I want to search for...
Permit #2024040780
Permit Details
Status: COED
| Parcel Id: 29-10-31-5540-00000-1070 |
| CONDITIONED SPACE: 2967 sqft |
| OPENED PORCH (WITH ROOF) : 507 sqft |
| GARAGE: 775 sqft |
| OPENED PORCH (WITH ROOF) : 78 sqft |
| Total Square Footage: 4327 sqft |
| Block: 00000 |
| Subdivision: - |
| Job Phone: 386-931-6577 |
| Location Address: 17 OLD OAK DR N |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 06/12/2024 |
| NOC: RECORDED |
| Applicant name: LUIS JORGE MEDEIROS |
| Owner: ARCHANJO ERIK CARAMELO & ALEANDRA MAFALDA DE ASSIS |
|
Address 903 S BLACK CHERRY DR # 301 ST JOHNS, FL 32259 |
| Lot: 1070 |
| Contracted Stated Job Value: ¤550,000.00 |
| Job Description: Single Family Dwelling |
| Type: CN |
Contractor
A PLUS HOME IMPROVEMENTS LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
306 S RAILROAD ST BUNNELL, FL 32110 |
CRC1327024 (Exp: 08/31/2026) | 386-263-2167 |
Sub Contractors
JOSEPH MOUAG
| Status | Location Address | State License Number | Phone |
| ACTIVE |
842 BANBURY DRIVE PORT ORANGE, FL 32129 |
EC13006957 (Exp: 08/31/2026) | 386-547-3722 |
LUIS JORGE MEDEIROS
| Status | Location Address | State License Number | Phone |
| INACTIVE |
306 S RAILROAD ST BUNNELL, FL 32110 |
CCC1335446 (Exp: 08/31/2026) | 386-931-6577 |
GLEN WILLIAM KEHLE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
P. O. Box 353511 BUNNELL, FL 32110 |
CFC057241 (Exp: 08/31/2026) | (386) 447-4249 | (386) 437-8488 |
DANIEL GOULDNER
| Status | Location Address | State License Number |
| ACTIVE |
400 OLD HAW CREEK RD BUNNELL, FL 32110 |
CAC1818907 (Exp: 08/31/2026) |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 10/24/2025 | FINAL APPROVED | HCAMACHO |
| Note: 10/10/2025 - PREVIOUS INSPECTION NOTES 1. Dryer needs GFCI breaker.NEC 210.8 2. Wall ovens and Cooktop needs locking breakers.NEC 422.31 &110.25 3. Microwave needs GFCI breaker. It is within 6' of sink.NEC 210.8 4. Bath fan in guest bathroom not running. | |||
| U-CROSS CONNECTION | 10/10/2025 | APPROVED | BWRIGHT |
| U -UTILITY RESIDENTIAL FINAL | 10/10/2025 | FINAL APPROVED | BWRIGHT |
| BLD - BUILDING FINAL | 10/10/2025 | Disapproved - NO FEE | HCAMACHO |
| Note: 1. Dryer needs GFCI breaker.NEC 210.8 2. Wall ovens and Cooktop needs locking breakers.NEC 422.31 &110.25 3. Microwave needs GFCI breaker. It is within 6' of sink.NEC 210.8 4. Bath fan in guest bathroom not running. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 10/09/2025 | APPROVED - AS NOTED | GBERTOLA |
| Note: 10/9/25=THE FINAL SURVEY ON THE LEFT SIDE SHOWS A HIGH NUMBER BECAUSE IT'S A ROOT BALL AND A HEALTHIER TREE, WHICH IS WHY THE ELEVATION IS HIGHER. 8/21/2025 - PREVIOUS INSPECTION NOTES ** 08/21/25 YOUR REVISED PROPOSED SITE PLAN INDICATES COMMON SWALE DRAINAGE ALONG BOTH THE LEFT AND RIGHT SIDE PROPERTY LINES YOUR FINAL SURVEY SHOWS INSIDE SWALE THAT DO NOT MEET THE CITY OF PALM COASTS MINIMUM STANDARD TFROM THE BOTTOM OF YOUR INSIDE SWALE TO THE TOP OF BERM NEEDS TO BE A MINIMUM OF .30 THAT IS BUILT OF COMPACTED MATERIAL AND SODDED ** 6) The top of slope of “W” swales along the property lines shall be a minimum of 0.30 of a foot higher than the toe of slope. Section 300.01 D(6) V-17 ** "Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan. (1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor. Section 300.01 F(1) V-17" ______________________________________________________________________________________________________________________ 7/31/2025 - PREVIOUS INSPECTION NOTES FINAL SURVEY STILL SHOWS GRADE WILL IMPACT THE ADJACENT LOT TO THE RIGHT NEED TO FIX SO NO WATER IMPACT THE LOT TO THE RIGHT. ---------------------------------------------------------------------------- 6/23/2025 - PREVIOUS INSPECTION NOTES ** 06/23/25 RIGHT SIDE ALONG PROPERTY LINE YOU SHOW YOUR WATER DRAINING ONTO THE ADJACENT PROPERTY ** 6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 ** LEFT SIDE ALONG PROPERTY LINE YOU PROPOSED A COMMON DRAINAGE CONVEYANCE , YOU BUILT IN A BERM THAT DOES NOT MEET THE COPC MINIMUM, STANDARD. YOU NEED TO MAKE THIS A COMMON SWALE (DRAINAGE CONVEYANCE) ** "Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan. (1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor. Section 300.01 F(1) V-17" | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 10/09/2025 | APPROVED | GBERTOLA |
| Note: Inspector Notes from Inspection 9463 10/9/25=THE FINAL SURVEY ON THE LEFT SIDE SHOWS A HIGH NUMBER BECAUSE IT'S A ROOT BALL AND A HEALTHIER TREE, WHICH IS WHY THE ELEVATION IS HIGHER. 8/21/2025 - PREVIOUS INSPECTION NOTES ** 08/21/25 YOUR REVISED PROPOSED SITE PLAN INDICATES COMMON SWALE DRAINAGE ALONG BOTH THE LEFT AND RIGHT SIDE PROPERTY LINES YOUR FINAL SURVEY SHOWS INSIDE SWALE THAT DO NOT MEET THE CITY OF PALM COASTS MINIMUM STANDARD TFROM THE BOTTOM OF YOUR INSIDE SWALE TO THE TOP OF BERM NEEDS TO BE A MINIMUM OF .30 THAT IS BUILT OF COMPACTED MATERIAL AND SODDED ** 6) The top of slope of “W” swales along the property lines shall be a minimum of 0.30 of a foot higher than the toe of slope. Section 300.01 D(6) V-17 ** "Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan. (1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor. Section 300.01 F(1) V-17" ______________________________________________________________________________________________________________________ 7/31/2025 - PREVIOUS INSPECTION NOTES FINAL SURVEY STILL SHOWS GRADE WILL IMPACT THE ADJACENT LOT TO THE RIGHT NEED TO FIX SO NO WATER IMPACT THE LOT TO THE RIGHT. ---------------------------------------------------------------------------- 6/23/2025 - PREVIOUS INSPECTION NOTES ** 06/23/25 RIGHT SIDE ALONG PROPERTY LINE YOU SHOW YOUR WATER DRAINING ONTO THE ADJACENT PROPERTY ** 6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 ** LEFT SIDE ALONG PROPERTY LINE YOU PROPOSED A COMMON DRAINAGE CONVEYANCE , YOU BUILT IN A BERM THAT DOES NOT MEET THE COPC MINIMUM, STANDARD. YOU NEED TO MAKE THIS A COMMON SWALE (DRAINAGE CONVEYANCE) ** "Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan. (1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor. Section 300.01 F(1) V-17" AT THE TIME OF THE INSPECTION, WALKING THE PROPERTY DOES NOT INDICATE ANY STANDING WATER UP. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW - STORMWATER FINAL | 10/09/2025 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW - FINAL APRON (AFTER POUR) | 10/09/2025 | APPROVED | EMADISON |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 08/21/2025 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 08/21/25 YOUR REVISED PROPOSED SITE PLAN INDICATES COMMON SWALE DRAINAGE ALONG BOTH THE LEFT AND RIGHT SIDE PROPERTY LINES YOUR FINAL SURVEY SHOWS INSIDE SWALE THAT DO NOT MEET THE CITY OF PALM COASTS MINIMUM STANDARD TFROM THE BOTTOM OF YOUR INSIDE SWALE TO THE TOP OF BERM NEEDS TO BE A MINIMUM OF .30 THAT IS BUILT OF COMPACTED MATERIAL AND SODDED ** 6) The top of slope of “W” swales along the property lines shall be a minimum of 0.30 of a foot higher than the toe of slope. Section 300.01 D(6) V-17 ** "Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan. (1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor. Section 300.01 F(1) V-17" ______________________________________________________________________________________________________________________ 7/31/2025 - PREVIOUS INSPECTION NOTES FINAL SURVEY STILL SHOWS GRADE WILL IMPACT THE ADJACENT LOT TO THE RIGHT NEED TO FIX SO NO WATER IMPACT THE LOT TO THE RIGHT. ---------------------------------------------------------------------------- 6/23/2025 - PREVIOUS INSPECTION NOTES ** 06/23/25 RIGHT SIDE ALONG PROPERTY LINE YOU SHOW YOUR WATER DRAINING ONTO THE ADJACENT PROPERTY ** 6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 ** LEFT SIDE ALONG PROPERTY LINE YOU PROPOSED A COMMON DRAINAGE CONVEYANCE , YOU BUILT IN A BERM THAT DOES NOT MEET THE COPC MINIMUM, STANDARD. YOU NEED TO MAKE THIS A COMMON SWALE (DRAINAGE CONVEYANCE) ** "Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan. (1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor. Section 300.01 F(1) V-17" | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 07/31/2025 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: FINAL SURVEY STILL SHOWS GRADE WILL IMPACT THE ADJACENT LOT TO THE RIGHT NEED TO FIX SO NO WATER IMPACT THE LOT TO THE RIGHT. ---------------------------------------------------------------------------- 6/23/2025 - PREVIOUS INSPECTION NOTES ** 06/23/25 RIGHT SIDE ALONG PROPERTY LINE YOU SHOW YOUR WATER DRAINING ONTO THE ADJACENT PROPERTY ** 6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 ** LEFT SIDE ALONG PROPERTY LINE YOU PROPOSED A COMMON DRAINAGE CONVEYANCE , YOU BUILT IN A BERM THAT DOES NOT MEET THE COPC MINIMUM, STANDARD. YOU NEED TO MAKE THIS A COMMON SWALE (DRAINAGE CONVEYANCE) ** "Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan. (1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor. Section 300.01 F(1) V-17" | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 06/23/2025 | Disapproved - NO FEE | EMADISON |
| Note: ** 06/23/25 RIGHT SIDE ALONG PROPERTY LINE YOU SHOW YOUR WATER DRAINING ONTO THE ADJACENT PROPERTY ** 6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 ** LEFT SIDE ALONG PROPERTY LINE YOU PROPOSED A COMMON DRAINAGE CONVEYANCE , YOU BUILT IN A BERM THAT DOES NOT MEET THE COPC MINIMUM, STANDARD. YOU NEED TO MAKE THIS A COMMON SWALE (DRAINAGE CONVEYANCE) ** "Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan. (1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor. Section 300.01 F(1) V-17" | |||
| ELECTRIC - EARLY POWER | 05/23/2025 | APPROVED | HCAMACHO |
| ROW- PRE-APRON (PRE-POUR) | 04/14/2025 | APPROVED | GBERTOLA |
| Note: 4/11/25= READY FOR PAVERS 4/8/2025 - PREVIOUS INSPECTION NOTES 4/8/25 AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS 4/7/2025 - PREVIOUS INSPECTION NOTES 4/7/25 Your site plan shows a concrete driveway, you have it formed for a paver driveway. You do not have a paver detail sheet uploaded. Your doc box does not have the COPC required documents on site. Photo for reference. | |||
| ROW- PAVER RESTRAINTS | 04/08/2025 | APPROVED | FSLADISH |
| Note: 4/8/25 AT THE TIME OF THIS INSPECTION YOU ARE APPROVED TO POUR YOUR PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS | |||
| ROW- PRE-APRON (PRE-POUR) | 04/08/2025 | PARTIALLY APPROVED | FSLADISH |
| Note: 4/8/25 AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS 4/7/2025 - PREVIOUS INSPECTION NOTES 4/7/25 Your site plan shows a concrete driveway, you have it formed for a paver driveway. You do not have a paver detail sheet uploaded. Your doc box does not have the COPC required documents on site. Photo for reference. | |||
| ROW- PRE-APRON (PRE-POUR) | 04/07/2025 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 4/7/25 Your site plan shows a concrete driveway, you have it formed for a paver driveway. You do not have a paver detail sheet uploaded. Your doc box does not have the COPC required documents on site. Photo for reference. | |||
| GRAVITY SEWER TEST | 04/02/2025 | APPROVED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 NEED TO HAVE SILT FENCE REPAIRED FBC3307.1 | |||
| SEWER TIE IN | 04/02/2025 | APPROVED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 NEED TO HAVE SILT FENCE REPAIRED FBC3307.1 | |||
| INSULATION | 03/12/2025 | APPROVED | HCAMACHO |
| LATH/BRICK/ WATER BARRIER | 03/11/2025 | APPROVED | HCAMACHO |
| ALL ROUGH | 03/07/2025 | APPROVED | HCAMACHO |
| WALL SHEATHING | 02/28/2025 | APPROVED | HCAMACHO |
| Note: Inspector Notes from Inspection 2460 Truss 21 & 22 missing one peice of engineering at the back near the block wall. | |||
| ALL ROUGH | 02/28/2025 | Disapproved - NO FEE | HCAMACHO |
| Note: 1. Need Revised A/C Layout for the entire house.FBC [A]107.4 2. Several A/C Ducts are missing mastic and at least one is not connected. Over the Guest bedrooms.FBCR M1601.4.1 3. Need approved nail Plate on dryer vent.FBCR M1308.2 4. Bath fans can not use 3" duct and it needs a second mechanical attachment.FBCR M1604.4.1 5. Plumbing needs 5' head.FBCR P2503.7 6. Need Revised Product Approval for windows and doors.FBC [A]107.4 7. Check all windows for missing screws, and need installation Instructions on site.FBC [A]107.4 8. Front Door is not screwed off correctly.FBC [A]107.4 9. Need Fire Blocking at Front Entry left side.FCBR 302.11 Note - Adjust wood in Elecrical Panel chase to close off excessive gaps between wires and wall.FCBR 302.11 | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/27/2025 | APPROVED - AS NOTED | HCAMACHO |
| Note: Truss 21 & 22 missing one peice of engineering at the back near the block wall. | |||
| ELECTRIC-TUG | 02/20/2025 | APPROVED | HCAMACHO |
| ROOF VALLEY & METAL | 02/13/2025 | APPROVED | HCAMACHO |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/13/2025 | Disapproved - NO FEE | HCAMACHO |
| Note: 1. Truss layouts (3) provided do not have the Truss #'s marked on the plan. Therefore making it hard to know where the trusses are on the house. Please mark truss #'s on the approved layout. *Trusses still need to be checked for engineering 2. 3 straps in the lanai holding the valley trusses need to be nailed. In the Lanai in front of the slider. | |||
| FOUND SURVEY APPROVED (OFFICE) | 12/09/2024 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 12/02/2024 | APPROVED | HCAMACHO |
| LATH/BRICK/ WATER BARRIER | 12/02/2024 | CANCELLED BY APPLICANT | WEB |
| MONOLITHIC SLAB | 11/07/2024 | APPROVED | HCAMACHO |
| PLUMBING 1ST ROUGH UNDERGROUND | 10/29/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: NEED TO HAVE SILT FENCE REPAIRED FBC3307.1 | |||
| WATER METER INSTALLATION REQUEST | 09/26/2024 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 07/21/2025 | 07/22/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 07/21/2025 | 07/22/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 04/17/2025 | 04/17/2025 |
| Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM Met with Luis, Gabriel and I agreed to let him drain to the back of the property do to the narutal grade of surrounding lots. | |||
| ENGIN1 | COMPLETE | 04/17/2025 | 04/17/2025 |
| Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM Met with Luis, Gabriel and I agreed to let him drain to the back of the property do to the narutal grade of surrounding lots. | |||
| ENGIN1 | HOLD | 04/07/2025 | 04/10/2025 |
| Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM Meeting with Luis 4/11/2025 to talk about drainage. | |||
| SW1 | HOLD | 04/07/2025 | 04/10/2025 |
| Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM This lot cannot drain to the back, there is no approved drainage conveyance system in the back of this lot. Please revise site plan to an A drainage. | |||
| ZON | COMPLETE | 04/07/2025 | 04/07/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 03/06/2025 | 03/06/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/03/2025 | 03/05/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 03/03/2025 | 03/05/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/16/2025 | 01/22/2025 |
| Note: Released By: PETER KNAPIK - - PKNAPIK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 12/03/2024 | 12/09/2024 |
| Note: Released By: LEVI SALYERDS - - LSALYERDS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/03/2024 | 12/03/2024 |
| Note: Released By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 10/22/2024 | 10/28/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/05/2024 | 06/05/2024 |
| Note: Released By: JPI | |||
| ZON | COMPLETE | 05/24/2024 | 05/28/2024 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 05/24/2024 | 05/29/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/24/2024 | 06/04/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 05/24/2024 | 06/03/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | HOLD | 05/24/2024 | 05/30/2024 |
| Note: Held By: JPI 1. Based on a DBPR inquiry, underlayment #17499 (windows) is a recently expired product on the DBPR website. Please delete from the project approval table and/or provide a substitute. 107.2.4 | |||
| URB | COMPLETE | 04/16/2024 | 04/17/2024 |
| Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM 4/17/24 (JB) COMPLETE PER ZONING HOLD. | |||
| BADMIN | COMPLETE | 04/15/2024 | 04/22/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | HOLD | 04/15/2024 | 04/18/2024 |
| Note: Held By: JPI 1. For product approvals, please reprint, or type, the numbers. The uploaded file was not readable in areas. 107.2.4 2. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet. | |||
| CUSVC | COMPLETE | 04/15/2024 | 04/16/2024 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 04/15/2024 | 04/18/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Submit electrical laod calcs. | |||
| ENGIN1 | COMPLETE | 04/15/2024 | 04/15/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 04/15/2024 | 04/16/2024 |
| LOCATE | COMPLETE | 04/15/2024 | 04/17/2024 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | HOLD | 04/15/2024 | 04/17/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Design location on Energy calcs and Heatload needs to be Daytona Beach 2. Duct layout needs to be signed by the AC contractor | |||
| SW1 | HOLD | 04/15/2024 | 04/17/2024 |
| Note: Held By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM 1) Please show rear drainage @ 6" minimum slope from the structure for the first 10’. A 5% slope for 10’ totaling 0.5’ elevation difference perpendicular to the structure is a requirement of the Florida Building Code Section 1804.4 This applies along entire rear of the lot, adjacent to proposed structure and must be shown at each rear corner. | |||
| ZON | HOLD | 04/15/2024 | 04/16/2024 |
| Note: Held By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM 1. IRRIGATION MUST BE SHOWN ON LANDSCAPE PLAN WITH ST. AUGUSTINE SOD 2. COLOR MATERIAL SHEET MISSING LRV, MATERIAL EXTERIOR WALLS, SW REFERENCE # INCORRECT |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 10/24/2025 |
| PLAN REVIEW - REVISION | ¤32.50 | 10/24/2025 |
| PLAN REVIEW - REVISION | ¤32.50 | 10/24/2025 |
| CONTRACTOR CHANGE | ¤20.00 | 10/24/2025 |
| SW ENG REINSPECTION 30 | ¤30.00 | 10/24/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 06/12/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 06/12/2024 |
| SEWER INSPECTION | ¤25.00 | 06/12/2024 |
| SEWER CAPITAL FACILITY | ¤5,441.03 | 06/12/2024 |
| WATER CAPITAL FACILITY FEE | ¤3,994.51 | 06/12/2024 |
| SITE PLAN 30 | ¤30.00 | 06/12/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 06/12/2024 |
| IMPACT FEE FIRE | ¤428.09 | 06/12/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 06/12/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 06/12/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 06/12/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 06/12/2024 |
| IMPACT FEE TRANSPORTATION | ¤3,404.00 | 06/12/2024 |
| SURCHARGE FS 533.721 | ¤10.37 | 06/12/2024 |
| SURCHARGE - FS 468.631 | ¤15.56 | 06/12/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 06/12/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 06/12/2024 |
| SW ENG PRE APRON | ¤30.00 | 06/12/2024 |
| CONNECTION FEES | ¤25.00 | 06/12/2024 |
| WATER-METER | ¤514.49 | 06/12/2024 |
| ADJUSTMENT 50% | (¤1,036.94) | 06/12/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 06/12/2024 |
| INSPECTION - RESIDENTIAL | ¤1,592.25 | 06/12/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤451.62 | 06/12/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤23,221.47 |