Permit #2024040649

Permit Details

Status: COED

Parcel Id: 07-11-31-7059-00150-0120
CONDITIONED SPACE: 1985 sqft
GARAGE: 517 sqft
OPENED PORCH (WITH ROOF) : 107 sqft
OPENED PORCH (WITH ROOF) : 42 sqft
Total Square Footage: 2651 sqft
Block: 00150
Subdivision: 7059 -
Job Phone: 831-383-2883
Location Address: 14 SEA SERPENT TRL E
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 07/22/2024
NOC: RECORDED
Applicant name: EDWARD LEE DAUBERT JR
Owner: BRITE LAND INVESTMENT FUND LP

Address

21380 LORAIN ROAD

CLEVELAND, OH 44106

Address

SUITE 202

CLEVELAND, OH 44106

Lot: 0120
Contracted Stated Job Value: ¤226,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

BRITE BUILDING GROUP LLC
Status Location Address State License Number Phone
ACTIVE

6751 FORUM DRIVE SUITE 210

ORLANDO, FL 32821

CBC1266303 (Exp: 08/31/2026) 831-383-2883

Sub Contractors

ANDREW MICHAEL KELLY
Status Location Address Mailing Address State License Number Phone Fax
INACTIVE

2784 WRIGHTS RD

OVIEDO, FL 32765

STE 1012

OVIEDO, FL 32765

CCC1329979 (Exp: 08/31/2024) 407-210-1503 321-239-1973
JOSEPH HORATIO STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PARKWAY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2026) 877-906-1113
JOSEPH H STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PKWY

SANFORD, FL 32771

CAC043953 (Exp: 08/31/2026) 877-906-1113
JOSEPH HORATIO STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PARKWAY

, 0

CFC1432331 (Exp: 08/31/2026) 877-906-1113

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 03/16/2026 FINAL APPROVED PKNAPIK
ROW - FINAL APRON (AFTER POUR) 03/16/2026 APPROVED FSLADISH
Note: 3/16/26 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S AND/OR HOMEOWNER’S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
ROW - STORMWATER FINAL 03/16/2026 APPROVED FSLADISH
Note: 3/16/26 AT THE TIME OF THIS INSPECTION I AM GOING TO ALLOW SEED AND STRAW AS THE DISTANCE TO THE CITY DRAINAGE CONVEYANCE IS A FAIR AMOUNT. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S AND/OR HOMEOWNER’S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. _________________________________________________________________________________________________________________________________ *** INSPECTORS NOTE. BUILDER IS REQUIRED TO SOD BARE EATH AREAS IN REAR OF PROPETY TO CONTROL WASHOUT AND EROSION.***
U -UTILITY RESIDENTIAL FINAL 03/12/2026 FINAL APPROVED BWRIGHT
U-CROSS CONNECTION 03/12/2026 APPROVED - AS NOTED BWRIGHT
Note: No CC. IRR with potable water us PVB.
ROW- FINAL SURVEY/GRADING CERTIFICATION 03/11/2026 APPROVED FSLADISH
ROW FIELD SURVEY /GRADING CERTIFICATION 03/11/2026 APPROVED FSLADISH
Note: 3/11/26 . AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S AND/OR HOMEOWNER’S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. *** INSPECTORS NOTE. BUILDER IS REQUIRED TO SOD BARE EATH AREAS IN REAR OF PROPETY TO CONTROL WASHOUT AND EROSION.***
ELECTRIC - EARLY POWER 01/27/2026 APPROVED - AS NOTED BTAYLOR
Note: 1-27-26 1. Emailed FPL at 1:37. Inspector Notes from Inspection 2200 11-14-25 1. Emailed FPL at 12:48.
GRAVITY SEWER TEST 01/13/2026 APPROVED CVANSTRAHLEN
SEWER TIE IN 01/13/2026 APPROVED CVANSTRAHLEN
ROW- PRE-APRON (PRE-POUR) 01/09/2026 APPROVED FSLADISH
Note: 1/9/26 PIPE INVERT IS GOOD AT THIS INSPECTION. BUILDER REFER TO CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. . IF FIBERGLASS OPTION IS USED, BUILDER REQUIRED TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR AT THE TIME OF THE INSPECTION READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK SITE FOR ANY STANDING WATER. ALSO VERIFY PIPE ELEVATION HAS NOT CHANGED. NO EXPANSION JOINTS ALLOWED, AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIREMENTS ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. Inspector Notes from Inspection 9470 10/20/25 FOUNDATIONS ARE BEING FORMED. AT THIS TIME MINIMUM COPC CONTRUCTION ENTRANCE AND EROSION CONTROL REQUIREMENTS ARE MET. 10/6/2025 - PREVIOUS INSPECTION NOTES 10/6/25 You will be required to repair/reset your silt fence where neccessary. In the rear you will need to get washout off of the silt fence and reset it. Once debris reaches 1/2 way up the silt fence it must be removed as the fence is compromised. 6. Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day. 3. Sediment deposits should be removed when deposits reach approximately onehalf the height of the barrier. 1. Silt fences shall be inspected within 24 hours after each 1/2-inch rainfall event and at least once a week (every 7 calendar days according to the CGP). Any required repairs shall be made immediately. Inspector Notes from Inspection 9470 8/25/25 . AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. PLEASE CONTINUE TO ADHERE TO ALL COPC CONSTUCTION ENTRANCE STANDARDS THROUGHOUT THE CONSTRUCTION PRECESS.
PEP TANK INSTALLATION REQUEST 12/19/2025 APPROVED BVITALE
LATH/BRICK/ WATER BARRIER 12/11/2025 APPROVED BTAYLOR
INSULATION 12/09/2025 APPROVED BTAYLOR
ALL ROUGH 12/05/2025 APPROVED BTAYLOR
ROOF VALLEY & METAL 11/26/2025 APPROVED BTAYLOR
Note: Inspector Notes from Inspection 2460 11/21/25 1. Plans call for 2x8 knee wall to be secured to masonry. Masonry block was installed instead. Please revise plans to show this change in detail FBC(A) 107.4 2. Ledger boards is not secured per detail 1/T-01 3. Truss' are not secured to ledger with HUS-28 per plan
WALL SHEATHING 11/21/2025 APPROVED MCONTRYMAN
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/21/2025 APPROVED - AS NOTED MCONTRYMAN
Note: 11/21/25 1. Plans call for 2x8 knee wall to be secured to masonry. Masonry block was installed instead. Please revise plans to show this change in detail FBC(A) 107.4 2. Ledger boards is not secured per detail 1/T-01 3. Truss' are not secured to ledger with HUS-28 per plan
ELECTRIC-TUG 11/14/2025 APPROVED - AS NOTED BTAYLOR
Note: 11-14-25 1. Emailed FPL at 12:48.
TIE BEAM / LINTEL 11/04/2025 APPROVED MCONTRYMAN
MONOLITHIC SLAB 10/23/2025 APPROVED BTAYLOR
ROW - DRAINAGE 10/20/2025 APPROVED - AS NOTED FSLADISH
Note: 10/20/25 FOUNDATIONS ARE BEING FORMED. AT THIS TIME MINIMUM COPC CONTRUCTION ENTRANCE AND EROSION CONTROL REQUIREMENTS ARE MET. 10/6/2025 - PREVIOUS INSPECTION NOTES 10/6/25 You will be required to repair/reset your silt fence where neccessary. In the rear you will need to get washout off of the silt fence and reset it. Once debris reaches 1/2 way up the silt fence it must be removed as the fence is compromised. 6. Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day. 3. Sediment deposits should be removed when deposits reach approximately onehalf the height of the barrier. 1. Silt fences shall be inspected within 24 hours after each 1/2-inch rainfall event and at least once a week (every 7 calendar days according to the CGP). Any required repairs shall be made immediately. Inspector Notes from Inspection 9470 8/25/25 . AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. PLEASE CONTINUE TO ADHERE TO ALL COPC CONSTUCTION ENTRANCE STANDARDS THROUGHOUT THE CONSTRUCTION PRECESS.
FOUND SURVEY APPROVED (OFFICE) 10/16/2025 APPROVED RRICKS
PLUMBING 1ST ROUGH UNDERGROUND 10/14/2025 APPROVED MGIBSON
ROW - DRAINAGE 10/06/2025 Disapproved -FEE REQUIRED FSLADISH
Note: 10/6/25 You will be required to repair/reset your silt fence where neccessary. In the rear you will need to get washout off of the silt fence and reset it. Once debris reaches 1/2 way up the silt fence it must be removed as the fence is compromised. 6. Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day. 3. Sediment deposits should be removed when deposits reach approximately onehalf the height of the barrier. 1. Silt fences shall be inspected within 24 hours after each 1/2-inch rainfall event and at least once a week (every 7 calendar days according to the CGP). Any required repairs shall be made immediately. Inspector Notes from Inspection 9470 8/25/25 . AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. PLEASE CONTINUE TO ADHERE TO ALL COPC CONSTUCTION ENTRANCE STANDARDS THROUGHOUT THE CONSTRUCTION PRECESS.
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 09/15/2025 APPROVED PKNAPIK
ROW - DRAINAGE 08/25/2025 APPROVED - AS NOTED FSLADISH
Note: 8/25/25 . AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. PLEASE CONTINUE TO ADHERE TO ALL COPC CONSTUCTION ENTRANCE STANDARDS THROUGHOUT THE CONSTRUCTION PRECESS.
ROW - DRAINAGE 08/22/2025 Status Check FSLADISH
Note: 8/20/2025 - PREVIOUS INSPECTION NOTES 8/20/25 SILT FENCE INSTALLED ON BOTH PROPERTIES AT THE TIME OF THIS INSPECTION. THE FRONT SWALE IS CLEAR AND FREE OF OBSTRUCTIONS. TEMPORARY PIPE IS ON SITE AND NOT YET INSTALLED. I AM GOING TO PARTIALLY APPROVE THIS INSPECTION AND WILL REMIND YOU THAT YOU WILL NEED TO ADHERE TO COPC RESIDENTIAL SCATTERED LOT DRIVE CONSTUCTION ENTRANCE REQUIREMENTS THROUGHOUT THE CONSTRUCTION PROCESS. WILL BE BACK FOR REINSPECTION ON 8/22/25. 8/13/2025 - PREVIOUS INSPECTION NOTES NEED TO DO THE FOLLOWING 1) NEED TO INSTALL STILL FENCE AROUND ENTIRE PROPERTYS AND ACROSSED THE FRONT WITH A CONSTRUCTION ENTERANCE FOR THE SITE. 2) NEED FIX SWALE SO ALL RUTS AND HIGH SPOTS IN IT ARE OUT SO WATER CAN FLOW TO OUTFALL. YOU WILL HAVE 7DAY TO FIX ALL ISSUES OR THERE WILL BE A INSPECTION HOLD ON THESE PERMITS.
ROW- PROJECT STATUS 08/21/2025 Status Check PFLANAGAN
Note: AT THIS TIME OF TODAYS INSPECTION THE BUILDER HAS CLEARED LOT AND PUT SILT FENCE AROUND PROPERTY. THEY HAVE PLACED CONSTRUCTION ENTERANCE FOR CONTRACTORS TO ENTER SITE. NO TEMP. CULVERTS ARE NOT INPLACE OR PORTER JON IS NOT ON THERE LOT. FRANK HAS A DRAINAGE ON THIS LOT TOMORROW TO MAKE SURE CONTRACTOR FIXES ALL ISSUES. ------------------------------------------------------------------------------------ Please give a detailed status of the site to ensure it's being maintained,etc. before an extension can be granted.
ROW - DRAINAGE 08/20/2025 PARTIALLY APPROVED FSLADISH
Note: 8/20/25 SILT FENCE INSTALLED ON BOTH PROPERTIES AT THE TIME OF THIS INSPECTION. THE FRONT SWALE IS CLEAR AND FREE OF OBSTRUCTIONS. TEMPORARY PIPE IS ON SITE AND NOT YET INSTALLED. I AM GOING TO PARTIALLY APPROVE THIS INSPECTION AND WILL REMIND YOU THAT YOU WILL NEED TO ADHERE TO COPC RESIDENTIAL SCATTERED LOT DRIVE CONSTUCTION ENTRANCE REQUIREMENTS THROUGHOUT THE CONSTRUCTION PROCESS. WILL BE BACK FOR REINSPECTION ON 8/22/25. 8/13/2025 - PREVIOUS INSPECTION NOTES NEED TO DO THE FOLLOWING 1) NEED TO INSTALL STILL FENCE AROUND ENTIRE PROPERTYS AND ACROSSED THE FRONT WITH A CONSTRUCTION ENTERANCE FOR THE SITE. 2) NEED FIX SWALE SO ALL RUTS AND HIGH SPOTS IN IT ARE OUT SO WATER CAN FLOW TO OUTFALL. YOU WILL HAVE 7DAY TO FIX ALL ISSUES OR THERE WILL BE A INSPECTION HOLD ON THESE PERMITS.
ROW - DRAINAGE 08/13/2025 Disapproved - NO FEE PFLANAGAN
Note: NEED TO DO THE FOLLOWING 1) NEED TO INSTALL STILL FENCE AROUND ENTIRE PROPERTYS AND ACROSSED THE FRONT WITH A CONSTRUCTION ENTERANCE FOR THE SITE. 2) NEED FIX SWALE SO ALL RUTS AND HIGH SPOTS IN IT ARE OUT SO WATER CAN FLOW TO OUTFALL. YOU WILL HAVE 7DAY TO FIX ALL ISSUES OR THERE WILL BE A INSPECTION HOLD ON THESE PERMITS.
WATER METER INSTALLATION REQUEST 08/20/2024 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
BLD COMPLETE 12/04/2025 12/10/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
SW1 COMPLETE 10/16/2025 10/16/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 10/16/2025 10/16/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 10/07/2025 10/08/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 09/12/2025 09/15/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
BLD HOLD 08/28/2025 08/29/2025
Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Upload density report for geotech
BADMIN INFORMATION 08/20/2025 08/20/2025
Note: Marked INFORMATION By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM Extension form incomplete. Projected timeline incomplete.
MECH COMPLETE 06/27/2025 07/01/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BADMIN INFORMATION 05/16/2025 05/16/2025
Note: Marked INFORMATION By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM Can't use form submitted with a stamp on top from another permit.
BADMIN INFORMATION 05/16/2025 05/16/2025
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM for all uture extension requestions, please complete the entire form to include the status of the project and the projected timeframe.
BLD COMPLETE 09/26/2024 09/30/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ELEC COMPLETE 09/26/2024 09/30/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
MECH COMPLETE 09/26/2024 09/30/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ZON COMPLETE 09/26/2024 09/26/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 07/22/2024 07/29/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ZON COMPLETE 07/22/2024 07/22/2024
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
ZON COMPLETE 07/08/2024 07/08/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM House layout in the front on landscape plan doesn't match plans and site plan.
ELEC COMPLETE 07/08/2024 07/15/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Range outlet needs to be GFCI protected. NEC 2020 210.8
BLD COMPLETE 06/11/2024 06/13/2024
Note: Released By: JPI
PLSW COMPLETE 06/11/2024 06/26/2024
Note: Released By: CARMELO MORALES - (386)986-4758 - CMORALES@PALMCOASTGOV.COM
ELEC HOLD 06/11/2024 06/17/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Range outlet needs to be GFCI protected. NEC 2020 210.8
BADMIN COMPLETE 06/11/2024 06/17/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 06/11/2024 06/13/2024
Note: Released By: JPI
CUSVC COMPLETE 06/11/2024 06/12/2024
Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM
ENGIN1 COMPLETE 06/11/2024 06/11/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 06/11/2024 06/17/2024
LOCATE COMPLETE 06/11/2024 06/13/2024
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 06/11/2024 06/17/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 06/11/2024 06/14/2024
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 approval valid with the following notes: Final PEP location to be provided by the City of Palm Coast. The stormwater conveyance swales associated with the lot’s grading shall be diverted around the PEP lids/covers SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD
ZON HOLD 06/11/2024 06/12/2024
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM House layout in the front on landscape plan doesn't match plans and site plan.
BADMIN COMPLETE 05/10/2024 05/17/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
PLSW HOLD 05/10/2024 05/14/2024
Note: Held By: CARMELO MORALES - (386)986-4758 - CMORALES@PALMCOASTGOV.COM 1. The update was for submittal of the Geotech report. There was no grading plan submitted. Previous comment still pending to be addressed: FFE cannot be more than 22" above centerline elevation of frontage road. Please revise FFE accordingly.
ZON HOLD 05/10/2024 05/13/2024
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Repeat comment: Cannot have an office in a single family residence. Please relabel to den/study Please provide walkway width on site plan/survey All windows and doors facing right of way must hhave banding. Garage missing banding
ELEC HOLD 05/10/2024 05/17/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need correct outlet spacing in dining room. NEC 2020 210.52 2. All outlets in kitchen, laundry and garage need to be GFCI protected. NEC 2020 210.8 3. Electrical riser diagram needs to include the surge protector. NEC 2020 230.67 4. Wire sizes are wrong for a 200 amp service. NEC 2020 310.12 5. Submit electrical load calcs.
BLD HOLD 05/10/2024 05/13/2024
Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet.
ZON HOLD 04/30/2024 04/30/2024
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Cannot have an office in a single family residence. Please relabel to den/study Please provide walkway width on site plan/survey All windows and doors facing right of way must hhave banding. Garage missing banding
SW1 COMPLETE 04/19/2024 04/25/2024
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM Released By: CARMELO MORALES - (386)986-4758 - CMORALES@PALMCOASTGOV.COM
UD1 INFORMATION 04/12/2024 04/12/2024
Note: Marked INFORMATION By: GREG DEGLER - - GDEGLER@PALMCOASTGOV.COM Please contact Rebecca Torres at 386-986-2355 or rtorres@palmcoastgov.com to coordinate the installation of the water meter and the pep tank (for sanitary sewer) by The City of Palm Coast.
PLSW HOLD 04/12/2024 04/29/2024
Note: Held By: CARMELO MORALES - (386)986-4758 - CMORALES@PALMCOASTGOV.COM 1. FFE cannot be more than 22" above centerline elevation of frontage road. Please revise FFE accordingly.
BADMIN COMPLETE 04/11/2024 04/18/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD HOLD 04/11/2024 04/17/2024
Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet.
CUSVC COMPLETE 04/11/2024 04/15/2024
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC HOLD 04/11/2024 04/16/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need correct outlet spacing in dining room. NEC 2020 210.52 2. All outlets in kitchen, laundry and garage need to be GFCI protected. NEC 2020 210.8 3. Electrical riser diagram needs to include the surge protector. NEC 2020 230.67 4. Wire sizes are wrong for a 200 amp service. NEC 2020 310.12 5. Submit electrical load calcs.
ENGIN1 COMPLETE 04/11/2024 04/11/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 04/11/2024 04/15/2024
LOCATE COMPLETE 04/11/2024 04/16/2024
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 04/11/2024 04/15/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 HOLD 04/11/2024 04/11/2024
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Please lower slab elevation to be less 1.83' above average crown of road elevation
ZON HOLD 04/11/2024 04/11/2024
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM AC pad location on landscape does not match location on site plan and floor plan Cannot have an office in a single family residence. Please relabel to den/study Please provide walkway width on site plan/survey All windows and doors facing right of way must hhave banding. Garage missing banding
SWALE COMPLETE 04/11/2024 07/17/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BADMIN HOLD 04/11/2024 04/18/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Provide geotechnical investigation report in accordance with Section 1803.2. Report to be conducted per Sections 1803.3 through 1803.5. Completed report shall comply with Section 1803.6. Report shall be signed and sealed by a Florida licensed professional engineer in accordance with F.S. 471.025 and Florida Administrative Code Sections 61G15-30.001 and 61G15-23.001 through .005. If report determines unsuitable sub-surface conditions or unsuitable soil conditions, then engineer shall provide a soils mitigation plan in order to ensure soils are suitable to receive the building's foundation. Report to include fill and compaction specifications and engineering inspection requirements. At conclusion of any soils mitigation work, engineer will be required to certify work was performed according to plans. Be advised, if the geotechnical report reveals any unsuitable soils and / or subsurface conditions, the first inspection for this permit (1st Rough / Underground Plumbing) will be HELD until such time as a report by the geotechnical engineer is submitted to the Building Division documenting that the soil mitigation work has been completed according to the engineer's plans and is now suitable for construction. Report must also include a record of all required compaction testing.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
EXTENSION ¤40.00 03/10/2026
EXTENSION ¤40.00 03/10/2026
PLAN REVIEW - REVISION ¤32.50 03/10/2026
CONTRACTOR CHANGE ¤20.00 03/10/2026
CONTRACTOR CHANGE ¤20.00 03/10/2026
CONTRACTOR CHANGE ¤20.00 03/10/2026
SW ENG - INSPECTION 20 ¤20.00 03/10/2026
SW ENG - INSPECTION 20 ¤20.00 03/10/2026
SW ENG - INSPECTION 20 ¤20.00 03/10/2026
SW ENG - INSPECTION 20 ¤20.00 03/10/2026
SW ENG - INSPECTION 20 ¤20.00 03/10/2026
SW ENG - INSPECTION 20 ¤20.00 03/10/2026
SW ENG INSPECTION 80 ¤80.00 07/22/2024
SW ENG PRE APRON ¤30.00 07/22/2024
SW ENG - REVIEW 20 ¤20.00 07/22/2024
SW ENG RES REVIEW 200 ¤200.00 07/22/2024
SEWER CAPITAL FACILITY ¤4,730.52 07/22/2024
WATER CAPITAL FACILITY FEE ¤2,851.14 07/22/2024
SITE PLAN 30 ¤30.00 07/22/2024
FC IMPACT FEE EMS ¤62.00 07/22/2024
IMPACT FEE FIRE ¤428.09 07/22/2024
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 07/22/2024
FC IMPACT FEE LIBRARY ¤268.00 07/22/2024
IMPACT FEE PARKS ¤1,800.99 07/22/2024
IMPACT FEE SCHOOL ¤5,450.00 07/22/2024
IMPACT FEE TRANSPORTATION ¤1,862.00 07/22/2024
WATER -IRRIGATION INSPECTION ¤25.00 07/22/2024
SURCHARGE FS 533.721 ¤6.72 07/22/2024
SURCHARGE - FS 468.631 ¤10.07 07/22/2024
SW ENG - FOUNDATION SURVEY ¤20.00 07/22/2024
CONNECTION FEES ¤953.51 07/22/2024
WATER- TURN ON ¤10.00 07/22/2024
ADJUSTMENT 50% (¤671.58) 07/22/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 07/22/2024
INSPECTION - RESIDENTIAL ¤1,023.00 07/22/2024
PLAN REVIEW - RESIDENTIAL ¤290.16 07/22/2024
Fees Total Due: ¤0.00 Total Paid: ¤20,020.12