Permit #2024040755

Permit Details

Status: COED

Parcel Id: 07-11-31-7037-00490-0030
CONDITIONED SPACE: 1800 sqft
GARAGE: 434 sqft
OPENED PORCH (WITH ROOF) : 108 sqft
OPENED PORCH (WITH ROOF) : 132 sqft
Total Square Footage: 2474 sqft
Block: 00490
Subdivision: -
Job Phone: 832-726-2202
Location Address: 5 LANSING LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 06/20/2024
NOC: RECORDED
Applicant name: JONATHON AMBAR
Owner: CARTOLANO DIANE

Address

547 LINDEN ST

W HEMPSTEAD, NY 11552

Lot: 0030
Contracted Stated Job Value: ¤131,500.00
Job Description: Single Family Residence
Type: CN

Contractor

CASPIAN HOMES, LLC
Status Location Address Mailing Address State License Number Phone
ACTIVE

1802 N ALAFAYA TRAIL

ORLANDO, FL 32826

SUITE 162

ORLANDO, FL 32826

CBC1264918 (Exp: 08/31/2026) 832-726-2202

Sub Contractors

TERRY BRICE DICKERSON
Status Location Address State License Number Phone
ACTIVE

4300 ST JOHN'S PARKWAY

ALPHARETTA, GA 30009

CCC1326209 (Exp: 08/31/2026) 407-548-6733
HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823
MOISES MERINO DIAZ
Status Location Address State License Number Phone
ACTIVE

3104 ORANOLE ROAD

ORLANDO, FL 32810

CAC1820980 (Exp: 08/31/2026) 407-225-3149
JAMES M GREENSLADE
Status Location Address State License Number Phone Fax
ACTIVE

311 S BAY ST

BUNNELL, FL 32110

EC13006083 (Exp: 08/31/2026) 386-263-2960 386-263-2980

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 04/30/2025 FINAL APPROVED JSTEWART
ROW - FINAL APRON (AFTER POUR) 04/30/2025 APPROVED FSLADISH
Note: 4/30/25 PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. _________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 TALKED WITH RICH AND HE IS GOING TO MATCH EXISTING GRADE ON THE RIGHT SIDE SO SOD WONT BE HIGHER THEN ADJACENT LOTS GRADE. WILL CATCH THIS ON ROW FINAL
ROW - STORMWATER FINAL 04/30/2025 APPROVED FSLADISH
Note: 4/30/25 INSPECTOR REQUIRED CORRECTIONS COMPLETED AT THE TIME OF THIS INSPECTION. AT THE TIME OF THIS INSPECTIONS ALL COPC REQUIREMENTS WERE MET, NEITHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. Inspector Notes from Inspection 9465 TALKED WITH RICH AND HE IS GOING TO MATCH EXISTING GRADE ON THE RIGHT SIDE SO SOD WONT BE HIGHER THEN ADJACENT LOTS GRADE. WILL CATCH THIS ON ROW FINAL
U -UTILITY RESIDENTIAL FINAL 04/30/2025 FINAL APPROVED DHANEY
ROW- FINAL SURVEY/GRADING CERTIFICATION 04/29/2025 APPROVED PFLANAGAN
Note: final survey meets city stanadards
ROW FIELD SURVEY /GRADING CERTIFICATION 04/29/2025 APPROVED - AS NOTED PFLANAGAN
Note: TALKED WITH RICH AND HE IS GOING TO MATCH EXISTING GRADE ON THE RIGHT SIDE SO SOD WONT BE HIGHER THEN ADJACENT LOTS GRADE. WILL CATCH THIS ON ROW FINAL
ROW - DRAINAGE 04/14/2025 APPROVED - AS NOTED FSLADISH
Note: 4/14/25 DUMPSTER HAS BEEN REMOVED AT THE TIME OF THIS INSPECTION. YOU WILL BE REQUIRED TO REPAIR SWALE ACROSS THE STREET TO GRADE IN AS GOOD OR BETTER CONDITION BEFORE ROW FINAL PASSAGE. APPROVING THIS INSPECTION AS NOTED. _______________________________________________________________________________________________________________________ 4/7/2025 - PREVIOUS INSPECTION NOTES 4/7/25 YOU ARE REQUIRED TO MOVE THE DUMPSTER OUT OF THE COPC ROW AND ONTO YOUR PROPERTY. YOU WILL BE REQUIRE TO REPAIR ALL ROW DAMAGE ACROSS THE STREET WHERE THE DUMPSTER IS SITING. YOU HAVE 7 DAYS TO MAKE CORRECTIONS OR A STOP WORK ORDER MAY BE PLACED ON THIS PERMIT. WILL BE BACK FOR COMPLIANCE REINSPECTION ON 4/14/24
ROW - DRAINAGE 04/07/2025 Disapproved - NO FEE FSLADISH
Note: 4/7/25 YOU ARE REQUIRED TO MOVE THE DUMPSTER OUT OF THE COPC ROW AND ONTO YOUR PROPERTY. YOU WILL BE REQUIRE TO REPAIR ALL ROW DAMAGE ACROSS THE STREET WHERE THE DUMPSTER IS SITING. YOU HAVE 7 DAYS TO MAKE CORRECTIONS OR A STOP WORK ORDER MAY BE PLACED ON THIS PERMIT. WILL BE BACK FOR COMPLIANCE REINSPECTION ON 4/14/24
ROW- PRE-APRON (PRE-POUR) 04/07/2025 APPROVED FSLADISH
Note: 4/7/25 REQUIRED CORRECTIONS COMPLETED AT THE TIME OF THIS INSPECTION. PIPE ELEVATION GOOD. BUILDER TO USE MINIMUM 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. AT THE TIME OF THE INSPECTION READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK ELEVATIONS MAKE SURE CONCRETE IS 3000 PSI BUILDER RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. 4/4/2025 - PREVIOUS INSPECTION NOTES ** 04/04/25 NEED TO RE-ESTABLISH AND DIG OUT FOOTERS ** NEED TO BAK FILL AROUND FORM BOARDS TOCONTAIN THE CONCRETE WITHIN THE POUR AREA ** CULVERT PIPE ELEVATION GOOD AT THE TIME OF THISINSPECTION ________________________________________________________________________________________________________________ 4/3/2025 - PREVIOUS INSPECTION NOTES 4/3/25= I CAN'T FIND THE BM ON THE ROAD. PLEASE REESTABLISH THE BM AND CALL BACK THE INSPECTION An on-site, easily identifiable benchmark referenced to NAVD 1988 (e.g., fire hydrant, nail in power pole [1 nail per power pole], and manhole covers). Pavement nails will be accepted if the above locations are not available on site. (The benchmark must be maintained throughout the construction cycle and will be used in the swale plan and Final Survey). NAVD 1988 data sheets are available Section 300.01 B(9) V-15 ** 01/27/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/16/2025 - PREVIOUS INSPECTION NOTES THE TEMPORARY ACCESS CULVERT IN ROW IS BURIED, BLOCKING THE SWALE, AND NEEDS TO BE OPENED. LDC.9.04.04-Prior to and during construction, the permittee shall implement and maintain all erosion and sediment control measures (best management practices) required to retain sediment on-site and to prevent violations of state water quality standards. All practices must be in accordance with Section 9.04.06. If site specific conditions require additional measures during any phase of construction or operation to prevent erosion or control sediment beyond those specified in the erosion and sediment control plan, the permittee shall implement additional best management practices as necessary, in accordance with Section 9.04.06. The permittee shall correct any erosion or shoaling that causes adverse impacts to the water resources. INSPECTOR BE BACK 1/27/25- PICTURES ATTACHED
ROW- PRE-APRON (PRE-POUR) 04/04/2025 Disapproved -FEE REQUIRED EMADISON
Note: ** 04/04/25 NEED TO RE-ESTABLISH AND DIG OUT FOOTERS ** NEED TO BAK FILL AROUND FORM BOARDS TOCONTAIN THE CONCRETE WITHIN THE POUR AREA ** CULVERT PIPE ELEVATION GOOD AT THE TIME OF THISINSPECTION ________________________________________________________________________________________________________________ 4/3/2025 - PREVIOUS INSPECTION NOTES 4/3/25= I CAN'T FIND THE BM ON THE ROAD. PLEASE REESTABLISH THE BM AND CALL BACK THE INSPECTION An on-site, easily identifiable benchmark referenced to NAVD 1988 (e.g., fire hydrant, nail in power pole [1 nail per power pole], and manhole covers). Pavement nails will be accepted if the above locations are not available on site. (The benchmark must be maintained throughout the construction cycle and will be used in the swale plan and Final Survey). NAVD 1988 data sheets are available Section 300.01 B(9) V-15 ** 01/27/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/16/2025 - PREVIOUS INSPECTION NOTES THE TEMPORARY ACCESS CULVERT IN ROW IS BURIED, BLOCKING THE SWALE, AND NEEDS TO BE OPENED. LDC.9.04.04-Prior to and during construction, the permittee shall implement and maintain all erosion and sediment control measures (best management practices) required to retain sediment on-site and to prevent violations of state water quality standards. All practices must be in accordance with Section 9.04.06. If site specific conditions require additional measures during any phase of construction or operation to prevent erosion or control sediment beyond those specified in the erosion and sediment control plan, the permittee shall implement additional best management practices as necessary, in accordance with Section 9.04.06. The permittee shall correct any erosion or shoaling that causes adverse impacts to the water resources. INSPECTOR BE BACK 1/27/25- PICTURES ATTACHED
ROW- PRE-APRON (PRE-POUR) 04/03/2025 Disapproved - NO FEE GBERTOLA
Note: 4/3/25= I CAN'T FIND THE BM ON THE ROAD. PLEASE REESTABLISH THE BM AND CALL BACK THE INSPECTION An on-site, easily identifiable benchmark referenced to NAVD 1988 (e.g., fire hydrant, nail in power pole [1 nail per power pole], and manhole covers). Pavement nails will be accepted if the above locations are not available on site. (The benchmark must be maintained throughout the construction cycle and will be used in the swale plan and Final Survey). NAVD 1988 data sheets are available Section 300.01 B(9) V-15 ** 01/27/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/16/2025 - PREVIOUS INSPECTION NOTES THE TEMPORARY ACCESS CULVERT IN ROW IS BURIED, BLOCKING THE SWALE, AND NEEDS TO BE OPENED. LDC.9.04.04-Prior to and during construction, the permittee shall implement and maintain all erosion and sediment control measures (best management practices) required to retain sediment on-site and to prevent violations of state water quality standards. All practices must be in accordance with Section 9.04.06. If site specific conditions require additional measures during any phase of construction or operation to prevent erosion or control sediment beyond those specified in the erosion and sediment control plan, the permittee shall implement additional best management practices as necessary, in accordance with Section 9.04.06. The permittee shall correct any erosion or shoaling that causes adverse impacts to the water resources. INSPECTOR BE BACK 1/27/25- PICTURES ATTACHED
U-CROSS CONNECTION 03/31/2025 APPROVED DHANEY
ELECTRIC - EARLY POWER 03/31/2025 APPROVED JSTEWART
Note: Inspector Notes from Inspection 2200 *** NOTES ADDED BY JSTEWART 2/20/2025 11:02:44 AM *** Authorize release of email to FPL.
GRAVITY SEWER TEST 03/12/2025 APPROVED MGIBSON
SEWER TIE IN 03/12/2025 APPROVED MGIBSON
ELECTRIC-TUG 02/20/2025 APPROVED - AS NOTED JSTEWART
Note: *** NOTES ADDED BY JSTEWART 2/20/2025 11:02:44 AM *** Authorize release of email to FPL.
PEP TANK INSTALLATION REQUEST 02/20/2025 APPROVED CBOWERMASTER
INSULATION 02/18/2025 APPROVED FWILLIS
LATH/BRICK/ WATER BARRIER 02/18/2025 APPROVED FWILLIS
TUB SET 02/12/2025 APPROVED JSTEWART
ALL ROUGH 02/12/2025 APPROVED JSTEWART
ROOF VALLEY & METAL 02/03/2025 APPROVED FWILLIS
WALL SHEATHING 01/27/2025 APPROVED FWILLIS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/27/2025 APPROVED FWILLIS
ROW - DRAINAGE 01/27/2025 APPROVED - AS NOTED EMADISON
Note: ** 01/27/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/16/2025 - PREVIOUS INSPECTION NOTES THE TEMPORARY ACCESS CULVERT IN ROW IS BURIED, BLOCKING THE SWALE, AND NEEDS TO BE OPENED. LDC.9.04.04-Prior to and during construction, the permittee shall implement and maintain all erosion and sediment control measures (best management practices) required to retain sediment on-site and to prevent violations of state water quality standards. All practices must be in accordance with Section 9.04.06. If site specific conditions require additional measures during any phase of construction or operation to prevent erosion or control sediment beyond those specified in the erosion and sediment control plan, the permittee shall implement additional best management practices as necessary, in accordance with Section 9.04.06. The permittee shall correct any erosion or shoaling that causes adverse impacts to the water resources. INSPECTOR BE BACK 1/27/25- PICTURES ATTACHED
ROW - DRAINAGE 01/16/2025 Disapproved - NO FEE GBERTOLA
Note: THE TEMPORARY ACCESS CULVERT IN ROW IS BURIED, BLOCKING THE SWALE, AND NEEDS TO BE OPENED. LDC.9.04.04-Prior to and during construction, the permittee shall implement and maintain all erosion and sediment control measures (best management practices) required to retain sediment on-site and to prevent violations of state water quality standards. All practices must be in accordance with Section 9.04.06. If site specific conditions require additional measures during any phase of construction or operation to prevent erosion or control sediment beyond those specified in the erosion and sediment control plan, the permittee shall implement additional best management practices as necessary, in accordance with Section 9.04.06. The permittee shall correct any erosion or shoaling that causes adverse impacts to the water resources. INSPECTOR BE BACK 1/27/25- PICTURES ATTACHED
FOUND SURVEY APPROVED (OFFICE) 12/23/2024 APPROVED TBAKER
TIE BEAM / LINTEL 12/16/2024 APPROVED FWILLIS
MONOLITHIC SLAB 12/09/2024 APPROVED FWILLIS
Note: 12/5/2024 - PREVIOUS INSPECTION NOTES 107.3.1 NEED APPROVED DRAWINGS ON SITE. NEED DETAILS ON CONNECTING EXISTING BLOCK TO NEW BLOCK. NEED READABLE DETAILS ENLARGED.
MONOLITHIC SLAB 12/05/2024 Disapproved - NO FEE FWILLIS
Note: 107.3.1 NEED APPROVED DRAWINGS ON SITE. NEED DETAILS ON CONNECTING EXISTING BLOCK TO NEW BLOCK. NEED READABLE DETAILS ENLARGED.
TIE BEAM / LINTEL 08/20/2024 APPROVED FWILLIS
TIE BEAM / LINTEL 08/07/2024 CANCELLED BY APPLICANT WEB
MONOLITHIC SLAB 08/07/2024 APPROVED FWILLIS
MONOLITHIC SLAB 08/05/2024 Approval - Private Provider PPROVIDER
Note: 8/2/2024 - PREVIOUS INSPECTION NOTES NOT READY FOR INSPECTION. NO REBAR INSTALLED, NO PLASTIC, NO UFER......
MONOLITHIC SLAB 08/02/2024 Disapproved -FEE REQUIRED FWILLIS
Note: NOT READY FOR INSPECTION. NO REBAR INSTALLED, NO PLASTIC, NO UFER......
MONOLITHIC SLAB 07/31/2024 CANCELLED BY APPLICANT WEB
PLUMBING 1ST ROUGH UNDERGROUND 07/30/2024 APPROVED MGIBSON
PLUMBING 1ST ROUGH UNDERGROUND 07/26/2024 APPROVED MGIBSON
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 07/25/2024 APPROVED JMUNSON
WATER METER INSTALLATION REQUEST 07/12/2024 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 04/24/2025 04/25/2025
Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 04/24/2025 04/24/2025
Note: Released By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM
ENGIN1 COMPLETE 04/22/2025 04/24/2025
Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 04/22/2025 04/22/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
SW1 COMPLETE 04/22/2025 04/24/2025
Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM Verified the edge of pavement on the right side is 25.05'.
BADMIN INFORMATION 04/22/2025 04/22/2025
Note: Marked INFORMATION By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM Once the revised site plan is approved then you will upload the formboard survey
SW1 COMPLETE 04/15/2025 04/15/2025
Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM
ENGIN1 COMPLETE 04/15/2025 04/15/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
ZON COMPLETE 04/15/2025 04/15/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ENGIN1 COMPLETE 04/11/2025 04/14/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
SW1 HOLD 04/11/2025 04/15/2025
Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM There needs to be a minimum of 0.3' fall from the berm to the swale.
ZON COMPLETE 04/11/2025 04/11/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
MECH COMPLETE 04/01/2025 04/02/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 12/23/2024 12/23/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 12/23/2024 12/23/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ZON COMPLETE 12/05/2024 12/05/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BADMIN INFORMATION 11/08/2024 11/08/2024
Note: Marked INFORMATION By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM USE OF PRIVATE PROVIDER FOR INSPECTIONS MUST BE SUBMITTED BEFORE FIRST INSPECTION.
ENGIN1 COMPLETE 11/04/2024 11/06/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 11/04/2024 11/05/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BADMIN INFORMATION 07/29/2024 07/29/2024
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM A private provider cannot be used for inspections at this location. a notice was not provided prior to the first inspection. Your notice only indicated plan review.
ZON COMPLETE 04/22/2024 04/23/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BADMIN COMPLETE 04/22/2024 04/23/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
SWALE COMPLETE 04/15/2024 07/19/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
CUSVC COMPLETE 04/12/2024 04/16/2024
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ENGIN1 COMPLETE 04/12/2024 04/15/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 04/12/2024 04/17/2024
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
SW1 COMPLETE 04/12/2024 04/15/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON HOLD 04/12/2024 04/15/2024
Note: Held By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM LOT TOTAL SQ FOOTAGE MISSING FROM SITE PLAN

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤20.00 04/30/2025
CONTRACTOR CHANGE ¤20.00 04/30/2025
SW ENG - INSPECTION 20 ¤20.00 04/30/2025
SW ENG - INSPECTION 20 ¤20.00 04/30/2025
SW ENG - INSPECTION 20 ¤20.00 04/30/2025
SW ENG - INSPECTION 20 ¤20.00 04/30/2025
SW ENG REINSPECTION 30 ¤30.00 04/30/2025
REINSPECTION RESIDENTIAL ¤40.00 04/30/2025
CONNECTION FEES ¤1,187.26 06/20/2024
SW ENG - REVIEW 20 ¤20.00 06/20/2024
SW ENG RES REVIEW 200 ¤200.00 06/20/2024
SEWER CREDIT (¤2,465.75) 06/20/2024
SEWER INSPECTION ¤25.00 06/20/2024
SEWER CAPITAL FACILITY ¤5,441.03 06/20/2024
WATER CAPITAL FACILITY FEE ¤3,994.51 06/20/2024
SITE PLAN 30 ¤30.00 06/20/2024
SW ENG INSPECTION 80 ¤80.00 06/20/2024
SW ENG PRE APRON ¤30.00 06/20/2024
WATER- TURN ON ¤25.00 06/20/2024
ADJUSTMENT 50% (¤485.25) 06/20/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 06/20/2024
ADMINISTRATIVE - RESID PP ¤225.00 06/20/2024
INSPECTION - RESIDENTIAL ¤940.50 06/20/2024
FC IMPACT FEE EMS ¤62.00 06/20/2024
IMPACT FEE FIRE ¤428.09 06/20/2024
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 06/20/2024
FC IMPACT FEE LIBRARY ¤268.00 06/20/2024
IMPACT FEE PARKS ¤1,800.99 06/20/2024
IMPACT FEE SCHOOL ¤5,450.00 06/20/2024
IMPACT FEE TRANSPORTATION ¤1,862.00 06/20/2024
WATER -IRRIGATION INSPECTION ¤25.00 06/20/2024
SURCHARGE FS 533.721 ¤7.10 06/20/2024
SURCHARGE - FS 468.631 ¤10.65 06/20/2024
SW ENG - FOUNDATION SURVEY ¤20.00 06/20/2024
Fees Total Due: ¤0.00 Total Paid: ¤19,619.13