I want to search for...
Permit #2024050152
Permit Details
Status: COED
| Parcel Id: 35-11-31-4075-00000-1060 |
| CONDITIONED SPACE: 2158 sqft |
| OPENED PORCH (WITH ROOF) : 237 sqft |
| GARAGE: 464 sqft |
| Total Square Footage: 2859 sqft |
| Block: 00000 |
| Subdivision: 4075 - |
| Job Phone: (386)756-0439 |
| Location Address: 77 DEL PALMA DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 05/08/2024 |
| NOC: RECORDED |
| Applicant name: JAMES MICHAEL MATHER |
| Owner: SHAMROCK- SHAMROCK INC |
|
Address 250 PALM COAST PARKWAY NE PALM COAST, FL 32137 |
|
Address SUITE 607-508 PALM COAST, FL 32137 |
| Lot: 1060 |
| Contracted Stated Job Value: ¤350,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
PAYTAS HOMES INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 290490 PORT ORANGE, FL 32127 |
CBC1261873 (Exp: 08/31/2026) | (386)756-0439 |
Sub Contractors
GERALD EDWARD MASTERS JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
505 HERBERT STREET PORT ORANGE, FL 32129 |
EC13003217 (Exp: 08/31/2026) | (386)304-2600 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
DANIEL P HUCKS
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
400 N. U.S. 1 Ormond Beach, FL 32174 |
CAC029376 (Exp: 08/31/2024) | 386-672-8494 | 386-673-7856 |
IAN ALAN BRENNER
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
691 GARDEN COMMERCE PKWY WINTER GARDEN, FL 34787 |
STE 170 WINTER GARDEN, FL 34787 |
CCC1331270 (Exp: 08/31/2026) | 407-649-1333 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 10/25/2024 | Approval - Private Provider | PPROVIDER |
| U -UTILITY RESIDENTIAL FINAL | 10/25/2024 | FINAL APPROVED | BWRIGHT |
| Note: Inspector Notes from Inspection 9035 Has a well. No CC | |||
| U-CROSS CONNECTION | 10/24/2024 | APPROVED - AS NOTED | BWRIGHT |
| Note: Has a well. No CC | |||
| ROW - FINAL APRON (AFTER POUR) | 10/24/2024 | APPROVED | FSLADISH |
| Note: 10/24/24 No broken or chipped pavers or concrete observed at the time of this inspection. AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIEMENT ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 10/24/2024 | APPROVED | FSLADISH |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 10/24/2024 | APPROVED | FSLADISH |
| Note: 10/24/2 4UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW - STORMWATER FINAL | 10/24/2024 | APPROVED | FSLADISH |
| Note: 1/24/24 AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIEMENT ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ELECTRIC - EARLY POWER | 09/24/2024 | Approval - Private Provider | PPROVIDER |
| ROW- PRE-APRON (PRE-POUR) | 09/19/2024 | APPROVED | FSLADISH |
| Note: 9/19/24 YOU ARE APPROVED TO LAY PAVERS AT THE TIME OF THIS INSPECTION. ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9271 9/13/24 AT THE TIME OF THIS INSPECTION YOU ARE APPROVED TO POUR YOUR PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS | |||
| ROW- PAVER RESTRAINTS | 09/13/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 9/13/24 AT THE TIME OF THIS INSPECTION YOU ARE APPROVED TO POUR YOUR PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS | |||
| ROW- PRE-APRON (PRE-POUR) | 09/13/2024 | PARTIALLY APPROVED | FSLADISH |
| Note: 9/13/24 AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS | |||
| GRAVITY SEWER TEST | 08/15/2024 | Approval - Private Provider | PPROVIDER |
| Note: Inspector Notes from Inspection 2095 THIS WAS A VIRTUAL INSPECTION | |||
| SEWER TIE IN | 08/15/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| LATH/BRICK/ WATER BARRIER | 08/02/2024 | Approval - Private Provider | PPROVIDER |
| INSULATION | 07/25/2024 | Approval - Private Provider | PPROVIDER |
| ALL ROUGH | 07/22/2024 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 07/08/2024 | Approval - Private Provider | PPROVIDER |
| WALL SHEATHING | 06/24/2024 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/24/2024 | Approval - Private Provider | PPROVIDER |
| ELECTRIC-TUG | 06/06/2024 | Approval - Private Provider | PPROVIDER |
| ELECTRIC-TUG | 06/05/2024 | CANCELLED BY APPLICANT | WEB |
| TIE BEAM / LINTEL | 06/03/2024 | Approval - Private Provider | PPROVIDER |
| FOUND SURVEY APPROVED (OFFICE) | 05/30/2024 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 05/22/2024 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH UNDERGROUND | 05/20/2024 | Approval - Private Provider | PPROVIDER |
| WATER METER INSTALLATION REQUEST | 05/17/2024 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 05/30/2024 | 05/30/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/30/2024 | 05/30/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| URB | COMPLETE | 05/06/2024 | 05/06/2024 |
| Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 05/02/2024 | 05/07/2024 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/02/2024 | 05/03/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 05/02/2024 | 05/07/2024 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/02/2024 | 05/07/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/02/2024 | 05/06/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 05/02/2024 | 05/07/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| WATER-METER | ¤514.49 | 05/08/2024 |
| ADJUSTMENT 10% | (¤145.26) | 05/08/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 05/08/2024 |
| INSPECTION - RESIDENTIAL | ¤1,108.25 | 05/08/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤314.34 | 05/08/2024 |
| CONNECTION FEES | ¤25.00 | 05/08/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 05/08/2024 |
| IMPACT FEE FIRE | ¤428.09 | 05/08/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 05/08/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 05/08/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 05/08/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 05/08/2024 |
| IMPACT FEE TRANSPORTATION | ¤3,404.00 | 05/08/2024 |
| SURCHARGE FS 533.721 | ¤13.07 | 05/08/2024 |
| SURCHARGE - FS 468.631 | ¤19.61 | 05/08/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 05/08/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 05/08/2024 |
| SW ENG PRE APRON | ¤30.00 | 05/08/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 05/08/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 05/08/2024 |
| SEWER INSPECTION | ¤25.00 | 05/08/2024 |
| SEWER CAPITAL FACILITY | ¤3,408.87 | 05/08/2024 |
| WATER CAPITAL FACILITY FEE | ¤3,025.59 | 05/08/2024 |
| SITE PLAN 30 | ¤30.00 | 05/08/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤20,350.04 |