I want to search for...
Permit #2024050120
Permit Details
Status: COED
| Parcel Id: 07-11-31-7035-00230-0200 |
| CONDITIONED SPACE: 1516 sqft |
| GARAGE: 487 sqft |
| SCREEN PORCH (SOLID ROOF) : 220 sqft |
| ENCLOSE EXISTING PORCH TO LIVING : 71 sqft |
| Total Square Footage: 2294 sqft |
| Block: 00230 |
| Subdivision: - |
| Job Phone: 386-627-0430 |
| Location Address: 5 BURNABY LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 06/14/2024 |
| NOC: RECORDED |
| Applicant name: ANNA WIKTORIA LISOWSKI |
| Owner: GOLDEN FOX PROPERTIES LLC |
|
Address 72 HERNANDEZ AVE PALM COAST, FL 32137 |
| Lot: 0200 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
GOLDEN FOX HOME REMODELING, INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
72 HERNANDEZ AVE PALM COAST, FL 32137 |
CBC1259266 (Exp: 08/31/2026) | 386-627-0430 |
Sub Contractors
DANIEL J LUSINSKI
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
389 PALM COAST PARKWAY SW PALM COAST, FL 32137 |
#4 PALM COAST, FL 32137 |
CCC1330133 (Exp: 08/31/2026) | 386-338-7926 |
WILLIAM TODD SIKES
| Status | Location Address | State License Number | Phone |
| ACTIVE |
83 PORT ROYAL DR ST AUGUSTINE, FL 32084 |
EC0002726 (Exp: 08/31/2026) | 904-762-8762 |
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
SCOTT H STILLWELL
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4500 US 1 UNIT 206 BUNNELL, FL 32110 |
CAC1819433 (Exp: 08/31/2026) | 386-864-4404 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 01/16/2025 | FINAL APPROVED | MCONTRYMAN |
| Note: 1/15/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 1/15/2025 2:12:04 PM *** 1. Please relocate surge protection to Outside, at Main disconnect. NEC 230.67 2. Please have receptacle in communication box in Garage GFCI Protection. NEC 210.8 | |||
| U -UTILITY RESIDENTIAL FINAL | 01/16/2025 | FINAL APPROVED | LFITZGERALD |
| Note: 1/15/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 1/15/2025 10:29:24 AM *** locate sewer clean iut at pep tank | |||
| U -UTILITY RESIDENTIAL FINAL | 01/15/2025 | Disapproved -FEE REQUIRED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 1/15/2025 10:29:24 AM *** locate sewer clean iut at pep tank | |||
| BLD - BUILDING FINAL | 01/15/2025 | Disapproved - NO FEE | JSTEWART |
| Note: *** NOTES ADDED BY JSTEWART 1/15/2025 2:12:04 PM *** 1. Please relocate surge protection to Outside, at Main disconnect. NEC 230.67 2. Please have receptacle in communication box in Garage GFCI Protection. NEC 210.8 | |||
| U-CROSS CONNECTION | 01/15/2025 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 1/15/2025 10:28:38 AM *** irrigation meter with PVB-no cross connectin | |||
| ROW - FINAL APRON (AFTER POUR) | 01/14/2025 | APPROVED | TPOLACEK |
| Note: PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 01/14/2025 | APPROVED | TPOLACEK |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/14/2025 | APPROVED | TPOLACEK |
| Note: UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW - STORMWATER FINAL | 01/14/2025 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 12/20/2024 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 12/20/24 YOUR FINAL SURVEY IS THE SAME AS THE PREVIOUS FINAL SURVEY NO CORRECTIONS WERE MADE 1) ALL RIGHT OF WAY / FRONT PROPOERTY LINE ELEVATIONS MUST EQUAL OR GREATER THEN THE EDGE OF PAVEMENT. SEC #300.01 C3 • Elevation at the front property line shall match the edge of pavement elevation. 2) ALL SWALE ELEVATIONS NEED TO HAVE .30 FROM THE TOE OF THE SWALE TO THE TOP OF SWALE SO NO WATER WILL IMPACT ADJACENT LOTS. Sec. 300.04 E7 The top of slope of “w” swales along the property lines shall be a minimum of 0.30 feet higher than the toe of slope. 3) THE ROADSIDE SWALE IS FLOWING IN THE WRONG DIRECTION NEED TO REGRADE SO WATER WILL FLOW TO OUTFALL. ** FINISHED FLOOR ELEVATION REQUIRED ON ALL ADJACENT IMPROVED PROPERTIES ** Finished Floor Elevations (FFE): Final Survey must include the FFE of the subjectproperty as well as the FFE of any adjacent developed properties. (A)A.Land Development Code Technical Manual, Section 300.01 (A)(1)(B)(3) _____________________________________________________________________________________________________________________ 12/11/2024 - PREVIOUS INSPECTION NOTES 1) ALL RIGHT OF WAY / FRONT PROPOERTY LINE ELEVATIONS MUST EQUAL OR GREATER THEN THE EDGE OF PAVEMENT. SEC #300.01 C3 • Elevation at the front property line shall match the edge of pavement elevation. 2) ALL SWALE ELEVATIONS NEED TO HAVE .30 FROM THE TOE OF THE SWALE TO THE TOP OF SWALE SO NO WATER WILL IMPACT ADJACENT LOTS. Sec. 300.04 E7 The top of slope of “w” swales along the property lines shall be a minimum of 0.30 feet higher than the toe of slope. 3) THE ROADSIDE SWALE IS FLOWING IN THE WRONG DIRECTION NEED TO REGRADE SO WATER WILL FLOW TO OUTFALL. -------------------------------------------------------------------------- 12/6/2024 - PREVIOUS INSPECTION NOTES ** 12/06/24 BUILDER NEEDS TO PROVIDE 10 FT OFFSET ELEVATION SHOTS ON ALL ADJACENT PROPERTIES TO ENSURE YOUR WATER IS NOT NEGATIVELY IMPACTING THE ADJACENT PROPERTY ** PER FLORIDA STATUTE 472.029 Surveyors and mappers or their subordinates may go on, over, and upon the lands of others when necessary to make surveys and maps or locate or set monuments, and, in so doing, may carry with them their agents and employees necessary for that purpose. Entry under the right granted by this subsection does not constitute trespass, and surveyors and mappers and their duly authorized agents or employees so entering are not liable to arrest or to a civil action by reason of such entry; however, this subsection does not give authority to registrants, subordinates, agents, or employees to destroy, injure, damage, or move any physical improvements on lands of another without the written permission of the landowner. _____________________________________________________________________________________________________________________ 12/4/2024 - PREVIOUS INSPECTION NOTES ** 12/04/24 CULVERT PIPE IS OUT OF TOLERANCE IN ACCORDANCE WITH THE SWALE PLAN DIAGRAM ** Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 12/11/2024 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) ALL RIGHT OF WAY / FRONT PROPOERTY LINE ELEVATIONS MUST EQUAL OR GREATER THEN THE EDGE OF PAVEMENT. SEC #300.01 C3 • Elevation at the front property line shall match the edge of pavement elevation. 2) ALL SWALE ELEVATIONS NEED TO HAVE .30 FROM THE TOE OF THE SWALE TO THE TOP OF SWALE SO NO WATER WILL IMPACT ADJACENT LOTS. Sec. 300.04 E7 The top of slope of “w” swales along the property lines shall be a minimum of 0.30 feet higher than the toe of slope. 3) THE ROADSIDE SWALE IS FLOWING IN THE WRONG DIRECTION NEED TO REGRADE SO WATER WILL FLOW TO OUTFALL. -------------------------------------------------------------------------- 12/6/2024 - PREVIOUS INSPECTION NOTES ** 12/06/24 BUILDER NEEDS TO PROVIDE 10 FT OFFSET ELEVATION SHOTS ON ALL ADJACENT PROPERTIES TO ENSURE YOUR WATER IS NOT NEGATIVELY IMPACTING THE ADJACENT PROPERTY ** PER FLORIDA STATUTE 472.029 Surveyors and mappers or their subordinates may go on, over, and upon the lands of others when necessary to make surveys and maps or locate or set monuments, and, in so doing, may carry with them their agents and employees necessary for that purpose. Entry under the right granted by this subsection does not constitute trespass, and surveyors and mappers and their duly authorized agents or employees so entering are not liable to arrest or to a civil action by reason of such entry; however, this subsection does not give authority to registrants, subordinates, agents, or employees to destroy, injure, damage, or move any physical improvements on lands of another without the written permission of the landowner. _____________________________________________________________________________________________________________________ 12/4/2024 - PREVIOUS INSPECTION NOTES ** 12/04/24 CULVERT PIPE IS OUT OF TOLERANCE IN ACCORDANCE WITH THE SWALE PLAN DIAGRAM ** Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 12/06/2024 | Disapproved - NO FEE | EMADISON |
| Note: ** 12/06/24 BUILDER NEEDS TO PROVIDE 10 FT OFFSET ELEVATION SHOTS ON ALL ADJACENT PROPERTIES TO ENSURE YOUR WATER IS NOT NEGATIVELY IMPACTING THE ADJACENT PROPERTY ** PER FLORIDA STATUTE 472.029 Surveyors and mappers or their subordinates may go on, over, and upon the lands of others when necessary to make surveys and maps or locate or set monuments, and, in so doing, may carry with them their agents and employees necessary for that purpose. Entry under the right granted by this subsection does not constitute trespass, and surveyors and mappers and their duly authorized agents or employees so entering are not liable to arrest or to a civil action by reason of such entry; however, this subsection does not give authority to registrants, subordinates, agents, or employees to destroy, injure, damage, or move any physical improvements on lands of another without the written permission of the landowner. _____________________________________________________________________________________________________________________ 12/4/2024 - PREVIOUS INSPECTION NOTES ** 12/04/24 CULVERT PIPE IS OUT OF TOLERANCE IN ACCORDANCE WITH THE SWALE PLAN DIAGRAM ** Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 12/04/2024 | Disapproved - NO FEE | EMADISON |
| Note: ** 12/04/24 CULVERT PIPE IS OUT OF TOLERANCE IN ACCORDANCE WITH THE SWALE PLAN DIAGRAM ** Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place | |||
| ROW- PRE-APRON (PRE-POUR) | 10/29/2024 | APPROVED | PFLANAGAN |
| Note: IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. -------------------------------------------------------------------------- 10/28/2024 - PREVIOUS INSPECTION NOTES THERE IS A VAN PARKED OVER BENCHMARK NEED TO HAVE ACCESS TO BENCH MARK AT TIME OF INSPECTIONS. THIS IS WHY NAILS IN ROADS ARE LAST RESORT AS STATED IN THE TECH. MANUAL AT SEC 300.01 A1 9 -------------------------------------------------------------------------- 10/25/2024 - PREVIOUS INSPECTION NOTES THIS NOT READY FOR INSPECTION ALL FORM IN PLACE AT THIS TIME. | |||
| ROW- PRE-APRON (PRE-POUR) | 10/28/2024 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: THERE IS A VAN PARKED OVER BENCHMARK NEED TO HAVE ACCESS TO BENCH MARK AT TIME OF INSPECTIONS. THIS IS WHY NAILS IN ROADS ARE LAST RESORT AS STATED IN THE TECH. MANUAL AT SEC 300.01 A1 9 -------------------------------------------------------------------------- 10/25/2024 - PREVIOUS INSPECTION NOTES THIS NOT READY FOR INSPECTION ALL FORM IN PLACE AT THIS TIME. | |||
| ROW- PRE-APRON (PRE-POUR) | 10/25/2024 | Disapproved - NO FEE | PFLANAGAN |
| Note: THIS NOT READY FOR INSPECTION ALL FORM IN PLACE AT THIS TIME. | |||
| GRAVITY SEWER TEST | 10/24/2024 | APPROVED | MGIBSON |
| SEWER TIE IN | 10/24/2024 | APPROVED | MGIBSON |
| WINDOW NAILING | 10/18/2024 | APPROVED | FWILLIS |
| Note: Inspector Notes from Inspection 2490 Added window/door nailing for garage entry door, leave trim off for inspection | |||
| ELECTRIC - EARLY POWER | 10/07/2024 | APPROVED - AS NOTED | JSTEWART |
| Note: *** NOTES ADDED BY JSTEWART 10/7/2024 10:19:08 AM *** Please have Surge protection by final. Authorize release of email to FPL | |||
| PEP TANK INSTALLATION REQUEST | 09/25/2024 | APPROVED | CBOWERMASTER |
| INSULATION | 09/20/2024 | APPROVED - AS NOTED | MKRASKI |
| Note: Added window/door nailing for garage entry door, leave trim off for inspection | |||
| ALL ROUGH | 09/17/2024 | APPROVED - AS NOTED | JSTEWART |
| Note: *** NOTES ADDED BY JSTEWART 9/17/2024 10:46:18 AM *** 1. Please install Proper strap at Kitchen exhaust TP. (both sides in addition to NP) R602.6.1 Drilling and notching of top plate....a galvanized metal tie not less than 0.054 inch thick (1.37 mm) (16ga) and 1 1/2 inches ...The metal tie must extend not less than 6 inches past the opening. 2. Please fasten Romex entering Smoke detector box at Foyer/kitchen. NEC 334.30 | |||
| LATH/BRICK/ WATER BARRIER | 09/09/2024 | APPROVED | FWILLIS |
| ROOF VALLEY & METAL | 09/06/2024 | APPROVED | JSTEWART |
| WALL SHEATHING | 09/03/2024 | APPROVED | JSTEWART |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/03/2024 | APPROVED | JSTEWART |
| ELECTRIC-TUG | 08/26/2024 | APPROVED | RMARTIN |
| TIE BEAM / LINTEL | 08/21/2024 | APPROVED | FWILLIS |
| Note: Inspector Notes from Inspection 2250 Have siltfence around entire jobsite to protect neighboring properties. Make repaire before next inspection FBC 3307.1 | |||
| FOUND SURVEY APPROVED (OFFICE) | 08/20/2024 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 08/12/2024 | APPROVED - AS NOTED | MKRASKI |
| Note: Have siltfence around entire jobsite to protect neighboring properties. Make repaire before next inspection FBC 3307.1 | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 08/09/2024 | APPROVED | MGIBSON |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 08/08/2024 | APPROVED | JMUNSON |
| WATER METER INSTALLATION REQUEST | 07/01/2024 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 01/09/2025 | 01/13/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 08/19/2024 | 08/19/2024 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Please indicvate finished slab elevation on foundation survey. | |||
| ZON | COMPLETE | 08/19/2024 | 08/19/2024 |
| Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/19/2024 | 08/20/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/19/2024 | 08/20/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 08/06/2024 | 08/08/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/30/2024 | 07/30/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 07/30/2024 | 07/30/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD | |||
| ENGIN1 | COMPLETE | 07/30/2024 | 07/30/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/24/2024 | 07/24/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 07/24/2024 | 07/25/2024 |
| Note: Held By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM 1) Please show existing elevations 10' offset from property lines extending into adjacent lots 19 and 21. 2) Proposed elevations along north property line adjacent to lot 19 are significantly higher than existing. Please provide a cross section here showing contractor exactly how to tie into existing grade on lot 19. You may show grading into lot 19 but only within the 5' utility easement. The slope here cannot exceet 2:1. 3) Please provide driveway apron width at edge of pavement | |||
| ZON | HOLD | 07/24/2024 | 07/24/2024 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM pLease note the changes as it appears that the width of the driveway was corrected but the rear setback was not provided. | |||
| BLD | COMPLETE | 07/15/2024 | 07/22/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 05/08/2024 | 05/13/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 05/02/2024 | 05/07/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/02/2024 | 05/07/2024 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 05/02/2024 | 05/07/2024 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 05/02/2024 | 05/07/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/02/2024 | 05/02/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 05/02/2024 | 05/06/2024 |
| LOCATE | COMPLETE | 05/02/2024 | 05/07/2024 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | HOLD | 05/02/2024 | 05/07/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Direction house faces on Energy Calcs does not match the site plan. Revise to match per R405.4.2.1 FBC Energy Conservation 2023 8Th Edition 2. Design location on Heatload needs to be Daytona Beach | |||
| SW1 | COMPLETE | 05/02/2024 | 05/02/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/02/2024 | 05/03/2024 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 05/02/2024 | 08/19/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 01/15/2025 |
| REINSPECTION FEE | ¤40.00 | 01/15/2025 |
| SW ENG REINSPECTION 30 | ¤30.00 | 01/15/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 06/14/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 06/14/2024 |
| SEWER CREDIT | (¤850.00) | 06/14/2024 |
| SEWER INSPECTION | ¤25.00 | 06/14/2024 |
| SEWER CAPITAL FACILITY | ¤6,120.52 | 06/14/2024 |
| WATER CAPITAL FACILITY FEE | ¤4,351.14 | 06/14/2024 |
| SITE PLAN 30 | ¤30.00 | 06/14/2024 |
| SURCHARGE FS 533.721 | ¤9.86 | 06/14/2024 |
| SURCHARGE - FS 468.631 | ¤14.80 | 06/14/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 06/14/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 06/14/2024 |
| SW ENG PRE APRON | ¤30.00 | 06/14/2024 |
| WATER-METER | ¤514.49 | 06/14/2024 |
| WATER- TURN ON | ¤25.00 | 06/14/2024 |
| WATER- TURN ON | ¤25.00 | 06/14/2024 |
| ADJUSTMENT 10% | (¤109.61) | 06/14/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 06/14/2024 |
| INSPECTION - RESIDENTIAL | ¤830.50 | 06/14/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤235.56 | 06/14/2024 |
| CONNECTION FEES | ¤1,187.26 | 06/14/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 06/14/2024 |
| IMPACT FEE FIRE | ¤428.09 | 06/14/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 06/14/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 06/14/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 06/14/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 06/14/2024 |
| IMPACT FEE TRANSPORTATION | ¤1,862.00 | 06/14/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 06/14/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 06/14/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤23,031.10 |