I want to search for...
Permit #2024040890
Permit Details
Status: COED
| Parcel Id: 07-11-31-7019-00040-0010 |
| CONDITIONED SPACE: 2303 sqft |
| GARAGE: 726 sqft |
| OPENED PORCH (WITH ROOF) : 449 sqft |
| Total Square Footage: 3478 sqft |
| Block: 00040 |
| Subdivision: 7019 - |
| Job Phone: 386-237-8427 |
| Location Address: 1 WAVRA PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 04/25/2024 |
| NOC: RECORDED |
| Applicant name: JAY DARREN CURBOW |
| Owner: BLUE WATER HOMES INC |
|
Address 4881 PALM COAST PARKWAY NW PALM COAST, FL 32137 |
|
Address UNIT 1 PALM COAST, FL 32137 |
| Lot: 0010 |
| Contracted Stated Job Value: ¤454,178.29 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
BLUE WATER HOMES INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4881 PALM COAST PARKWAY NW UNIT 1 PALM COAST, FL 32137 |
CBC1258679 (Exp: 08/31/2026) | 386-445-3405 |
Sub Contractors
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
BRETT CHRISTIAN GIBSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
250 SEGOVIA RD ST AUGUSTINE, FL 32086 |
CAC1818423 (Exp: 08/31/2026) | 904-229-8131 |
JACK DOUGLAS LANIER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
485 COMMERCE WAY LONGWOOD , FL 32750 |
CCC058022 (Exp: 08/31/2026) | (321)441-2300 | (321)441-2313 |
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 11/21/2024 | Approval - Private Provider | PPROVIDER |
| U-CROSS CONNECTION | 11/20/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 11/20/2024 12:07:59 PM *** irrigation meter with PVB-no cross connection | |||
| ROW - FINAL APRON (AFTER POUR) | 11/20/2024 | APPROVED | TPOLACEK |
| Note: PAVERS ARE SET CULVERT PIPES CLEAN, AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW - STORMWATER FINAL | 11/20/2024 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| U -UTILITY RESIDENTIAL FINAL | 11/20/2024 | FINAL APPROVED | LFITZGERALD |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 11/18/2024 | APPROVED | TPOLACEK |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/18/2024 | APPROVED | TPOLACEK |
| Note: UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW- PRE-APRON (PRE-POUR) | 11/01/2024 | APPROVED | TPOLACEK |
| Note: 11/01/24 TPOLACEK*** YOU ARE APPROVED TO LAY PAVERS 10/28/2024 - PREVIOUS INSPECTION NOTES AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS | |||
| ROW- PAVER RESTRAINTS | 10/28/2024 | APPROVED | TPOLACEK |
| Note: 10/28/24 TPOLACEK*** AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS | |||
| ROW- PRE-APRON (PRE-POUR) | 10/28/2024 | PARTIALLY APPROVED | TPOLACEK |
| Note: AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS | |||
| TUB SET | 10/16/2024 | Approval - Private Provider | PPROVIDER |
| Note: Inspector Notes from Inspection 2095 THIS WAS A VIRTUAL INSPECTION | |||
| ELECTRIC - EARLY POWER | 10/16/2024 | Approval - Private Provider | PPROVIDER |
| INSULATION | 08/22/2024 | Approval - Private Provider | PPROVIDER |
| SEWER SERVICE | 08/20/2024 | CANCELLED BY APPLICANT | WEB |
| SEWER TIE IN | 08/20/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| ALL ROUGH | 08/09/2024 | Approval - Private Provider | PPROVIDER |
| LATH/BRICK/ WATER BARRIER | 08/09/2024 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 07/11/2024 | Approval - Private Provider | PPROVIDER |
| WALL SHEATHING | 07/10/2024 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/10/2024 | Approval - Private Provider | PPROVIDER |
| FOUND SURVEY APPROVED (OFFICE) | 06/25/2024 | APPROVED | TBAKER |
| ELECTRIC TEMP POLE | 06/20/2024 | Approval - Private Provider | PPROVIDER |
| TIE BEAM / LINTEL | 06/14/2024 | Approval - Private Provider | PPROVIDER |
| MONOLITHIC SLAB | 06/03/2024 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH UNDERGROUND | 05/30/2024 | Approval - Private Provider | PPROVIDER |
| GRAVITY SEWER TEST | 05/30/2024 | Approval - Private Provider | PPROVIDER |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 05/28/2024 | APPROVED | JMUNSON |
| WATER METER INSTALLATION REQUEST | 05/13/2024 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 10/28/2024 | 11/05/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 10/28/2024 | 10/29/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any deviation from the approved site plan with significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD | |||
| ZON | COMPLETE | 09/03/2024 | 09/03/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | HOLD | 08/19/2024 | 08/19/2024 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please turn in the original right of way agreement | |||
| SW1 | COMPLETE | 08/19/2024 | 08/20/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD | |||
| ENGIN1 | COMPLETE | 08/19/2024 | 08/19/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | HOLD | 08/16/2024 | 08/16/2024 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please submit a revised site plan showing the paver driveway Please turn in the original right of way agreement | |||
| ZON | HOLD | 08/16/2024 | 08/19/2024 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please submit a revised site plan showing the paver driveway going into right of way Please turn in the original right of way agreement | |||
| ENGIN1 | COMPLETE | 08/16/2024 | 08/19/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 08/16/2024 | 08/19/2024 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM They need to resubmit a new site plan | |||
| ENGIN1 | COMPLETE | 06/25/2024 | 06/25/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/25/2024 | 06/25/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/21/2024 | 05/28/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/25/2024 | 04/25/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 04/25/2024 | 04/25/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/25/2024 | 04/25/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/23/2024 | 04/23/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 04/23/2024 | 04/25/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 04/16/2024 | 04/22/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 04/16/2024 | 04/18/2024 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/16/2024 | 04/16/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 04/16/2024 | 04/18/2024 |
| LOCATE | COMPLETE | 04/16/2024 | 04/17/2024 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 04/16/2024 | 04/16/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | HOLD | 04/16/2024 | 04/17/2024 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Flood panel number incorrect on site plan/survey Please show setback from the arc of circular driveway to front property line Landscape plan missing plantings on right side. Plantings must wrap corner and have a minimum of four along the front side | |||
| SWALE | COMPLETE | 04/16/2024 | 07/26/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| RECORDING FEE REIMBURSE DOC | ¤44.00 | 11/22/2024 |
| IMPACT FEE TRANSPORTATION | ¤1,862.00 | 04/25/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 04/25/2024 |
| SURCHARGE FS 533.721 | ¤2.40 | 04/25/2024 |
| SURCHARGE - FS 468.631 | ¤3.60 | 04/25/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 04/25/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 04/25/2024 |
| SW ENG PRE APRON | ¤30.00 | 04/25/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 04/25/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 04/25/2024 |
| SEWER CREDIT | (¤1,147.00) | 04/25/2024 |
| SEWER INSPECTION | ¤25.00 | 04/25/2024 |
| SEWER CAPITAL FACILITY | ¤5,441.03 | 04/25/2024 |
| WATER CAPITAL FACILITY FEE | ¤3,994.51 | 04/25/2024 |
| SITE PLAN 30 | ¤30.00 | 04/25/2024 |
| WATER- TURN ON | ¤25.00 | 04/25/2024 |
| ADJUSTMENT 50% | (¤15.00) | 04/25/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 04/25/2024 |
| ADMINISTRATIVE - RESID PP | ¤225.00 | 04/25/2024 |
| CONNECTION FEES | ¤1,187.26 | 04/25/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 04/25/2024 |
| IMPACT FEE FIRE | ¤428.09 | 04/25/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 04/25/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 04/25/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 04/25/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 04/25/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤20,309.88 |