I want to search for...
Permit #2024050144
Permit Details
Status: COED
| Parcel Id: 05-12-31-2755-00000-0410 |
| CONDITIONED SPACE: 2118 sqft |
| GARAGE: 478 sqft |
| OPENED PORCH (WITH ROOF) : 288 sqft |
| Total Square Footage: 2884 sqft |
| Subdivision: 2313 - THE GABLES SUBDIVISION AT TOWN CENTER |
| Job Phone: (386)756-0439 |
| Location Address: 14 JUNIPER LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 05/20/2024 |
| NOC: RECORDED |
| Applicant name: JAMES MICHAEL MATHER |
| Owner: PAYTAS HOMES INC |
|
Address PO BOX 290490 PORT ORANGE, FL 32127 |
| Lot: 41 |
| Contracted Stated Job Value: ¤300,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
PAYTAS HOMES INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 290490 PORT ORANGE, FL 32127 |
CBC1261873 (Exp: 08/31/2026) | (386)756-0439 |
Sub Contractors
GERALD EDWARD MASTERS JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
505 HERBERT STREET PORT ORANGE, FL 32129 |
EC13003217 (Exp: 08/31/2026) | (386)304-2600 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
DANIEL P HUCKS
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
400 N. U.S. 1 Ormond Beach, FL 32174 |
CAC029376 (Exp: 08/31/2024) | 386-672-8494 | 386-673-7856 |
JACK DOUGLAS LANIER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
485 COMMERCE WAY LONGWOOD , FL 32750 |
CCC058022 (Exp: 08/31/2026) | (321)441-2300 | (321)441-2313 |
PHILIP ALAN KENOVICH
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 1470 HOLLY HILL, FL 32117 |
LG270 (Exp: 08/31/2026) | (386)672-2507 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - STORMWATER FINAL | 11/13/2024 | APPROVED | FSLADISH |
| Note: 11/13/24 AT THE TIME OF THIS INSPECTIONS ALL COPC REQUIREMENTS WERE MET, NEITHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. 11/12/2024 - PREVIOUS INSPECTION NOTES ** 11/12/24 LEFT REAR CORNER ON SLOPE WASHOUT UNDER SOD NEEDS TO BE REPAIRED ** RIGHT FRONT CORNER AT CURB NEED TO PUT SOD IN PLACE AT ADJACENT LOT TO ASSIST WITH THE EROSION CONTROL ** CLEAN CURB AND GUTTER ______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 11/8/24 REQUIRED CORRECTIONS MADE AT THE TIME OF THIS INSPECTION. APPROVING AS NOTED. UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED ________________________________________________________________________________________________________________________ 11/5/2024 - PREVIOUS INSPECTION NOTES 11/5/24 UPON WALKING PROPERTY DETERMINED THERE ARE AREAS IN THE REAR ON THE BACKSLOPE THAT ARE WASHING/WASHED OUT AND SLOPE DEGRADED. THESE AREAS WILL NEED TO BE REPAIRED AND SOD RESET. PINNING AND OR STABILIZING MAY BE REQUIRED DEPENDING ON THE RESULTS AFTER CORRECTIONS AND INSPECTION. YOU WILL NEED TO SOD AND STABILIZE ALL BARE AREAS AT THE BOTTOM OF THE BACK YARK SLOPE AS WELL. Inspector Notes from Inspection 9463 11/5/24 SITE PLAN SUBMITTED AND APPROVED SHOWING POOL AND PROPOSED DRAINAGE AT THE TIME OF THIS INSPECTION. APPROVING AS NOTED. ___________________________________________________________________________________________________________________________ 10/25/2024 - PREVIOUS INSPECTION NOTES THE SITE P[LAN DONT SHOW THE POOL NEED TO SUBMIT A NEW SITE PLAN WITH THE POOL AND THE NEW DRAINAGE AFTER THE POOL IS COMPLETE. | |||
| U -UTILITY RESIDENTIAL FINAL | 11/12/2024 | FINAL APPROVED | DHANEY |
| ROW - FINAL APRON (AFTER POUR) | 11/12/2024 | APPROVED | EMADISON |
| Note: | |||
| ROW - STORMWATER FINAL | 11/12/2024 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 11/12/24 LEFT REAR CORNER ON SLOPE WASHOUT UNDER SOD NEEDS TO BE REPAIRED ** RIGHT FRONT CORNER AT CURB NEED TO PUT SOD IN PLACE AT ADJACENT LOT TO ASSIST WITH THE EROSION CONTROL ** CLEAN CURB AND GUTTER ______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 11/8/24 REQUIRED CORRECTIONS MADE AT THE TIME OF THIS INSPECTION. APPROVING AS NOTED. UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED ________________________________________________________________________________________________________________________ 11/5/2024 - PREVIOUS INSPECTION NOTES 11/5/24 UPON WALKING PROPERTY DETERMINED THERE ARE AREAS IN THE REAR ON THE BACKSLOPE THAT ARE WASHING/WASHED OUT AND SLOPE DEGRADED. THESE AREAS WILL NEED TO BE REPAIRED AND SOD RESET. PINNING AND OR STABILIZING MAY BE REQUIRED DEPENDING ON THE RESULTS AFTER CORRECTIONS AND INSPECTION. YOU WILL NEED TO SOD AND STABILIZE ALL BARE AREAS AT THE BOTTOM OF THE BACK YARK SLOPE AS WELL. Inspector Notes from Inspection 9463 11/5/24 SITE PLAN SUBMITTED AND APPROVED SHOWING POOL AND PROPOSED DRAINAGE AT THE TIME OF THIS INSPECTION. APPROVING AS NOTED. ___________________________________________________________________________________________________________________________ 10/25/2024 - PREVIOUS INSPECTION NOTES THE SITE P[LAN DONT SHOW THE POOL NEED TO SUBMIT A NEW SITE PLAN WITH THE POOL AND THE NEW DRAINAGE AFTER THE POOL IS COMPLETE. | |||
| BLD - BUILDING FINAL | 11/12/2024 | Approval - Private Provider | PPROVIDER |
| U-CROSS CONNECTION | 11/08/2024 | APPROVED | DHANEY |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/08/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 11/8/24 REQUIRED CORRECTIONS MADE AT THE TIME OF THIS INSPECTION. APPROVING AS NOTED. UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED ________________________________________________________________________________________________________________________ 11/5/2024 - PREVIOUS INSPECTION NOTES 11/5/24 UPON WALKING PROPERTY DETERMINED THERE ARE AREAS IN THE REAR ON THE BACKSLOPE THAT ARE WASHING/WASHED OUT AND SLOPE DEGRADED. THESE AREAS WILL NEED TO BE REPAIRED AND SOD RESET. PINNING AND OR STABILIZING MAY BE REQUIRED DEPENDING ON THE RESULTS AFTER CORRECTIONS AND INSPECTION. YOU WILL NEED TO SOD AND STABILIZE ALL BARE AREAS AT THE BOTTOM OF THE BACK YARK SLOPE AS WELL. Inspector Notes from Inspection 9463 11/5/24 SITE PLAN SUBMITTED AND APPROVED SHOWING POOL AND PROPOSED DRAINAGE AT THE TIME OF THIS INSPECTION. APPROVING AS NOTED. ___________________________________________________________________________________________________________________________ 10/25/2024 - PREVIOUS INSPECTION NOTES THE SITE P[LAN DONT SHOW THE POOL NEED TO SUBMIT A NEW SITE PLAN WITH THE POOL AND THE NEW DRAINAGE AFTER THE POOL IS COMPLETE. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 11/05/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 11/5/24 SITE PLAN SUBMITTED AND APPROVED SHOWING POOL AND PROPOSED DRAINAGE AT THE TIME OF THIS INSPECTION. APPROVING AS NOTED. ___________________________________________________________________________________________________________________________ 10/25/2024 - PREVIOUS INSPECTION NOTES THE SITE P[LAN DONT SHOW THE POOL NEED TO SUBMIT A NEW SITE PLAN WITH THE POOL AND THE NEW DRAINAGE AFTER THE POOL IS COMPLETE. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/05/2024 | Disapproved - NO FEE | FSLADISH |
| Note: 11/5/24 UPON WALKING PROPERTY DETERMINED THERE ARE AREAS IN THE REAR ON THE BACKSLOPE THAT ARE WASHING/WASHED OUT AND SLOPE DEGRADED. THESE AREAS WILL NEED TO BE REPAIRED AND SOD RESET. PINNING AND OR STABILIZING MAY BE REQUIRED DEPENDING ON THE RESULTS AFTER CORRECTIONS AND INSPECTION. YOU WILL NEED TO SOD AND STABILIZE ALL BARE AREAS AT THE BOTTOM OF THE BACK YARK SLOPE AS WELL. Inspector Notes from Inspection 9463 11/5/24 SITE PLAN SUBMITTED AND APPROVED SHOWING POOL AND PROPOSED DRAINAGE AT THE TIME OF THIS INSPECTION. APPROVING AS NOTED. ___________________________________________________________________________________________________________________________ 10/25/2024 - PREVIOUS INSPECTION NOTES THE SITE P[LAN DONT SHOW THE POOL NEED TO SUBMIT A NEW SITE PLAN WITH THE POOL AND THE NEW DRAINAGE AFTER THE POOL IS COMPLETE. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 10/25/2024 | Disapproved - NO FEE | PFLANAGAN |
| Note: THE SITE P[LAN DONT SHOW THE POOL NEED TO SUBMIT A NEW SITE PLAN WITH THE POOL AND THE NEW DRAINAGE AFTER THE POOL IS COMPLETE. | |||
| ELECTRIC - EARLY POWER | 10/02/2024 | Approval - Private Provider | PPROVIDER |
| ROW- PRE-APRON (PRE-POUR) | 09/19/2024 | APPROVED | FSLADISH |
| Note: 9/19/24 YOU ARE APPROVED TO LAY PAVERS AT THE TIME OF THIS INSPECTION. ________________________________________________________________________________________________________________________ 9/10/2024 - PREVIOUS INSPECTION NOTES 9/10/24 YOU ARE PARTIALLY APPROVED TO POUR PVER RESTRAINTS AND DRIVEWAY APRON AT THE TIME OF THIS INSPECTION. WITH RAIN IN THE FORECAST DAILY IT IS THE BUILDERS RESPONSIBILITY TO ENSURE THAT ALL WATER IS OUT OF POUR AREA AND PAVER RESTRAINTS ARE MAINTAINED. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION PREPOUR HAS BEEN SUBMITTED AND PASSED*** | |||
| ROW- PRE-APRON (PRE-POUR) | 09/10/2024 | PARTIALLY APPROVED | FSLADISH |
| Note: 9/10/24 YOU ARE PARTIALLY APPROVED TO POUR PVER RESTRAINTS AND DRIVEWAY APRON AT THE TIME OF THIS INSPECTION. WITH RAIN IN THE FORECAST DAILY IT IS THE BUILDERS RESPONSIBILITY TO ENSURE THAT ALL WATER IS OUT OF POUR AREA AND PAVER RESTRAINTS ARE MAINTAINED. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION PREPOUR HAS BEEN SUBMITTED AND PASSED*** | |||
| LATH/BRICK/ WATER BARRIER | 08/05/2024 | Approval - Private Provider | PPROVIDER |
| GRAVITY SEWER TEST | 08/01/2024 | Approval - Private Provider | PPROVIDER |
| Note: Inspector Notes from Inspection 2095 THIS WAS A VIRTUAL INSPECTION | |||
| SEWER TIE IN | 07/31/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| INSULATION | 07/31/2024 | Approval - Private Provider | PPROVIDER |
| WATER METER INSTALLATION REQUEST | 07/26/2024 | APPROVED | CBOWERMASTER |
| ALL ROUGH | 07/25/2024 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 07/01/2024 | Approval - Private Provider | PPROVIDER |
| WALL SHEATHING | 06/25/2024 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/25/2024 | Approval - Private Provider | PPROVIDER |
| ELECTRIC-TUG | 06/13/2024 | Approval - Private Provider | PPROVIDER |
| TIE BEAM / LINTEL | 06/07/2024 | Approval - Private Provider | PPROVIDER |
| FOUND SURVEY APPROVED (OFFICE) | 06/05/2024 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 05/30/2024 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH UNDERGROUND | 05/28/2024 | Approval - Private Provider | PPROVIDER |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 11/01/2024 | 11/01/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/29/2024 | 10/31/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 10/29/2024 | 10/30/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/05/2024 | 06/05/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/05/2024 | 06/05/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/14/2024 | 05/14/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ZON | HOLD | 05/08/2024 | 05/08/2024 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM REPEAT COMMENT: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Elevation plan. The house on the plan appears as if the home will have two colors. Please refer to the color sheet as only accents can have a separate color and accents are listed. This plan does not meet code as it exceeds 20 percent of any one elevation. Change plans accordingly. | |||
| URB | COMPLETE | 05/03/2024 | 05/06/2024 |
| Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 05/02/2024 | 05/07/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 05/02/2024 | 05/07/2024 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/02/2024 | 05/02/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 05/02/2024 | 05/07/2024 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/02/2024 | 05/07/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM | |||
| ZON | HOLD | 05/02/2024 | 05/03/2024 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Elevation plan. The house on the plan appears as if the home will have two colors. Please refer to the color sheet as only accents can have a separate color and accents are listed. This plan does not meet code as it exceeds 20 percent of any one elevation. Change plans accordingly. please bring in originals for ROW |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG REINSPECTION 20 | ¤20.00 | 11/13/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 05/20/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 05/20/2024 |
| SEWER INSPECTION | ¤25.00 | 05/20/2024 |
| SITE PLAN 30 | ¤30.00 | 05/20/2024 |
| WATER-METER | ¤514.49 | 05/20/2024 |
| WATER-METER | ¤427.42 | 05/20/2024 |
| ADJUSTMENT 10% | (¤144.55) | 05/20/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 05/20/2024 |
| INSPECTION - RESIDENTIAL | ¤1,102.75 | 05/20/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤312.78 | 05/20/2024 |
| CONNECTION FEES | ¤25.00 | 05/20/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 05/20/2024 |
| IMPACT FEE FIRE | ¤428.09 | 05/20/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 05/20/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 05/20/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 05/20/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 05/20/2024 |
| RECORDING FEE REIMBURSE DOC | ¤44.00 | 05/20/2024 |
| IMPACT FEE TRANSPORTATION | ¤3,404.00 | 05/20/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 05/20/2024 |
| SURCHARGE FS 533.721 | ¤13.01 | 05/20/2024 |
| SURCHARGE - FS 468.631 | ¤19.52 | 05/20/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 05/20/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 05/20/2024 |
| SW ENG PRE APRON | ¤30.00 | 05/20/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤14,425.50 |