Permit #2024040820
Permit Details
Status: INSPECT
| Parcel Id: 07-11-31-7024-00020-0230 |
| OPENED PORCH (WITH ROOF) : 42 sqft |
| GARAGE: 398 sqft |
| CONDITIONED SPACE: 1461 sqft |
| Total Square Footage: 1901 sqft |
| Block: 00020 |
| Subdivision: 7024 - |
| Job Phone: 844-885-8913 |
| Location Address: 10 PRINCESS ELLEN PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 04/23/2024 |
| NOC: RECORDED |
| Applicant name: SIMON DALE VANWAGENEN |
| Owner: LGI HOMES-FLORIDA LLC |
|
Address 1450 LAKE ROBBINS DRIVE THE WOODLANDS, TX 77380 |
|
Address STE 430 THE WOODLANDS, TX 77380 |
| Lot: 0230 |
| Contracted Stated Job Value: ¤210,765.37 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
LGI HOMES-FLORIDA LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
2304 SPRING HILL CT TAMPA, FL 33602 |
CBC1257972 (Exp: 08/31/2026) | 904-451-8258 |
Sub Contractors
BRETT CHRISTIAN GIBSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
250 SEGOVIA RD ST AUGUSTINE, FL 32086 |
CAC1818423 (Exp: 08/31/2026) | 904-229-8131 |
PAUL ERIC FORSTER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
6114 GOODMAN RD JACKSONVILLE, FL 32244 |
CFC1429261 (Exp: 08/31/2026) | 904-647-1820 |
CHRISTOPHER DENNIS O'CONNER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
240 N LAKE CUNNINGHAM AVE JACKSONVILLE, FL 32257 |
ER13015361 (Exp: 08/31/2026) | 904-540-0858 |
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
Inspection History
| Type | Request Date | Result | Inspector |
| MONOLITHIC SLAB | 06/12/2026 | RSIMS | |
| PLUMBING 1ST ROUGH UNDERGROUND | 06/11/2026 | APPROVED | MCONTRYMAN |
| Note: 6/10/2026 - PREVIOUS INSPECTION NOTES 6/10/26: 1). Drainage piping has excess backfill covering piping and fittings. FBC-[A]110.3 Needs to be exposed for inspection. 2). Hot and cold water piping needs pipe insulation where crossing each other and/or 6" separation per manufacturer. FBC-P2906.10 Cross-linked polyethylene plastic (PEX). Joints between cross-linked polyethylene plastic tubing or fittings shall comply with Section P2906.10.1 or Section P2906.10.2. Bundling Parallel runs of Uponor PEX may be bundled together, when approved by local code, given the following: • Bundle hot and cold water pipes separately at least 6"" apart (15.2cm), unless piping is insulated. • Support the bundle at the required on-center distance. • Use cable ties to group a bundle.* *Cable ties are not approved for supporting pipe. PEX Piping Systems Installation Guide | 45" NOTE: Main underground water service piping is installed from house to meter location but no pressure test has been applied. Trench will need to be opened for visual inspection with pressure test to be inspected by All Rough Inspection 2420 at the latest. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 06/10/2026 | Disapproved - NO FEE | RSIMS |
| Note: 6/10/26: 1). Drainage piping has excess backfill covering piping and fittings. FBC-[A]110.3 Needs to be exposed for inspection. 2). Hot and cold water piping needs pipe insulation where crossing each other and/or 6" separation per manufacturer. FBC-P2906.10 Cross-linked polyethylene plastic (PEX). Joints between cross-linked polyethylene plastic tubing or fittings shall comply with Section P2906.10.1 or Section P2906.10.2. Bundling Parallel runs of Uponor PEX may be bundled together, when approved by local code, given the following: • Bundle hot and cold water pipes separately at least 6"" apart (15.2cm), unless piping is insulated. • Support the bundle at the required on-center distance. • Use cable ties to group a bundle.* *Cable ties are not approved for supporting pipe. PEX Piping Systems Installation Guide | 45" NOTE: Main underground water service piping is installed from house to meter location but no pressure test has been applied. Trench will need to be opened for visual inspection with pressure test to be inspected by All Rough Inspection 2420 at the latest. | |||
| ROW- PROJECT STATUS | 10/23/2025 | Status Check | TPOLACEK |
| Note: 10-23-25 TPOLACEK*** ALL SILT FENCE IS GOOD, TEMPORARY PIPE IS CLEAR. AND SWALE IS OPEN please check all drainage and sediment control devices as there case #320091 | |||
| ROW - DRAINAGE | 10/15/2025 | APPROVED | PFLANAGAN |
| Note: CORRECTIONS ARE MADE ITS THE CONTRACTORS RESPONSIBILITY TO KEEP UP WITH SEDIMENT CONTROL --------------------------------------------------------------------------------- 10/8/2025 - PREVIOUS INSPECTION NOTES TALKED WITH AJ WITH LGI AND HE WILL BE FIXING ALL ISSUES BY WEDNESDAY SO WE WILL BE ALLOWING THEM A EXTENTION TILL 10/15/25. IF CORRECTIONS ARE NOT FIXED A INSPECTION HOLD WILL BE PLACED ON PERMIT. --------------------------------------------------------------------------------- 10/7/2025 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN ALL DIRT AND SEDIMENT FROM ROADSIDE SWALE SO WATER CAN FLOW. 2) NEED TO INSTALL SILT FENCE ACROSSED THE FRONT OF THE LOT WITH A CONSTRUCTION ENTERANCE YOU WILL HAVE TILL 10/13/25 TO FIX ALL ISSUES OR THERE WILL BE A INSPECTION HOLD FOR THIS PERMIT. | |||
| ROW - DRAINAGE | 10/13/2025 | CANCELLED BY APPLICANT | PFLANAGAN |
| Note: TALKED WITH AJ WITH LGI AND HE WILL BE FIXING ALL ISSUES BY WEDNESDAY SO WE WILL BE ALLOWING THEM A EXTENTION TILL 10/15/25. IF CORRECTIONS ARE NOT FIXED A INSPECTION HOLD WILL BE PLACED ON PERMIT. --------------------------------------------------------------------------------- 10/7/2025 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN ALL DIRT AND SEDIMENT FROM ROADSIDE SWALE SO WATER CAN FLOW. 2) NEED TO INSTALL SILT FENCE ACROSSED THE FRONT OF THE LOT WITH A CONSTRUCTION ENTERANCE YOU WILL HAVE TILL 10/13/25 TO FIX ALL ISSUES OR THERE WILL BE A INSPECTION HOLD FOR THIS PERMIT. | |||
| ROW - DRAINAGE | 10/07/2025 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) NEED TO CLEAN ALL DIRT AND SEDIMENT FROM ROADSIDE SWALE SO WATER CAN FLOW. 2) NEED TO INSTALL SILT FENCE ACROSSED THE FRONT OF THE LOT WITH A CONSTRUCTION ENTERANCE YOU WILL HAVE TILL 10/13/25 TO FIX ALL ISSUES OR THERE WILL BE A INSPECTION HOLD FOR THIS PERMIT. | |||
| LATH/BRICK/ WATER BARRIER | 03/31/2025 | CANCELLED BY APPLICANT | WEB |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 11/04/2024 | APPROVED | JMUNSON |
| WATER METER INSTALLATION REQUEST | 06/06/2024 | APPROVED | CBOWERMASTER |
| U-CROSS CONNECTION | |||
| FOUND SURVEY APPROVED (OFFICE) | |||
| GRAVITY SEWER TEST | |||
| SEWER TIE IN | |||
| ELECTRIC - EARLY POWER | |||
| LATH/BRICK/ WATER BARRIER | |||
| ALL ROUGH | |||
| Note: 6/10/26: Main underground water service piping is installed from house to meter location but no pressure test has been applied. Trench will need to be opened for visual inspection with pressure test to be inspected by All Rough Inspection 2420 at the latest. | |||
| WALL SHEATHING | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | |||
| ROOF VALLEY & METAL | |||
| INSULATION | |||
| BLD - BUILDING FINAL | |||
| ROW - STORMWATER FINAL | |||
| U -UTILITY RESIDENTIAL FINAL | |||
| ROW- PRE-APRON (PRE-POUR) | |||
| ROW - FINAL APRON (AFTER POUR) | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 05/21/2026 | 05/26/2026 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | HOLD | 05/18/2026 | 05/20/2026 |
| Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Lot 23 block 20 on plans. Lot 23 block 2 on site plan. | |||
| MECH | COMPLETE | 05/18/2026 | 05/19/2026 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/18/2026 | 05/19/2026 |
| Note: Released By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/29/2025 | 09/29/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/30/2025 | 01/31/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 10/29/2024 | 11/04/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/18/2024 | 04/18/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/18/2024 | 04/18/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 04/18/2024 | 04/18/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 04/16/2024 | 07/24/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/15/2024 | 04/17/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 04/15/2024 | 04/17/2024 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 04/15/2024 | 04/18/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/15/2024 | 04/16/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 04/15/2024 | 04/16/2024 |
| LOCATE | COMPLETE | 04/15/2024 | 04/17/2024 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 04/15/2024 | 04/17/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 04/15/2024 | 04/16/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | HOLD | 04/15/2024 | 04/16/2024 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Site plan/survey must state material for driveway Rear patio size on landscape plan does not match site and floor plan |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| WATER-METER | ¤514.49 | 04/23/2024 |
| WATER- TURN ON | ¤25.00 | 04/23/2024 |
| WATER- TURN ON | ¤25.00 | 04/23/2024 |
| ADJUSTMENT 50% | (¤493.32) | 04/23/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 04/23/2024 |
| CONNECTION FEES | (¤233.75) | 04/23/2024 |
| CONNECTION FEES | ¤1,187.26 | 04/23/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 04/23/2024 |
| IMPACT FEE FIRE | ¤428.09 | 04/23/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 04/23/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 04/23/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 04/23/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 04/23/2024 |
| IMPACT FEE TRANSPORTATION | ¤1,862.00 | 04/23/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 04/23/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 04/23/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 04/23/2024 |
| SW ENG PRE APRON | ¤30.00 | 04/23/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 04/23/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 04/23/2024 |
| SEWER CREDIT | (¤1,147.00) | 04/23/2024 |
| SEWER INSPECTION | (¤25.00) | 04/23/2024 |
| SEWER INSPECTION | ¤25.00 | 04/23/2024 |
| SEWER CAPITAL FACILITY | ¤5,441.03 | 04/23/2024 |
| SEWER CAPITAL FACILITY | (¤243.00) | 04/23/2024 |
| WATER CAPITAL FACILITY FEE | (¤1,500.00) | 04/23/2024 |
| WATER CAPITAL FACILITY FEE | ¤3,994.51 | 04/23/2024 |
| SITE PLAN 30 | ¤30.00 | 04/23/2024 |
| SURCHARGE FS 533.721 | ¤4.93 | 04/23/2024 |
| SURCHARGE - FS 468.631 | ¤7.40 | 04/23/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 04/23/2024 |
| INSPECTION - RESIDENTIAL | ¤745.25 | 04/23/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤211.38 | 04/23/2024 |
| PLAN REVIEW - REVISION | ¤130.00 | |
| SW ENG - INSPECTION 20 | ¤20.00 | |
| SW ENG - INSPECTION 20 | ¤20.00 | |
| RSI REINSPECTION 1 | ¤35.00 | |
| EXTENSION | ¤40.00 | |
| EXTENSION | ¤40.00 | |
| EXTENSION | ¤40.00 | |
| ADMINISTRATIVE - EXTENSION | ¤40.00 | |
| Fees | Total Due: ¤365.00 | Total Paid: ¤19,088.26 |