Permit #2024041480
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7028-00120-0150 |
| Total Square Footage: 3539 sqft |
| Block: 00120 |
| Subdivision: 7028 - |
| Job Phone: (904)824-1468 |
| Location Address: 6 PONDEROSA LN |
| Type: BIA - BUILDING INTERIOR EXTERIOR ALTERATION |
| Issue Date: 06/04/2024 |
| NOC: RECORDED |
| Applicant name: JOHN E BUENING |
| Owner: EFROS BELLA & OLEG EFROS H&W & EDWARD ANGERT & VIC |
|
Address 50 LONNSTROM LN SLINGERLANDS, NY 12159 |
| Lot: 0150 |
| Contracted Stated Job Value: ¤199,762.03 |
| Job Description: Fire Damage Repair |
| Type: CN |
Contractor
PAUL DAVIS RESTORATION OF ST. AUGUSTINE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2050 DOBBS ROAD ST. AUGUSTINE, FL 32086 |
CGC056634 (Exp: 08/31/2026) | (904)824-1468 | (904)823-9586 |
Sub Contractors
WILLIAM ALEXANDER BUSTRAAN
| Status | State License Number |
| INACTIVE | EC13006254 (Exp: 08/31/2026) |
ALLEN N PRESSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
2674 PEMBERTON DR SAINT AUGUSTINE, FL 32084 |
CAC1816851 (Exp: 08/31/2026) | 904-823-1066 |
JAYSON CONVERSE
| Status | Location Address | State License Number | Phone |
| ACTIVE |
2674 PEMBERTON DR APOPKA, FL 32703 |
CFC1433007 (Exp: 08/31/2026) | 844-396-9662 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 06/18/2025 | FINAL APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 6/18/2025 3:36:18 PM *** 6/18/25: NOTE: Previously listed item 6: Original energy calcs met. AHRI document for verification of installed units meeting minimum requirements. 6/3/2025 - PREVIOUS INSPECTION NOTES 6/3/25: 1). Guest bathroom: hot water is backwards in the sink and shower. FBCR P2722.2 2). Dishwasher drain is not installed as required. FBC-P2712.2 3). Rear hose bibb is missing the anti-siphon device. FBC-P2902.4.3 4). Range (and microwave) are not installed. 1 cooking appliance minimum for Final. FBC-[A] 110.1 5). Master bathroom: shower hot water is on the wrong side (insufficient hot water). FBCR P2722.2 6). No energy calcs on site. FBC [A]107.3.1 7). Range breaker needs to be GFCI protected within 6ft of water. NEC 210.8(A)(7) 8). Dryer breaker needs to be GFCI protected within 6ft of water. NEC 210.8(A)(7) 9). Missing final termite bond. FBC-R105.11 10). Holes in garage need to be sealed with the approved material. (FBC-R302.11) NOTE: check dryer gooseneck for screen removal. | |||
| BLD - BUILDING FINAL | 06/03/2025 | Disapproved -FEE REQUIRED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 6/3/2025 3:25:02 PM *** 6/3/25: 1). Guest bathroom: hot water is backwards in the sink and shower. FBCR P2722.2 2). Dishwasher drain is not installed as required. FBC-P2712.2 3). Rear hose bibb is missing the anti-siphon device. FBC-P2902.4.3 4). Range (and microwave) are not installed. 1 cooking appliance minimum for Final. FBC-[A] 110.1 5). Master bathroom: shower hot water is on the wrong side (insufficient hot water). FBCR P2722.2 6). No energy calcs on site. FBC [A]107.3.1 7). Range breaker needs to be GFCI protected within 6ft of water. NEC 210.8(A)(7) 8). Dryer breaker needs to be GFCI protected within 6ft of water. NEC 210.8(A)(7) 9). Missing final termite bond. FBC-R105.11 10). Holes in garage need to be sealed with the approved material. (FBC-R302.11) NOTE: check dryer gooseneck for screen removal. | |||
| ELECTRIC - EARLY POWER | 05/08/2025 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 5/8/2025 1:53:51 PM *** 5/8/25: FPL emailed to release power 5/6/2025 - PREVIOUS INSPECTION NOTES 5/6/25: 1). Service feed wires need to be landed (installed) into breakers at this inspection. NEC 110.27 / FBC [A]107.4 2). Surge protectors are required at the top of the buss bars of the breaker panels (in both units) per NEC-230.67(A)/(B) 3). Unit B: dead front cover of meter main will need to be securely fastened. | |||
| ELECTRIC - EARLY POWER | 05/06/2025 | Disapproved - NO FEE | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 5/6/2025 2:04:49 PM *** 5/6/25: 1). Service feed wires need to be landed (installed) into breakers at this inspection. NEC 110.27 / FBC [A]107.4 2). Surge protectors are required at the top of the buss bars of the breaker panels (in both units) per NEC-230.67(A)/(B) 3). Unit B: dead front cover of meter main will need to be securely fastened. | |||
| FIREWALL PENETRATIONS | 01/24/2025 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 1/24/2025 1:31:48 PM *** 1/22/2025 - PREVIOUS INSPECTION NOTES 1/22/25: No Access to veiw side B for penetrations. *** Need access to complete inspection. FBC[A] 110.5 12/9/2024 - PREVIOUS INSPECTION NOTES 12/9/24: 1). Sleeve pipe for Service wire needs broken bushing replaced. FBC [A]107.4 2). Sleeve pipe for Service wire needs to be firecaulked at sleeve ends as required. FBC-R302.2 3). 1/2" MC sleeves for NM-B wires need to be extended so that they are 24 inches minimum on either side of drywall of firewall. FBC-R302.2 . New pipes will need to be firecaulked at sleeve ends as required. FBC-R302.2 | |||
| INSULATION | 01/24/2025 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 1/24/2025 1:31:32 PM *** | |||
| FIREWALL FINAL | 01/24/2025 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 1/24/2025 1:32:02 PM *** 1/22/2025 - PREVIOUS INSPECTION NOTES | |||
| FIREWALL DRYWALL NAILING | 01/22/2025 | APPROVED - AS NOTED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 1/22/2025 11:47:22 AM *** 1/22/25: Approved as noted for nailing. Soffits will need to stay open for Final. 12/9/2024 - PREVIOUS INSPECTION NOTES 12/9/24: 1). Firewall drywall nailing (screws) do not meet the required spread of 6 inches in the field. FBC-Table 702.3.5 2). Front and back areas of soffit at Firewall need to be removed and the rafter/truss tails need to be covered with the 5/8" Type X drywall on sides & bottom as required. FBC-R302.2 / UL Design U 465 - 1 hour wall. | |||
| FIREWALL FINAL | 01/22/2025 | Disapproved - NO FEE | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 1/22/2025 11:51:48 AM *** 1/22/25: Not Ready for Firewall Final inspection until firewall penetration inspection is approved and all areas are finished and sealed properly. FBC [A]107.4 | |||
| FIREWALL PENETRATIONS | 01/22/2025 | Disapproved - NO FEE | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 1/22/2025 11:49:57 AM *** 1/22/25: No Access to veiw side B for penetrations. *** Need access to complete inspection. FBC[A] 110.5 12/9/2024 - PREVIOUS INSPECTION NOTES 12/9/24: 1). Sleeve pipe for Service wire needs broken bushing replaced. FBC [A]107.4 2). Sleeve pipe for Service wire needs to be firecaulked at sleeve ends as required. FBC-R302.2 3). 1/2" MC sleeves for NM-B wires need to be extended so that they are 24 inches minimum on either side of drywall of firewall. FBC-R302.2 . New pipes will need to be firecaulked at sleeve ends as required. FBC-R302.2 | |||
| ALL ROUGH | 01/21/2025 | APPROVED | MCONTRYMAN |
| Note: 12/9/2024 - PREVIOUS INSPECTION NOTES 12/9/24: 1). Wires in breaker box need to be phased out. NEC 215.12(C) 2). All wires need to be secured at 12" max above breaker box. (NEC 334.30) 3). Bathroom exhaust needs 2 points of connection. FBC-M1502.4.2 / FBC-M1601.4.1 4). Dryer exhaust needs to be secured with metal strap on vertical section and needs to be sealed at roof sheathing. FBC-M1502.4.2 5). Bushing for Service feed raceway pipe needs to be replaced. FBC [A]107.4 6). Slab for plumbing needs final repair with cement type product. FBC [A]107.4 Inspector Notes from Inspection 2250 *** NOTES ADDED BY RSIMS 12/9/2024 11:18:54 AM *** 12/9/24: Slab Inspection - Approved as noted to be repaired with concrete. Check final slab repair during All Rough re-inspection. 10/2/2024 - PREVIOUS INSPECTION NOTES 10/2/24: Walked with Superintendent. 1). Will need a new revision for the front bump out section that does not match the Engineer's revision letter. The letter calls for HUC-3s to be installed. The current wall configuration will not allow for proper mounting of that bracket so you will need another option to meet Engineer's requirements. FBC[A] 107.4 2). Bathroom exhaust fans need to be installed, wired and duct connected. The existing 3" needs to be changed to 4" to meet the minimum 50 CFM code requirement. Both will need to be supported at 12ft. intervals and cannot exceed 56ft in total developed length. FBC-M1502.4.2 / FBC-M1601.4.1 / Table 1506.2 3). No water pressure. P2503.7 4). No 5ft. head pressure on drainage. FBC-P2503.5.1 5). Wires are not phased out as required in electrical panel as required. NEC 215.12(C) 6). Shower pans need to be filled to the curb for the test. FBC-P2503.5.1 | |||
| FIREWALL DRYWALL NAILING | 12/09/2024 | Disapproved - NO FEE | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 12/9/2024 11:56:56 AM *** 12/9/24: 1). Firewall drywall nailing (screws) do not meet the required spread of 6 inches in the field. FBC-Table 702.3.5 2). Front and back areas of soffit at Firewall need to be removed and the rafter/truss tails need to be covered with the 5/8" Type X drywall on sides & bottom as required. FBC-R302.2 / UL Design U 465 - 1 hour wall. | |||
| ALL ROUGH | 12/09/2024 | Disapproved -FEE REQUIRED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 12/9/2024 11:39:46 AM *** 12/9/24: 1). Wires in breaker box need to be phased out. NEC 215.12(C) 2). All wires need to be secured at 12" max above breaker box. (NEC 334.30) 3). Bathroom exhaust needs 2 points of connection. FBC-M1502.4.2 / FBC-M1601.4.1 4). Dryer exhaust needs to be secured with metal strap on vertical section and needs to be sealed at roof sheathing. FBC-M1502.4.2 5). Bushing for Service feed raceway pipe needs to be replaced. FBC [A]107.4 6). Slab for plumbing needs final repair with cement type product. FBC [A]107.4 Inspector Notes from Inspection 2250 *** NOTES ADDED BY RSIMS 12/9/2024 11:18:54 AM *** 12/9/24: Slab Inspection - Approved as noted to be repaired with concrete. Check final slab repair during All Rough re-inspection. 10/2/2024 - PREVIOUS INSPECTION NOTES 10/2/24: Walked with Superintendent. 1). Will need a new revision for the front bump out section that does not match the Engineer's revision letter. The letter calls for HUC-3s to be installed. The current wall configuration will not allow for proper mounting of that bracket so you will need another option to meet Engineer's requirements. FBC[A] 107.4 2). Bathroom exhaust fans need to be installed, wired and duct connected. The existing 3" needs to be changed to 4" to meet the minimum 50 CFM code requirement. Both will need to be supported at 12ft. intervals and cannot exceed 56ft in total developed length. FBC-M1502.4.2 / FBC-M1601.4.1 / Table 1506.2 3). No water pressure. P2503.7 4). No 5ft. head pressure on drainage. FBC-P2503.5.1 5). Wires are not phased out as required in electrical panel as required. NEC 215.12(C) 6). Shower pans need to be filled to the curb for the test. FBC-P2503.5.1 | |||
| FIREWALL PENETRATIONS | 12/09/2024 | Disapproved - NO FEE | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 12/9/2024 11:44:46 AM *** 12/9/24: 1). Sleeve pipe for Service wire needs broken bushing replaced. FBC [A]107.4 2). Sleeve pipe for Service wire needs to be firecaulked at sleeve ends as required. FBC-R302.2 3). 1/2" MC sleeves for NM-B wires need to be extended so that they are 24 inches minimum on either side of drywall of firewall. FBC-R302.2 . New pipes will need to be firecaulked at sleeve ends as required. FBC-R302.2 | |||
| MONOLITHIC SLAB | 12/09/2024 | APPROVED - AS NOTED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 12/9/2024 11:18:54 AM *** 12/9/24: Approved as noted to be repaired with concrete. Check final slab repair during All Rough re-inspection. | |||
| ALL ROUGH | 10/02/2024 | Disapproved -FEE REQUIRED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 10/2/2024 1:02:20 PM *** 10/2/24: Walked with Superintendent. 1). Will need a new revision for the front bump out section that does not match the Engineer's revision letter. The letter calls for HUC-3s to be installed. The current wall configuration will not allow for proper mounting of that bracket so you will need another option to meet Engineer's requirements. FBC[A] 107.4 2). Bathroom exhaust fans need to be installed, wired and duct connected. The existing 3" needs to be changed to 4" to meet the minimum 50 CFM code requirement. Both will need to be supported at 12ft. intervals and cannot exceed 56ft in total developed length. FBC-M1502.4.2 / FBC-M1601.4.1 / Table 1506.2 3). No water pressure. P2503.7 4). No 5ft. head pressure on drainage. FBC-P2503.5.1 5). Wires are not phased out as required in electrical panel as required. NEC 215.12(C) 6). Shower pans need to be filled to the curb for the test. FBC-P2503.5.1 | |||
| LATH/BRICK/ WATER BARRIER | 09/05/2024 | APPROVED | RSIMS |
| Note: New inspection due to canceled inspection Inspector Notes from Inspection 246 *** NOTES ADDED BY RSIMS 8/21/2024 4:13:03 PM *** 8/21/24: Approved as noted to keep project moving. ALL MUST BE COMPLETE PRIOR TO NEXT INSPECTION. Check at next inspection. 1). Plans show 2" x 10" at the front window to replace removed truss. Will need a revision submitted to and approved by the City for an engineer's letter accepting the installed 2" x 6" SYP ceiling beam, etc. or specifying the required repair. 8/19/2024 - PREVIOUS INSPECTION NOTES 8/14/2024 - PREVIOUS INSPECTION NOTES 8/14/24: Approved plans missing detail page SD-1. A full set of approved plans need to be kept on site. (FBC-R107.3.1). 1). Repairs not completed as required by the Engineer. (Above window area.) Walked with Superintendent. 8/6/2024 - PREVIOUS INSPECTION NOTES 8/6/24: Plans on site are not stamped approved. Could not complete inspection. FBC 107.3.1 Walked with Superintendent to identify some corrections that are required to help avoid failed inspections going forward. 8/5/2024 - PREVIOUS INSPECTION NOTES 08-05-2024 Approved drawings not on site. Please have an Approved set on site for all inspections. 08-19-2024 1. Above issues not resolved from 08-14-2024 Approved plans missing detail page SD-1. A full set of approved plans need to be kept on site. (FBC-R107.3.1). Please have a large, complete, set of approved drawings on site for all inspections as stated on earlier inspections. 2. Repairs not completed as required by the Engineer. (Above window area.) Walked with Superintendent. Please be ready for inspections. | |||
| LATH/BRICK/ WATER BARRIER | 09/03/2024 | CANCELLED BY APPLICANT | WEB |
| Note: Inspector Notes from Inspection 2460 *** NOTES ADDED BY RSIMS 8/21/2024 4:13:03 PM *** 8/21/24: Approved as noted to keep project moving. ALL MUST BE COMPLETE PRIOR TO NEXT INSPECTION. Check at next inspection. 1). Plans show 2" x 10" at the front window to replace removed truss. Will need a revision submitted to and approved by the City for an engineer's letter accepting the installed 2" x 6" SYP ceiling beam, etc. or specifying the required repair. 8/19/2024 - PREVIOUS INSPECTION NOTES 8/14/2024 - PREVIOUS INSPECTION NOTES 8/14/24: Approved plans missing detail page SD-1. A full set of approved plans need to be kept on site. (FBC-R107.3.1). 1). Repairs not completed as required by the Engineer. (Above window area.) Walked with Superintendent. 8/6/2024 - PREVIOUS INSPECTION NOTES 8/6/24: Plans on site are not stamped approved. Could not complete inspection. FBC 107.3.1 Walked with Superintendent to identify some corrections that are required to help avoid failed inspections going forward. 8/5/2024 - PREVIOUS INSPECTION NOTES 08-05-2024 Approved drawings not on site. Please have an Approved set on site for all inspections. 08-19-2024 1. Above issues not resolved from 08-14-2024 Approved plans missing detail page SD-1. A full set of approved plans need to be kept on site. (FBC-R107.3.1). Please have a large, complete, set of approved drawings on site for all inspections as stated on earlier inspections. 2. Repairs not completed as required by the Engineer. (Above window area.) Walked with Superintendent. Please be ready for inspections. | |||
| LATH/BRICK/ WATER BARRIER | 08/21/2024 | Disapproved - NO FEE | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 8/21/2024 4:08:48 PM *** 8/21/24: Not ready yet. Water barrier needs to be complete & taped, Brick veneer requires the brick ties to be installed for this inspection. 8/19/2024 - PREVIOUS INSPECTION NOTES 8/14/2024 - PREVIOUS INSPECTION NOTES 8/14/24: As previously stated requires window nailing inspection first so that taping can be inspected prior to the water barrier inspection. 8/6/2024 - PREVIOUS INSPECTION NOTES 8/6/24: NOT READY! Will require Window nailing inspection first. 1). Side windows are covered with trim so tape seal (per manufacturer) cannot be verified. 2). Front window is not tape sealed as required (by Manufacturer). 08-19-2024 Lathe brick water barrier not ready. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/21/2024 | APPROVED - AS NOTED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 8/21/2024 4:13:03 PM *** 8/21/24: Approved as noted to keep project moving. ALL MUST BE COMPLETE PRIOR TO NEXT INSPECTION. Check at next inspection. 1). Plans show 2" x 10" at the front window to replace removed truss. Will need a revision submitted to and approved by the City for an engineer's letter accepting the installed 2" x 6" SYP ceiling beam, etc. or specifying the required repair. 8/19/2024 - PREVIOUS INSPECTION NOTES 8/14/2024 - PREVIOUS INSPECTION NOTES 8/14/24: Approved plans missing detail page SD-1. A full set of approved plans need to be kept on site. (FBC-R107.3.1). 1). Repairs not completed as required by the Engineer. (Above window area.) Walked with Superintendent. 8/6/2024 - PREVIOUS INSPECTION NOTES 8/6/24: Plans on site are not stamped approved. Could not complete inspection. FBC 107.3.1 Walked with Superintendent to identify some corrections that are required to help avoid failed inspections going forward. 8/5/2024 - PREVIOUS INSPECTION NOTES 08-05-2024 Approved drawings not on site. Please have an Approved set on site for all inspections. 08-19-2024 1. Above issues not resolved from 08-14-2024 Approved plans missing detail page SD-1. A full set of approved plans need to be kept on site. (FBC-R107.3.1). Please have a large, complete, set of approved drawings on site for all inspections as stated on earlier inspections. 2. Repairs not completed as required by the Engineer. (Above window area.) Walked with Superintendent. Please be ready for inspections. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/19/2024 | Disapproved - NO FEE | AGAETANO |
| Note: 8/14/2024 - PREVIOUS INSPECTION NOTES 8/14/24: Approved plans missing detail page SD-1. A full set of approved plans need to be kept on site. (FBC-R107.3.1). 1). Repairs not completed as required by the Engineer. (Above window area.) Walked with Superintendent. 8/6/2024 - PREVIOUS INSPECTION NOTES 8/6/24: Plans on site are not stamped approved. Could not complete inspection. FBC 107.3.1 Walked with Superintendent to identify some corrections that are required to help avoid failed inspections going forward. 8/5/2024 - PREVIOUS INSPECTION NOTES 08-05-2024 Approved drawings not on site. Please have an Approved set on site for all inspections. 08-19-2024 1. Above issues not resolved from 08-14-2024 Approved plans missing detail page SD-1. A full set of approved plans need to be kept on site. (FBC-R107.3.1). Please have a large, complete, set of approved drawings on site for all inspections as stated on earlier inspections. 2. Repairs not completed as required by the Engineer. (Above window area.) Walked with Superintendent. Please be ready for inspections. | |||
| LATH/BRICK/ WATER BARRIER | 08/19/2024 | Disapproved - NO FEE | AGAETANO |
| Note: 8/14/2024 - PREVIOUS INSPECTION NOTES 8/14/24: As previously stated requires window nailing inspection first so that taping can be inspected prior to the water barrier inspection. 8/6/2024 - PREVIOUS INSPECTION NOTES 8/6/24: NOT READY! Will require Window nailing inspection first. 1). Side windows are covered with trim so tape seal (per manufacturer) cannot be verified. 2). Front window is not tape sealed as required (by Manufacturer). 08-19-2024 Lathe brick water barrier not ready. | |||
| WINDOW NAILING | 08/19/2024 | APPROVED | AGAETANO |
| Note: 08-19-2024 | |||
| LATH/BRICK/ WATER BARRIER | 08/14/2024 | CANCELLED BY APPLICANT | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 8/14/2024 11:32:36 AM *** 8/14/24: As previously stated requires window nailing inspection first so that taping can be inspected prior to the water barrier inspection. 8/6/2024 - PREVIOUS INSPECTION NOTES 8/6/24: NOT READY! Will require Window nailing inspection first. 1). Side windows are covered with trim so tape seal (per manufacturer) cannot be verified. 2). Front window is not tape sealed as required (by Manufacturer). | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/14/2024 | Disapproved -FEE REQUIRED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 8/14/2024 11:47:55 AM *** 8/14/24: Approved plans missing detail page SD-1. A full set of approved plans need to be kept on site. (FBC-R107.3.1). 1). Repairs not completed as required by the Engineer. (Above window area.) Walked with Superintendent. 8/6/2024 - PREVIOUS INSPECTION NOTES 8/6/24: Plans on site are not stamped approved. Could not complete inspection. FBC 107.3.1 Walked with Superintendent to identify some corrections that are required to help avoid failed inspections going forward. 8/5/2024 - PREVIOUS INSPECTION NOTES 08-05-2024 Approved drawings not on site. Please have an Approved set on site for all inspections. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/06/2024 | Disapproved - NO FEE | RSIMS |
| Note: 8/6/24: Plans on site are not stamped approved. Could not complete inspection. FBC 107.3.1 Walked with Superintendent to identify some corrections that are required to help avoid failed inspections going forward. 8/5/2024 - PREVIOUS INSPECTION NOTES 08-05-2024 Approved drawings not on site. Please have an Approved set on site for all inspections. | |||
| LATH/BRICK/ WATER BARRIER | 08/06/2024 | Disapproved - NO FEE | RSIMS |
| Note: 8/6/24: NOT READY! Will require Window nailing inspection first. 1). Side windows are covered with trim so tape seal (per manufacturer) cannot be verified. 2). Front window is not tape sealed as required (by Manufacturer). | |||
| WALL SHEATHING | 08/05/2024 | APPROVED | AGAETANO |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/05/2024 | Disapproved - NO FEE | AGAETANO |
| Note: 08-05-2024 Approved drawings not on site. Please have an Approved set on site for all inspections. | |||
| ROOF VALLEY & METAL | 08/05/2024 | APPROVED | AGAETANO |
| ELECTRIC TEMP POLE | 06/05/2024 | APPROVED | RMARTIN |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 12/12/2024 | 12/16/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 11/12/2024 | 11/19/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 08/26/2024 | 08/30/2024 |
| Note: Released By: ALPHANETTE WATERS - (386)986-2624 - AWATERS@PALMCOASTGOV.COM | |||
| BLD | HOLD | 07/23/2024 | 07/29/2024 |
| Note: Held By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/23/2024 | 07/30/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 06/04/2024 | 06/04/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Range, washer, dryer need to be GFCI protected. NEC 2020 210.8 | |||
| BLD | COMPLETE | 06/04/2024 | 06/04/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Please use the most current roofing worksheet this is a old one that is no longer used. | |||
| BLD | HOLD | 05/29/2024 | 06/03/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Please use the most current roofing worksheet this is a old one that is no longer used. | |||
| ELEC | HOLD | 05/29/2024 | 06/03/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Range, washer, dryer need to be GFCI protected. NEC 2020 210.8 | |||
| ZON | COMPLETE | 05/09/2024 | 05/10/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 05/09/2024 | 05/14/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 05/09/2024 | 05/16/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Submit a complete electrical plan since both units are being rewired and brought up to the 2020 NEC. 2. Submit a electrical riser diagram for the service. Your riser is not complete. Must show all wire sizes, breaker sizes, surge protector and outside disconnect. Needs to be signed the electrical contractor with his license number. 2ND REQUEST | |||
| BLD | HOLD | 05/09/2024 | 05/16/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 2. Provide City of Palm Coast roofing worksheet (Second request) | |||
| BLD | HOLD | 04/26/2024 | 05/02/2024 |
| Note: Held By: JIM WALKER - (386)529-4112 - JWALKER@PALMCOASTGOV.COM 1. Plan sheets need to be verifiable per 471.025 2. Provide City of Palm Coast roofing worksheet | |||
| ELEC | HOLD | 04/26/2024 | 05/02/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Submit a complete electrical plan since both units are being rewired and brought up to the 2020 NEC. 2. Submit a electrical riser diagram for the service. | |||
| MECH | HOLD | 04/26/2024 | 05/01/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Scope says replacing Unit A complete. Is this equipment only or ductwork as well? Provide details and duct layout if applicable | |||
| PLUM | CANCEL | 04/26/2024 | 05/02/2024 |
| ZON | HOLD | 04/26/2024 | 04/26/2024 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Please submit a color sheet stating that any roof shingles to be replaced will match the existing shingles and that all exterior painting will match the existing house color. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/17/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/17/2025 |
| PLAN REVIEW - REVISION | ¤32.50 | 12/06/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 11/12/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 09/27/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 09/04/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 08/09/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 08/09/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 07/08/2024 |
| SURCHARGE FS 533.721 | ¤3.68 | 06/04/2024 |
| SURCHARGE - FS 468.631 | ¤5.52 | 06/04/2024 |
| SITE PLAN 30 | ¤30.00 | 06/04/2024 |
| ADJUSTMENT 50% | (¤368.00) | 06/04/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 06/04/2024 |
| INSPECTION - RESIDENTIAL | ¤550.00 | 06/04/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤156.00 | 06/04/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤679.70 |