I want to search for...

Permit #2024050053

Permit Details

Status: EXPIRED

Parcel Id: 42-10-30-3210-00000-0060
CONDITIONED SPACE: 3022 sqft
GARAGE: 818 sqft
OPENED PORCH (WITH ROOF) : 518 sqft
OPENED PORCH (WITH ROOF) : 70 sqft
Total Square Footage: 4428 sqft
Block: 00000
Subdivision: -
Job Phone: 386-237-0328
Location Address: 221 CONSERVATORY DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 05/23/2024
NOC: RECORDED
Applicant name: JAMES JOSEPH ALBANO
Owner: BEREZNICKI ZBIGNIEW & DANUTA KLIM-BEREZNICKI H&W

Address

10 VILLAGE CIRCLE

PALM COAST, FL 32164

Lot: 0060
Contracted Stated Job Value: ¤575,000.00
Job Description: Single Family Residence
Type: CN

Contractor

ALBANO DESIGNS STUDIOS, INC
Status Location Address State License Number Phone
ACTIVE

82 LEE DR

PALM COAST, FL 32137

CBC050078 (Exp: 08/31/2026) 386-237-0328

Sub Contractors

WILLIAM FRANK DUDLEY JR.
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 978

Bunnell, FL 32110

EC0003177 (Exp: 08/31/2026) (386)437-3068
SHAWN MICHAEL HISS
Status Location Address State License Number Phone
ACTIVE

1315 LPGA BLVD

HOLLY HILL, FL 32117

CAC1813585 (Exp: 08/31/2026) (386)672-8688
SCOTT DALE CRIDER
Status Location Address State License Number Phone
ACTIVE

PO BOX 353092

PALM COAST, FL 32137

CCC1333991 (Exp: 08/31/2026) 386-276-0758
ROBERTO F GONZALEZ
Status Location Address State License Number Phone
ACTIVE

212 PALMETTO AVE

CRESCENT CITY, FL 32112

RF11067887 (Exp: 08/31/2027) 286-559-2885

Inspection History

Type Request Date Result Inspector
ROW- FINAL SURVEY/GRADING CERTIFICATION 07/01/2025 Disapproved - NO FEE PFLANAGAN
Note: FINAL SURVEY STATES THAT THE DRAINAGE DOESN'T MATCH THE SITE PLAN. SITE PLAN ONLY SHOWS LIKE 20' OF THE SIDES AND BACK FLOWING TO THE RETENTION POND.
U-CROSS CONNECTION 06/30/2025 APPROVED DHANEY
ELECTRIC - EARLY POWER 01/16/2025 APPROVED HCAMACHO
ROW- PRE-APRON (PRE-POUR) 01/08/2025 APPROVED - AS NOTED EMADISON
Note: ** 01/08/25 READY TO SET PAVERS ________________________________________________________________________________________________________________ 12/19/2024 - PREVIOUS INSPECTION NOTES ** 12/19/24 READY TO POUR YOUR APRON ONLY ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED ____________________________________________________________________________________________________________________ 12/17/2024 - PREVIOUS INSPECTION NOTES ** 12/18/24 DRIVEWAY APRON NEEDS TO BE COMPLETELY FORME WITH APRON WINGS AS SHOWN ON YOUR SITE PLAN ** ENSURE YOUR PAVER RESTRAINTS ARE ALL DUG 8 INCHES DEEP BY 4 INCHES WIDE __________________________________________________________________________________________________________________ 12/16/2024 - PREVIOUS INSPECTION NOTES ** 12/16/24 BUILDER NEEDS TO PROVIDE AND HOOSE WHICH OPTION YOU ARE INSTALLING YOUR PAVER DRIVEWAY SEE DRAWINGS ON DRAWING 300.H Pg V32-3 PICK YOUR OPTION CIRCLE IT AND UPLOAD INTO THE ATTACHMENTS OR LEAVE A HARD COPY IN YOUR EMPTY PERMIT BOX ON SITE ** ENSURE YOUR PAVER RESTRAINTS ARE ALL DUG 8 INCHES DEEP BY 4 INCHES WIDE
ROW- PAVER RESTRAINTS 12/20/2024 APPROVED EMADISON
Note: ** 12/20/24 READY TO POUR PAVER RESTRAINT WITH APRON ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE ___________________________________________________________________________________________________________________ 12/19/2024 - PREVIOUS INSPECTION NOTES ** BUILDER PLEASE REVIEW NOTES AS NOTED IN PREVIOUS INSPECTION YOUR PAVER RESTRAINT NEED TO BE DUG AT A MINIMUM OF *** 8 INCHES DEEP BY 4 INCHES WIDE*** ** SEVERAL MEASUREMENTS AT 3 - 3 1/2 INCHES DEEP DOES NOT MEET THE MINIMUM STANDARD ______________________________________________________________________________________________________________________ 12/17/2024 - PREVIOUS INSPECTION NOTES ** 12/17/24 ENSURE YOUR PAVER RESTRAINTS ARE ALL DUG 8 INCHES DEEP BY 4 INCHES WIDE
ROW- PRE-APRON (PRE-POUR) 12/19/2024 PARTIALLY APPROVED EMADISON
Note: ** 12/19/24 READY TO POUR YOUR APRON ONLY ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED ____________________________________________________________________________________________________________________ 12/17/2024 - PREVIOUS INSPECTION NOTES ** 12/18/24 DRIVEWAY APRON NEEDS TO BE COMPLETELY FORME WITH APRON WINGS AS SHOWN ON YOUR SITE PLAN ** ENSURE YOUR PAVER RESTRAINTS ARE ALL DUG 8 INCHES DEEP BY 4 INCHES WIDE __________________________________________________________________________________________________________________ 12/16/2024 - PREVIOUS INSPECTION NOTES ** 12/16/24 BUILDER NEEDS TO PROVIDE AND HOOSE WHICH OPTION YOU ARE INSTALLING YOUR PAVER DRIVEWAY SEE DRAWINGS ON DRAWING 300.H Pg V32-3 PICK YOUR OPTION CIRCLE IT AND UPLOAD INTO THE ATTACHMENTS OR LEAVE A HARD COPY IN YOUR EMPTY PERMIT BOX ON SITE ** ENSURE YOUR PAVER RESTRAINTS ARE ALL DUG 8 INCHES DEEP BY 4 INCHES WIDE
ROW- PAVER RESTRAINTS 12/19/2024 Disapproved -FEE REQUIRED EMADISON
Note: ** BUILDER PLEASE REVIEW NOTES AS NOTED IN PREVIOUS INSPECTION YOUR PAVER RESTRAINT NEED TO BE DUG AT A MINIMUM OF *** 8 INCHES DEEP BY 4 INCHES WIDE*** ** SEVERAL MEASUREMENTS AT 3 - 3 1/2 INCHES DEEP DOES NOT MEET THE MINIMUM STANDARD ______________________________________________________________________________________________________________________ 12/17/2024 - PREVIOUS INSPECTION NOTES ** 12/17/24 ENSURE YOUR PAVER RESTRAINTS ARE ALL DUG 8 INCHES DEEP BY 4 INCHES WIDE
ROW- PAVER RESTRAINTS 12/17/2024 Disapproved - NO FEE EMADISON
Note: ** 12/17/24 ENSURE YOUR PAVER RESTRAINTS ARE ALL DUG 8 INCHES DEEP BY 4 INCHES WIDE
ROW- PRE-APRON (PRE-POUR) 12/17/2024 Disapproved -FEE REQUIRED EMADISON
Note: ** 12/18/24 DRIVEWAY APRON NEEDS TO BE COMPLETELY FORME WITH APRON WINGS AS SHOWN ON YOUR SITE PLAN ** ENSURE YOUR PAVER RESTRAINTS ARE ALL DUG 8 INCHES DEEP BY 4 INCHES WIDE __________________________________________________________________________________________________________________ 12/16/2024 - PREVIOUS INSPECTION NOTES ** 12/16/24 BUILDER NEEDS TO PROVIDE AND HOOSE WHICH OPTION YOU ARE INSTALLING YOUR PAVER DRIVEWAY SEE DRAWINGS ON DRAWING 300.H Pg V32-3 PICK YOUR OPTION CIRCLE IT AND UPLOAD INTO THE ATTACHMENTS OR LEAVE A HARD COPY IN YOUR EMPTY PERMIT BOX ON SITE ** ENSURE YOUR PAVER RESTRAINTS ARE ALL DUG 8 INCHES DEEP BY 4 INCHES WIDE
ROW- PRE-APRON (PRE-POUR) 12/16/2024 Disapproved -FEE REQUIRED EMADISON
Note: ** 12/16/24 BUILDER NEEDS TO PROVIDE AND HOOSE WHICH OPTION YOU ARE INSTALLING YOUR PAVER DRIVEWAY SEE DRAWINGS ON DRAWING 300.H Pg V32-3 PICK YOUR OPTION CIRCLE IT AND UPLOAD INTO THE ATTACHMENTS OR LEAVE A HARD COPY IN YOUR EMPTY PERMIT BOX ON SITE ** ENSURE YOUR PAVER RESTRAINTS ARE ALL DUG 8 INCHES DEEP BY 4 INCHES WIDE
INSULATION 12/12/2024 APPROVED HCAMACHO
Note: 1. Need Insulation Certificate for Final Inspection
INSULATION 12/02/2024 CANCELLED BY APPLICANT HCAMACHO
Note: Waiting on Revisions Inspector Notes from Inspection 2420 1. Revise Product approval for windows and Energy Calcs. 2. Revise Duct layout to match installation, 2 closets were added.
ALL ROUGH 11/22/2024 APPROVED - AS NOTED HCAMACHO
Note: 1. Revise Product approval for windows and Energy Calcs. 2. Revise Duct layout to match installation, 2 closets were added.
WALL SHEATHING 11/21/2024 APPROVED JSTEWART
Note: Inspector Notes from Inspection 2320 FBC 3307.1 NEEDS SILT FENCE PROPERLY INSTALLED - Will check at next inspection.
GRAVITY SEWER TEST 11/08/2024 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
SEWER TIE IN 11/08/2024 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
LATH/BRICK/ WATER BARRIER 10/02/2024 APPROVED - AS NOTED HCAMACHO
Note: FBC 3307.1 NEEDS SILT FENCE PROPERLY INSTALLED - Will check at next inspection.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/11/2024 APPROVED FWILLIS
ROOF VALLEY & METAL 09/11/2024 APPROVED FWILLIS
FOUND SURVEY APPROVED (OFFICE) 09/09/2024 APPROVED TDOAK
ELECTRIC-TUG 08/05/2024 APPROVED - AS NOTED JSTEWART
Note: *** NOTES ADDED BY JSTEWART 8/5/2024 9:47:29 AM *** 1. Authorize release of email to FPL. 2. FBCR 319.1 Address Posted by next Inspection.
TIE BEAM / LINTEL 07/23/2024 APPROVED FWILLIS
MONOLITHIC SLAB 06/20/2024 APPROVED FWILLIS
PLUMBING 1ST ROUGH UNDERGROUND 06/14/2024 APPROVED MGIBSON
PLUMBING 1ST ROUGH UNDERGROUND 06/13/2024 CANCELLED BY APPLICANT WEB
WATER METER INSTALLATION REQUEST 05/29/2024 APPROVED CBOWERMASTER
ROW - FINAL APRON (AFTER POUR)
ROW- FINAL SURVEY/GRADING CERTIFICATION
Note: 7/1/2025 - PREVIOUS INSPECTION NOTES FINAL SURVEY STATES THAT THE DRAINAGE DOESN'T MATCH THE SITE PLAN. SITE PLAN ONLY SHOWS LIKE 20' OF THE SIDES AND BACK FLOWING TO THE RETENTION POND.
ROW FIELD SURVEY /GRADING CERTIFICATION
ROW - STORMWATER FINAL
U -UTILITY RESIDENTIAL FINAL
BLD - BUILDING FINAL

Review History

Department Status Date In Date Out
SW1 COMPLETE 12/16/2024 12/17/2024
Note: Released By: LEVI SALYERDS - - LSALYERDS@PALMCOASTGOV.COM
MECH COMPLETE 12/09/2024 12/11/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 12/02/2024 12/09/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 09/09/2024 09/09/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 09/09/2024 09/09/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
MECH COMPLETE 05/13/2024 05/17/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ELEC COMPLETE 05/13/2024 05/20/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 05/13/2024 05/14/2024
Note: Released By: JPI
URB COMPLETE 05/06/2024 05/06/2024
Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM
ZON COMPLETE 05/06/2024 05/06/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ELEC HOLD 05/06/2024 05/10/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Electrical riser diagram needs to include the surge protector and outside disconnect. NEC 2020 230.67 230.85
MECH HOLD 05/06/2024 05/09/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide Duct layout signed by the AC contractor 107.1(second request)
BLD HOLD 05/06/2024 05/12/2024
Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet.
BADMIN COMPLETE 05/06/2024 05/13/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BADMIN HOLD 05/01/2024 05/06/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM All documents not submitted. No review done
BLD HOLD 05/01/2024 05/06/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM All documents not submitted. No review done
CUSVC COMPLETE 05/01/2024 05/06/2024
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC HOLD 05/01/2024 05/06/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Upload electrical plan 2. Upload electrical load calcs 3. Upload electrical riser
ENGIN1 COMPLETE 05/01/2024 05/01/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 05/01/2024 05/06/2024
LOCATE COMPLETE 05/01/2024 05/06/2024
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH HOLD 05/01/2024 05/06/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide Duct layout signed by the AC contractor 107.1
SW1 COMPLETE 05/01/2024 05/01/2024
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM
ZON HOLD 05/01/2024 05/02/2024
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Missing Floor plan Landscape plan Zoysia requires irrigation please indicate that on the plan

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
WATER-METER ¤514.49 05/23/2024
ADJUSTMENT 10% (¤211.62) 05/23/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 05/23/2024
INSPECTION - RESIDENTIAL ¤1,625.25 05/23/2024
PLAN REVIEW - RESIDENTIAL ¤460.98 05/23/2024
CONNECTION FEES ¤25.00 05/23/2024
FC IMPACT FEE EMS ¤62.00 05/23/2024
IMPACT FEE FIRE ¤428.09 05/23/2024
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 05/23/2024
FC IMPACT FEE LIBRARY ¤268.00 05/23/2024
IMPACT FEE PARKS ¤1,800.99 05/23/2024
IMPACT FEE SCHOOL ¤5,450.00 05/23/2024
IMPACT FEE TRANSPORTATION ¤3,404.00 05/23/2024
SURCHARGE FS 533.721 ¤19.05 05/23/2024
SURCHARGE - FS 468.631 ¤28.57 05/23/2024
SW ENG - FOUNDATION SURVEY ¤20.00 05/23/2024
SW ENG INSPECTION 80 ¤80.00 05/23/2024
SW ENG PRE APRON ¤30.00 05/23/2024
SW ENG - REVIEW 20 ¤20.00 05/23/2024
SW ENG RES REVIEW 200 ¤200.00 05/23/2024
SEWER INSPECTION ¤25.00 05/23/2024
SITE PLAN 30 ¤30.00 05/23/2024
Fees Total Due: ¤0.00 Total Paid: ¤14,527.80