I want to search for...

Permit #2024041268

Permit Details

Status: COED

Parcel Id: 07-11-31-7032-00420-0100
GARAGE: 444 sqft
CONDITIONED SPACE: 1855 sqft
OPENED PORCH (WITH ROOF) : 179 sqft
Total Square Footage: 2478 sqft
Block: 00420
Subdivision: -
Job Phone: 386-931-5741
Location Address: 6 RUSSELL DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 05/08/2024
NOC: RECORDED
Applicant name: MICHAEL MARINO HANSEN
Owner: JMR III LLC DBA RBI HOMES & ROOFING INC

Address

PO BOX 9

CISSNA PARK, IL 60924

Lot: 0100
Contracted Stated Job Value: ¤250,000.00
Job Description: Single Family
Type: CN

Contractor

RBI HOMES
Status Location Address State License Number Phone
ACTIVE

PO BOX 1347

PALM COAST, FL 32137

RB29003877 (Exp: 08/31/2027) 386-585-4097

Sub Contractors

WILLIAM ROBERT BARRICK
Status Location Address State License Number Phone
CANCEL

21 CEDARWOOD CT

PALM COAST, FL 32137

RB29003845 (Exp: 08/31/2025) 386-585-4097
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
GARY LLOYD SHEFFIELD
Status Location Address State License Number Phone
ACTIVE

PO BOX 912

PALM COAST, FL 32164

CAC1820539 (Exp: 08/31/2026) 386-264-0550
ARTHUR J PASCOE
Status Location Address State License Number Phone
ACTIVE

PO BOX 730007

ORMOND BEACH, FL 32174

EC13007168 (Exp: 08/31/2026) 386-547-6439
MICHAEL JON HOWES
Status Location Address State License Number Phone
CANCEL

29 MALACOMPRA RD

PALM COAST, FL 32137

RC29027794 (Exp: 08/31/2025) 410-984-6787

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 12/11/2024 APPROVED CVANSTRAHLEN
BLD - BUILDING FINAL 12/09/2024 Disapproved - NO FEE CVANSTRAHLEN
Note: back porch Slidding door need lock AC supply grill for laundry room Isulation on ceiling do not match E-Calcs , please summit for revision and approval ( need insulation certifique )
ROW - STORMWATER FINAL 11/21/2024 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 11/19/2024 - PREVIOUS INSPECTION NOTES 11/19/24 TPOLACEK** MET WITH CM THEY ARE SEEDING THE BACK PROPERTY LINE AND WILL REQUEST FINAL ROW UPON COMPLETION 11/18/24 TPOLACEK** INSPECTOR NOTE*** BACK OF PROPERTY MUST HAVE SOD OR SEED AND STRAW COVERING ALL BARE EARTH. ALL DEBRIS BEHIND PROPERTY MUST BE REMOVED. THIS IS A COURTESY NOTE AND AT TIME OF FINAL ROW INSPECTION THERE MAY OR MAY NOT BE OTHER ISSUES. AT THE TIME OF THE FIELD SURVEY THIS IS SOMETHING THE INSPECTOR NOTICED AND WANTED TO NOTE FOR THE INSPECTOR CONDUCTING THE FINAL ROW.
U -UTILITY RESIDENTIAL FINAL 11/19/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 11/19/2024 10:25:03 AM *** use flush mount sewer ckean out cap-not the square nut type
ROW - STORMWATER FINAL 11/19/2024 Disapproved - NO FEE TPOLACEK
Note: 11/19/24 TPOLACEK** MET WITH CM THEY ARE SEEDING THE BACK PROPERTY LINE AND WILL REQUEST FINAL ROW UPON COMPLETION 11/18/24 TPOLACEK** INSPECTOR NOTE*** BACK OF PROPERTY MUST HAVE SOD OR SEED AND STRAW COVERING ALL BARE EARTH. ALL DEBRIS BEHIND PROPERTY MUST BE REMOVED. THIS IS A COURTESY NOTE AND AT TIME OF FINAL ROW INSPECTION THERE MAY OR MAY NOT BE OTHER ISSUES. AT THE TIME OF THE FIELD SURVEY THIS IS SOMETHING THE INSPECTOR NOTICED AND WANTED TO NOTE FOR THE INSPECTOR CONDUCTING THE FINAL ROW.
ROW - FINAL APRON (AFTER POUR) 11/19/2024 APPROVED TPOLACEK
Note: PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
U-CROSS CONNECTION 11/19/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 11/19/2024 10:23:59 AM *** no irrigation-no cross connection
ROW- FINAL SURVEY/GRADING CERTIFICATION 11/18/2024 APPROVED TPOLACEK
ROW FIELD SURVEY /GRADING CERTIFICATION 11/18/2024 APPROVED TPOLACEK
Note: UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
ELECTRIC - EARLY POWER 10/21/2024 APPROVED - AS NOTED RMARTIN
Note: *** NOTES ADDED BY RMARTIN 10/21/2024 2:27:12 PM *** Need to have surge protection installed by next inspection 10/18/2024 - PREVIOUS INSPECTION NOTES 10/18/24 NEC 230.67-SURGE PROTECTOR INSTALLED
ELECTRIC - EARLY POWER 10/18/2024 Disapproved -FEE REQUIRED CVANSTRAHLEN
Note: 10/18/24 NEC 230.67-SURGE PROTECTOR INSTALLED
ROW- PRE-APRON (PRE-POUR) 10/18/2024 APPROVED PFLANAGAN
Note: IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. ---------------------------------------------------------------------- 10/17/2024 - PREVIOUS INSPECTION NOTES 10/17/24 TPOLACEK*** 08:18AM RECIEVED CALL FROM JIM ASKING TO CANCEL PRE POUR INSPECTION
ROW- PRE-APRON (PRE-POUR) 10/17/2024 CANCELLED BY APPLICANT TPOLACEK
Note: 10/17/24 TPOLACEK*** 08:18AM RECIEVED CALL FROM JIM ASKING TO CANCEL PRE POUR INSPECTION
ELECTRIC - EARLY POWER 10/03/2024 CANCELLED BY APPLICANT WEB
GRAVITY SEWER TEST 10/02/2024 APPROVED - AS NOTED MGIBSON
Note: 6/12/2024 - PREVIOUS INSPECTION NOTES GRAVITY SEWER NOT RAN YET. THIS WAS A VIRTUAL INSPECTION
SEWER TIE IN 10/02/2024 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
ROW- PROJECT STATUS 09/26/2024 APPROVED - AS NOTED TPOLACEK
Note: 09/26/24 TPOLACEK** SPOKE WITH HOME OWNERS AT #4 AND EXPLAINED THAT THE BUILDER WILL CORRECT THE WASHOUTS HOWEVER, THE ISSUE AT THIS POINT IS THE DRIVEWAY CULVERT AT #8 DOWNSTREAM IS 100% BLOCKED NOT ALLOWING FOR THE UPSTREAM SWALES TO EMPTY. i WILL ALSO REQUEST THE VAC CON FOR BTH 4 & 8 AS WELL AS A REGRADE FROM HIGH TO OUTFALL NIEGHBOR AT 4 IS REQUESTING TO SPEAK TO INSPECTOR SAYS #6 IS CAUSING HIS SWALE TO FLOOD.MH
INSULATION 08/30/2024 APPROVED AGAETANO
LATH/BRICK/ WATER BARRIER 08/23/2024 APPROVED AGAETANO
ALL ROUGH 08/21/2024 APPROVED AGAETANO
Note: 8/19/2024 - PREVIOUS INSPECTION NOTES 08-19-2024 Contractor not ready. Electricians on site. A complete inspection is required.
ALL ROUGH 08/19/2024 Disapproved -FEE REQUIRED AGAETANO
Note: 08-19-2024 Contractor not ready. Electricians on site. A complete inspection is required.
ROOF VALLEY & METAL 08/08/2024 APPROVED KSANDOE
WALL SHEATHING 08/07/2024 APPROVED JSTEWART
ROOF SHEATHING / BRACES/TIES/DOWN CELL 08/07/2024 APPROVED JSTEWART
FOOTER 07/02/2024 APPROVED RSIMS
FOUND SURVEY APPROVED (OFFICE) 06/28/2024 APPROVED TBAKER
TIE BEAM / LINTEL 06/27/2024 APPROVED KSANDOE
MONOLITHIC SLAB 06/18/2024 APPROVED AGAETANO
Note: 6/17/2024 - PREVIOUS INSPECTION NOTES 6/14/2024 - PREVIOUS INSPECTION NOTES 06-14-2024 1. Slab not proper depth. Noted on drawings. Check all areas. Please have multiple lines set up for inspection. 2. Drawings are ripped and not in order. Please organize. 06-17-2024 Vapor barrier not installed at multiple areas of slab.
MONOLITHIC SLAB 06/17/2024 Disapproved - NO FEE AGAETANO
Note: 6/14/2024 - PREVIOUS INSPECTION NOTES 06-14-2024 1. Slab not proper depth. Noted on drawings. Check all areas. Please have multiple lines set up for inspection. 2. Drawings are ripped and not in order. Please organize. 06-17-2024 Vapor barrier not installed at multiple areas of slab.
MONOLITHIC SLAB 06/14/2024 Disapproved - NO FEE AGAETANO
Note: 06-14-2024 1. Slab not proper depth. Noted mon drawings. Check all areas. Please have multiple lines set up for inspection. 2. Drawings are ripped and not in order. Please organize.
PLUMBING 1ST ROUGH UNDERGROUND 06/12/2024 APPROVED - AS NOTED MGIBSON
Note: WATER SERVICE NOT RAN YET
GRAVITY SEWER TEST 06/12/2024 Disapproved - NO FEE MGIBSON
Note: GRAVITY SEWER NOT RAN YET
WATER METER INSTALLATION REQUEST 06/12/2024 APPROVED CBOWERMASTER
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 06/11/2024 APPROVED JMUNSON

Review History

Department Status Date In Date Out
MECH COMPLETE 12/10/2024 12/10/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH COMPLETE 12/03/2024 12/06/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 06/28/2024 06/28/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 06/28/2024 06/28/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 06/27/2024 06/28/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 06/05/2024 06/11/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ZON COMPLETE 05/01/2024 05/01/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ELEC COMPLETE 05/01/2024 05/06/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 05/01/2024 05/01/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 05/01/2024 05/01/2024
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM
BADMIN COMPLETE 04/23/2024 04/29/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 04/23/2024 04/28/2024
Note: Released By: JPI
CUSVC COMPLETE 04/23/2024 04/24/2024
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC HOLD 04/23/2024 04/29/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Submit electrical load calcs. 2. Need correct outlet spacing in bed3 NEC 2020 210.52
ENGIN1 COMPLETE 04/23/2024 04/23/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 04/23/2024 04/25/2024
LOCATE COMPLETE 04/23/2024 04/24/2024
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 04/23/2024 04/25/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 04/23/2024 04/23/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON HOLD 04/23/2024 04/23/2024
Note: Held By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM Site plan missing type of driveway.
SWALE COMPLETE 04/23/2024 08/05/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤20.00 12/11/2024
CONTRACTOR CHANGE ¤20.00 12/11/2024
CONTRACTOR CHANGE ¤20.00 12/11/2024
CONTRACTOR CHANGE ¤20.00 12/11/2024
SW ENG REINSPECTION 20 ¤20.00 12/11/2024
PLAN REVIEW - REVISION ¤32.50 12/11/2024
REINSPECTION RESIDENTIAL ¤40.00 12/11/2024
CONNECTION FEES ¤1,187.26 05/08/2024
WATER- TURN ON ¤25.00 05/08/2024
ADJUSTMENT 50% (¤629.22) 05/08/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 05/08/2024
INSPECTION - RESIDENTIAL ¤957.00 05/08/2024
PLAN REVIEW - RESIDENTIAL ¤271.44 05/08/2024
SW ENG - REVIEW 20 ¤20.00 05/08/2024
SW ENG RES REVIEW 200 ¤200.00 05/08/2024
SEWER CREDIT (¤2,051.27) 05/08/2024
SEWER INSPECTION ¤25.00 05/08/2024
SEWER CAPITAL FACILITY ¤5,441.03 05/08/2024
WATER CREDIT (¤448.98) 05/08/2024
WATER CAPITAL FACILITY FEE ¤3,994.51 05/08/2024
SITE PLAN 30 ¤30.00 05/08/2024
FC IMPACT FEE EMS ¤62.00 05/08/2024
IMPACT FEE FIRE ¤428.09 05/08/2024
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 05/08/2024
FC IMPACT FEE LIBRARY ¤268.00 05/08/2024
IMPACT FEE PARKS ¤1,800.99 05/08/2024
IMPACT FEE SCHOOL ¤5,450.00 05/08/2024
IMPACT FEE TRANSPORTATION ¤1,862.00 05/08/2024
WATER -IRRIGATION INSPECTION ¤25.00 05/08/2024
SURCHARGE FS 533.721 ¤6.29 05/08/2024
SURCHARGE - FS 468.631 ¤9.44 05/08/2024
SW ENG - FOUNDATION SURVEY ¤20.00 05/08/2024
SW ENG INSPECTION 80 ¤80.00 05/08/2024
SW ENG PRE APRON ¤30.00 05/08/2024
Fees Total Due: ¤0.00 Total Paid: ¤19,484.08