Permit #2024041426
Permit Details
Status: COED
| Parcel Id: 07-11-31-7058-00090-0090 |
| CONDITIONED SPACE: 1983 sqft |
| GARAGE: 516 sqft |
| OPENED PORCH (WITH ROOF) : 106 sqft |
| SCREEN PORCH (SOLID ROOF) : 48 sqft |
| Total Square Footage: 2653 sqft |
| Block: 00090 |
| Subdivision: - |
| Job Phone: 831-383-2883 |
| Location Address: 3 SENLAC CT |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 07/11/2024 |
| NOC: RECORDED |
| Applicant name: EDWARD LEE DAUBERT JR |
| Owner: FLORIDA SUN PARTNERS II LLC |
|
Address P O BOX 770279 ORLANDO, FL 32877 |
| Lot: 0090 |
| Contracted Stated Job Value: ¤226,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
BRITE BUILDING GROUP LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
6751 FORUM DRIVE SUITE 210 ORLANDO, FL 32821 |
CBC1266303 (Exp: 08/31/2026) | 831-383-2883 |
Sub Contractors
JASON LEE JAMES
| Status | Location Address | State License Number | Phone |
| ACTIVE |
217 N WESTMONTE DR SUITE 1007 ALTAMONTE SPRINGS, FL 32714 |
CAC1820196 (Exp: 08/31/2026) | 407-404-4000 |
ANTHONY OKEITH FENNELL
| Status | Location Address | State License Number | Phone |
| ACTIVE |
217 N. WESTMONTE DR, SUITE 1007 ALTAMONTE SPRINGS, FL 32714 |
EC13011194 (Exp: 08/31/2026) | 407-404-4000 |
JASON LEE JAMES
| Status | Location Address | State License Number | Phone |
| ACTIVE |
217 N WESTMONTE DR SUITE 1007 ALTAMONTE SPRINGS, FL 32714 |
CFC1430061 (Exp: 08/31/2026) | 407-404-4000 |
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 10/06/2025 | FINAL APPROVED | BTAYLOR |
| Note: 10/2/2025 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1-FBC [A] 107.4-MECHANICAL EQUIPMENT DOES NOT MATCH ENERGY CALCS #2-FBC-R . 302.6 seal all garage penetration , wall and ceiling ( hole in the wall , behing water heater ) | |||
| U-CROSS CONNECTION | 10/02/2025 | APPROVED - AS NOTED | BHAINES |
| Note: No CC, IRR using potable water, PVB in place | |||
| BLD - BUILDING FINAL | 10/02/2025 | Disapproved -FEE REQUIRED | CVANSTRAHLEN |
| Note: Please fix items before next inspection #1-FBC [A] 107.4-MECHANICAL EQUIPMENT DOES NOT MATCH ENERGY CALCS #2-FBC-R . 302.6 seal all garage penetration , wall and ceiling ( hole in the wall , behing water heater ) | |||
| U -UTILITY RESIDENTIAL FINAL | 10/02/2025 | FINAL APPROVED | BHAINES |
| ROW - STORMWATER FINAL | 09/25/2025 | APPROVED | FSLADISH |
| Note: 9/25/25 AT THE TIME OF THIS INSPECTIONS ALL COPC REQUIREMENTS WERE MET, NEITHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. ____________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 9/23/25 UPON WALKING PROPERTY DETERMINED DRAINAGE IN GENERAL WILL WORK. ON THE RIGHT SIDE PROPERTY LINE NEAR THE FRONT CORNER OF STRUCTURE IT APPEARS TO ME THAT YOUR SPRINKLER HEAD IS OVER THE PROPERTY LINE. IT IS YOUR RESPONSIBILITY TO VERIFY THIS AND RELOCATE IT ONTO YOUR PROPERTY IF IT IS. I WILL APPROVE THIS FIELD SURVEY AS NOTED TO ALLOW YOU TO MOVE FORWARD WITH INSPECTIONS. PLEASE VERIFY SPRINKLER PLACEMENT LOCATION IS ON YOUR PROPERTY BEFORE SUBMITTING FOR ROW FINAL INSPECTION. PHOTO FOR REFERENCE. | |||
| ROW - FINAL APRON (AFTER POUR) | 09/25/2025 | APPROVED | FSLADISH |
| Note: 9/25/25 PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. _______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 9/23/25 UPON WALKING PROPERTY DETERMINED DRAINAGE IN GENERAL WILL WORK. ON THE RIGHT SIDE PROPERTY LINE NEAR THE FRONT CORNER OF STRUCTURE IT APPEARS TO ME THAT YOUR SPRINKLER HEAD IS OVER THE PROPERTY LINE. IT IS YOUR RESPONSIBILITY TO VERIFY THIS AND RELOCATE IT ONTO YOUR PROPERTY IF IT IS. I WILL APPROVE THIS FIELD SURVEY AS NOTED TO ALLOW YOU TO MOVE FORWARD WITH INSPECTIONS. PLEASE VERIFY SPRINKLER PLACEMENT LOCATION IS ON YOUR PROPERTY BEFORE SUBMITTING FOR ROW FINAL INSPECTION. PHOTO FOR REFERENCE. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 09/23/2025 | APPROVED | FSLADISH |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 09/23/2025 | APPROVED - AS NOTED | FSLADISH |
| Note: 9/23/25 UPON WALKING PROPERTY DETERMINED DRAINAGE IN GENERAL WILL WORK. ON THE RIGHT SIDE PROPERTY LINE NEAR THE FRONT CORNER OF STRUCTURE IT APPEARS TO ME THAT YOUR SPRINKLER HEAD IS OVER THE PROPERTY LINE. IT IS YOUR RESPONSIBILITY TO VERIFY THIS AND RELOCATE IT ONTO YOUR PROPERTY IF IT IS. I WILL APPROVE THIS FIELD SURVEY AS NOTED TO ALLOW YOU TO MOVE FORWARD WITH INSPECTIONS. PLEASE VERIFY SPRINKLER PLACEMENT LOCATION IS ON YOUR PROPERTY BEFORE SUBMITTING FOR ROW FINAL INSPECTION. PHOTO FOR REFERENCE. | |||
| ELECTRIC - EARLY POWER | 08/29/2025 | APPROVED - AS NOTED | BTAYLOR |
| Note: 8-29-25 1. Emailed FPL at 1:47. 8/28/2025 - PREVIOUS INSPECTION NOTES 8-28-25 1. Light cover needs to be a weather proof cover. 8/27/2025 - PREVIOUS INSPECTION NOTES 8-27-25 1. Entry way light is not safed off. | |||
| ELECTRIC - EARLY POWER | 08/28/2025 | Disapproved - NO FEE | BTAYLOR |
| Note: 8-28-25 1. Light cover needs to be a weather proof cover. 8/27/2025 - PREVIOUS INSPECTION NOTES 8-27-25 1. Entry way light is not safed off. | |||
| ELECTRIC - EARLY POWER | 08/27/2025 | Disapproved - NO FEE | BTAYLOR |
| Note: 8-27-25 1. Entry way light is not safed off. | |||
| ROW- PRE-APRON (PRE-POUR) | 08/20/2025 | APPROVED - AS NOTED | FSLADISH |
| Note: 8/20/25 TEXTED DAN AND LET HIM KNOW THAT THEY WOULD NEED TO REDRAW THE DRIVEWAY ON THE SITE PLAN TO REFLECT WHAT HAS BEEN CHANGED IN THR FIELD DUE TO SITE SPECIFIC CONDITIONS, I AM APPOVING THIS PREPOUR AS NOTED BECAUSE THE RECONFIGUREMENT MAKES SENSE AND WILL WORK DUE TO FIELD CONDITIONS. HE INDICATED THIS WOULD BE TAKEN CARE OF. BUILDER REFER TO CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. . IF FIBERGLASS OPTION IS USED, BUILDER REQUIRED TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR AT THE TIME OF THE INSPECTION READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK SITE FOR ANY STANDING WATER. ALSO VERIFY PIPE ELEVATION HAS NOT CHANGED. AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIREMENTS ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. | |||
| LATH/BRICK/ WATER BARRIER | 07/25/2025 | APPROVED | BTAYLOR |
| INSULATION | 07/18/2025 | APPROVED | BTAYLOR |
| Note: 7/17/2025 - PREVIOUS INSPECTION NOTES 7-17-25 1. Guest bathroom window not foamed in. 2. Front bedroom window not foamed in. 3. No 5'head pressure. Inspector Notes from Inspection 2420 7-1-25 1. No 5' head pressure. 2. Missing front bedroom window. 3. Missing guest bathroom window. Check at insulation. | |||
| INSULATION | 07/17/2025 | Disapproved - NO FEE | BTAYLOR |
| Note: 7-17-25 1. Guest bathroom window not foamed in. 2. Front bedroom window not foamed in. 3. No 5'head pressure. Inspector Notes from Inspection 2420 7-1-25 1. No 5' head pressure. 2. Missing front bedroom window. 3. Missing guest bathroom window. Check at insulation. | |||
| ALL ROUGH | 07/01/2025 | APPROVED - AS NOTED | BTAYLOR |
| Note: 7-1-25 1. No 5' head pressure. 2. Missing front bedroom window. 3. Missing guest bathroom window. Check at insulation. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/11/2025 | APPROVED | BTAYLOR |
| Note: 6/9/2025 - PREVIOUS INSPECTION NOTES 6-9-25 1. Missing wedge anchor for both MGT connections. 6/2/2025 - PREVIOUS INSPECTION NOTES 6-2-25 1. Missing engineering on truss T18T. 2. Missing MGT tie down on both sides of double truss. 3. Over framing straps are not strapped down to truss below. | |||
| ROOF VALLEY & METAL | 06/11/2025 | APPROVED | BTAYLOR |
| Note: 6/9/2025 - PREVIOUS INSPECTION NOTES 6-9-25 1. Can not pass this inspection until roof brace tie downs has been passed. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/09/2025 | Disapproved -FEE REQUIRED | BTAYLOR |
| Note: 6-9-25 1. Missing wedge anchor for both MGT connections. 6/2/2025 - PREVIOUS INSPECTION NOTES 6-2-25 1. Missing engineering on truss T18T. 2. Missing MGT tie down on both sides of double truss. 3. Over framing straps are not strapped down to truss below. | |||
| ROOF VALLEY & METAL | 06/09/2025 | Disapproved - NO FEE | BTAYLOR |
| Note: 6-9-25 1. Can not pass this inspection until roof brace tie downs has been passed. | |||
| WALL SHEATHING | 06/09/2025 | APPROVED | BTAYLOR |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/02/2025 | Disapproved - NO FEE | BTAYLOR |
| Note: 6-2-25 1. Missing engineering on truss T18T. 2. Missing MGT tie down on both sides of double truss. 3. Over framing straps are not strapped down to truss below. | |||
| FOUND SURVEY APPROVED (OFFICE) | 05/23/2025 | APPROVED | RRICKS |
| ELECTRIC-TUG | 04/21/2025 | APPROVED | RMARTIN |
| TIE BEAM / LINTEL | 03/26/2025 | APPROVED | BTAYLOR |
| MONOLITHIC SLAB | 02/03/2025 | APPROVED | BTAYLOR |
| PLUMBING 1ST ROUGH UNDERGROUND | 01/29/2025 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 01/29/2025 | APPROVED | MGIBSON |
| SEWER TIE IN | 01/29/2025 | APPROVED | MGIBSON |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 01/27/2025 | APPROVED | PKNAPIK |
| WATER METER INSTALLATION REQUEST | 11/26/2024 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| MECH | HOLD | 10/03/2025 | 10/06/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 10/03/2025 | 10/06/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Energy Calcs need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2023 8Th edition | |||
| ZON | COMPLETE | 09/22/2025 | 09/22/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 05/30/2025 | 05/30/2025 |
| Note: Marked INFORMATION By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM extension request form incomplete. Must have all areas explains and details of why extension is needed | |||
| ENGIN1 | COMPLETE | 05/22/2025 | 05/23/2025 |
| Note: Released By: RODNEY RICKS - (386)986-2001 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/22/2025 | 05/22/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/21/2025 | 01/27/2025 |
| Note: Released By: PETER KNAPIK - - PKNAPIK@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 11/22/2024 | 11/22/2024 |
| Note: Marked INFORMATION By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM 1. RENAME TO S2.3.PDF, E1.O.PDF, ... | |||
| BLD | COMPLETE | 11/22/2024 | 12/02/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 11/22/2024 | 12/02/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 11/22/2024 | 12/02/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/23/2024 | 09/24/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 09/23/2024 | 09/24/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD | |||
| ZON | COMPLETE | 09/23/2024 | 09/23/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/11/2024 | 07/18/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/11/2024 | 07/11/2024 |
| Note: Released By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 06/26/2024 | 06/27/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/20/2024 | 05/23/2024 |
| Note: Released By: JPI | |||
| ELEC | HOLD | 05/20/2024 | 05/28/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Range and dryer outlet need to be GFCI protected. NEC 2020 210.8 3rd REQUEST | |||
| BLD | HOLD | 05/01/2024 | 05/03/2024 |
| Note: Held By: JPI 1. Roofing product approvals do not appear to match what is shown on the roofing worksheet. Please cure. 107.2.4 2. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet. | |||
| ELEC | HOLD | 05/01/2024 | 05/06/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Range and dryer outlet need to be GFCI protected. NEC 2020 210.8 2. Electrical riser diagram needs to include the surge protector. NEC 2020 230.67 2nd REQUEST | |||
| MECH | COMPLETE | 05/01/2024 | 05/06/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 04/25/2024 | 04/30/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | HOLD | 04/25/2024 | 04/28/2024 |
| Note: Held By: JPI 1. Roofing product approvals do not appear to match what is shown on the roofing worksheet. Please cure. 107.2.4 2. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet. | |||
| CUSVC | COMPLETE | 04/25/2024 | 04/29/2024 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 04/25/2024 | 04/30/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Range and dryer outlet need to be GFCI protected. NEC 2020 210.8 2. Electrical riser diagram needs to include the surge protector. NEC 2020 230.67 | |||
| ENGIN1 | COMPLETE | 04/25/2024 | 04/25/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 04/25/2024 | 04/30/2024 |
| LOCATE | COMPLETE | 04/25/2024 | 04/30/2024 |
| Note: Released By: TONI CHURCHILL - - TCHURCHILL@PALMCOASTGOV.COM | |||
| MECH | HOLD | 04/25/2024 | 05/01/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Design location on Energy Calcs and Heatload need to be Daytona Beach | |||
| SW1 | COMPLETE | 04/25/2024 | 04/25/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/25/2024 | 04/25/2024 |
| Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 04/25/2024 | 08/06/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| MECH | PENDING |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 10/03/2025 |
| PLAN REVIEW - REVISION | ¤32.50 | 10/02/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 10/02/2025 |
| WATER-METER | ¤514.49 | 07/11/2024 |
| WATER- TURN ON | ¤25.00 | 07/11/2024 |
| WATER- TURN ON | ¤25.00 | 07/11/2024 |
| ADJUSTMENT 50% | (¤671.58) | 07/11/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 07/11/2024 |
| INSPECTION - RESIDENTIAL | ¤1,023.00 | 07/11/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤290.16 | 07/11/2024 |
| CONNECTION FEES | ¤1,187.26 | 07/11/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 07/11/2024 |
| IMPACT FEE FIRE | ¤428.09 | 07/11/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 07/11/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 07/11/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 07/11/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 07/11/2024 |
| IMPACT FEE TRANSPORTATION | ¤1,862.00 | 07/11/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 07/11/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 07/11/2024 |
| SURCHARGE FS 533.721 | ¤6.72 | 07/11/2024 |
| SURCHARGE - FS 468.631 | ¤10.07 | 07/11/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 07/11/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 07/11/2024 |
| SW ENG PRE APRON | ¤30.00 | 07/11/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 07/11/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 07/11/2024 |
| SEWER CREDIT | (¤850.00) | 07/11/2024 |
| SEWER INSPECTION | ¤25.00 | 07/11/2024 |
| SEWER CAPITAL FACILITY | ¤5,441.03 | 07/11/2024 |
| WATER CAPITAL FACILITY FEE | ¤3,994.51 | 07/11/2024 |
| SITE PLAN 30 | ¤30.00 | 07/11/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤21,682.24 |