I want to search for...

Permit #2024040780

Permit Details

Status: COED

Parcel Id: 29-10-31-5540-00000-1070
CONDITIONED SPACE: 2967 sqft
OPENED PORCH (WITH ROOF) : 507 sqft
GARAGE: 775 sqft
OPENED PORCH (WITH ROOF) : 78 sqft
Total Square Footage: 4327 sqft
Block: 00000
Subdivision: -
Job Phone: 386-931-6577
Location Address: 17 OLD OAK DR N
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 06/12/2024
NOC: RECORDED
Applicant name: LUIS JORGE MEDEIROS
Owner: ARCHANJO ERIK CARAMELO & ALEANDRA MAFALDA DE ASSIS

Address

903 S BLACK CHERRY DR # 301

ST JOHNS, FL 32259

Lot: 1070
Contracted Stated Job Value: ¤550,000.00
Job Description: Single Family Dwelling
Type: CN

Contractor

A PLUS HOME IMPROVEMENTS LLC
Status Location Address State License Number Phone
ACTIVE

306 S RAILROAD ST

BUNNELL, FL 32110

CRC1327024 (Exp: 08/31/2026) 386-263-2167

Sub Contractors

JOSEPH MOUAG
Status Location Address State License Number Phone
ACTIVE

842 BANBURY DRIVE

PORT ORANGE, FL 32129

EC13006957 (Exp: 08/31/2026) 386-547-3722
LUIS JORGE MEDEIROS
Status Location Address State License Number Phone
INACTIVE

306 S RAILROAD ST

BUNNELL, FL 32110

CCC1335446 (Exp: 08/31/2026) 386-931-6577
GLEN WILLIAM KEHLE
Status Location Address State License Number Phone Fax
ACTIVE

P. O. Box 353511

BUNNELL, FL 32110

CFC057241 (Exp: 08/31/2026) (386) 447-4249 (386) 437-8488
DANIEL GOULDNER
Status Location Address State License Number
ACTIVE

400 OLD HAW CREEK RD

BUNNELL, FL 32110

CAC1818907 (Exp: 08/31/2026)

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 10/24/2025 FINAL APPROVED HCAMACHO
Note: 10/10/2025 - PREVIOUS INSPECTION NOTES 1. Dryer needs GFCI breaker.NEC 210.8 2. Wall ovens and Cooktop needs locking breakers.NEC 422.31 &110.25 3. Microwave needs GFCI breaker. It is within 6' of sink.NEC 210.8 4. Bath fan in guest bathroom not running.
U-CROSS CONNECTION 10/10/2025 APPROVED BWRIGHT
U -UTILITY RESIDENTIAL FINAL 10/10/2025 FINAL APPROVED BWRIGHT
BLD - BUILDING FINAL 10/10/2025 Disapproved - NO FEE HCAMACHO
Note: 1. Dryer needs GFCI breaker.NEC 210.8 2. Wall ovens and Cooktop needs locking breakers.NEC 422.31 &110.25 3. Microwave needs GFCI breaker. It is within 6' of sink.NEC 210.8 4. Bath fan in guest bathroom not running.
ROW- FINAL SURVEY/GRADING CERTIFICATION 10/09/2025 APPROVED - AS NOTED GBERTOLA
Note: 10/9/25=THE FINAL SURVEY ON THE LEFT SIDE SHOWS A HIGH NUMBER BECAUSE IT'S A ROOT BALL AND A HEALTHIER TREE, WHICH IS WHY THE ELEVATION IS HIGHER. 8/21/2025 - PREVIOUS INSPECTION NOTES ** 08/21/25 YOUR REVISED PROPOSED SITE PLAN INDICATES COMMON SWALE DRAINAGE ALONG BOTH THE LEFT AND RIGHT SIDE PROPERTY LINES YOUR FINAL SURVEY SHOWS INSIDE SWALE THAT DO NOT MEET THE CITY OF PALM COASTS MINIMUM STANDARD TFROM THE BOTTOM OF YOUR INSIDE SWALE TO THE TOP OF BERM NEEDS TO BE A MINIMUM OF .30 THAT IS BUILT OF COMPACTED MATERIAL AND SODDED ** 6) The top of slope of “W” swales along the property lines shall be a minimum of 0.30 of a foot higher than the toe of slope. Section 300.01 D(6) V-17 ** "Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan. (1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor. Section 300.01 F(1) V-17" ______________________________________________________________________________________________________________________ 7/31/2025 - PREVIOUS INSPECTION NOTES FINAL SURVEY STILL SHOWS GRADE WILL IMPACT THE ADJACENT LOT TO THE RIGHT NEED TO FIX SO NO WATER IMPACT THE LOT TO THE RIGHT. ---------------------------------------------------------------------------- 6/23/2025 - PREVIOUS INSPECTION NOTES ** 06/23/25 RIGHT SIDE ALONG PROPERTY LINE YOU SHOW YOUR WATER DRAINING ONTO THE ADJACENT PROPERTY ** 6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 ** LEFT SIDE ALONG PROPERTY LINE YOU PROPOSED A COMMON DRAINAGE CONVEYANCE , YOU BUILT IN A BERM THAT DOES NOT MEET THE COPC MINIMUM, STANDARD. YOU NEED TO MAKE THIS A COMMON SWALE (DRAINAGE CONVEYANCE) ** "Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan. (1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor. Section 300.01 F(1) V-17"
ROW FIELD SURVEY /GRADING CERTIFICATION 10/09/2025 APPROVED GBERTOLA
Note: Inspector Notes from Inspection 9463 10/9/25=THE FINAL SURVEY ON THE LEFT SIDE SHOWS A HIGH NUMBER BECAUSE IT'S A ROOT BALL AND A HEALTHIER TREE, WHICH IS WHY THE ELEVATION IS HIGHER. 8/21/2025 - PREVIOUS INSPECTION NOTES ** 08/21/25 YOUR REVISED PROPOSED SITE PLAN INDICATES COMMON SWALE DRAINAGE ALONG BOTH THE LEFT AND RIGHT SIDE PROPERTY LINES YOUR FINAL SURVEY SHOWS INSIDE SWALE THAT DO NOT MEET THE CITY OF PALM COASTS MINIMUM STANDARD TFROM THE BOTTOM OF YOUR INSIDE SWALE TO THE TOP OF BERM NEEDS TO BE A MINIMUM OF .30 THAT IS BUILT OF COMPACTED MATERIAL AND SODDED ** 6) The top of slope of “W” swales along the property lines shall be a minimum of 0.30 of a foot higher than the toe of slope. Section 300.01 D(6) V-17 ** "Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan. (1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor. Section 300.01 F(1) V-17" ______________________________________________________________________________________________________________________ 7/31/2025 - PREVIOUS INSPECTION NOTES FINAL SURVEY STILL SHOWS GRADE WILL IMPACT THE ADJACENT LOT TO THE RIGHT NEED TO FIX SO NO WATER IMPACT THE LOT TO THE RIGHT. ---------------------------------------------------------------------------- 6/23/2025 - PREVIOUS INSPECTION NOTES ** 06/23/25 RIGHT SIDE ALONG PROPERTY LINE YOU SHOW YOUR WATER DRAINING ONTO THE ADJACENT PROPERTY ** 6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 ** LEFT SIDE ALONG PROPERTY LINE YOU PROPOSED A COMMON DRAINAGE CONVEYANCE , YOU BUILT IN A BERM THAT DOES NOT MEET THE COPC MINIMUM, STANDARD. YOU NEED TO MAKE THIS A COMMON SWALE (DRAINAGE CONVEYANCE) ** "Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan. (1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor. Section 300.01 F(1) V-17" AT THE TIME OF THE INSPECTION, WALKING THE PROPERTY DOES NOT INDICATE ANY STANDING WATER UP. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW - STORMWATER FINAL 10/09/2025 APPROVED GBERTOLA
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW - FINAL APRON (AFTER POUR) 10/09/2025 APPROVED EMADISON
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW- FINAL SURVEY/GRADING CERTIFICATION 08/21/2025 Disapproved -FEE REQUIRED EMADISON
Note: ** 08/21/25 YOUR REVISED PROPOSED SITE PLAN INDICATES COMMON SWALE DRAINAGE ALONG BOTH THE LEFT AND RIGHT SIDE PROPERTY LINES YOUR FINAL SURVEY SHOWS INSIDE SWALE THAT DO NOT MEET THE CITY OF PALM COASTS MINIMUM STANDARD TFROM THE BOTTOM OF YOUR INSIDE SWALE TO THE TOP OF BERM NEEDS TO BE A MINIMUM OF .30 THAT IS BUILT OF COMPACTED MATERIAL AND SODDED ** 6) The top of slope of “W” swales along the property lines shall be a minimum of 0.30 of a foot higher than the toe of slope. Section 300.01 D(6) V-17 ** "Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan. (1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor. Section 300.01 F(1) V-17" ______________________________________________________________________________________________________________________ 7/31/2025 - PREVIOUS INSPECTION NOTES FINAL SURVEY STILL SHOWS GRADE WILL IMPACT THE ADJACENT LOT TO THE RIGHT NEED TO FIX SO NO WATER IMPACT THE LOT TO THE RIGHT. ---------------------------------------------------------------------------- 6/23/2025 - PREVIOUS INSPECTION NOTES ** 06/23/25 RIGHT SIDE ALONG PROPERTY LINE YOU SHOW YOUR WATER DRAINING ONTO THE ADJACENT PROPERTY ** 6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 ** LEFT SIDE ALONG PROPERTY LINE YOU PROPOSED A COMMON DRAINAGE CONVEYANCE , YOU BUILT IN A BERM THAT DOES NOT MEET THE COPC MINIMUM, STANDARD. YOU NEED TO MAKE THIS A COMMON SWALE (DRAINAGE CONVEYANCE) ** "Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan. (1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor. Section 300.01 F(1) V-17"
ROW- FINAL SURVEY/GRADING CERTIFICATION 07/31/2025 Disapproved -FEE REQUIRED PFLANAGAN
Note: FINAL SURVEY STILL SHOWS GRADE WILL IMPACT THE ADJACENT LOT TO THE RIGHT NEED TO FIX SO NO WATER IMPACT THE LOT TO THE RIGHT. ---------------------------------------------------------------------------- 6/23/2025 - PREVIOUS INSPECTION NOTES ** 06/23/25 RIGHT SIDE ALONG PROPERTY LINE YOU SHOW YOUR WATER DRAINING ONTO THE ADJACENT PROPERTY ** 6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 ** LEFT SIDE ALONG PROPERTY LINE YOU PROPOSED A COMMON DRAINAGE CONVEYANCE , YOU BUILT IN A BERM THAT DOES NOT MEET THE COPC MINIMUM, STANDARD. YOU NEED TO MAKE THIS A COMMON SWALE (DRAINAGE CONVEYANCE) ** "Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan. (1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor. Section 300.01 F(1) V-17"
ROW- FINAL SURVEY/GRADING CERTIFICATION 06/23/2025 Disapproved - NO FEE EMADISON
Note: ** 06/23/25 RIGHT SIDE ALONG PROPERTY LINE YOU SHOW YOUR WATER DRAINING ONTO THE ADJACENT PROPERTY ** 6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 ** LEFT SIDE ALONG PROPERTY LINE YOU PROPOSED A COMMON DRAINAGE CONVEYANCE , YOU BUILT IN A BERM THAT DOES NOT MEET THE COPC MINIMUM, STANDARD. YOU NEED TO MAKE THIS A COMMON SWALE (DRAINAGE CONVEYANCE) ** "Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan. (1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor. Section 300.01 F(1) V-17"
ELECTRIC - EARLY POWER 05/23/2025 APPROVED HCAMACHO
ROW- PRE-APRON (PRE-POUR) 04/14/2025 APPROVED GBERTOLA
Note: 4/11/25= READY FOR PAVERS 4/8/2025 - PREVIOUS INSPECTION NOTES 4/8/25 AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS 4/7/2025 - PREVIOUS INSPECTION NOTES 4/7/25 Your site plan shows a concrete driveway, you have it formed for a paver driveway. You do not have a paver detail sheet uploaded. Your doc box does not have the COPC required documents on site. Photo for reference.
ROW- PAVER RESTRAINTS 04/08/2025 APPROVED FSLADISH
Note: 4/8/25 AT THE TIME OF THIS INSPECTION YOU ARE APPROVED TO POUR YOUR PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS
ROW- PRE-APRON (PRE-POUR) 04/08/2025 PARTIALLY APPROVED FSLADISH
Note: 4/8/25 AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS 4/7/2025 - PREVIOUS INSPECTION NOTES 4/7/25 Your site plan shows a concrete driveway, you have it formed for a paver driveway. You do not have a paver detail sheet uploaded. Your doc box does not have the COPC required documents on site. Photo for reference.
ROW- PRE-APRON (PRE-POUR) 04/07/2025 Disapproved -FEE REQUIRED FSLADISH
Note: 4/7/25 Your site plan shows a concrete driveway, you have it formed for a paver driveway. You do not have a paver detail sheet uploaded. Your doc box does not have the COPC required documents on site. Photo for reference.
GRAVITY SEWER TEST 04/02/2025 APPROVED MGIBSON
Note: Inspector Notes from Inspection 2060 NEED TO HAVE SILT FENCE REPAIRED FBC3307.1
SEWER TIE IN 04/02/2025 APPROVED MGIBSON
Note: Inspector Notes from Inspection 2060 NEED TO HAVE SILT FENCE REPAIRED FBC3307.1
INSULATION 03/12/2025 APPROVED HCAMACHO
LATH/BRICK/ WATER BARRIER 03/11/2025 APPROVED HCAMACHO
ALL ROUGH 03/07/2025 APPROVED HCAMACHO
WALL SHEATHING 02/28/2025 APPROVED HCAMACHO
Note: Inspector Notes from Inspection 2460 Truss 21 & 22 missing one peice of engineering at the back near the block wall.
ALL ROUGH 02/28/2025 Disapproved - NO FEE HCAMACHO
Note: 1. Need Revised A/C Layout for the entire house.FBC [A]107.4 2. Several A/C Ducts are missing mastic and at least one is not connected. Over the Guest bedrooms.FBCR M1601.4.1 3. Need approved nail Plate on dryer vent.FBCR M1308.2 4. Bath fans can not use 3" duct and it needs a second mechanical attachment.FBCR M1604.4.1 5. Plumbing needs 5' head.FBCR P2503.7 6. Need Revised Product Approval for windows and doors.FBC [A]107.4 7. Check all windows for missing screws, and need installation Instructions on site.FBC [A]107.4 8. Front Door is not screwed off correctly.FBC [A]107.4 9. Need Fire Blocking at Front Entry left side.FCBR 302.11 Note - Adjust wood in Elecrical Panel chase to close off excessive gaps between wires and wall.FCBR 302.11
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/27/2025 APPROVED - AS NOTED HCAMACHO
Note: Truss 21 & 22 missing one peice of engineering at the back near the block wall.
ELECTRIC-TUG 02/20/2025 APPROVED HCAMACHO
ROOF VALLEY & METAL 02/13/2025 APPROVED HCAMACHO
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/13/2025 Disapproved - NO FEE HCAMACHO
Note: 1. Truss layouts (3) provided do not have the Truss #'s marked on the plan. Therefore making it hard to know where the trusses are on the house. Please mark truss #'s on the approved layout. *Trusses still need to be checked for engineering 2. 3 straps in the lanai holding the valley trusses need to be nailed. In the Lanai in front of the slider.
FOUND SURVEY APPROVED (OFFICE) 12/09/2024 APPROVED TBAKER
TIE BEAM / LINTEL 12/02/2024 APPROVED HCAMACHO
LATH/BRICK/ WATER BARRIER 12/02/2024 CANCELLED BY APPLICANT WEB
MONOLITHIC SLAB 11/07/2024 APPROVED HCAMACHO
PLUMBING 1ST ROUGH UNDERGROUND 10/29/2024 APPROVED - AS NOTED MGIBSON
Note: NEED TO HAVE SILT FENCE REPAIRED FBC3307.1
WATER METER INSTALLATION REQUEST 09/26/2024 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
BLD COMPLETE 07/21/2025 07/22/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH COMPLETE 07/21/2025 07/22/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 04/17/2025 04/17/2025
Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM Met with Luis, Gabriel and I agreed to let him drain to the back of the property do to the narutal grade of surrounding lots.
ENGIN1 COMPLETE 04/17/2025 04/17/2025
Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM Met with Luis, Gabriel and I agreed to let him drain to the back of the property do to the narutal grade of surrounding lots.
ENGIN1 HOLD 04/07/2025 04/10/2025
Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM Meeting with Luis 4/11/2025 to talk about drainage.
SW1 HOLD 04/07/2025 04/10/2025
Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM This lot cannot drain to the back, there is no approved drainage conveyance system in the back of this lot. Please revise site plan to an A drainage.
ZON COMPLETE 04/07/2025 04/07/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
MECH COMPLETE 03/06/2025 03/06/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 03/03/2025 03/05/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH COMPLETE 03/03/2025 03/05/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 01/16/2025 01/22/2025
Note: Released By: PETER KNAPIK - - PKNAPIK@PALMCOASTGOV.COM
ENGIN1 COMPLETE 12/03/2024 12/09/2024
Note: Released By: LEVI SALYERDS - - LSALYERDS@PALMCOASTGOV.COM
ZON COMPLETE 12/03/2024 12/03/2024
Note: Released By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM
BLD COMPLETE 10/22/2024 10/28/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 06/05/2024 06/05/2024
Note: Released By: JPI
ZON COMPLETE 05/24/2024 05/28/2024
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
MECH COMPLETE 05/24/2024 05/29/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 05/24/2024 06/04/2024
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM
ELEC COMPLETE 05/24/2024 06/03/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD HOLD 05/24/2024 05/30/2024
Note: Held By: JPI 1. Based on a DBPR inquiry, underlayment #17499 (windows) is a recently expired product on the DBPR website. Please delete from the project approval table and/or provide a substitute. 107.2.4
URB COMPLETE 04/16/2024 04/17/2024
Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM 4/17/24 (JB) COMPLETE PER ZONING HOLD.
BADMIN COMPLETE 04/15/2024 04/22/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD HOLD 04/15/2024 04/18/2024
Note: Held By: JPI 1. For product approvals, please reprint, or type, the numbers. The uploaded file was not readable in areas. 107.2.4 2. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet.
CUSVC COMPLETE 04/15/2024 04/16/2024
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC HOLD 04/15/2024 04/18/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Submit electrical laod calcs.
ENGIN1 COMPLETE 04/15/2024 04/15/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 04/15/2024 04/16/2024
LOCATE COMPLETE 04/15/2024 04/17/2024
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH HOLD 04/15/2024 04/17/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Design location on Energy calcs and Heatload needs to be Daytona Beach 2. Duct layout needs to be signed by the AC contractor
SW1 HOLD 04/15/2024 04/17/2024
Note: Held By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM 1) Please show rear drainage @ 6" minimum slope from the structure for the first 10’. A 5% slope for 10’ totaling 0.5’ elevation difference perpendicular to the structure is a requirement of the Florida Building Code Section 1804.4 This applies along entire rear of the lot, adjacent to proposed structure and must be shown at each rear corner.
ZON HOLD 04/15/2024 04/16/2024
Note: Held By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM 1. IRRIGATION MUST BE SHOWN ON LANDSCAPE PLAN WITH ST. AUGUSTINE SOD 2. COLOR MATERIAL SHEET MISSING LRV, MATERIAL EXTERIOR WALLS, SW REFERENCE # INCORRECT

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 10/24/2025
PLAN REVIEW - REVISION ¤32.50 10/24/2025
PLAN REVIEW - REVISION ¤32.50 10/24/2025
CONTRACTOR CHANGE ¤20.00 10/24/2025
SW ENG REINSPECTION 30 ¤30.00 10/24/2025
SW ENG - REVIEW 20 ¤20.00 06/12/2024
SW ENG RES REVIEW 200 ¤200.00 06/12/2024
SEWER INSPECTION ¤25.00 06/12/2024
SEWER CAPITAL FACILITY ¤5,441.03 06/12/2024
WATER CAPITAL FACILITY FEE ¤3,994.51 06/12/2024
SITE PLAN 30 ¤30.00 06/12/2024
FC IMPACT FEE EMS ¤62.00 06/12/2024
IMPACT FEE FIRE ¤428.09 06/12/2024
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 06/12/2024
FC IMPACT FEE LIBRARY ¤268.00 06/12/2024
IMPACT FEE PARKS ¤1,800.99 06/12/2024
IMPACT FEE SCHOOL ¤5,450.00 06/12/2024
IMPACT FEE TRANSPORTATION ¤3,404.00 06/12/2024
SURCHARGE FS 533.721 ¤10.37 06/12/2024
SURCHARGE - FS 468.631 ¤15.56 06/12/2024
SW ENG - FOUNDATION SURVEY ¤20.00 06/12/2024
SW ENG INSPECTION 80 ¤80.00 06/12/2024
SW ENG PRE APRON ¤30.00 06/12/2024
CONNECTION FEES ¤25.00 06/12/2024
WATER-METER ¤514.49 06/12/2024
ADJUSTMENT 50% (¤1,036.94) 06/12/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 06/12/2024
INSPECTION - RESIDENTIAL ¤1,592.25 06/12/2024
PLAN REVIEW - RESIDENTIAL ¤451.62 06/12/2024
Fees Total Due: ¤0.00 Total Paid: ¤23,221.47