I want to search for...
Permit #2024050092
Permit Details
Status: COED
| Parcel Id: 07-11-31-7034-00650-0080 |
| CONDITIONED SPACE: 2430 sqft |
| GARAGE: 1169 sqft |
| OPENED PORCH (WITH ROOF) : 96 sqft |
| ENCLOSE EXISTING PORCH TO LIVING : 504 sqft |
| Total Square Footage: 4199 sqft |
| Block: 00650 |
| Subdivision: - |
| Job Phone: 386-627-0430 |
| Location Address: 15 ELIAS LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 05/14/2024 |
| NOC: RECORDED |
| Applicant name: ANNA WIKTORIA LISOWSKI |
| Owner: SPEVAK, DAVID & JOY |
|
Address 32 CLINTON AVE BUDD LAKE, NJ 07828 |
| Lot: 0080 |
| Contracted Stated Job Value: ¤575,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
GOLDEN FOX HOME REMODELING, INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
72 HERNANDEZ AVE PALM COAST, FL 32137 |
CBC1259266 (Exp: 08/31/2026) | 386-627-0430 |
Sub Contractors
DANIEL J LUSINSKI
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
389 PALM COAST PARKWAY SW PALM COAST, FL 32137 |
#4 PALM COAST, FL 32137 |
CCC1330133 (Exp: 08/31/2026) | 386-338-7926 |
SCOTT H STILLWELL
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4500 US 1 UNIT 206 BUNNELL, FL 32110 |
CAC1819433 (Exp: 08/31/2026) | 386-864-4404 |
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
WILLIAM TODD SIKES
| Status | Location Address | State License Number | Phone |
| ACTIVE |
83 PORT ROYAL DR ST AUGUSTINE, FL 32084 |
EC0002726 (Exp: 08/31/2026) | 904-762-8762 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 02/03/2025 | APPROVED | CVANSTRAHLEN |
| Note: | |||
| BLD - BUILDING FINAL | 01/28/2025 | Disapproved - NO FEE | BTAYLOR |
| Note: 1-28-25 1. Breakers need to be GFI. 2. Energy cals do not match. Inspector Notes from Inspection 2490 *** NOTES ADDED BY RSIMS 9/6/2024 3:52:56 PM *** 9/6/24: 1). Please complete your silt fence on the right side and repair it on the left side prior to any additional inspections. FBC 3307.1 9/3/2024 - PREVIOUS INSPECTION NOTES 9/3/24: 1). Missing fireblocking at ceiling level change in garage on wall with electric panel. FBC-R302.11 NOTE: Per plan page 3 - Duct into garage needs to be metal or fiberglass duct board 1" thick. Please submit documentation that flex duct is approved for the application. | |||
| U-CROSS CONNECTION | 01/27/2025 | APPROVED - AS NOTED | LFITZGERALD |
| Note: irr meter with PVB-no crossconnection | |||
| ROW - FINAL APRON (AFTER POUR) | 01/27/2025 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection, all minimum city requirements were met. The builder's responsible for ensuring that nothing changes after this Inspection is approved. | |||
| ROW - STORMWATER FINAL | 01/27/2025 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection, all minimum city requirements were met. The builder's responsible for ensuring that nothing changes after this Inspection is approved. | |||
| U -UTILITY RESIDENTIAL FINAL | 01/27/2025 | FINAL APPROVED | LFITZGERALD |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 01/23/2025 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/23/2025 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. | |||
| ROW- PRE-APRON (PRE-POUR) | 12/19/2024 | APPROVED | FSLADISH |
| Note: 12/19/24 YOU ARE APPROVED TO LAY PAVERS AT THE TIME OF THIS INSPECTION. AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIREMENTS ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. _______________________________________________________________________________________________________________________ 12/17/2024 - PREVIOUS INSPECTION NOTES 12/17/24 TPOLACEK*** AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 12/16/2024 - PREVIOUS INSPECTION NOTES 12/16/24 TPOLACEK** CULVERT IS PITCHED IN THE WRONG DIRECTION. PLEASE RESET PIPE ACCORDING TO SWALE PLAN DIAGRAM. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 12/13/2024 - PREVIOUS INSPECTION NOTES 12/13/24 YOUR SITE IS NOT SET UP FOR THE PAVER OPTION YOU CHOSE. YOU CHOSE THE OPTION FOR 8" OF PAVER BASE AND YOU HAVE FORMBOARDS SET UP FOR SOMETHING ELSE. PLEASE CORRECT BEFORE RESUBMITTING. I WILL NOT FEE YOU TODAY AS A ONE TIME COURTESY. PHOTO FOR REFERENCE. | |||
| ROW- PAVER RESTRAINTS | 12/17/2024 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS | |||
| ROW- PRE-APRON (PRE-POUR) | 12/17/2024 | PARTIALLY APPROVED | TPOLACEK |
| Note: 12/17/24 TPOLACEK*** AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 12/16/2024 - PREVIOUS INSPECTION NOTES 12/16/24 TPOLACEK** CULVERT IS PITCHED IN THE WRONG DIRECTION. PLEASE RESET PIPE ACCORDING TO SWALE PLAN DIAGRAM. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 12/13/2024 - PREVIOUS INSPECTION NOTES 12/13/24 YOUR SITE IS NOT SET UP FOR THE PAVER OPTION YOU CHOSE. YOU CHOSE THE OPTION FOR 8" OF PAVER BASE AND YOU HAVE FORMBOARDS SET UP FOR SOMETHING ELSE. PLEASE CORRECT BEFORE RESUBMITTING. I WILL NOT FEE YOU TODAY AS A ONE TIME COURTESY. PHOTO FOR REFERENCE. | |||
| ROW- PRE-APRON (PRE-POUR) | 12/16/2024 | Disapproved - NO FEE | TPOLACEK |
| Note: 12/16/24 TPOLACEK** CULVERT IS PITCHED IN THE WRONG DIRECTION. PLEASE RESET PIPE ACCORDING TO SWALE PLAN DIAGRAM. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 12/13/2024 - PREVIOUS INSPECTION NOTES 12/13/24 YOUR SITE IS NOT SET UP FOR THE PAVER OPTION YOU CHOSE. YOU CHOSE THE OPTION FOR 8" OF PAVER BASE AND YOU HAVE FORMBOARDS SET UP FOR SOMETHING ELSE. PLEASE CORRECT BEFORE RESUBMITTING. I WILL NOT FEE YOU TODAY AS A ONE TIME COURTESY. PHOTO FOR REFERENCE. | |||
| ROW- PRE-APRON (PRE-POUR) | 12/13/2024 | Disapproved - NO FEE | FSLADISH |
| Note: 12/13/24 YOUR SITE IS NOT SET UP FOR THE PAVER OPTION YOU CHOSE. YOU CHOSE THE OPTION FOR 8" OF PAVER BASE AND YOU HAVE FORMBOARDS SET UP FOR SOMETHING ELSE. PLEASE CORRECT BEFORE RESUBMITTING. I WILL NOT FEE YOU TODAY AS A ONE TIME COURTESY. PHOTO FOR REFERENCE. | |||
| GRAVITY SEWER TEST | 11/06/2024 | APPROVED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 3307.1 protection of property, MUST HAVE SILT FENCE IN PLACE BEFORE SCHEDULING NEXT INSPECTION, ALSO REMOVE ALL AND ANY VEGITATION FROM EXTERIOR FOOTERS | |||
| SEWER TIE IN | 11/06/2024 | APPROVED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 3307.1 protection of property, MUST HAVE SILT FENCE IN PLACE BEFORE SCHEDULING NEXT INSPECTION, ALSO REMOVE ALL AND ANY VEGITATION FROM EXTERIOR FOOTERS | |||
| ELECTRIC - EARLY POWER | 10/08/2024 | APPROVED | CVANSTRAHLEN |
| PEP TANK INSTALLATION REQUEST | 09/17/2024 | APPROVED | CBOWERMASTER |
| Note: 9/16/2024 7:57:59 AM- PREVIOUS INSPECTION NOTES dumpster needs to move | |||
| PEP TANK INSTALLATION REQUEST | 09/11/2024 | Disapproved - NO FEE | CBOWERMASTER |
| Note: dumpster needs to move | |||
| INSULATION | 09/06/2024 | APPROVED - AS NOTED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 9/6/2024 3:52:56 PM *** 9/6/24: 1). Please complete your silt fence on the right side and repair it on the left side prior to any additional inspections. FBC 3307.1 9/3/2024 - PREVIOUS INSPECTION NOTES 9/3/24: 1). Missing fireblocking at ceiling level change in garage on wall with electric panel. FBC-R302.11 NOTE: Per plan page 3 - Duct into garage needs to be metal or fiberglass duct board 1" thick. Please submit documentation that flex duct is approved for the application. | |||
| INSULATION | 09/03/2024 | Disapproved - NO FEE | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 9/3/2024 10:33:12 AM *** 9/3/24: 1). Missing fireblocking at ceiling level change in garage on wall with electric panel. FBC-R302.11 NOTE: Per plan page 3 - Duct into garage needs to be metal or fiberglass duct board 1" thick. Please submit documentation that flex duct is approved for the application. | |||
| LATH/BRICK/ WATER BARRIER | 08/26/2024 | APPROVED | JSTEWART |
| ALL ROUGH | 08/26/2024 | APPROVED | JSTEWART |
| ROOF VALLEY & METAL | 08/14/2024 | APPROVED | AGAETANO |
| WALL SHEATHING | 08/09/2024 | APPROVED | AGAETANO |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/09/2024 | APPROVED | AGAETANO |
| FOUND SURVEY APPROVED (OFFICE) | 07/24/2024 | APPROVED | TBAKER |
| ELECTRIC-TUG | 07/19/2024 | APPROVED | RMARTIN |
| TIE BEAM / LINTEL | 07/12/2024 | APPROVED | BTAYLOR |
| MONOLITHIC SLAB | 06/27/2024 | APPROVED | AGAETANO |
| Note: 6/26/2024 - PREVIOUS INSPECTION NOTES 6/26/24: Incomplete inspection. * Footers are flooded so I could not see rebar or footer details. Also, need silt fence along the right side of the property. FBC 3307.1 (3307.1Protection required. Adjoining public and private property shall be protected from damage during construction, remodeling and demolition work.) | |||
| MONOLITHIC SLAB | 06/26/2024 | Disapproved - NO FEE | RSIMS |
| Note: 6/26/24: Incomplete inspection. * Footers are flooded so I could not see rebar or footer details. Also, need silt fence along the right side of the property. FBC 3307.1 (3307.1Protection required. Adjoining public and private property shall be protected from damage during construction, remodeling and demolition work.) | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 06/20/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: 3307.1 protection of property, MUST HAVE SILT FENCE IN PLACE BEFORE SCHEDULING NEXT INSPECTION, ALSO REMOVE ALL AND ANY VEGITATION FROM EXTERIOR FOOTERS | |||
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 06/13/2024 | APPROVED | JMUNSON |
| WATER METER INSTALLATION REQUEST | 06/04/2024 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 01/29/2025 | 01/31/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 01/23/2025 | 01/27/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 12/13/2024 | 12/16/2024 |
| Note: Released By: LEVI SALYERDS - - LSALYERDS@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 12/03/2024 | 12/05/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 12/03/2024 | 12/11/2024 |
| Note: Released By: LEVI SALYERDS - - LSALYERDS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/03/2024 | 12/04/2024 |
| Note: Released By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/23/2024 | 07/24/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/23/2024 | 07/23/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/10/2024 | 06/13/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/08/2024 | 05/10/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 approval valid with the following notes: Final PEP location to be provided by the City of Palm Coast. The stormwater conveyance swales associated with the lot’s grading shall be diverted around the PEP lids/covers SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD | |||
| ZON | COMPLETE | 05/08/2024 | 05/08/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/08/2024 | 05/13/2024 |
| Note: Released By: JPI | |||
| ELEC | COMPLETE | 05/08/2024 | 05/13/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 05/08/2024 | 05/13/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 05/02/2024 | 05/07/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/02/2024 | 05/07/2024 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 05/02/2024 | 05/06/2024 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 05/02/2024 | 05/07/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/02/2024 | 05/02/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 05/02/2024 | 05/06/2024 |
| LOCATE | COMPLETE | 05/02/2024 | 05/07/2024 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 05/02/2024 | 05/07/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 05/02/2024 | 05/02/2024 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Please lower proposed slab elevation to be within 1.83' MAX of adjacent structure. | |||
| ZON | HOLD | 05/02/2024 | 05/03/2024 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Floor Plan: Garage exceeds the maximum depth of 30' as per LDC. Please adjust plans accordingly. | |||
| SWALE | COMPLETE | 05/02/2024 | 08/19/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 02/03/2025 |
| RECORDING FEE REIMBURSE DOC | ¤44.00 | 12/11/2024 |
| IMPACT FEE TRANSPORTATION | ¤1,862.00 | 05/14/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 05/14/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 05/14/2024 |
| SURCHARGE FS 533.721 | ¤18.54 | 05/14/2024 |
| SURCHARGE - FS 468.631 | ¤27.81 | 05/14/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 05/14/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 05/14/2024 |
| SW ENG PRE APRON | ¤30.00 | 05/14/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 05/14/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 05/14/2024 |
| SEWER CREDIT | (¤850.00) | 05/14/2024 |
| SEWER INSPECTION | ¤25.00 | 05/14/2024 |
| SEWER CAPITAL FACILITY | ¤6,120.52 | 05/14/2024 |
| WATER CAPITAL FACILITY FEE | ¤4,351.14 | 05/14/2024 |
| SITE PLAN 30 | ¤30.00 | 05/14/2024 |
| CONNECTION FEES | ¤1,187.26 | 05/14/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 05/14/2024 |
| IMPACT FEE FIRE | ¤428.09 | 05/14/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 05/14/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 05/14/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 05/14/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 05/14/2024 |
| WATER-METER | ¤514.49 | 05/14/2024 |
| WATER- TURN ON | ¤25.00 | 05/14/2024 |
| WATER- TURN ON | ¤25.00 | 05/14/2024 |
| ADJUSTMENT 10% | (¤205.98) | 05/14/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 05/14/2024 |
| INSPECTION - RESIDENTIAL | ¤1,581.25 | 05/14/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤448.50 | 05/14/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤23,894.11 |