I want to search for...
Permit #2024040609
Permit Details
Status: COED
| Parcel Id: 07-11-31-7035-00070-0040 |
| CONDITIONED SPACE: 1504 sqft |
| GARAGE: 397 sqft |
| OPENED PORCH (WITH ROOF) : 112 sqft |
| Total Square Footage: 2013 sqft |
| Block: 00070 |
| Subdivision: - |
| Job Phone: 202-494-2019 |
| Location Address: 58 BIRD OF PARADISE DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 04/29/2024 |
| NOC: RECORDED |
| Applicant name: GARY ANDREW FISCHER |
| Owner: INB BFR FUND 1 LLC |
|
Address 3670 MAGUIRE BOULEVARD ORLANDO, FL 32803 |
|
Address SUITE 220 ORLANDO, FL 32803 |
| Lot: 0040 |
| Contracted Stated Job Value: ¤150,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
INB HOMES
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
3670 MAGUIRE BLVD ORLANDO, FL 32803 |
SUITE 210 ORLANDO, FL 32803 |
CGC048746 (Exp: 08/31/2026) | 407-476-8195 |
Sub Contractors
ROBERT MICHAEL RENNER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
531 CODISCO WAY SANFORD, FL 32771 |
CAC051477 (Exp: 08/31/2026) | 407-333-2665 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
JOSEPH C WRIGHT
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
15 HARGROVE LANE PALM COAST, FL 32137 |
UNIT 3 D PALM COAST, FL 32137 |
EC13003278 (Exp: 08/31/2026) | 386-447-9644 | 386-447-9633 |
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 12/11/2024 | FINAL APPROVED | JSTEWART |
| Note: 12/9/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 12/9/2024 3:02:20 PM *** 1. Please seal wall penetration at RG6, By main disconnect. R402.4.1.1 2. Missing 3rd service port Locking cap at ODU. FBCR M1411.8 3. Please raise ODU Pad to min 3" clearence from surrounding ground. FBCR M1305.1.4.1 4. Need to install solid soffit 36" each way from center of exhaust termination, and sucure. M1502.3 Duct termination. 5. Microwave outlet requires GFCI protection. NEC 210.8 | |||
| BLD - BUILDING FINAL | 12/09/2024 | Disapproved -FEE REQUIRED | JSTEWART |
| Note: *** NOTES ADDED BY JSTEWART 12/9/2024 3:02:20 PM *** 1. Please seal wall penetration at RG6, By main disconnect. R402.4.1.1 2. Missing 3rd service port Locking cap at ODU. FBCR M1411.8 3. Please raise ODU Pad to min 3" clearence from surrounding ground. FBCR M1305.1.4.1 4. Need to install solid soffit 36" each way from center of exhaust termination, and sucure. M1502.3 Duct termination. 5. Microwave outlet requires GFCI protection. NEC 210.8 | |||
| U -UTILITY RESIDENTIAL FINAL | 12/06/2024 | FINAL APPROVED | DHANEY |
| Note: 12/5/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 12/5/2024 11:34:39 AM *** remove excess soils from meter/checkvalve assembly(s already noted) Inspector Notes from Inspection 9035 *** NOTES ADDED BY DHANEY 11/26/2024 7:56:30 AM *** Note; Water meter pit will need cleaned out before final can be completed . | |||
| ROW - FINAL APRON (AFTER POUR) | 12/05/2024 | APPROVED | EMADISON |
| ROW - STORMWATER FINAL | 12/05/2024 | APPROVED | EMADISON |
| U -UTILITY RESIDENTIAL FINAL | 12/05/2024 | Disapproved -FEE REQUIRED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 12/5/2024 11:34:39 AM *** remove excess soils from meter/checkvalve assembly(s already noted) Inspector Notes from Inspection 9035 *** NOTES ADDED BY DHANEY 11/26/2024 7:56:30 AM *** Note; Water meter pit will need cleaned out before final can be completed . | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 12/04/2024 | APPROVED | EMADISON |
| U-CROSS CONNECTION | 11/26/2024 | APPROVED - AS NOTED | DHANEY |
| Note: *** NOTES ADDED BY DHANEY 11/26/2024 7:56:30 AM *** Note; Water meter pit will need cleaned out before final can be completed . | |||
| ROW- PROJECT STATUS | 11/25/2024 | APPROVED | GBERTOLA |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 11/20/2024 | APPROVED | PFLANAGAN |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/20/2024 | Disapproved - NO FEE | PFLANAGAN |
| Note: THE FIELD DON'T MATCH THE FINAL SURVEY NEED TO REGRADE RIGHT AND LEFT SIDE TO MATCH THE FINAL SURVEY FOR COMMON SWALES | |||
| ROW- PRE-APRON (PRE-POUR) | 10/31/2024 | APPROVED | PFLANAGAN |
| Note: CORRECTIONS MADE IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. ----------------------------------------------------------------------------- 10/30/2024 - PREVIOUS INSPECTION NOTES 10/29/2024 - PREVIOUS INSPECTION NOTES STILL NEED TO HAVE THE FOLOWING 1) NEED TO HAVE 6" OF CONCRETE IN THE RIGHT OF WAY AND AT THE SIDEWALK AT THE DRIVEWAY. SEE SEC. 400.02 ALSO SEC. 900.04A 2) NEED TO HAVE 4" OF CONCRETE IN THE SIDEWALK ANA THE DRIVEWAY ABOVE THE RIGHT OF WAY. SEE SEC. 400.02 -------------------------------------------------------------------------------------------- 10/28/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO HAVE 6" OF CONCRETE IN THE RIGHT OF WAY AND AT THE SIDEWALK AT THE DRIVEWAY. SEE SEC. 400.02 ALSO SEC. 900.04A 2) NEED TO HAVE 4" OF CONCRETE IN THE SIDEWALK ANA THE DRIVEWAY ABOVE THE RIGHT OF WAY. SEE SEC. 400.02 ---------------------------------------------------------------------------------------- 10/25/2024 - PREVIOUS INSPECTION NOTES NOT READY FOR INSPECTION ALL FORMS NEED TO BE IN PLACE AT THE TIME OF THE INSPECTION. Sec. 900.09f Permittee shall be charged an additional fee for each re-inspection required should permittee call for an inspection and NOT be prepared for the requested inspection. | |||
| ROW- PRE-APRON (PRE-POUR) | 10/30/2024 | CANCELLED BY APPLICANT | PFLANAGAN |
| Note: 10/29/2024 - PREVIOUS INSPECTION NOTES STILL NEED TO HAVE THE FOLOWING 1) NEED TO HAVE 6" OF CONCRETE IN THE RIGHT OF WAY AND AT THE SIDEWALK AT THE DRIVEWAY. SEE SEC. 400.02 ALSO SEC. 900.04A 2) NEED TO HAVE 4" OF CONCRETE IN THE SIDEWALK ANA THE DRIVEWAY ABOVE THE RIGHT OF WAY. SEE SEC. 400.02 -------------------------------------------------------------------------------------------- 10/28/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO HAVE 6" OF CONCRETE IN THE RIGHT OF WAY AND AT THE SIDEWALK AT THE DRIVEWAY. SEE SEC. 400.02 ALSO SEC. 900.04A 2) NEED TO HAVE 4" OF CONCRETE IN THE SIDEWALK ANA THE DRIVEWAY ABOVE THE RIGHT OF WAY. SEE SEC. 400.02 ---------------------------------------------------------------------------------------- 10/25/2024 - PREVIOUS INSPECTION NOTES NOT READY FOR INSPECTION ALL FORMS NEED TO BE IN PLACE AT THE TIME OF THE INSPECTION. Sec. 900.09f Permittee shall be charged an additional fee for each re-inspection required should permittee call for an inspection and NOT be prepared for the requested inspection. | |||
| ROW- PRE-APRON (PRE-POUR) | 10/29/2024 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: STILL NEED TO HAVE THE FOLOWING 1) NEED TO HAVE 6" OF CONCRETE IN THE RIGHT OF WAY AND AT THE SIDEWALK AT THE DRIVEWAY. SEE SEC. 400.02 ALSO SEC. 900.04A 2) NEED TO HAVE 4" OF CONCRETE IN THE SIDEWALK ANA THE DRIVEWAY ABOVE THE RIGHT OF WAY. SEE SEC. 400.02 -------------------------------------------------------------------------------------------- 10/28/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO HAVE 6" OF CONCRETE IN THE RIGHT OF WAY AND AT THE SIDEWALK AT THE DRIVEWAY. SEE SEC. 400.02 ALSO SEC. 900.04A 2) NEED TO HAVE 4" OF CONCRETE IN THE SIDEWALK ANA THE DRIVEWAY ABOVE THE RIGHT OF WAY. SEE SEC. 400.02 ---------------------------------------------------------------------------------------- 10/25/2024 - PREVIOUS INSPECTION NOTES NOT READY FOR INSPECTION ALL FORMS NEED TO BE IN PLACE AT THE TIME OF THE INSPECTION. Sec. 900.09f Permittee shall be charged an additional fee for each re-inspection required should permittee call for an inspection and NOT be prepared for the requested inspection. | |||
| ROW- PRE-APRON (PRE-POUR) | 10/28/2024 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) NEED TO HAVE 6" OF CONCRETE IN THE RIGHT OF WAY AND AT THE SIDEWALK AT THE DRIVEWAY. SEE SEC. 400.02 ALSO SEC. 900.04A 2) NEED TO HAVE 4" OF CONCRETE IN THE SIDEWALK ANA THE DRIVEWAY ABOVE THE RIGHT OF WAY. SEE SEC. 400.02 ---------------------------------------------------------------------------------------- 10/25/2024 - PREVIOUS INSPECTION NOTES NOT READY FOR INSPECTION ALL FORMS NEED TO BE IN PLACE AT THE TIME OF THE INSPECTION. Sec. 900.09f Permittee shall be charged an additional fee for each re-inspection required should permittee call for an inspection and NOT be prepared for the requested inspection. | |||
| ROW- PRE-APRON (PRE-POUR) | 10/25/2024 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: NOT READY FOR INSPECTION ALL FORMS NEED TO BE IN PLACE AT THE TIME OF THE INSPECTION. Sec. 900.09f Permittee shall be charged an additional fee for each re-inspection required should permittee call for an inspection and NOT be prepared for the requested inspection. | |||
| ELECTRIC - EARLY POWER | 10/04/2024 | APPROVED - AS NOTED | MKRASKI |
| Note: 10/4/24 Emailed FPL @ 9:20am 10/2/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 10/2/2024 12:53:37 PM *** NEC 230.67 SURGE PROTECTOR INSTALLED Inspector Notes from Inspection 2200 *** NOTES ADDED BY JSTEWART 8/19/2024 11:57:01 AM *** Authorize release of email to FPL | |||
| ELECTRIC - EARLY POWER | 10/02/2024 | Disapproved - NO FEE | JSTEWART |
| Note: *** NOTES ADDED BY JSTEWART 10/2/2024 12:53:37 PM *** NEC 230.67 SURGE PROTECTOR INSTALLED Inspector Notes from Inspection 2200 *** NOTES ADDED BY JSTEWART 8/19/2024 11:57:01 AM *** Authorize release of email to FPL | |||
| GRAVITY SEWER TEST | 09/23/2024 | APPROVED | MGIBSON |
| SEWER TIE IN | 09/23/2024 | APPROVED | MGIBSON |
| PEP TANK INSTALLATION REQUEST | 09/09/2024 | APPROVED | CBOWERMASTER |
| Note: 9/4/2024 7:35:16 AM- PREVIOUS INSPECTION NOTES dumpster | |||
| PEP TANK INSTALLATION REQUEST | 09/03/2024 | Disapproved -FEE REQUIRED | CBOWERMASTER |
| Note: dumpster | |||
| INSULATION | 08/29/2024 | APPROVED | FWILLIS |
| Note: Inspector Notes from Inspection 2420 *** NOTES ADDED BY JSTEWART 8/19/2024 12:00:00 PM *** 1. 5ft head fail (empty). FBCR P2503.7 2. install mechanical fasteners at exhaust duct to fan assembly (heavy duty zip tie etc)FBCR M1601.4.1 | |||
| LATH/BRICK/ WATER BARRIER | 08/19/2024 | APPROVED | JSTEWART |
| ALL ROUGH | 08/19/2024 | APPROVED - AS NOTED | JSTEWART |
| Note: *** NOTES ADDED BY JSTEWART 8/19/2024 12:00:00 PM *** 1. 5ft head fail (empty). FBCR P2503.7 2. install mechanical fasteners at exhaust duct to fan assembly (heavy duty zip tie etc)FBCR M1601.4.1 | |||
| ELECTRIC-TUG | 08/19/2024 | APPROVED - AS NOTED | JSTEWART |
| Note: *** NOTES ADDED BY JSTEWART 8/19/2024 11:57:01 AM *** Authorize release of email to FPL | |||
| ROOF VALLEY & METAL | 08/02/2024 | APPROVED | KSANDOE |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/30/2024 | APPROVED | FWILLIS |
| ROOF SHEATHING | 07/26/2024 | APPROVED | FWILLIS |
| WALL SHEATHING | 07/26/2024 | APPROVED | FWILLIS |
| TIE BEAM / LINTEL | 07/18/2024 | APPROVED | FWILLIS |
| FOUND SURVEY APPROVED (OFFICE) | 07/16/2024 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 07/09/2024 | APPROVED | FWILLIS |
| PLUMBING 1ST ROUGH UNDERGROUND | 07/03/2024 | APPROVED | MGIBSON |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 07/02/2024 | APPROVED | JMUNSON |
| WATER METER INSTALLATION REQUEST | 06/12/2024 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 11/19/2024 | 11/22/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 11/14/2024 | 11/19/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide new energy calc. Efficiency of system has changed and btus | |||
| ENGIN1 | COMPLETE | 07/16/2024 | 07/16/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/16/2024 | 07/16/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 07/03/2024 | 07/03/2024 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Formboard survey is unacceptable as foundation survey. Please submit foundation survey showing location, dimensions and elevation of finished concrete foundation/slab. | |||
| ZON | COMPLETE | 07/03/2024 | 07/03/2024 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/01/2024 | 07/02/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 04/17/2024 | 04/22/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 04/10/2024 | 04/15/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/10/2024 | 04/15/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 04/10/2024 | 04/11/2024 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 04/10/2024 | 04/15/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need correct outlet spacing in master bedroom. NEC 2020 210.52 | |||
| ENGIN1 | COMPLETE | 04/10/2024 | 04/10/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 04/10/2024 | 04/15/2024 |
| LOCATE | COMPLETE | 04/10/2024 | 04/16/2024 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 04/10/2024 | 04/15/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 04/10/2024 | 04/10/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/10/2024 | 04/11/2024 |
| Note: Released By: LIBBY MUSGROVE - (386)986-3780 - LMUSGROVE@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 04/10/2024 | 07/17/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 12/11/2024 |
| REINSPECTION FEE | ¤40.00 | 12/11/2024 |
| SW ENG REINSPECTION 20 | ¤20.00 | 12/04/2024 |
| SW ENG REINSPECTION 30 | ¤30.00 | 12/04/2024 |
| SW ENG REINSPECTION 30 | ¤30.00 | 12/04/2024 |
| SW ENG REINSPECTION 30 | ¤30.00 | 12/04/2024 |
| UTILITY PEP REINSPECTION | ¤40.00 | 12/04/2024 |
| PLAN REVIEW - REVISION | ¤32.50 | 12/04/2024 |
| SEWER CREDIT | (¤850.00) | 04/29/2024 |
| SEWER INSPECTION | ¤25.00 | 04/29/2024 |
| SEWER CAPITAL FACILITY | ¤5,441.03 | 04/29/2024 |
| WATER CAPITAL FACILITY FEE | ¤3,994.51 | 04/29/2024 |
| SITE PLAN 30 | ¤30.00 | 04/29/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 04/29/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 04/29/2024 |
| SURCHARGE FS 533.721 | ¤5.13 | 04/29/2024 |
| SURCHARGE - FS 468.631 | ¤7.69 | 04/29/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 04/29/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 04/29/2024 |
| SW ENG PRE APRON | ¤30.00 | 04/29/2024 |
| WATER- TURN ON | ¤25.00 | 04/29/2024 |
| ADJUSTMENT 50% | (¤512.73) | 04/29/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 04/29/2024 |
| INSPECTION - RESIDENTIAL | ¤775.50 | 04/29/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤219.96 | 04/29/2024 |
| CONNECTION FEES | ¤1,187.26 | 04/29/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 04/29/2024 |
| IMPACT FEE FIRE | ¤428.09 | 04/29/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 04/29/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 04/29/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 04/29/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 04/29/2024 |
| IMPACT FEE TRANSPORTATION | ¤1,862.00 | 04/29/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 04/29/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤21,104.93 |