INSPECTION NOTES ** 12/10/24 AS INDICATED IN PREVIOUS INSPECTION YOUR SUBMITTED SITE PLAN CALLS FOR A CONCRETE DRIVEWAY.YOU NEED TO SUBMITT A REVISED SITE PLAN INDICATING YOU ARE BUILDING A PAVER DRIVEWAY ** YOU ALSO NEED TO SUBMITT DRAWING # 300.H RESIDENTIAL PAVER DRIVEWAY DETAILS AND CIRCLE THE OPTION YOU ARE GOING TO BUILD THE DRIVEWAY TO, SO THE INSPECTOR KNOWS WHAT TO INSPECT. ** BUILDER CAN ALSO LEAVE A HARD COPY OF DRAWING 300.H IN HIS PERMIT BOX FOR INSPECTOR TO CHECK OR PUT IN APPICANT NOTES WHICH OPTION YOU CHOOSE _________________________________________________________________________________________________________________ 12/4/2024 - PREVIOUS INSPECTION NOTES ** 12/04/24 BUILDERS SITE PLAN INDICATES A 16 FOOT CONCRETE DRIVEWAY SITE IS NOT READY FOR THE INSPECTION THAT HAS BEEN REQUESTED ** SEE ATTACHED PHOTOS | |||
| ROW- PAVER RESTRAINTS | 12/12/2024 | APPROVED | EMADISON |
| Note: ** 12/12/24 READY TO POUR PAVER RESTRAINTS WITH APRON ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED | |||
| ROW- PRE-APRON (PRE-POUR) | 12/12/2024 | PARTIALLY APPROVED | EMADISON |
| Note: ** 12/12/24 READY TO POUR APRON AND PVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED ______________________________________________________________________________________________________________________ 12/10/2024 - PREVIOUS INSPECTION NOTES ** 12/10/24 AS INDICATED IN PREVIOUS INSPECTION YOUR SUBMITTED SITE PLAN CALLS FOR A CONCRETE DRIVEWAY.YOU NEED TO SUBMITT A REVISED SITE PLAN INDICATING YOU ARE BUILDING A PAVER DRIVEWAY ** YOU ALSO NEED TO SUBMITT DRAWING # 300.H RESIDENTIAL PAVER DRIVEWAY DETAILS AND CIRCLE THE OPTION YOU ARE GOING TO BUILD THE DRIVEWAY TO, SO THE INSPECTOR KNOWS WHAT TO INSPECT. ** BUILDER CAN ALSO LEAVE A HARD COPY OF DRAWING 300.H IN HIS PERMIT BOX FOR INSPECTOR TO CHECK OR PUT IN APPICANT NOTES WHICH OPTION YOU CHOOSE _________________________________________________________________________________________________________________ 12/4/2024 - PREVIOUS INSPECTION NOTES ** 12/04/24 BUILDERS SITE PLAN INDICATES A 16 FOOT CONCRETE DRIVEWAY SITE IS NOT READY FOR THE INSPECTION THAT HAS BEEN REQUESTED ** SEE ATTACHED PHOTOS | |||
| LATH/BRICK/ WATER BARRIER | 12/11/2024 | APPROVED | HCAMACHO |
| ROW- PRE-APRON (PRE-POUR) | 12/10/2024 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 12/10/24 AS INDICATED IN PREVIOUS INSPECTION YOUR SUBMITTED SITE PLAN CALLS FOR A CONCRETE DRIVEWAY.YOU NEED TO SUBMITT A REVISED SITE PLAN INDICATING YOU ARE BUILDING A PAVER DRIVEWAY ** YOU ALSO NEED TO SUBMITT DRAWING # 300.H RESIDENTIAL PAVER DRIVEWAY DETAILS AND CIRCLE THE OPTION YOU ARE GOING TO BUILD THE DRIVEWAY TO, SO THE INSPECTOR KNOWS WHAT TO INSPECT. ** BUILDER CAN ALSO LEAVE A HARD COPY OF DRAWING 300.H IN HIS PERMIT BOX FOR INSPECTOR TO CHECK OR PUT IN APPICANT NOTES WHICH OPTION YOU CHOOSE _________________________________________________________________________________________________________________ 12/4/2024 - PREVIOUS INSPECTION NOTES ** 12/04/24 BUILDERS SITE PLAN INDICATES A 16 FOOT CONCRETE DRIVEWAY SITE IS NOT READY FOR THE INSPECTION THAT HAS BEEN REQUESTED ** SEE ATTACHED PHOTOS | |||
| WALL SHEATHING | 12/10/2024 | CANCELLED BY APPLICANT | WEB |
| Note: Inspector Notes from Inspection 2490 1. Gas company needs to reapply for Permit. Permit was pulled but it expired. Inspector Notes from Inspection 2420 1. Arch windows need attachemnt on the arch. 2. Need second attic access in the house do to spray foam insulation. 3. Need house to garage door installed. 4. Need to move island outlets to the side. 5. Revise Product approval for windows. 6. Revise Energy Calcs. to show spray Foam Insulation. 7. Gas pipe needs to be bonded, was holding pressure at the time of inspection. 8. Gas company needs to reapply for Permit. Permit was pulled but it expired. 9. Revised master bath layout. Contractor is going to termite spray need fill and call for inspection before pouring cement. 11/13/2024 - PREVIOUS INSPECTION NOTES 10/31/2024 - PREVIOUS INSPECTION NOTES 03/13/2023: Check at all rough 1. Return walls at rake both sides of entry missing conventional frame strapping for continuous load path. 2. Conventional framing fron garage to main house valley missing strapping | |||
| DRYWALL NAILING | 12/10/2024 | CANCELLED BY APPLICANT | WEB |
| Note: Inspector Notes from Inspection 2490 1. Gas company needs to reapply for Permit. Permit was pulled but it expired. Inspector Notes from Inspection 2420 1. Arch windows need attachemnt on the arch. 2. Need second attic access in the house do to spray foam insulation. 3. Need house to garage door installed. 4. Need to move island outlets to the side. 5. Revise Product approval for windows. 6. Revise Energy Calcs. to show spray Foam Insulation. 7. Gas pipe needs to be bonded, was holding pressure at the time of inspection. 8. Gas company needs to reapply for Permit. Permit was pulled but it expired. 9. Revised master bath layout. Contractor is going to termite spray need fill and call for inspection before pouring cement. 11/13/2024 - PREVIOUS INSPECTION NOTES 10/31/2024 - PREVIOUS INSPECTION NOTES 03/13/2023: Check at all rough 1. Return walls at rake both sides of entry missing conventional frame strapping for continuous load path. 2. Conventional framing fron garage to main house valley missing strapping | |||
| ROW- PRE-APRON (PRE-POUR) | 12/04/2024 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 12/04/24 BUILDERS SITE PLAN INDICATES A 16 FOOT CONCRETE DRIVEWAY SITE IS NOT READY FOR THE INSPECTION THAT HAS BEEN REQUESTED ** SEE ATTACHED PHOTOS | |||
| INSULATION | 12/03/2024 | APPROVED - AS NOTED | HCAMACHO |
| Note: 1. Gas company needs to reapply for Permit. Permit was pulled but it expired. Inspector Notes from Inspection 2420 1. Arch windows need attachemnt on the arch. 2. Need second attic access in the house do to spray foam insulation. 3. Need house to garage door installed. 4. Need to move island outlets to the side. 5. Revise Product approval for windows. 6. Revise Energy Calcs. to show spray Foam Insulation. 7. Gas pipe needs to be bonded, was holding pressure at the time of inspection. 8. Gas company needs to reapply for Permit. Permit was pulled but it expired. 9. Revised master bath layout. Contractor is going to termite spray need fill and call for inspection before pouring cement. 11/13/2024 - PREVIOUS INSPECTION NOTES 10/31/2024 - PREVIOUS INSPECTION NOTES 03/13/2023: Check at all rough 1. Return walls at rake both sides of entry missing conventional frame strapping for continuous load path. 2. Conventional framing fron garage to main house valley missing strapping | |||
| MONOLITHIC SLAB | 12/03/2024 | APPROVED | HCAMACHO |
| Note: Inspector Notes from Inspection 2420 1. Arch windows need attachemnt on the arch. 2. Need second attic access in the house do to spray foam insulation. 3. Need house to garage door installed. 4. Need to move island outlets to the side. 5. Revise Product approval for windows. 6. Revise Energy Calcs. to show spray Foam Insulation. 7. Gas pipe needs to be bonded, was holding pressure at the time of inspection. 8. Gas company needs to reapply for Permit. Permit was pulled but it expired. 9. Revised master bath layout. Contractor is going to termite spray need fill and call for inspection before pouring cement. 11/13/2024 - PREVIOUS INSPECTION NOTES 10/31/2024 - PREVIOUS INSPECTION NOTES 03/13/2023: Check at all rough 1. Return walls at rake both sides of entry missing conventional frame strapping for continuous load path. 2. Conventional framing fron garage to main house valley missing strapping | |||
| GRAVITY SEWER TEST | 11/27/2024 | APPROVED | MGIBSON |
| U - SEWER TIE IN | 11/27/2024 | APPROVED | MGIBSON |
| ALL ROUGH | 11/15/2024 | APPROVED - AS NOTED | HCAMACHO |
| Note: 1. Arch windows need attachemnt on the arch. 2. Need second attic access in the house do to spray foam insulation. 3. Need house to garage door installed. 4. Need to move island outlets to the side. 5. Revise Product approval for windows. 6. Revise Energy Calcs. to show spray Foam Insulation. 7. Gas pipe needs to be bonded, was holding pressure at the time of inspection. 8. Gas company needs to reapply for Permit. Permit was pulled but it expired. 9. Revised master bath layout. Contractor is going to termite spray need fill and call for inspection before pouring cement. 11/13/2024 - PREVIOUS INSPECTION NOTES 10/31/2024 - PREVIOUS INSPECTION NOTES 03/13/2023: Check at all rough 1. Return walls at rake both sides of entry missing conventional frame strapping for continuous load path. 2. Conventional framing fron garage to main house valley missing strapping | |||
| ALL ROUGH | 11/13/2024 | CANCELLED BY APPLICANT | HCAMACHO |
| Note: 10/31/2024 - PREVIOUS INSPECTION NOTES 03/13/2023: Check at all rough 1. Return walls at rake both sides of entry missing conventional frame strapping for continuous load path. 2. Conventional framing fron garage to main house valley missing strapping | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 11/13/2024 | APPROVED | MGIBSON |
| ELECTRIC-TUG | 11/12/2024 | APPROVED | HCAMACHO |
| Note: 11/4/2024 - PREVIOUS INSPECTION NOTES Service feeding the breaker panel in the house needs to be disconnected. | |||
| ELECTRIC-TUG | 11/04/2024 | Disapproved - NO FEE | HCAMACHO |
| Note: Service feeding the breaker panel in the house needs to be disconnected. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 11/01/2024 | CANCELLED BY APPLICANT | WEB |
| ALL ROUGH | 10/31/2024 | CANCELLED BY APPLICANT | HCAMACHO |
| Note: 03/13/2023: Check at all rough 1. Return walls at rake both sides of entry missing conventional frame strapping for continuous load path. 2. Conventional framing fron garage to main house valley missing strapping | |||
| ROOF VALLEY & METAL | 03/14/2023 | APPROVED | AGAETANO |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/13/2023 | APPROVED - AS NOTED | TSTAUFFACHER |
| Note: 03/13/2023: Check at all rough 1. Return walls at rake both sides of entry missing conventional frame strapping for continuous load path. 2. Conventional framing fron garage to main house valley missing strapping 3/10/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2340 09-22-2022 Please organize drawings in the box Please remove the high grass prior to next inspection. 03-10-2023 Please have an approved set of drawings on site for inspection. | |||
| WALL SHEATHING | 03/13/2023 | APPROVED | TSTAUFFACHER |
| Note: Inspector Notes from Inspection 2460 03/13/2023: Check at all rough 1. Return walls at rake both sides of entry missing conventional frame strapping for continuous load path. 2. Conventional framing fron garage to main house valley missing strapping 3/10/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2340 09-22-2022 Please organize drawings in the box Please remove the high grass prior to next inspection. 03-10-2023 Please have an approved set of drawings on site for inspection. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/10/2023 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: Inspector Notes from Inspection 2340 09-22-2022 Please organize drawings in the box Please remove the high grass prior to next inspection. 03-10-2023 Please have an approved set of drawings on site for inspection. | |||
| TIE BEAM / LINTEL | 09/22/2022 | APPROVED - AS NOTED | AGAETANO |
| Note: 09-22-2022 Please organize drawings in the box Please remove the high grass prior to next inspection. | |||
| FOUND SURVEY APPROVED (OFFICE) | 08/23/2022 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 06/02/2022 | Disapproved - NO FEE | LMILLER |
| Note: Footing at back porch details calls for minimum depth of 20 inches | |||
| MONOLITHIC SLAB | 06/02/2022 | APPROVED | LMILLER |
| Note: THIS IS A REINSPECTION Footing at back porch details calls for minimum depth of 20 inches 6-2-22 second visit today after footing corrections, notes above resolved, ok to pour. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 06/01/2022 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 04/18/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 07/10/2025 | 07/11/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 07/02/2025 | 07/02/2025 |
| Note: Marked INFORMATION By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM priority inspection before this can be done | |||
| BLD | COMPLETE | 12/10/2024 | 12/16/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 12/10/2024 | 12/10/2024 |
| Note: Released By: LEVI SALYERDS - - LSALYERDS@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 12/10/2024 | 12/11/2024 |
| Note: Released By: LEVI SALYERDS - - LSALYERDS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/10/2024 | 12/10/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 12/03/2024 | 12/03/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 12/03/2024 | 12/03/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 11/05/2024 | 11/12/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 10/29/2024 | 11/04/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM duct layout needs to be signed by the AC contractor | |||
| BLD | COMPLETE | 10/29/2024 | 11/05/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 10/01/2024 | 10/01/2024 |
| Note: Marked INFORMATION By: NICOLE DIMATTINA - - NDIMATTINA@PALMCOASTGOV.COM NOC is for a different address. | |||
| BLD | HOLD | 04/24/2024 | 04/30/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide electrical plans and Energy calcs from 2023 code cycle | |||
| ENGIN1 | COMPLETE | 08/23/2022 | 08/23/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/23/2022 | 08/23/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/25/2022 | 03/25/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | HOLD | 03/24/2022 | 03/24/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM Correction submittal - Product approval specification review comments: 1. OK 2. FL 7849 - boral roofing tile - provide specific FL number as there are several models to choose at different manufacturer specification and installation instructions. 3. Provide wood connector product approval. Please use Code Version 2020 per F.S. 553.842. | |||
| ZON | COMPLETE | 03/22/2022 | 03/23/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM | |||
| BLD | HOLD | 03/22/2022 | 03/23/2022 |
| Note: Held By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM Correction submittal - Product approval specification review comments: 1. FL 15777.2 - mullion - cannot be found on approval listing of DBPR website. 2. FL 7849 - boral roofing tile - provide specific FL number as there are several models to choose at different manufacturer specification and installation instructions. 3. FL 10446 - R5 - for wood connectors but incorrectly indicated on the sheet as wood anchors. Also, this FL number is Code Version 2017. Please use Code Version 2020 per F.S. 553.842. 4. Provde FL number for wood anchors as explained in item 3 above. | |||
| BADMIN | COMPLETE | 03/18/2022 | 03/18/2022 |
| Note: Released By: MARGA DEFREITAS - - MDEFREITAS@PALMCOASTGOV.COM | |||
| BLD | HOLD | 03/18/2022 | 03/21/2022 |
| Note: Held By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM Provide product approval specification sheet completely filled in per F.S. 553.842 and Administrative Code 9 - 72. | |||
| CUSVC | COMPLETE | 03/18/2022 | 03/22/2022 |
| Note: Released By: ALYSSA ROSCOE - - | |||
| ELEC | COMPLETE | 03/18/2022 | 03/18/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/18/2022 | 03/21/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 03/18/2022 | 03/31/2022 |
| Note: Released By: TONI CHURCHILL - - | |||
| MECH | COMPLETE | 03/18/2022 | 03/21/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 03/18/2022 | 03/23/2022 |
| Note: Released By: PARREN FLANAGAN - - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 03/18/2022 | 03/18/2022 |
| Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM Landscape Plan is very hard to read. Text is very small. States St Augustine sod but does not confirm if it will have an irrigation system. please note that on plan. | |||
| BADMIN | HOLD | 03/17/2022 | 03/17/2022 |
| Note: Held By: LIBBY MUSGROVE - - LMUSGROVE@PALMCOASTGOV.COM need to list roofer on application |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADJUSTMENT 50% | (¤457.75) | 04/09/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 04/09/2024 |
| INSPECTION - RESIDENTIAL | ¤885.50 | 04/09/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/09/2024 |
| CONTRACTOR CHANGE | ¤80.00 | 04/09/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 04/09/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 04/09/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 04/09/2024 |
| SURCHARGE FS 533.721 | ¤4.58 | 04/09/2024 |
| SURCHARGE - FS 468.631 | ¤6.87 | 04/09/2024 |
| SW ENG REINSPECTION 30 | ¤30.00 | |
| SW ENG REINSPECTION 30 | ¤30.00 | |
| IMPACT FEE PARKS | ¤1,455.13 | |
| IMPACT FEE TRANSPORTATION | ¤3,224.00 | |
| IMPACT FEE FIRE | ¤388.65 | |
| PLAN REVIEW - RESIDENTIAL | ¤32.50 | |
| EXTENSION | ¤40.00 | |
| Fees | Total Due: ¤5,200.28 | Total Paid: ¤1,137.20 |