I want to search for...

Permit #2024040661

Permit Details

Status: COED

Parcel Id: 07-11-31-7024-00180-0070
GARAGE: 420 sqft
OPENED PORCH (WITH ROOF) : 30 sqft
CONDITIONED SPACE: 1211 sqft
Total Square Footage: 1661 sqft
Block: 00180
Subdivision: -
Job Phone: 844-885-8913
Location Address: 19 PRINCE KAAREL LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 04/24/2024
NOC: RECORDED
Applicant name: SIMON DALE VANWAGENEN
Owner: LGI HOMES-FLORIDA LLC

Address

1450 LAKE ROBBINS DRIVE

THE WOODLANDS, TX 77380

Address

STE 430

THE WOODLANDS, TX 77380

Lot: 0070
Contracted Stated Job Value: ¤197,705.46
Job Description: Single Family Residence
Type: CN

Contractor

LGI HOMES-FLORIDA LLC
Status Location Address State License Number Phone
ACTIVE

2304 SPRING HILL CT

TAMPA, FL 33602

CBC1257972 (Exp: 08/31/2026) 904-451-8258

Sub Contractors

BRETT CHRISTIAN GIBSON
Status Location Address State License Number Phone
ACTIVE

250 SEGOVIA RD

ST AUGUSTINE, FL 32086

CAC1818423 (Exp: 08/31/2026) 904-229-8131
PAUL ERIC FORSTER
Status Location Address State License Number Phone
ACTIVE

6114 GOODMAN RD

JACKSONVILLE, FL 32244

CFC1429261 (Exp: 08/31/2026) 904-647-1820
CHRISTOPHER DENNIS O'CONNER
Status Location Address State License Number Phone
ACTIVE

240 N LAKE CUNNINGHAM AVE

JACKSONVILLE, FL 32257

ER13015361 (Exp: 08/31/2026) 904-540-0858
TERRY BRICE DICKERSON
Status Location Address State License Number Phone
ACTIVE

4300 ST JOHN'S PARKWAY

ALPHARETTA, GA 30009

CCC1326209 (Exp: 08/31/2026) 407-548-6733

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 05/28/2025 FINAL APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 5/28/2025 9:19:20 AM ***
ROW - FINAL APRON (AFTER POUR) 05/22/2025 APPROVED TPOLACEK
Note: PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE, AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW - STORMWATER FINAL 05/22/2025 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
U -UTILITY RESIDENTIAL FINAL 05/14/2025 FINAL APPROVED LFITZGERALD
U-CROSS CONNECTION 05/14/2025 APPROVED - AS NOTED LFITZGERALD
Note: irr meter-no cc
ROW- FINAL SURVEY/GRADING CERTIFICATION 05/07/2025 APPROVED TPOLACEK
ROW FIELD SURVEY /GRADING CERTIFICATION 05/07/2025 APPROVED TPOLACEK
Note: UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ELECTRIC - EARLY POWER 05/05/2025 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 5/5/2025 11:22:45 AM *** 5/5/25: FPL emailed to release power.
ROW- PRE-APRON (PRE-POUR) 04/24/2025 APPROVED - AS NOTED TPOLACEK
Note: 04/24/25 TPOLACEK*** LEFT SIDE MITER FORM BOARDS NEED TO BE RAISED TO ACHIEVE 2" OVER MITERED OPEN END APPROVING AS NOTED. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. CONTRACTORS WILL BE NOTIFIED WHEN TICKETS WILL BE REQUIRED WITH AN EMAIL BLAST.THE FOLLOWING IS CURRENTLY FOR INFORMATION ONLY: TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR.
GRAVITY SEWER TEST 04/04/2025 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
SEWER TIE IN 04/04/2025 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
INSULATION 04/04/2025 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 4/4/2025 2:01:55 PM *** 4/3/2025 - PREVIOUS INSPECTION NOTES 4/3/25: --->>> Previously listed items 4 and 5 remain unresolved. (Item 5- Spoke to electrical sub-contractor after notes were added to the All Rough Inspection to explain why it had to be done and how). 4). Dryer exhaust needs vertical support at 5ft. minimum spacing. FBC-M1502.4.1 5). Missing Fireblocking above the breaker panel as required. FBC-R302.11 / FBC-302.11.1 (for approved material). 2" x 4" blocking must be installed flat and wires drilled through as required. (firefoam also incomplete). New: 3). Fireblocking at top plate area of pack out wall for Master bathroom shower stall does not meet the fireblocking requirements. FBC-302.11 / See FBC-302.11.1 for approved material. Inspector Notes from Inspection 2420 *** NOTES ADDED BY RSIMS 3/31/2025 11:52:40 AM *** 3/31/25: Approved as noted to keep project moving. ALL MUST BE COMPLETE PRIOR TO NEXT INSPECTION. Check at next inspection. Previously listed items 3, 4 and 5 remain unresolved. 3). Installed 12" supply duct does not match the 14" required on Energy calcs. Highlighted. FBC [A]107.4 Correction or revision required. 4). Dryer exhaust needs vertical support at 5ft. minimum spacing. FBC-M1502.4.1 5). Missing Fireblocking above the breaker panel as required. FBC-R302.11 / FBC-302.11.1 (for approved material). 2" x 4" blocking must be installed flat and wires drilled through as required. NOTE: Will require Surge Protector at Main Meter Panel prior to Early Power. NEC-230.67(A)/(B) 3/26/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY RSIMS 3/26/2025 12:56:52 PM *** 3/26/25: 1). Master bathroom: exhaust fans are not electrically wired as rrequired for All Rough. FBC [A]107.4 2). All bathroom exhaust fans are missing the second (mechanical) point of contact. FBC-M1502.4.2 3). Installed 12" supply duct does not match the 14" required on Energy calcs. Highlighted. FBC [A]107.4 Correction or revision required. 4). Dryer exhaust needs vertical support at 5ft. minimum spacing. FBC-M1502.4.1 5). Missing Fireblocking above the breaker panel as required. FBC-R302.11 / FBC-302.11.1 (for approved material). 2" x 4" blocking must be installed flat and wires drilled through as required. NOTE: Will require Surge Protector at Main Meter Panel prior to Early Power. NEC-230.67(A)/(B) Inspector Notes from Inspection 2420 4/3/25: *** NOTES ADDED BY RSIMS 3/31/2025 11:52:40 AM *** 3/31/25: Approved as noted to keep project moving. ALL MUST BE COMPLETE PRIOR TO NEXT INSPECTION. Check at next inspection. Previously listed items 3, 4 and 5 remain unresolved. 3). Installed 12" supply duct does not match the 14" required on Energy calcs. Highlighted. FBC [A]107.4 Correction or revision required. 4). Dryer exhaust needs vertical support at 5ft. minimum spacing. FBC-M1502.4.1 5). Missing Fireblocking above the breaker panel as required. FBC-R302.11 / FBC-302.11.1 (for approved material). 2" x 4" blocking must be installed flat and wires drilled through as required. NOTE: Will require Surge Protector at Main Meter Panel prior to Early Power. NEC-230.67(A)/(B) 3/26/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY RSIMS 3/26/2025 12:56:52 PM *** 3/26/25: 1). Master bathroom: exhaust fans are not electrically wired as rrequired for All Rough. FBC [A]107.4 2). All bathroom exhaust fans are missing the second (mechanical) point of contact. FBC-M1502.4.2 3). Installed 12" supply duct does not match the 14" required on Energy calcs. Highlighted. FBC [A]107.4 Correction or revision required. 4). Dryer exhaust needs vertical support at 5ft. minimum spacing. FBC-M1502.4.1 5). Missing Fireblocking above the breaker panel as required. FBC-R302.11 / FBC-302.11.1 (for approved material). 2" x 4" blocking must be installed flat and wires drilled through as required. NOTE: Will require Surge Protector at Main Meter Panel prior to Early Power. NEC-230.67(A)/(B)
INSULATION 04/03/2025 Disapproved -FEE REQUIRED RSIMS
Note: *** NOTES ADDED BY RSIMS 4/3/2025 2:15:11 PM *** 4/3/25: --->>> Previously listed items 4 and 5 remain unresolved. (Item 5- Spoke to electrical sub-contractor after notes were added to the All Rough Inspection to explain why it had to be done and how). 4). Dryer exhaust needs vertical support at 5ft. minimum spacing. FBC-M1502.4.1 5). Missing Fireblocking above the breaker panel as required. FBC-R302.11 / FBC-302.11.1 (for approved material). 2" x 4" blocking must be installed flat and wires drilled through as required. (firefoam also incomplete). New: 3). Fireblocking at top plate area of pack out wall for Master bathroom shower stall does not meet the fireblocking requirements. FBC-302.11 / See FBC-302.11.1 for approved material. Inspector Notes from Inspection 2420 *** NOTES ADDED BY RSIMS 3/31/2025 11:52:40 AM *** 3/31/25: Approved as noted to keep project moving. ALL MUST BE COMPLETE PRIOR TO NEXT INSPECTION. Check at next inspection. Previously listed items 3, 4 and 5 remain unresolved. 3). Installed 12" supply duct does not match the 14" required on Energy calcs. Highlighted. FBC [A]107.4 Correction or revision required. 4). Dryer exhaust needs vertical support at 5ft. minimum spacing. FBC-M1502.4.1 5). Missing Fireblocking above the breaker panel as required. FBC-R302.11 / FBC-302.11.1 (for approved material). 2" x 4" blocking must be installed flat and wires drilled through as required. NOTE: Will require Surge Protector at Main Meter Panel prior to Early Power. NEC-230.67(A)/(B) 3/26/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY RSIMS 3/26/2025 12:56:52 PM *** 3/26/25: 1). Master bathroom: exhaust fans are not electrically wired as rrequired for All Rough. FBC [A]107.4 2). All bathroom exhaust fans are missing the second (mechanical) point of contact. FBC-M1502.4.2 3). Installed 12" supply duct does not match the 14" required on Energy calcs. Highlighted. FBC [A]107.4 Correction or revision required. 4). Dryer exhaust needs vertical support at 5ft. minimum spacing. FBC-M1502.4.1 5). Missing Fireblocking above the breaker panel as required. FBC-R302.11 / FBC-302.11.1 (for approved material). 2" x 4" blocking must be installed flat and wires drilled through as required. NOTE: Will require Surge Protector at Main Meter Panel prior to Early Power. NEC-230.67(A)/(B) Inspector Notes from Inspection 2420 4/3/25: *** NOTES ADDED BY RSIMS 3/31/2025 11:52:40 AM *** 3/31/25: Approved as noted to keep project moving. ALL MUST BE COMPLETE PRIOR TO NEXT INSPECTION. Check at next inspection. Previously listed items 3, 4 and 5 remain unresolved. 3). Installed 12" supply duct does not match the 14" required on Energy calcs. Highlighted. FBC [A]107.4 Correction or revision required. 4). Dryer exhaust needs vertical support at 5ft. minimum spacing. FBC-M1502.4.1 5). Missing Fireblocking above the breaker panel as required. FBC-R302.11 / FBC-302.11.1 (for approved material). 2" x 4" blocking must be installed flat and wires drilled through as required. NOTE: Will require Surge Protector at Main Meter Panel prior to Early Power. NEC-230.67(A)/(B) 3/26/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY RSIMS 3/26/2025 12:56:52 PM *** 3/26/25: 1). Master bathroom: exhaust fans are not electrically wired as rrequired for All Rough. FBC [A]107.4 2). All bathroom exhaust fans are missing the second (mechanical) point of contact. FBC-M1502.4.2 3). Installed 12" supply duct does not match the 14" required on Energy calcs. Highlighted. FBC [A]107.4 Correction or revision required. 4). Dryer exhaust needs vertical support at 5ft. minimum spacing. FBC-M1502.4.1 5). Missing Fireblocking above the breaker panel as required. FBC-R302.11 / FBC-302.11.1 (for approved material). 2" x 4" blocking must be installed flat and wires drilled through as required. NOTE: Will require Surge Protector at Main Meter Panel prior to Early Power. NEC-230.67(A)/(B)
ALL ROUGH 03/31/2025 APPROVED - AS NOTED RSIMS
Note: *** NOTES ADDED BY RSIMS 3/31/2025 11:52:40 AM *** 3/31/25: Approved as noted to keep project moving. ALL MUST BE COMPLETE PRIOR TO NEXT INSPECTION. Check at next inspection. Previously listed items 3, 4 and 5 remain unresolved. 3). Installed 12" supply duct does not match the 14" required on Energy calcs. Highlighted. FBC [A]107.4 Correction or revision required. 4). Dryer exhaust needs vertical support at 5ft. minimum spacing. FBC-M1502.4.1 5). Missing Fireblocking above the breaker panel as required. FBC-R302.11 / FBC-302.11.1 (for approved material). 2" x 4" blocking must be installed flat and wires drilled through as required. NOTE: Will require Surge Protector at Main Meter Panel prior to Early Power. NEC-230.67(A)/(B) 3/26/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY RSIMS 3/26/2025 12:56:52 PM *** 3/26/25: 1). Master bathroom: exhaust fans are not electrically wired as rrequired for All Rough. FBC [A]107.4 2). All bathroom exhaust fans are missing the second (mechanical) point of contact. FBC-M1502.4.2 3). Installed 12" supply duct does not match the 14" required on Energy calcs. Highlighted. FBC [A]107.4 Correction or revision required. 4). Dryer exhaust needs vertical support at 5ft. minimum spacing. FBC-M1502.4.1 5). Missing Fireblocking above the breaker panel as required. FBC-R302.11 / FBC-302.11.1 (for approved material). 2" x 4" blocking must be installed flat and wires drilled through as required. NOTE: Will require Surge Protector at Main Meter Panel prior to Early Power. NEC-230.67(A)/(B)
ALL ROUGH 03/26/2025 Disapproved - NO FEE RSIMS
Note: *** NOTES ADDED BY RSIMS 3/26/2025 1:34:25 PM *** *** NOTES ADDED BY RSIMS 3/26/2025 12:56:52 PM *** 3/26/25: 1). Master bathroom: exhaust fans are not electrically wired as rrequired for All Rough. FBC [A]107.4 2). All bathroom exhaust fans are missing the second (mechanical) point of contact. FBC-M1502.4.2 3). Installed 12" supply duct does not match the 14" required on Energy calcs. Highlighted. FBC [A]107.4 Correction or revision required. 4). Dryer exhaust needs vertical support at 5ft. minimum spacing. FBC-M1502.4.1 5). Missing Fireblocking above the breaker panel as required. FBC-R302.11 / FBC-302.11.1 (for approved material). 2" x 4" blocking must be installed flat and wires drilled through as required. NOTE: Will require Surge Protector at Main Meter Panel prior to Early Power. NEC-230.67(A)/(B)
LATH/BRICK/ WATER BARRIER 03/26/2025 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 3/26/2025 12:57:06 PM ***
ELECTRIC-TUG 03/24/2025 APPROVED KSANDOE
ROOF VALLEY & METAL 03/11/2025 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 3/11/2025 12:05:38 PM *** Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 3/5/2025 12:02:48 PM *** 3/5/25: Approved as noted. Check at next inspection. 1). Stud in Laundry room on wall perpendicular to Shear wall that was removed for anchor tie in needs to be re-installed.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/05/2025 APPROVED - AS NOTED RSIMS
Note: *** NOTES ADDED BY RSIMS 3/5/2025 12:02:48 PM *** 3/5/25: Approved as noted. Check at next inspection. 1). Stud in Laundry room on wall perpendicular to Shear wall that was removed for anchor tie in needs to be re-installed.
WALL SHEATHING 02/28/2025 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 2/28/2025 11:30:29 AM ***
TIE BEAM / LINTEL 02/27/2025 CANCELLED BY INSPECTOR CVANSTRAHLEN
Note: inspection do not apply for this building , please call for the right inspection
FOUND SURVEY APPROVED (OFFICE) 02/19/2025 APPROVED RRICKS
MONOLITHIC SLAB 02/14/2025 APPROVED MCONTRYMAN
PLUMBING 1ST ROUGH UNDERGROUND 02/11/2025 APPROVED MGIBSON
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 11/04/2024 APPROVED JMUNSON
WATER METER INSTALLATION REQUEST 07/08/2024 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
MECH COMPLETE 04/28/2025 04/28/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH HOLD 04/25/2025 04/28/2025
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Energy Calcs need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2023 8Th edition
MECH COMPLETE 04/02/2025 04/03/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH HOLD 03/31/2025 04/01/2025
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Energy Calcs need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2023 8Th edition
ENGIN1 COMPLETE 02/18/2025 02/19/2025
Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 02/18/2025 02/18/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 01/30/2025 01/31/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
BLD COMPLETE 10/29/2024 11/04/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ZON COMPLETE 04/22/2024 04/23/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
MECH COMPLETE 04/22/2024 04/23/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 04/22/2024 04/23/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 04/22/2024 04/23/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BADMIN COMPLETE 04/11/2024 04/16/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 04/11/2024 04/17/2024
Note: Released By: JPI
CUSVC COMPLETE 04/11/2024 04/15/2024
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 04/11/2024 04/16/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 04/11/2024 04/11/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 04/11/2024 04/15/2024
LOCATE COMPLETE 04/11/2024 04/16/2024
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH HOLD 04/11/2024 04/15/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Direction house faces on Energy Calcs does not match the site plan. Revise to match per R405.4.2.1 FBC Energy Conservation 2023 8Th Edition
SW1 COMPLETE 04/11/2024 04/11/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON HOLD 04/11/2024 04/12/2024
Note: Held By: LIBBY MUSGROVE - (386)986-3780 - LMUSGROVE@PALMCOASTGOV.COM Site plan/boundary survey are missing the panel # A/C unit location on the site plan does not match the other documents
SWALE COMPLETE 04/11/2024 07/18/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 05/29/2025
REINSPECTION RESIDENTIAL ¤40.00 05/29/2025
CONNECTION FEES ¤1,187.26 04/24/2024
FC IMPACT FEE EMS ¤62.00 04/24/2024
IMPACT FEE FIRE ¤428.09 04/24/2024
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 04/24/2024
FC IMPACT FEE LIBRARY ¤268.00 04/24/2024
IMPACT FEE PARKS ¤1,800.99 04/24/2024
IMPACT FEE SCHOOL ¤5,450.00 04/24/2024
IMPACT FEE TRANSPORTATION ¤1,862.00 04/24/2024
WATER -IRRIGATION INSPECTION ¤25.00 04/24/2024
WATER -IRRIGATION INSPECTION ¤25.00 04/24/2024
SURCHARGE FS 533.721 ¤4.21 04/24/2024
SURCHARGE - FS 468.631 ¤6.32 04/24/2024
SW ENG - FOUNDATION SURVEY ¤20.00 04/24/2024
SW ENG INSPECTION 80 ¤80.00 04/24/2024
SW ENG PRE APRON ¤30.00 04/24/2024
SW ENG - REVIEW 20 ¤20.00 04/24/2024
SW ENG RES REVIEW 200 ¤200.00 04/24/2024
SEWER CREDIT (¤1,342.00) 04/24/2024
SEWER INSPECTION ¤25.00 04/24/2024
SEWER CAPITAL FACILITY ¤5,441.03 04/24/2024
WATER CAPITAL FACILITY FEE ¤3,994.51 04/24/2024
SITE PLAN 30 ¤30.00 04/24/2024
WATER-METER ¤514.49 04/24/2024
WATER- TURN ON ¤25.00 04/24/2024
WATER- TURN ON ¤25.00 04/24/2024
ADJUSTMENT 50% (¤420.95) 04/24/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 04/24/2024
INSPECTION - RESIDENTIAL ¤632.50 04/24/2024
PLAN REVIEW - RESIDENTIAL ¤179.40 04/24/2024
Fees Total Due: ¤0.00 Total Paid: ¤20,900.85