I want to search for...
Permit #2024041291
Permit Details
Status: COED
| Parcel Id: 07-11-31-7030-00290-0100 |
| CONDITIONED SPACE: 1970 sqft |
| GARAGE: 401 sqft |
| OPENED PORCH (WITH ROOF) : 21 sqft |
| OPENED PORCH (WITH ROOF) : 92 sqft |
| Total Square Footage: 2484 sqft |
| Block: 00290 |
| Subdivision: - |
| Job Phone: 904-531-5923 |
| Location Address: 101 RAE DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 05/31/2024 |
| NOC: RECORDED |
| Applicant name: TAVARIS JEROME DAVIS |
| Owner: BRIGHTLAND HOMES OF FLORIDA LLC |
|
Address 15725 N DALLAS PARKWAY SUITE 300 ADDISON, TX 75001 |
| Lot: 0100 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: New Single Family construction |
| Type: CN |
Contractor
BRIGHTLAND HOMES OF FLORIDA, LLC
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
3505 EAST FRONTAGE RD ADDISON, TX 75001 |
STE 145 TAMPA, FL 33607 |
CBC1267320 (Exp: 08/31/2026) | 904-531-5923 |
Sub Contractors
LARRY LAVON TURNAGE
| Status | Location Address | State License Number | Phone |
| CANCEL |
531 CODISCO WAY SANFORD, FL 32771 |
CMC1249777 (Exp: 08/31/2024) | 407-333-2665 |
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
OLIN MARSHALL CANNON
| Status | Location Address | State License Number | Phone |
| INACTIVE |
1794 ROGERO RD #2 JACKSONVILLE, FL 32211 |
CFC1426140 (Exp: 08/31/2026) | 904-343-4344 |
JAMES M GREENSLADE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
311 S BAY ST BUNNELL, FL 32110 |
EC13006083 (Exp: 08/31/2026) | 386-263-2960 | 386-263-2980 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - STORMWATER FINAL | 04/29/2025 | APPROVED | EMADISON |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW - STORMWATER FINAL | 04/25/2025 | CANCELLED BY APPLICANT | WEB |
| Note: 4/23/2025 - PREVIOUS INSPECTION NOTES 04/23/25 TPOLACEK**** AS STATED IN MULTIPLE PREVIOUS INSPECTIONS DRAINAGE DITCH ON LEFT SIDE MUST HAVE SOD TO BOTTOM. SEED AND STRAW ARE NOT PERMITTED IN DRAINAGE DITCHES, CANALS OR SWALES. PLEASE REMOVED STRAW AND PLACE SOD MATCHING GRADE. Sec. 42-46. - Utility or stormwater crossings. LDC SEC42-46 Drainage swales shall be restored to a design grade and any damage to swale area shall be fully repaired, including sodding, to conform to such condition as the swale existed prior to construction or to such other shape and grade as may be approved by the City Engineer. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 4/21/2025 - PREVIOUS INSPECTION NOTES 04/21/25 TPOLACEK*** AS STATED IN NOTE FROM 01/16/25 BUILDER MUST SOD TO BOTTOM OF DITCH AND ALL BARE GROUND ON VACANT MUST HAVE SEED AND STRAW. 1/16/25 TPOLACEK** BUILDER MUST SOD TO BOTTOM OF DITCH THAT RUNS ALONG LEFT SIDE PROPERTY. I WILL APPROVE FIELD SURVEY AND CHECK ON THE ROW FINAL TO MAKE SURE IT'S COMPLETED. | |||
| ROW - STORMWATER FINAL | 04/23/2025 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 04/23/25 TPOLACEK**** AS STATED IN MULTIPLE PREVIOUS INSPECTIONS DRAINAGE DITCH ON LEFT SIDE MUST HAVE SOD TO BOTTOM. SEED AND STRAW ARE NOT PERMITTED IN DRAINAGE DITCHES, CANALS OR SWALES. PLEASE REMOVED STRAW AND PLACE SOD MATCHING GRADE. Sec. 42-46. - Utility or stormwater crossings. LDC SEC42-46 Drainage swales shall be restored to a design grade and any damage to swale area shall be fully repaired, including sodding, to conform to such condition as the swale existed prior to construction or to such other shape and grade as may be approved by the City Engineer. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 4/21/2025 - PREVIOUS INSPECTION NOTES 04/21/25 TPOLACEK*** AS STATED IN NOTE FROM 01/16/25 BUILDER MUST SOD TO BOTTOM OF DITCH AND ALL BARE GROUND ON VACANT MUST HAVE SEED AND STRAW. 1/16/25 TPOLACEK** BUILDER MUST SOD TO BOTTOM OF DITCH THAT RUNS ALONG LEFT SIDE PROPERTY. I WILL APPROVE FIELD SURVEY AND CHECK ON THE ROW FINAL TO MAKE SURE IT'S COMPLETED. | |||
| ROW - STORMWATER FINAL | 04/21/2025 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 04/21/25 TPOLACEK*** AS STATED IN NOTE FROM 01/16/25 BUILDER MUST SOD TO BOTTOM OF DITCH AND ALL BARE GROUND ON VACANT MUST HAVE SEED AND STRAW. 1/16/25 TPOLACEK** BUILDER MUST SOD TO BOTTOM OF DITCH THAT RUNS ALONG LEFT SIDE PROPERTY. I WILL APPROVE FIELD SURVEY AND CHECK ON THE ROW FINAL TO MAKE SURE IT'S COMPLETED. | |||
| U -UTILITY RESIDENTIAL FINAL | 04/21/2025 | FINAL APPROVED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9035 *** NOTES ADDED BY LFITZGERALD 1/15/2025 12:38:19 PM *** n0 irr-no cross connection | |||
| BLD - BUILDING FINAL | 04/17/2025 | Approval - Private Provider | PPROVIDER |
| Note: 4/14/2025 4:21:52 PM- PREVIOUS INSPECTION NOTES | |||
| BLD - BUILDING FINAL | 04/14/2025 | Disapproved- Private Provider | PPROVIDER |
| ROW - FINAL APRON (AFTER POUR) | 01/16/2025 | APPROVED | TPOLACEK |
| Note: PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. =Inspector Notes from Inspection 9465 01/16/25 TPOLACEK** BUILDER MUST SOD TO BOTTOM OF DITCH THAT RUNS ALONG LEFT SIDE PROPERTY. I WILL APPROVE FIELD SURVEY AND CHECK ON THE ROW FINAL TO MAKE SURE IT'S COMPLETED. UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. 1/15/2025 - PREVIOUS INSPECTION NOTES 1/15/2025 - PREVIOUS INSPECTION NOTES THE ADDRESS MUST BE POSTED AND VISIBLE TO INSPECTORS Florida Building Code-;. Building Section 501.2 THE ADDRESS MUST BE POSTED AND VISIBLE TO INSPECTORS. IF THE ADDRESS IS NOT VISIBLE, INSPECTORS WILL NOT PERFORM INSPECTIONS, AND A REINSPECTION FEE WILL BE ISSUED. Florida Building Code-;. Building Section 501.2 | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/16/2025 | APPROVED - AS NOTED | TPOLACEK |
| Note: 01/16/25 TPOLACEK** BUILDER MUST SOD TO BOTTOM OF DITCH THAT RUNS ALONG LEFT SIDE PROPERTY. I WILL APPROVE FIELD SURVEY AND CHECK ON THE ROW FINAL TO MAKE SURE IT'S COMPLETED. UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. 1/15/2025 - PREVIOUS INSPECTION NOTES 1/15/2025 - PREVIOUS INSPECTION NOTES THE ADDRESS MUST BE POSTED AND VISIBLE TO INSPECTORS Florida Building Code-;. Building Section 501.2 THE ADDRESS MUST BE POSTED AND VISIBLE TO INSPECTORS. IF THE ADDRESS IS NOT VISIBLE, INSPECTORS WILL NOT PERFORM INSPECTIONS, AND A REINSPECTION FEE WILL BE ISSUED. Florida Building Code-;. Building Section 501.2 | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 01/15/2025 | APPROVED | TPOLACEK |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/15/2025 | Disapproved - NO FEE | TPOLACEK |
| Note: THE ADDRESS MUST BE POSTED AND VISIBLE TO INSPECTORS Florida Building Code-;. Building Section 501.2 THE ADDRESS MUST BE POSTED AND VISIBLE TO INSPECTORS. IF THE ADDRESS IS NOT VISIBLE, INSPECTORS WILL NOT PERFORM INSPECTIONS, AND A REINSPECTION FEE WILL BE ISSUED. Florida Building Code-;. Building Section 501.2 | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/15/2025 | Disapproved - NO FEE | TPOLACEK |
| Note: 1/15/2025 - PREVIOUS INSPECTION NOTES THE ADDRESS MUST BE POSTED AND VISIBLE TO INSPECTORS Florida Building Code-;. Building Section 501.2 THE ADDRESS MUST BE POSTED AND VISIBLE TO INSPECTORS. IF THE ADDRESS IS NOT VISIBLE, INSPECTORS WILL NOT PERFORM INSPECTIONS, AND A REINSPECTION FEE WILL BE ISSUED. Florida Building Code-;. Building Section 501.2 | |||
| U-CROSS CONNECTION | 01/15/2025 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 1/15/2025 12:38:19 PM *** n0 irr-no cross connection | |||
| ROW- PRE-APRON (PRE-POUR) | 11/06/2024 | APPROVED | FSLADISH |
| Note: 11/6/24 PIPE ELEVATION OK. READY TO POUR AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIEMENT ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. | |||
| LATH/BRICK/ WATER BARRIER | 10/24/2024 | Approval - Private Provider | PPROVIDER |
| ELECTRIC - EARLY POWER | 10/24/2024 | Approval - Private Provider | PPROVIDER |
| GRAVITY SEWER TEST | 10/14/2024 | Approval - Private Provider | PPROVIDER |
| SEWER TIE IN | 10/14/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| ELECTRIC-TUG | 10/04/2024 | APPROVED | PPROVIDER |
| INSULATION | 09/12/2024 | Approval - Private Provider | PPROVIDER |
| PEP TANK INSTALLATION REQUEST | 09/12/2024 | APPROVED | CBOWERMASTER |
| ALL ROUGH | 09/05/2024 | Approval - Private Provider | PPROVIDER |
| LATH/BRICK/ WATER BARRIER | 09/05/2024 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 08/28/2024 | Approval - Private Provider | PPROVIDER |
| WALL SHEATHING | 08/07/2024 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/07/2024 | Approval - Private Provider | PPROVIDER |
| FOUND SURVEY APPROVED (OFFICE) | 08/02/2024 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 07/08/2024 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH UNDERGROUND | 06/28/2024 | Approval - Private Provider | PPROVIDER |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 06/27/2024 | APPROVED | JMUNSON |
| WATER METER INSTALLATION REQUEST | 06/04/2024 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 08/02/2024 | 08/02/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/02/2024 | 08/02/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/24/2024 | 06/27/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 05/09/2024 | 05/16/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/09/2024 | 05/13/2024 |
| Note: Released By: JPI | |||
| ZON | COMPLETE | 05/09/2024 | 05/09/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/06/2024 | 05/06/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 05/06/2024 | 05/06/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 2. Dryer outlet needs to be GFCI protected. NEC 210.8 | |||
| ELEC | COMPLETE | 04/30/2024 | 05/06/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | HOLD | 04/30/2024 | 05/03/2024 |
| Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet. | |||
| BLD | COMPLETE | 04/29/2024 | 04/29/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM This is the correct review. disregard previous comments | |||
| ZON | COMPLETE | 04/25/2024 | 04/25/2024 |
| Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 04/23/2024 | 04/29/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Do not worry about the truss comment I can see the letter from your engineer. | |||
| BLD | HOLD | 04/23/2024 | 04/28/2024 |
| Note: Held By: JPI 1. Roofing product approvals do not appear to match what is shown on the roofing worksheet. Please cure. 107.2.42. 2. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet. | |||
| CUSVC | COMPLETE | 04/23/2024 | 04/24/2024 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 04/23/2024 | 04/29/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need correct outlet spacing in bed 3 and flex room. NEC 2020 210.52 2. Dryer outlet needs to be GFCI protected. NEC 210.8 | |||
| ENGIN1 | COMPLETE | 04/23/2024 | 04/23/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 04/23/2024 | 04/25/2024 |
| LOCATE | COMPLETE | 04/23/2024 | 04/29/2024 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 04/23/2024 | 04/25/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 04/23/2024 | 04/23/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | HOLD | 04/23/2024 | 04/24/2024 |
| Note: Held By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM Floor plan missing location of AC pad. | |||
| SWALE | COMPLETE | 04/23/2024 | 08/05/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 05/05/2025 |
| CONTRACTOR CHANGE | ¤20.00 | 05/05/2025 |
| SW ENG REINSPECTION 20 | ¤20.00 | 05/05/2025 |
| SW ENG REINSPECTION 20 | ¤20.00 | 05/05/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 05/31/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 05/31/2024 |
| SEWER CREDIT | (¤1,342.00) | 05/31/2024 |
| SEWER INSPECTION | ¤25.00 | 05/31/2024 |
| SEWER CAPITAL FACILITY | ¤5,441.03 | 05/31/2024 |
| WATER CAPITAL FACILITY FEE | ¤3,994.51 | 05/31/2024 |
| SITE PLAN 30 | ¤30.00 | 05/31/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 05/31/2024 |
| IMPACT FEE FIRE | ¤428.09 | 05/31/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 05/31/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 05/31/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 05/31/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 05/31/2024 |
| IMPACT FEE TRANSPORTATION | ¤1,862.00 | 05/31/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 05/31/2024 |
| SURCHARGE FS 533.721 | ¤3.80 | 05/31/2024 |
| SURCHARGE - FS 468.631 | ¤5.71 | 05/31/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 05/31/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 05/31/2024 |
| SW ENG PRE APRON | ¤30.00 | 05/31/2024 |
| WATER- TURN ON | ¤25.00 | 05/31/2024 |
| ADJUSTMENT 50% | (¤155.40) | 05/31/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 05/31/2024 |
| ADMINISTRATIVE - RESID PP | ¤225.00 | 05/31/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤280.80 | 05/31/2024 |
| CONNECTION FEES | ¤1,187.26 | 05/31/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤20,294.79 |