I want to search for...

Permit #2024050144

Permit Details

Status: COED

Parcel Id: 05-12-31-2755-00000-0410
CONDITIONED SPACE: 2118 sqft
GARAGE: 478 sqft
OPENED PORCH (WITH ROOF) : 288 sqft
Total Square Footage: 2884 sqft
Subdivision: 2313 - THE GABLES SUBDIVISION AT TOWN CENTER
Job Phone: (386)756-0439
Location Address: 14 JUNIPER LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 05/20/2024
NOC: RECORDED
Applicant name: JAMES MICHAEL MATHER
Owner: PAYTAS HOMES INC

Address

PO BOX 290490

PORT ORANGE, FL 32127

Lot: 41
Contracted Stated Job Value: ¤300,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

PAYTAS HOMES INC
Status Location Address State License Number Phone
ACTIVE

PO BOX 290490

PORT ORANGE, FL 32127

CBC1261873 (Exp: 08/31/2026) (386)756-0439

Sub Contractors

GERALD EDWARD MASTERS JR
Status Location Address State License Number Phone
ACTIVE

505 HERBERT STREET

PORT ORANGE, FL 32129

EC13003217 (Exp: 08/31/2026) (386)304-2600
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
DANIEL P HUCKS
Status Location Address State License Number Phone Fax
CANCEL

400 N. U.S. 1

Ormond Beach, FL 32174

CAC029376 (Exp: 08/31/2024) 386-672-8494 386-673-7856
JACK DOUGLAS LANIER
Status Location Address State License Number Phone Fax
ACTIVE

485 COMMERCE WAY

LONGWOOD , FL 32750

CCC058022 (Exp: 08/31/2026) (321)441-2300 (321)441-2313
PHILIP ALAN KENOVICH
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 1470

HOLLY HILL, FL 32117

LG270 (Exp: 08/31/2026) (386)672-2507

Inspection History

Type Request Date Result Inspector
ROW - STORMWATER FINAL 11/13/2024 APPROVED FSLADISH
Note: 11/13/24 AT THE TIME OF THIS INSPECTIONS ALL COPC REQUIREMENTS WERE MET, NEITHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. 11/12/2024 - PREVIOUS INSPECTION NOTES ** 11/12/24 LEFT REAR CORNER ON SLOPE WASHOUT UNDER SOD NEEDS TO BE REPAIRED ** RIGHT FRONT CORNER AT CURB NEED TO PUT SOD IN PLACE AT ADJACENT LOT TO ASSIST WITH THE EROSION CONTROL ** CLEAN CURB AND GUTTER ______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 11/8/24 REQUIRED CORRECTIONS MADE AT THE TIME OF THIS INSPECTION. APPROVING AS NOTED. UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED ________________________________________________________________________________________________________________________ 11/5/2024 - PREVIOUS INSPECTION NOTES 11/5/24 UPON WALKING PROPERTY DETERMINED THERE ARE AREAS IN THE REAR ON THE BACKSLOPE THAT ARE WASHING/WASHED OUT AND SLOPE DEGRADED. THESE AREAS WILL NEED TO BE REPAIRED AND SOD RESET. PINNING AND OR STABILIZING MAY BE REQUIRED DEPENDING ON THE RESULTS AFTER CORRECTIONS AND INSPECTION. YOU WILL NEED TO SOD AND STABILIZE ALL BARE AREAS AT THE BOTTOM OF THE BACK YARK SLOPE AS WELL. Inspector Notes from Inspection 9463 11/5/24 SITE PLAN SUBMITTED AND APPROVED SHOWING POOL AND PROPOSED DRAINAGE AT THE TIME OF THIS INSPECTION. APPROVING AS NOTED. ___________________________________________________________________________________________________________________________ 10/25/2024 - PREVIOUS INSPECTION NOTES THE SITE P[LAN DONT SHOW THE POOL NEED TO SUBMIT A NEW SITE PLAN WITH THE POOL AND THE NEW DRAINAGE AFTER THE POOL IS COMPLETE.
U -UTILITY RESIDENTIAL FINAL 11/12/2024 FINAL APPROVED DHANEY
ROW - FINAL APRON (AFTER POUR) 11/12/2024 APPROVED EMADISON
Note:
ROW - STORMWATER FINAL 11/12/2024 Disapproved -FEE REQUIRED EMADISON
Note: ** 11/12/24 LEFT REAR CORNER ON SLOPE WASHOUT UNDER SOD NEEDS TO BE REPAIRED ** RIGHT FRONT CORNER AT CURB NEED TO PUT SOD IN PLACE AT ADJACENT LOT TO ASSIST WITH THE EROSION CONTROL ** CLEAN CURB AND GUTTER ______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 11/8/24 REQUIRED CORRECTIONS MADE AT THE TIME OF THIS INSPECTION. APPROVING AS NOTED. UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED ________________________________________________________________________________________________________________________ 11/5/2024 - PREVIOUS INSPECTION NOTES 11/5/24 UPON WALKING PROPERTY DETERMINED THERE ARE AREAS IN THE REAR ON THE BACKSLOPE THAT ARE WASHING/WASHED OUT AND SLOPE DEGRADED. THESE AREAS WILL NEED TO BE REPAIRED AND SOD RESET. PINNING AND OR STABILIZING MAY BE REQUIRED DEPENDING ON THE RESULTS AFTER CORRECTIONS AND INSPECTION. YOU WILL NEED TO SOD AND STABILIZE ALL BARE AREAS AT THE BOTTOM OF THE BACK YARK SLOPE AS WELL. Inspector Notes from Inspection 9463 11/5/24 SITE PLAN SUBMITTED AND APPROVED SHOWING POOL AND PROPOSED DRAINAGE AT THE TIME OF THIS INSPECTION. APPROVING AS NOTED. ___________________________________________________________________________________________________________________________ 10/25/2024 - PREVIOUS INSPECTION NOTES THE SITE P[LAN DONT SHOW THE POOL NEED TO SUBMIT A NEW SITE PLAN WITH THE POOL AND THE NEW DRAINAGE AFTER THE POOL IS COMPLETE.
BLD - BUILDING FINAL 11/12/2024 Approval - Private Provider PPROVIDER
U-CROSS CONNECTION 11/08/2024 APPROVED DHANEY
ROW FIELD SURVEY /GRADING CERTIFICATION 11/08/2024 APPROVED - AS NOTED FSLADISH
Note: 11/8/24 REQUIRED CORRECTIONS MADE AT THE TIME OF THIS INSPECTION. APPROVING AS NOTED. UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED ________________________________________________________________________________________________________________________ 11/5/2024 - PREVIOUS INSPECTION NOTES 11/5/24 UPON WALKING PROPERTY DETERMINED THERE ARE AREAS IN THE REAR ON THE BACKSLOPE THAT ARE WASHING/WASHED OUT AND SLOPE DEGRADED. THESE AREAS WILL NEED TO BE REPAIRED AND SOD RESET. PINNING AND OR STABILIZING MAY BE REQUIRED DEPENDING ON THE RESULTS AFTER CORRECTIONS AND INSPECTION. YOU WILL NEED TO SOD AND STABILIZE ALL BARE AREAS AT THE BOTTOM OF THE BACK YARK SLOPE AS WELL. Inspector Notes from Inspection 9463 11/5/24 SITE PLAN SUBMITTED AND APPROVED SHOWING POOL AND PROPOSED DRAINAGE AT THE TIME OF THIS INSPECTION. APPROVING AS NOTED. ___________________________________________________________________________________________________________________________ 10/25/2024 - PREVIOUS INSPECTION NOTES THE SITE P[LAN DONT SHOW THE POOL NEED TO SUBMIT A NEW SITE PLAN WITH THE POOL AND THE NEW DRAINAGE AFTER THE POOL IS COMPLETE.
ROW- FINAL SURVEY/GRADING CERTIFICATION 11/05/2024 APPROVED - AS NOTED FSLADISH
Note: 11/5/24 SITE PLAN SUBMITTED AND APPROVED SHOWING POOL AND PROPOSED DRAINAGE AT THE TIME OF THIS INSPECTION. APPROVING AS NOTED. ___________________________________________________________________________________________________________________________ 10/25/2024 - PREVIOUS INSPECTION NOTES THE SITE P[LAN DONT SHOW THE POOL NEED TO SUBMIT A NEW SITE PLAN WITH THE POOL AND THE NEW DRAINAGE AFTER THE POOL IS COMPLETE.
ROW FIELD SURVEY /GRADING CERTIFICATION 11/05/2024 Disapproved - NO FEE FSLADISH
Note: 11/5/24 UPON WALKING PROPERTY DETERMINED THERE ARE AREAS IN THE REAR ON THE BACKSLOPE THAT ARE WASHING/WASHED OUT AND SLOPE DEGRADED. THESE AREAS WILL NEED TO BE REPAIRED AND SOD RESET. PINNING AND OR STABILIZING MAY BE REQUIRED DEPENDING ON THE RESULTS AFTER CORRECTIONS AND INSPECTION. YOU WILL NEED TO SOD AND STABILIZE ALL BARE AREAS AT THE BOTTOM OF THE BACK YARK SLOPE AS WELL. Inspector Notes from Inspection 9463 11/5/24 SITE PLAN SUBMITTED AND APPROVED SHOWING POOL AND PROPOSED DRAINAGE AT THE TIME OF THIS INSPECTION. APPROVING AS NOTED. ___________________________________________________________________________________________________________________________ 10/25/2024 - PREVIOUS INSPECTION NOTES THE SITE P[LAN DONT SHOW THE POOL NEED TO SUBMIT A NEW SITE PLAN WITH THE POOL AND THE NEW DRAINAGE AFTER THE POOL IS COMPLETE.
ROW- FINAL SURVEY/GRADING CERTIFICATION 10/25/2024 Disapproved - NO FEE PFLANAGAN
Note: THE SITE P[LAN DONT SHOW THE POOL NEED TO SUBMIT A NEW SITE PLAN WITH THE POOL AND THE NEW DRAINAGE AFTER THE POOL IS COMPLETE.
ELECTRIC - EARLY POWER 10/02/2024 Approval - Private Provider PPROVIDER
ROW- PRE-APRON (PRE-POUR) 09/19/2024 APPROVED FSLADISH
Note: 9/19/24 YOU ARE APPROVED TO LAY PAVERS AT THE TIME OF THIS INSPECTION. ________________________________________________________________________________________________________________________ 9/10/2024 - PREVIOUS INSPECTION NOTES 9/10/24 YOU ARE PARTIALLY APPROVED TO POUR PVER RESTRAINTS AND DRIVEWAY APRON AT THE TIME OF THIS INSPECTION. WITH RAIN IN THE FORECAST DAILY IT IS THE BUILDERS RESPONSIBILITY TO ENSURE THAT ALL WATER IS OUT OF POUR AREA AND PAVER RESTRAINTS ARE MAINTAINED. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION PREPOUR HAS BEEN SUBMITTED AND PASSED***
ROW- PRE-APRON (PRE-POUR) 09/10/2024 PARTIALLY APPROVED FSLADISH
Note: 9/10/24 YOU ARE PARTIALLY APPROVED TO POUR PVER RESTRAINTS AND DRIVEWAY APRON AT THE TIME OF THIS INSPECTION. WITH RAIN IN THE FORECAST DAILY IT IS THE BUILDERS RESPONSIBILITY TO ENSURE THAT ALL WATER IS OUT OF POUR AREA AND PAVER RESTRAINTS ARE MAINTAINED. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION PREPOUR HAS BEEN SUBMITTED AND PASSED***
LATH/BRICK/ WATER BARRIER 08/05/2024 Approval - Private Provider PPROVIDER
GRAVITY SEWER TEST 08/01/2024 Approval - Private Provider PPROVIDER
Note: Inspector Notes from Inspection 2095 THIS WAS A VIRTUAL INSPECTION
SEWER TIE IN 07/31/2024 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
INSULATION 07/31/2024 Approval - Private Provider PPROVIDER
WATER METER INSTALLATION REQUEST 07/26/2024 APPROVED CBOWERMASTER
ALL ROUGH 07/25/2024 Approval - Private Provider PPROVIDER
ROOF VALLEY & METAL 07/01/2024 Approval - Private Provider PPROVIDER
WALL SHEATHING 06/25/2024 Approval - Private Provider PPROVIDER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 06/25/2024 Approval - Private Provider PPROVIDER
ELECTRIC-TUG 06/13/2024 Approval - Private Provider PPROVIDER
TIE BEAM / LINTEL 06/07/2024 Approval - Private Provider PPROVIDER
FOUND SURVEY APPROVED (OFFICE) 06/05/2024 APPROVED TBAKER
MONOLITHIC SLAB 05/30/2024 Approval - Private Provider PPROVIDER
PLUMBING 1ST ROUGH UNDERGROUND 05/28/2024 Approval - Private Provider PPROVIDER

Review History

Department Status Date In Date Out
ZON COMPLETE 11/01/2024 11/01/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ENGIN1 COMPLETE 10/29/2024 10/31/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 10/29/2024 10/30/2024
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM
ENGIN1 COMPLETE 06/05/2024 06/05/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 06/05/2024 06/05/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ZON COMPLETE 05/14/2024 05/14/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ZON HOLD 05/08/2024 05/08/2024
Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM REPEAT COMMENT: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Elevation plan. The house on the plan appears as if the home will have two colors. Please refer to the color sheet as only accents can have a separate color and accents are listed. This plan does not meet code as it exceeds 20 percent of any one elevation. Change plans accordingly.
URB COMPLETE 05/03/2024 05/06/2024
Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM
BADMIN COMPLETE 05/02/2024 05/07/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
CUSVC COMPLETE 05/02/2024 05/07/2024
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ENGIN1 COMPLETE 05/02/2024 05/02/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 05/02/2024 05/07/2024
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
SW1 COMPLETE 05/02/2024 05/07/2024
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM
ZON HOLD 05/02/2024 05/03/2024
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Elevation plan. The house on the plan appears as if the home will have two colors. Please refer to the color sheet as only accents can have a separate color and accents are listed. This plan does not meet code as it exceeds 20 percent of any one elevation. Change plans accordingly. please bring in originals for ROW

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
SW ENG REINSPECTION 20 ¤20.00 11/13/2024
SW ENG - REVIEW 20 ¤20.00 05/20/2024
SW ENG RES REVIEW 200 ¤200.00 05/20/2024
SEWER INSPECTION ¤25.00 05/20/2024
SITE PLAN 30 ¤30.00 05/20/2024
WATER-METER ¤514.49 05/20/2024
WATER-METER ¤427.42 05/20/2024
ADJUSTMENT 10% (¤144.55) 05/20/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 05/20/2024
INSPECTION - RESIDENTIAL ¤1,102.75 05/20/2024
PLAN REVIEW - RESIDENTIAL ¤312.78 05/20/2024
CONNECTION FEES ¤25.00 05/20/2024
FC IMPACT FEE EMS ¤62.00 05/20/2024
IMPACT FEE FIRE ¤428.09 05/20/2024
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 05/20/2024
FC IMPACT FEE LIBRARY ¤268.00 05/20/2024
IMPACT FEE PARKS ¤1,800.99 05/20/2024
IMPACT FEE SCHOOL ¤5,450.00 05/20/2024
RECORDING FEE REIMBURSE DOC ¤44.00 05/20/2024
IMPACT FEE TRANSPORTATION ¤3,404.00 05/20/2024
WATER -IRRIGATION INSPECTION ¤25.00 05/20/2024
SURCHARGE FS 533.721 ¤13.01 05/20/2024
SURCHARGE - FS 468.631 ¤19.52 05/20/2024
SW ENG - FOUNDATION SURVEY ¤20.00 05/20/2024
SW ENG INSPECTION 80 ¤80.00 05/20/2024
SW ENG PRE APRON ¤30.00 05/20/2024
Fees Total Due: ¤0.00 Total Paid: ¤14,425.50