Permit #2024041596
Permit Details
Status: COED
| Parcel Id: 07-11-31-7034-00350-0030 |
| CONDITIONED SPACE: 2306 sqft |
| GARAGE: 466 sqft |
| OPENED PORCH (WITH ROOF) : 32 sqft |
| OPENED PORCH (WITH ROOF) : 142 sqft |
| Total Square Footage: 2946 sqft |
| Block: 00350 |
| Subdivision: - |
| Job Phone: 831-383-2883 |
| Location Address: 28 EASTMOOR LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 07/22/2024 |
| NOC: RECORDED |
| Applicant name: EDWARD LEE DAUBERT JR |
| Owner: FLORIDA SUN PARTNERS II LLC |
|
Address PO BOX 770279 ORLANDO, FL 32877 |
| Lot: 0030 |
| Contracted Stated Job Value: ¤252,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
BRITE BUILDING GROUP LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
6751 FORUM DRIVE SUITE 210 ORLANDO, FL 32821 |
CBC1266303 (Exp: 08/31/2026) | 831-383-2883 |
Sub Contractors
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
JOSEPH HORATIO STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PARKWAY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2026) | 877-906-1113 |
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
CAC043953 (Exp: 08/31/2026) | 877-906-1113 |
JOSEPH HORATIO STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PARKWAY , 0 |
CFC1432331 (Exp: 08/31/2026) | 877-906-1113 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 12/08/2025 | FINAL APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 12/8/2025 2:35:30 PM *** 12/5/2025 - PREVIOUS INSPECTION NOTES 1. Meter main cover (interior) is missing a screw per manufacturer specs 2. Diswasher drain line must be secured up FBCR P2717.2 3. Spare bathroom (not master side) GFCI has an open ground and does not trip NEC 210.8 4. Spare bathroom (not master side) vanity sink has hot and cold lines reveresed FBCR P2722.2 5. Spare bathroom (master side) shower/tub has hot and cold lines reveresed FBCR P2722.2 6. Garage light switch is upside down (not indicating) | |||
| U-CROSS CONNECTION | 12/05/2025 | APPROVED - AS NOTED | BHAINES |
| Note: No CC, IRR with potable water, PVB in place. | |||
| ROW - STORMWATER FINAL | 12/05/2025 | APPROVED | FSLADISH |
| Note: 12/5/25 INSPECTORS REQUIRED CORRECTIONS COMPLETED AT THE TIME OF THIS INSPECTION. AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIREMENTS ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. ______________________________________________________________________________________________________________________________ 12/3/2025 - PREVIOUS INSPECTION NOTES 1) LEFT AND RIGHT SIDE ALL SOD JOINING THE LOTS ADJACENT MUST MATCH THE GRADE OF THE ADJACENT PROPERTYS. Sec 300.03 F4 2) NEED TO CLEAN ALL DIRT AND SEDIMENT OUT OF THE CULVERT PIPE. Sec 300.03 F4 | |||
| U -UTILITY RESIDENTIAL FINAL | 12/05/2025 | FINAL APPROVED | BHAINES |
| BLD - BUILDING FINAL | 12/05/2025 | Disapproved - NO FEE | MKRASKI |
| Note: 1. Meter main cover (interior) is missing a screw per manufacturer specs 2. Diswasher drain line must be secured up FBCR P2717.2 3. Spare bathroom (not master side) GFCI has an open ground and does not trip NEC 210.8 4. Spare bathroom (not master side) vanity sink has hot and cold lines reveresed FBCR P2722.2 5. Spare bathroom (master side) shower/tub has hot and cold lines reveresed FBCR P2722.2 6. Garage light switch is upside down (not indicating) | |||
| ROW - DRAINAGE | 12/03/2025 | APPROVED | PFLANAGAN |
| Note: THIS LOT IS AT FINALS ---------------------------------------------------------------------- 7/15/2025 - PREVIOUS INSPECTION NOTES 7/15/25 YOU HAVE NOT PICKED UP CONSTRUCTION DEBRIS. TEMP PIPE PATIALLY FULL OF DIRT/SILT. PHOTO FOR REFERENCE. WILL BE BACK TOMORROW FOR COMPLIANCE REINSPECTION. 7/8/2025 - PREVIOUS INSPECTION NOTES 1) NEED TO OPEN UP SWALE SO WATER CAN FLOW TO OUTFALL. 2) YOU NEED PICK ALL CONSTRUCTION DEBRIS AND TRASH. YOU WILL HAVE 7DAY TO FIX AREAS OR THERE WILL BE INSPECTION HOLD. | |||
| ROW - STORMWATER FINAL | 12/03/2025 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) LEFT AND RIGHT SIDE ALL SOD JOINING THE LOTS ADJACENT MUST MATCH THE GRADE OF THE ADJACENT PROPERTYS. Sec 300.03 F4 2) NEED TO CLEAN ALL DIRT AND SEDIMENT OUT OF THE CULVERT PIPE. Sec 300.03 F4 | |||
| ROW - FINAL APRON (AFTER POUR) | 12/03/2025 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 11/26/2025 | APPROVED | FSLADISH |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/26/2025 | APPROVED | FSLADISH |
| Note: 11/26/25 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| GRAVITY SEWER TEST | 11/07/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| SEWER TIE IN | 11/07/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: Inspector Notes from Inspection 2075 THIS WAS A VIRTUAL INSPECTION THIS WAS A VIRTUAL INSPECTION | |||
| ROW- PRE-APRON (PRE-POUR) | 11/04/2025 | APPROVED - AS NOTED | FSLADISH |
| Note: 11/4/25 APPLICANT NOTE Site plan will be adjusted and submitted wuth Final Survey. Power pole guy wire is in the way. So the driveway forms had to be modified around it. DUE TO THE APPLICANT NOTE AND MY CONVERSATION WITH DAN I AM APPROVING THIS PREPOUR AS NOTED THAT SITE PLAN AND FINAL SURVEY WILL REFLECT CHANGE TO DRIVEWAY. BUILDER REFER TO CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. . IF FIBERGLASS OPTION IS USED, BUILDER REQUIRED TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR AT THE TIME OF THE INSPECTION READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK SITE FOR ANY STANDING WATER. ALSO VERIFY PIPE ELEVATION HAS NOT CHANGED. NO EXPANSION JOINTS ALLOWED, AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIREMENTS ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. AT THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. 11/3/2025 - PREVIOUS INSPECTION NOTES 11/3/25 SITE IS NOT READY FOR PREPOUR INSPECTION 12:55 PM. SEE PHOTO FOR REFERENCE. NOT READY FOR INSPECTION/REINSPECTIONS FEES. Sec. 900.09 F V-67 Sec. 900.09-F Permittee shall be charged an additional fee for each re-inspection required should permittee call for an inspection and NOT be prepared for the requested inspection. ____________________________________________________________________________________________________________________________ 10/31/2025 - PREVIOUS INSPECTION NOTES 10/31/25 RECEIVED TEXT FROM CM DAN TO PLEASE CANCEL THIS PREPOUR INSPECTION FOR TODAY. CANCELLING AS A COURTESY DUE TO COMMUNICATION BEFORE ARRIVAL. | |||
| ROW- PRE-APRON (PRE-POUR) | 11/03/2025 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 11/3/25 SITE IS NOT READY FOR PREPOUR INSPECTION 12:55 PM. SEE PHOTO FOR REFERENCE. NOT READY FOR INSPECTION/REINSPECTIONS FEES. Sec. 900.09 F V-67 Sec. 900.09-F Permittee shall be charged an additional fee for each re-inspection required should permittee call for an inspection and NOT be prepared for the requested inspection. ____________________________________________________________________________________________________________________________ 10/31/2025 - PREVIOUS INSPECTION NOTES 10/31/25 RECEIVED TEXT FROM CM DAN TO PLEASE CANCEL THIS PREPOUR INSPECTION FOR TODAY. CANCELLING AS A COURTESY DUE TO COMMUNICATION BEFORE ARRIVAL. | |||
| ROW- PRE-APRON (PRE-POUR) | 10/31/2025 | CANCELLED BY APPLICANT | FSLADISH |
| Note: 10/31/25 RECEIVED TEXT FROM CM DAN TO PLEASE CANCEL THIS PREPOUR INSPECTION FOR TODAY. CANCELLING AS A COURTESY DUE TO COMMUNICATION BEFORE ARRIVAL. | |||
| ELECTRIC - EARLY POWER | 10/30/2025 | APPROVED - AS NOTED | BTAYLOR |
| Note: 10-30-25 1. Emailed FPL at 11:20. Inspector Notes from Inspection 2200 Authorize release of email to FPL. | |||
| INSULATION | 09/15/2025 | APPROVED | CVANSTRAHLEN |
| Note: Bedroom 3 has a cracked window pane on the lower sash. FBC [A]107.4 | |||
| PEP TANK INSTALLATION REQUEST | 09/15/2025 | APPROVED | CBOWERMASTER |
| LATH/BRICK/ WATER BARRIER | 09/05/2025 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 9/5/2025 11:53:04 AM *** Inspector Notes from Inspection 2420 *** NOTES ADDED BY RSIMS 9/2/2025 1:07:48 PM *** 9/2/25: Check at Insulation Inspection. 1). Installed ductwork does not match Energy Calcs. Correction or Revision required. FBC [A]107.4 2). Bedroom 3 has a cracked window pane on the lower sash. FBC [A]107.4 | |||
| ALL ROUGH | 09/02/2025 | APPROVED - AS NOTED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 9/2/2025 1:07:48 PM *** 9/2/25: Check at Insulation Inspection. 1). Installed ductwork does not match Energy Calcs. Correction or Revision required. FBC [A]107.4 2). Bedroom 3 has a cracked window pane on the lower sash. FBC [A]107.4 | |||
| ROOF VALLEY & METAL | 07/23/2025 | APPROVED | HCAMACHO |
| WALL SHEATHING | 07/17/2025 | APPROVED | MCONTRYMAN |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/17/2025 | APPROVED - AS NOTED | MCONTRYMAN |
| Note: Please have a new set of plans available for next inspections | |||
| ROW - DRAINAGE | 07/15/2025 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 7/15/25 YOU HAVE NOT PICKED UP CONSTRUCTION DEBRIS. TEMP PIPE PATIALLY FULL OF DIRT/SILT. PHOTO FOR REFERENCE. WILL BE BACK TOMORROW FOR COMPLIANCE REINSPECTION. 7/8/2025 - PREVIOUS INSPECTION NOTES 1) NEED TO OPEN UP SWALE SO WATER CAN FLOW TO OUTFALL. 2) YOU NEED PICK ALL CONSTRUCTION DEBRIS AND TRASH. YOU WILL HAVE 7DAY TO FIX AREAS OR THERE WILL BE INSPECTION HOLD. | |||
| ROW - DRAINAGE | 07/08/2025 | Disapproved - NO FEE | PFLANAGAN |
| Note: 1) NEED TO OPEN UP SWALE SO WATER CAN FLOW TO OUTFALL. 2) YOU NEED PICK ALL CONSTRUCTION DEBRIS AND TRASH. YOU WILL HAVE 7DAY TO FIX AREAS OR THERE WILL BE INSPECTION HOLD. | |||
| ELECTRIC-TUG | 06/26/2025 | APPROVED - AS NOTED | JSTEWART |
| Note: Authorize release of email to FPL. | |||
| TIE BEAM / LINTEL | 06/11/2025 | APPROVED | MCONTRYMAN |
| Note: 6/9/2025 - PREVIOUS INSPECTION NOTES 6/9/25 1. Both front windows sill exceed the 1/2" max bed joint FBCR 606.3.1 | |||
| TIE BEAM / LINTEL | 06/09/2025 | Disapproved - NO FEE | MCONTRYMAN |
| Note: 6/9/25 1. Both front windows sill exceed the 1/2" max bed joint FBCR 606.3.1 | |||
| MONOLITHIC SLAB | 05/30/2025 | APPROVED | CVANSTRAHLEN |
| PLUMBING 1ST ROUGH UNDERGROUND | 05/22/2025 | APPROVED | MGIBSON |
| Note: 5/20/2025 - PREVIOUS INSPECTION NOTES NO HEAD TEST ON DWV, FBCR-P 2503.5. ALSO METER SHUT OFF BY INSPECTOR LEAKING @ METER | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 05/20/2025 | Disapproved -FEE REQUIRED | MGIBSON |
| Note: NO HEAD TEST ON DWV, FBCR-P 2503.5. ALSO METER SHUT OFF BY INSPECTOR LEAKING @ METER | |||
| FOUND SURVEY APPROVED (OFFICE) | 05/08/2025 | APPROVED | PFLANAGAN |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 03/17/2025 | APPROVED | PKNAPIK |
| WATER METER INSTALLATION REQUEST | 02/07/2025 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 11/25/2025 | 12/02/2025 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| RSI | COMPLETE | 11/25/2025 | 12/02/2025 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/25/2025 | 11/25/2025 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 09/03/2025 | 09/04/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/06/2025 | 05/07/2025 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/06/2025 | 05/06/2025 |
| Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/17/2025 | 03/17/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 11/19/2024 | 11/21/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 11/19/2024 | 11/22/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/22/2024 | 07/29/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/22/2024 | 07/22/2024 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 07/08/2024 | 07/15/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need correct outlet spacing in bed 2 and living room. NEC 2020 210.52 2. Electrical riser diagram needs to include the surge protector. NEC 2020 230.67 | |||
| BLD | COMPLETE | 05/29/2024 | 05/30/2024 |
| Note: Released By: JPI | |||
| ZON | COMPLETE | 05/29/2024 | 05/29/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 05/29/2024 | 06/04/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need correct outlet spacing in bed 2 and living room. NEC 2020 210.52 2. Electrical riser diagram needs to include the surge protector. NEC 2020 230.67 | |||
| MECH | COMPLETE | 05/29/2024 | 06/03/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 04/30/2024 | 08/09/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 04/29/2024 | 05/03/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | HOLD | 04/29/2024 | 04/30/2024 |
| Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet. | |||
| CUSVC | COMPLETE | 04/29/2024 | 05/01/2024 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ELEC | HOLD | 04/29/2024 | 05/02/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need correct outlet spacing in bed 2 and living room. NEC 2020 210.52 2. Electrical riser diagram needs to include the surge protector. NEC 2020 230.67 3. All outlets in kitchen, laundry and garage need to be GFCI protected. NEC 2020 210.8 4. Submit electrical load calcs. | |||
| ENGIN1 | COMPLETE | 04/29/2024 | 04/30/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 04/29/2024 | 05/02/2024 |
| LOCATE | COMPLETE | 04/29/2024 | 05/02/2024 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | HOLD | 04/29/2024 | 05/02/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Design location on Energy calcs needs to be Daytona Beach | |||
| SW1 | COMPLETE | 04/29/2024 | 04/30/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | HOLD | 04/29/2024 | 04/30/2024 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Cannot have an office in a single family residence please relabel that room on plans Bathrooms are numbered incorrectly on plans |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| EXTENSION | ¤40.00 | 12/05/2025 |
| PLAN REVIEW - REVISION | ¤32.50 | 12/05/2025 |
| PLAN REVIEW - REVISION | ¤32.50 | 12/05/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 12/05/2025 |
| CONTRACTOR CHANGE | ¤20.00 | 12/05/2025 |
| CONTRACTOR CHANGE | ¤20.00 | 12/05/2025 |
| CONTRACTOR CHANGE | ¤20.00 | 12/05/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 12/05/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 12/05/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 12/05/2025 |
| RSI REINSPECTION 1 | ¤35.00 | 12/05/2025 |
| RSI REINSPECTION 1 | ¤35.00 | 12/05/2025 |
| SURCHARGE FS 533.721 | ¤7.63 | 07/22/2024 |
| SURCHARGE - FS 468.631 | ¤11.45 | 07/22/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 07/22/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 07/22/2024 |
| SW ENG PRE APRON | ¤30.00 | 07/22/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 07/22/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 07/22/2024 |
| SEWER CREDIT | (¤1,342.00) | 07/22/2024 |
| SEWER INSPECTION | ¤25.00 | 07/22/2024 |
| SEWER CAPITAL FACILITY | ¤6,120.52 | 07/22/2024 |
| WATER CAPITAL FACILITY FEE | ¤4,351.14 | 07/22/2024 |
| SITE PLAN 30 | ¤30.00 | 07/22/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 07/22/2024 |
| IMPACT FEE FIRE | ¤428.09 | 07/22/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 07/22/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 07/22/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 07/22/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 07/22/2024 |
| IMPACT FEE TRANSPORTATION | ¤1,862.00 | 07/22/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 07/22/2024 |
| CONNECTION FEES | ¤1,187.26 | 07/22/2024 |
| INSPECTION - RESIDENTIAL | ¤1,166.00 | 07/22/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤330.72 | 07/22/2024 |
| WATER- TURN ON | ¤25.00 | 07/22/2024 |
| ADJUSTMENT 50% | (¤763.36) | 07/22/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 07/22/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤21,978.44 |