I want to search for...

Permit #2024041357

Permit Details

Status: COED

Parcel Id: 07-11-31-7033-00010-0040
CONDITIONED SPACE: 1851 sqft
GARAGE: 411 sqft
OPENED PORCH (WITH ROOF) : 39 sqft
OPENED PORCH (WITH ROOF) : 74 sqft
Total Square Footage: 2375 sqft
Block: 00010
Subdivision: -
Job Phone: 904-531-5923
Location Address: 34 REIDSVILLE DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 05/31/2024
NOC: RECORDED
Applicant name: TAVARIS JEROME DAVIS
Owner: BRIGHTLAND HOMES OF FLORIDA LLC

Address

15725 N DALLAS PARKWAY

ADDISON, TX 75001

Address

SUITE 300

ADDISON, TX 75001

Lot: 0040
Contracted Stated Job Value: ¤250,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

BRIGHTLAND HOMES OF FLORIDA, LLC
Status Location Address Mailing Address State License Number Phone
ACTIVE

3505 EAST FRONTAGE RD

ADDISON, TX 75001

STE 145

TAMPA, FL 33607

CBC1267320 (Exp: 08/31/2026) 904-531-5923

Sub Contractors

LARRY LAVON TURNAGE
Status Location Address State License Number Phone
CANCEL

531 CODISCO WAY

SANFORD, FL 32771

CMC1249777 (Exp: 08/31/2024) 407-333-2665
DUSTIN L ESTEP
Status Location Address State License Number Phone Fax
ACTIVE

2041 N HIAWASSEE RD

APOPKA, FL 32703

CCC1330971 (Exp: 08/31/2026) 407-702-0206 352-988-6629
OLIN MARSHALL CANNON
Status Location Address State License Number Phone
INACTIVE

1794 ROGERO RD #2

JACKSONVILLE, FL 32211

CFC1426140 (Exp: 08/31/2026) 904-343-4344
JAMES M GREENSLADE
Status Location Address State License Number Phone Fax
ACTIVE

311 S BAY ST

BUNNELL, FL 32110

EC13006083 (Exp: 08/31/2026) 386-263-2960 386-263-2980

Inspection History

Type Request Date Result Inspector
ROW - STORMWATER FINAL 04/04/2025 APPROVED GBERTOLA
Note: 4/4/25= AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. 3/25/2025 - PREVIOUS INSPECTION NOTES 03/25/25 TPOLACEK**** LEFT SIDE WHERE UTILITY WORK WAS PERFORMED SOD ELEVATION HAS BEEN RAISED BLOCKING DRAINAGE CONVEYANCE. ALL SOD MUST BE BROUGHT DOWN TO MATCH EXISTING GRADE.
BLD - BUILDING FINAL 04/03/2025 Approval - Private Provider PPROVIDER
Note: 4/1/2025 8:42:43 AM- PREVIOUS INSPECTION NOTES
BLD - BUILDING FINAL 04/01/2025 CANCELLED BY APPLICANT PPROVIDER
ROW - FINAL APRON (AFTER POUR) 03/25/2025 APPROVED TPOLACEK
Note: PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW - STORMWATER FINAL 03/25/2025 Disapproved - NO FEE TPOLACEK
Note: 03/25/25 TPOLACEK**** LEFT SIDE WHERE UTILITY WORK WAS PERFORMED SOD ELEVATION HAS BEEN RAISED BLOCKING DRAINAGE CONVEYANCE. ALL SOD MUST BE BROUGHT DOWN TO MATCH EXISTING GRADE.
U -UTILITY RESIDENTIAL FINAL 03/21/2025 FINAL APPROVED LFITZGERALD
Note: Inspector Notes from Inspection 9035 No IRR. No CC
ROW - FINAL APRON (AFTER POUR) 03/21/2025 CANCELLED BY APPLICANT WEB
ROW - STORMWATER FINAL 03/21/2025 CANCELLED BY APPLICANT WEB
ROW FIELD SURVEY /GRADING CERTIFICATION 02/10/2025 APPROVED TPOLACEK
Note: 02/10/25 TPOLACEK*** CORRECTIONS MADE. UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 12/27/2024 - PREVIOUS INSPECTION NOTES 12/27/24 TPOLACEK*** UPON WALKING PROPERTY THERE IS A LARGE HUMP ALONG LEFT SIDE PROPERTY LINE THAT NEEDS TO BE REMOVED TO ALLOW DRAINAGE TO FLOW TO THE FRONT.
U-CROSS CONNECTION 12/30/2024 APPROVED - AS NOTED BWRIGHT
Note: No IRR. No CC
ROW- FINAL SURVEY/GRADING CERTIFICATION 12/27/2024 APPROVED TPOLACEK
ROW FIELD SURVEY /GRADING CERTIFICATION 12/27/2024 Disapproved - NO FEE TPOLACEK
Note: 12/27/24 TPOLACEK*** UPON WALKING PROPERTY THERE IS A LARGE HUMP ALONG LEFT SIDE PROPERTY LINE THAT NEEDS TO BE REMOVED TO ALLOW DRAINAGE TO FLOW TO THE FRONT.
GRAVITY SEWER TEST 11/13/2024 Approval - Private Provider PPROVIDER
Note: Inspector Notes from Inspection 2095 THIS WAS A VIRTUAL INSPECTION
SEWER TIE IN 11/13/2024 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
ROW- PRE-APRON (PRE-POUR) 11/07/2024 APPROVED FSLADISH
Note: 11/7/24 PIPE ELEVATION IS GOOD. READY TO POUR AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIEMENT ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR.
LATH/BRICK/ WATER BARRIER 10/15/2024 Approval - Private Provider PPROVIDER
PEP TANK INSTALLATION REQUEST 10/08/2024 APPROVED CBOWERMASTER
Note: New inspection due to canceled inspection 9/18/2024 10:06:56 AM- PREVIOUS INSPECTION NOTES dumpster in the way
PEP TANK INSTALLATION REQUEST 10/07/2024 CANCELLED BY APPLICANT WEB
Note: 9/18/2024 10:06:56 AM- PREVIOUS INSPECTION NOTES dumpster in the way
ELECTRIC - EARLY POWER 10/04/2024 Approval - Private Provider PPROVIDER
ROW - DRAINAGE 10/03/2024 PARTIALLY APPROVED FSLADISH
Note: 10/3/24 RECEIVED A VOICEMAIL FROM NICK LGI CM AND HE INDICATED THAT HE IS IN THE PROCESS OF CORRECTING DRAINAGE ISSUES AND ASKED FOR A COUPLE OF DAYS TO HAVE CORRECTIONS COMPLETED. I TEXTED HIM AND LET HIM KNOW THAT WE WOULD RESCHEDULE THE DRAINAGE INSPECTION AS A COURTESY FOR 10/7 TO MAKE SURE THE CORRECTIONS ARE COMPLETED. I WILL PARTIALLY APPROVE THIS INSPECTION FOR TODAY AND WILL REVISIT UPON REINSPECTION FOR COMPLIANCE. ________________________________________________________________________________________________________________________ 9/27/2024 - PREVIOUS INSPECTION NOTES 9/27/24 NOTHING HAS BEEN DONE. READ PREVIOUS INSPECTORS NOTES. YOU NEED TO PUT IN A TEMPORARY CULVERT PIPE 12" DIAMETER MINIMUM AND/OR KEEP SWALE GRADED AND OPEN DAILY THROUGHOUT THE CONSTRUCTION PROCESS. YOU SILT FENCE NEEDS TO BE REPAIRED AND BROUGHT BACK INTO COPC STANDARDS. NEXT INSPECTION FOR COMPLIANC ON 9/30/24. PHOTO FOR REFERENCE. ________________________________________________________________________________________________________________________ 9/23/2024 - PREVIOUS INSPECTION NOTES BUILDER NEEDS TO OPEN DRAINAGE ACROSS THE FRONT SWALE ROW NEEDS A PIPE ON THE GROUND, A MINIMUM OF 12 INCHES; THE SWALE NEEDS TO BE OPENED AND MAINTAINED AT THE END OF EVERY DAY, PICTURES ATTACHED inspector be back on 9/27/24
ROW- PROJECT STATUS 10/02/2024 APPROVED EMADISON
Note: ** 10/02/24 PORT-A-JOHN REMOVED FROM THE SWALE (ROW) PLACED ONTO THE CONSTRUCTION SITE ________________________________________________________________________________________________________________________ Neighbor at 30 says Placement of the site Porta jon It is currently placed in the middle of the property culvert which is blocking the natural flow of rain water of respective surrounding properties. MH
ROW - DRAINAGE 09/27/2024 Disapproved -FEE REQUIRED FSLADISH
Note: 9/27/24 NOTHING HAS BEEN DONE. READ PREVIOUS INSPECTORS NOTES. YOU NEED TO PUT IN A TEMPORARY CULVERT PIPE 12" DIAMETER MINIMUM AND/OR KEEP SWALE GRADED AND OPEN DAILY THROUGHOUT THE CONSTRUCTION PROCESS. YOU SILT FENCE NEEDS TO BE REPAIRED AND BROUGHT BACK INTO COPC STANDARDS. NEXT INSPECTION FOR COMPLIANC ON 9/30/24. PHOTO FOR REFERENCE. ________________________________________________________________________________________________________________________ 9/23/2024 - PREVIOUS INSPECTION NOTES BUILDER NEEDS TO OPEN DRAINAGE ACROSS THE FRONT SWALE ROW NEEDS A PIPE ON THE GROUND, A MINIMUM OF 12 INCHES; THE SWALE NEEDS TO BE OPENED AND MAINTAINED AT THE END OF EVERY DAY, PICTURES ATTACHED inspector be back on 9/27/24
ROW - DRAINAGE 09/23/2024 Disapproved - NO FEE GBERTOLA
Note: BUILDER NEEDS TO OPEN DRAINAGE ACROSS THE FRONT SWALE ROW NEEDS A PIPE ON THE GROUND, A MINIMUM OF 12 INCHES; THE SWALE NEEDS TO BE OPENED AND MAINTAINED AT THE END OF EVERY DAY, PICTURES ATTACHED inspector be back on 9/27/24
PEP TANK INSTALLATION REQUEST 09/12/2024 Disapproved - NO FEE CBOWERMASTER
Note: dumpster in the way
LATH/BRICK/ WATER BARRIER 09/05/2024 Approval - Private Provider PPROVIDER
INSULATION 09/05/2024 Approval - Private Provider PPROVIDER
ALL ROUGH 08/28/2024 Approval - Private Provider PPROVIDER
ROOF VALLEY & METAL 08/08/2024 Approval - Private Provider PPROVIDER
WALL SHEATHING 08/07/2024 Approval - Private Provider PPROVIDER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 08/07/2024 Approval - Private Provider PPROVIDER
FOUND SURVEY APPROVED (OFFICE) 08/02/2024 APPROVED TBAKER
MONOLITHIC SLAB 07/08/2024 Approval - Private Provider PPROVIDER
PLUMBING 1ST ROUGH UNDERGROUND 06/28/2024 Approval - Private Provider PPROVIDER
WATER METER INSTALLATION REQUEST 06/20/2024 APPROVED CBOWERMASTER
Note: 6/6/2024 7:06:58 AM- PREVIOUS INSPECTION NOTES logs right side property
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 06/18/2024 APPROVED JMUNSON
WATER METER INSTALLATION REQUEST 06/04/2024 Disapproved -FEE REQUIRED CBOWERMASTER
Note: logs right side property

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 08/02/2024 08/02/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 08/02/2024 08/02/2024
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
BLD COMPLETE 06/14/2024 06/18/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 05/31/2024 05/31/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 05/31/2024 05/31/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 05/31/2024 05/31/2024
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM please advise what was chanaged on the site plan
ELEC COMPLETE 05/01/2024 05/06/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 04/29/2024 04/29/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM This is the correct review disregard comments
BADMIN COMPLETE 04/24/2024 04/29/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD HOLD 04/24/2024 04/28/2024
Note: Held By: JPI 1. Roofing product approvals do not appear to match what is shown on the roofing worksheet. Please cure. 107.2.4 2. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet. 
CUSVC COMPLETE 04/24/2024 04/26/2024
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC HOLD 04/24/2024 04/29/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need correct outlet spacing in office. NEC 2020 210.52
ENGIN1 COMPLETE 04/24/2024 04/24/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 04/24/2024 04/29/2024
LOCATE COMPLETE 04/24/2024 04/30/2024
Note: Released By: TONI CHURCHILL - - TCHURCHILL@PALMCOASTGOV.COM
MECH COMPLETE 04/24/2024 04/29/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 04/24/2024 04/24/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 04/24/2024 04/25/2024
Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM
SWALE COMPLETE 04/24/2024 08/06/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤20.00 04/15/2025
CONTRACTOR CHANGE ¤20.00 04/15/2025
REINSPECTION FEE ¤40.00 04/15/2025
SW ENG REINSPECTION 20 ¤20.00 04/15/2025
SW ENG - INSPECTION 20 ¤20.00 04/15/2025
SW ENG - INSPECTION 20 ¤20.00 04/15/2025
SW ENG - INSPECTION 20 ¤20.00 04/15/2025
SW ENG - INSPECTION 20 ¤20.00 04/15/2025
SW ENG INSPECTION 80 ¤80.00 05/31/2024
SW ENG PRE APRON ¤30.00 05/31/2024
SW ENG - REVIEW 20 ¤20.00 05/31/2024
SW ENG RES REVIEW 200 ¤200.00 05/31/2024
SEWER CREDIT (¤3,007.38) 05/31/2024
SEWER INSPECTION ¤25.00 05/31/2024
SEWER CAPITAL FACILITY ¤5,441.03 05/31/2024
WATER CREDIT (¤33.89) 05/31/2024
WATER CAPITAL FACILITY FEE ¤3,994.51 05/31/2024
SITE PLAN 30 ¤30.00 05/31/2024
SURCHARGE FS 533.721 ¤3.73 05/31/2024
SURCHARGE - FS 468.631 ¤5.60 05/31/2024
SW ENG - FOUNDATION SURVEY ¤20.00 05/31/2024
WATER- TURN ON ¤25.00 05/31/2024
ADJUSTMENT 50% (¤147.99) 05/31/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 05/31/2024
ADMINISTRATIVE - RESID PP ¤225.00 05/31/2024
PLAN REVIEW - RESIDENTIAL ¤265.98 05/31/2024
CONNECTION FEES ¤1,187.26 05/31/2024
FC IMPACT FEE EMS ¤62.00 05/31/2024
IMPACT FEE FIRE ¤428.09 05/31/2024
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 05/31/2024
FC IMPACT FEE LIBRARY ¤268.00 05/31/2024
IMPACT FEE PARKS ¤1,800.99 05/31/2024
IMPACT FEE SCHOOL ¤5,450.00 05/31/2024
IMPACT FEE TRANSPORTATION ¤1,862.00 05/31/2024
WATER -IRRIGATION INSPECTION ¤25.00 05/31/2024
Fees Total Due: ¤0.00 Total Paid: ¤18,687.93