I want to search for...
Permit #2024041317
Permit Details
Status: COED
| Parcel Id: 07-11-31-7037-01360-0020 |
| CONDITIONED SPACE: 2306 sqft |
| GARAGE: 466 sqft |
| OPENED PORCH (WITH ROOF) : 32 sqft |
| PATIO/DECK (NO ROOF) : 138 sqft |
| Total Square Footage: 2942 sqft |
| Block: 01360 |
| Subdivision: - |
| Job Phone: 831-383-2883 |
| Location Address: 86 LONDON DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 07/22/2024 |
| NOC: RECORDED |
| Applicant name: EDWARD LEE DAUBERT JR |
| Owner: FLORIDA SUN PARTNERS II LLC |
|
Address PO BOX 770279 ORLANDO, FL 32877 |
| Lot: 0020 |
| Contracted Stated Job Value: ¤252,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
BRITE BUILDING GROUP LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
6751 FORUM DRIVE SUITE 210 ORLANDO, FL 32821 |
CBC1266303 (Exp: 08/31/2026) | 831-383-2883 |
Sub Contractors
JASON LEE JAMES
| Status | Location Address | State License Number | Phone |
| ACTIVE |
217 N WESTMONTE DR SUITE 1007 ALTAMONTE SPRINGS, FL 32714 |
CFC1430061 (Exp: 08/31/2026) | 407-404-4000 |
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
CAC043953 (Exp: 08/31/2026) | 877-906-1113 |
JOSEPH HORATIO STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PARKWAY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2026) | 877-906-1113 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 10/10/2025 | FINAL APPROVED | JSTEWART |
| Note: 10/8/2025 - PREVIOUS INSPECTION NOTES 1. All Sprinkler heads required to be 12" from foundation wall line. FBCR 318.5 2. Future plumbing required a hard cap on drain pipe. (Laundry wash tub.) FPBC P704.4 | |||
| BLD - BUILDING FINAL | 10/08/2025 | Disapproved - NO FEE | JSTEWART |
| Note: 1. All Sprinkler heads required to be 12" from foundation wall line. FBCR 318.5 2. Future plumbing required a hard cap on drain pipe. (Laundry wash tub.) FPBC P704.4 | |||
| U-CROSS CONNECTION | 10/06/2025 | APPROVED | BWRIGHT |
| U -UTILITY RESIDENTIAL FINAL | 10/06/2025 | FINAL APPROVED | BWRIGHT |
| ROW - FINAL APRON (AFTER POUR) | 10/02/2025 | APPROVED | EMADISON |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 10/02/2025 | APPROVED | EMADISON |
| Note: NOTE TO INSPECTOR TALKED TO JASON WITH ROSS AND WE ARE GOING TO ALLOW THEM TO DO A INSIDE SWALE ON THE LEFT SIDE BECAUSE SITE PLAN WAS APPROVED WRONG BECAUSE CANT CHANGE EXISTING ELEVATIONS ON PROPERTY LINE MORE THEN A .10 ANY QUESTIONS CALL PARREN | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 10/02/2025 | APPROVED | EMADISON |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW - STORMWATER FINAL | 10/02/2025 | APPROVED | EMADISON |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW- PRE-APRON (PRE-POUR) | 09/12/2025 | APPROVED - AS NOTED | EMADISON |
| Note: ** 09/12/25 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. ** BUILDERS RESPONSIBILITY TO ENSURE CULVERT ELEVATION IS WITHIN TOLERANCE BEFORE THE POUR IN THE EVENT OF RAIN CHECK COMPACTION OF MATERIAL **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ___________________________________________________________________________________________________________________ 9/11/2025 - PREVIOUS INSPECTION NOTES ** 09/11/25 CANCELLED BY BUILDER VIA TEXT MESSAGE (509)-860-3919 _____________________________________________________________________________________________________________ 9/8/2025 - PREVIOUS INSPECTION NOTES ** 09/08/25 POUR AREA FLOODED FROM TODAYS RAIN _______________________________________________________________________________________________________________________ 9/3/2025 - PREVIOUS INSPECTION NOTES ** 9/3/25 NEEDS TO A MINIMUM OF 6 INCHES OF CONCRETE IN THE APRON OUT TO EDGE OF ROAD. COMPACTION OF MATERIAL WHERE FILL FIRT IS SCATTERED - SEE PINK PAINT FORMBOARD NEEDS TO BE BACKFILLED OR EXTENDED TO CONTAIN CONCRETE TO THE POUR AREA FOOTERS AND CULVERT PIPE FULL OF WATER | |||
| ELECTRIC - EARLY POWER | 09/12/2025 | APPROVED | JSTEWART |
| Note: Inspector Notes from Inspection 2200 Authorize release of email to FPL. | |||
| ROW- PRE-APRON (PRE-POUR) | 09/11/2025 | CANCELLED BY APPLICANT | EMADISON |
| Note: ** 09/11/25 CANCELLED BY BUILDER VIA TEXT MESSAGE (509)-860-3919 _____________________________________________________________________________________________________________ 9/8/2025 - PREVIOUS INSPECTION NOTES ** 09/08/25 POUR AREA FLOODED FROM TODAYS RAIN _______________________________________________________________________________________________________________________ 9/3/2025 - PREVIOUS INSPECTION NOTES ** 9/3/25 NEEDS TO A MINIMUM OF 6 INCHES OF CONCRETE IN THE APRON OUT TO EDGE OF ROAD. COMPACTION OF MATERIAL WHERE FILL FIRT IS SCATTERED - SEE PINK PAINT FORMBOARD NEEDS TO BE BACKFILLED OR EXTENDED TO CONTAIN CONCRETE TO THE POUR AREA FOOTERS AND CULVERT PIPE FULL OF WATER | |||
| ROW- PRE-APRON (PRE-POUR) | 09/08/2025 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 09/08/25 POUR AREA FLOODED FROM TODAYS RAIN _______________________________________________________________________________________________________________________ 9/3/2025 - PREVIOUS INSPECTION NOTES ** 9/3/25 NEEDS TO A MINIMUM OF 6 INCHES OF CONCRETE IN THE APRON OUT TO EDGE OF ROAD. COMPACTION OF MATERIAL WHERE FILL FIRT IS SCATTERED - SEE PINK PAINT FORMBOARD NEEDS TO BE BACKFILLED OR EXTENDED TO CONTAIN CONCRETE TO THE POUR AREA FOOTERS AND CULVERT PIPE FULL OF WATER | |||
| ROW- PRE-APRON (PRE-POUR) | 09/03/2025 | Disapproved -FEE REQUIRED | RRICKS |
| Note: ** 9/3/25 NEEDS TO A MINIMUM OF 6 INCHES OF CONCRETE IN THE APRON OUT TO EDGE OF ROAD. COMPACTION OF MATERIAL WHERE FILL FIRT IS SCATTERED - SEE PINK PAINT FORMBOARD NEEDS TO BE BACKFILLED OR EXTENDED TO CONTAIN CONCRETE TO THE POUR AREA FOOTERS AND CULVERT PIPE FULL OF WATER | |||
| GRAVITY SEWER TEST | 08/20/2025 | APPROVED | KSANDOE |
| SEWER TIE IN | 08/20/2025 | APPROVED | KSANDOE |
| PEP TANK INSTALLATION REQUEST | 08/07/2025 | APPROVED | CBOWERMASTER |
| LATH/BRICK/ WATER BARRIER | 07/30/2025 | APPROVED | MCONTRYMAN |
| INSULATION | 07/23/2025 | APPROVED | FWILLIS |
| Note: Inspector Notes from Inspection 2420 Previous notes not rectified.....please complete prior to Insulation. 4. please install steel strap at dryer duct notch at top plate over 50%. FBC R602.6.1 (additional to nail shields) 5. Please install nail shield at laundry wash tub vent at top plate. FBCR P2603.2.1 9. 5ft head preassure test fail (empty). FBCR P2503.7 7/8/2025 - PREVIOUS INSPECTION NOTES 1. Please repair 2x6 top plate over notched at breaker panel. FBC R602.6 2. Fire blocking for breaker panel chase, required at ceiling line (to Low). FBC R302.11 3. 2x6 and 2x4 end studs for gargae walls connecting to CMU need fastened for Lateral load preassure. (3/4" gap). 4. please install steel strap at dryer duct notch at top plate over 50%. FBC R602.6.1 5. Please install nail shield at laundry wash tub vent at top plate. FBCR P2603.2.1 6. Laundry wash tub horizontal vent needs to be sloped toward drain (1/8" per foot). FBC P3110.3 7. Return Boot in master bedroom needs installed to underside of truss (ceiling), currently in attic space. Per plan 8. Spare bath horizontal vent is not conected (venting into Attic space), please check for slope. FBC P3101 9. 5ft head preassure test fail (empty). FBCR P2503.7 was noted that windows and doors not installed. | |||
| ALL ROUGH | 07/18/2025 | APPROVED - AS NOTED | JSTEWART |
| Note: Previous notes not rectified.....please complete prior to Insulation. 4. please install steel strap at dryer duct notch at top plate over 50%. FBC R602.6.1 (additional to nail shields) 5. Please install nail shield at laundry wash tub vent at top plate. FBCR P2603.2.1 9. 5ft head preassure test fail (empty). FBCR P2503.7 7/8/2025 - PREVIOUS INSPECTION NOTES 1. Please repair 2x6 top plate over notched at breaker panel. FBC R602.6 2. Fire blocking for breaker panel chase, required at ceiling line (to Low). FBC R302.11 3. 2x6 and 2x4 end studs for gargae walls connecting to CMU need fastened for Lateral load preassure. (3/4" gap). 4. please install steel strap at dryer duct notch at top plate over 50%. FBC R602.6.1 5. Please install nail shield at laundry wash tub vent at top plate. FBCR P2603.2.1 6. Laundry wash tub horizontal vent needs to be sloped toward drain (1/8" per foot). FBC P3110.3 7. Return Boot in master bedroom needs installed to underside of truss (ceiling), currently in attic space. Per plan 8. Spare bath horizontal vent is not conected (venting into Attic space), please check for slope. FBC P3101 9. 5ft head preassure test fail (empty). FBCR P2503.7 was noted that windows and doors not installed. | |||
| ALL ROUGH | 07/08/2025 | Disapproved -FEE REQUIRED | JSTEWART |
| Note: 1. Please repair 2x6 top plate over notched at breaker panel. FBC R602.6 2. Fire blocking for breaker panel chase, required at ceiling line (to Low). FBC R302.11 3. 2x6 and 2x4 end studs for gargae walls connecting to CMU need fastened for Lateral load preassure. (3/4" gap). 4. please install steel strap at dryer duct notch at top plate over 50%. FBC R602.6.1 5. Please install nail shield at laundry wash tub vent at top plate. FBCR P2603.2.1 6. Laundry wash tub horizontal vent needs to be sloped toward drain (1/8" per foot). FBC P3110.3 7. Return Boot in master bedroom needs installed to underside of truss (ceiling), currently in attic space. Per plan 8. Spare bath horizontal vent is not conected (venting into Attic space), please check for slope. FBC P3101 9. 5ft head preassure test fail (empty). FBCR P2503.7 was noted that windows and doors not installed. | |||
| WALL SHEATHING | 07/01/2025 | APPROVED | FWILLIS |
| Note: Inspector Notes from Inspection 2340 REPAIR SILT FENCE IN THE REAR BY NEXT INSPECTION. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/01/2025 | APPROVED | FWILLIS |
| Note: Inspector Notes from Inspection 2340 REPAIR SILT FENCE IN THE REAR BY NEXT INSPECTION. | |||
| ROOF VALLEY & METAL | 07/01/2025 | APPROVED | FWILLIS |
| Note: Inspector Notes from Inspection 2340 REPAIR SILT FENCE IN THE REAR BY NEXT INSPECTION. | |||
| ELECTRIC-TUG | 06/26/2025 | APPROVED - AS NOTED | JSTEWART |
| Note: Authorize release of email to FPL. | |||
| TIE BEAM / LINTEL | 04/17/2025 | APPROVED - AS NOTED | FWILLIS |
| Note: REPAIR SILT FENCE IN THE REAR BY NEXT INSPECTION. | |||
| FOUND SURVEY APPROVED (OFFICE) | 04/11/2025 | APPROVED | RRICKS |
| MONOLITHIC SLAB | 03/20/2025 | APPROVED | FWILLIS |
| PLUMBING 1ST ROUGH UNDERGROUND | 02/05/2025 | APPROVED | MGIBSON |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 02/04/2025 | APPROVED | PKNAPIK |
| WATER METER INSTALLATION REQUEST | 11/20/2024 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 09/29/2025 | 09/30/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/11/2025 | 04/11/2025 |
| Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/11/2025 | 04/11/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/31/2025 | 02/04/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/09/2025 | 01/14/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 01/09/2025 | 01/14/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 01/09/2025 | 01/13/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/22/2024 | 07/29/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/22/2024 | 07/22/2024 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM revised the color sheet | |||
| ZON | COMPLETE | 06/27/2024 | 06/27/2024 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/27/2024 | 06/27/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 06/27/2024 | 07/09/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD | |||
| ZON | HOLD | 06/26/2024 | 06/26/2024 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM REPEAT COMMENT AC pad location doesn't match landscape and floor plans on site plan | |||
| ELEC | COMPLETE | 06/26/2024 | 06/27/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 06/26/2024 | 06/26/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 06/26/2024 | 06/27/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BADMIN | HOLD | 04/24/2024 | 04/30/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Complete truss plan packet cover sheet or first page to include the design professional of record (building design engineer or architect) approval stamp indicating acceptance and approval of truss design (Not wet seal) | |||
| BLD | COMPLETE | 04/24/2024 | 04/30/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 04/24/2024 | 04/26/2024 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 04/24/2024 | 04/29/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Range and dryer need to be GFCI protected. NEC 2020 210.8 2. Electrical riser diagram needs to include the surge protector. NEC 2020 230.67 | |||
| ENGIN1 | COMPLETE | 04/24/2024 | 04/24/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 04/24/2024 | 04/29/2024 |
| LOCATE | COMPLETE | 04/24/2024 | 05/02/2024 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | HOLD | 04/24/2024 | 04/29/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Design location on Energy calcs and Heatload need to be Daytona Beach | |||
| SW1 | COMPLETE | 04/24/2024 | 04/24/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | HOLD | 04/24/2024 | 04/24/2024 |
| Note: Held By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM Site plan / Survey AC pad location doesn't match landscape and floor plan. | |||
| SWALE | COMPLETE | 04/24/2024 | 08/05/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 10/03/2025 |
| CONTRACTOR CHANGE | ¤20.00 | 10/03/2025 |
| PLAN REVIEW - REVISION | ¤32.50 | 10/03/2025 |
| PLAN REVIEW - REVISION | ¤32.50 | 10/03/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 10/03/2025 |
| SW ENG REINSPECTION 30 | ¤30.00 | 10/03/2025 |
| SW ENG REINSPECTION 30 | ¤30.00 | 10/03/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 07/22/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 07/22/2024 |
| SEWER CREDIT | (¤1,466.00) | 07/22/2024 |
| SEWER INSPECTION | ¤25.00 | 07/22/2024 |
| SEWER CAPITAL FACILITY | ¤5,441.03 | 07/22/2024 |
| WATER CAPITAL FACILITY FEE | ¤3,994.51 | 07/22/2024 |
| SITE PLAN 30 | ¤30.00 | 07/22/2024 |
| CONNECTION FEES | ¤1,187.26 | 07/22/2024 |
| WATER-METER | ¤514.49 | 07/22/2024 |
| WATER- TURN ON | ¤25.00 | 07/22/2024 |
| WATER- TURN ON | ¤25.00 | 07/22/2024 |
| ADJUSTMENT 50% | (¤761.60) | 07/22/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 07/22/2024 |
| INSPECTION - RESIDENTIAL | ¤1,163.25 | 07/22/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤329.94 | 07/22/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 07/22/2024 |
| IMPACT FEE FIRE | ¤428.09 | 07/22/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 07/22/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 07/22/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 07/22/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 07/22/2024 |
| IMPACT FEE TRANSPORTATION | ¤1,862.00 | 07/22/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 07/22/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 07/22/2024 |
| SURCHARGE FS 533.721 | ¤7.62 | 07/22/2024 |
| SURCHARGE - FS 468.631 | ¤11.42 | 07/22/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 07/22/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 07/22/2024 |
| SW ENG PRE APRON | ¤30.00 | 07/22/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤21,251.00 |