I want to search for...

Permit #2024050154

Permit Details

Status: COED

Parcel Id: 07-11-31-7001-00180-0060
Block: 00180
Subdivision: 7001 -
Job Phone: 904-814-2349
Location Address: 10 FAYETTE LN
Type: RF - REROOF
Issue Date: 05/03/2024
NOC: RECORDED
Applicant name: ROLAND DENTON DOTSON
Owner: BOYD JOHN R & CLAUDIA A BOYD H&W

Address

10 FAYETTE LANE

PALM COAST, FL 32137

Lot: 0060
Contracted Stated Job Value: ¤17,000.00
Job Description: Re-Roof
Type: CN

Contractor

SOUTHEAST PREMIER ROOFING LLC
Status Location Address State License Number Phone
CANCEL

21 LAS BRASIS WAY

,

RC29027881 (Exp: 08/31/2025) 904-814-2349

Inspection History

Type Request Date Result Inspector
ROOF IN PROGRESS- MIDROOF 05/07/2024 APPROVED AWATERS
Note: 5/6/2024 - PREVIOUS INSPECTION NOTES contractor or contractors manager asked for inspection after 1pm, request was granted and inspection was added the the list to be inspectiod in the pm. contractor or contractors manager was advised by Cheif Inspector RM he could not procede past 50 percent with the shingles, on my arrival the roof was more than 90 percent shingled. What little bit of underlayment that was still visable was not nailed per current codes. maximum OC spacing on fasteners at overlaps exceeded, maximum OC spacing of fasteners in the field exceeded. Underlayment shall be attached to a nailable deck with corrosion-resistant fasteners with a maximum fastener spacing, measured horizontally and vertically, of 12 inches (305 mm) o.c. between side laps, and one row at the end and side laps fastened 6 inches. per FBC-R, 905.1.1.1 (3) Someone will need to meet with the inspector onsite at the next inspection with a crew and materials available to open the roof inseveral areas as directed by the inspector for visual inspection of the underlayment to the extent of the inspectors judgement for approval of the underlayment. also: the shingles are required per manufacturer instructions to be installed with 6 inch offset, in several areas the shingles did not meet this requirement.
ROOF FINAL 05/07/2024 FINAL APPROVED AWATERS
ROOF IN PROGRESS- MIDROOF 05/06/2024 Disapproved - NO FEE LMILLER
Note: contractor or contractors manager asked for inspection after 1pm, request was granted and inspection was added the the list to be inspectiod in the pm. contractor or contractors manager was advised by Cheif Inspector RM he could not procede past 50 percent with the shingles, on my arrival the roof was more than 90 percent shingled. What little bit of underlayment that was still visable was not nailed per current codes. maximum OC spacing on fasteners at overlaps exceeded, maximum OC spacing of fasteners in the field exceeded. Underlayment shall be attached to a nailable deck with corrosion-resistant fasteners with a maximum fastener spacing, measured horizontally and vertically, of 12 inches (305 mm) o.c. between side laps, and one row at the end and side laps fastened 6 inches. per FBC-R, 905.1.1.1 (3) Someone will need to meet with the inspector onsite at the next inspection with a crew and materials available to open the roof inseveral areas as directed by the inspector for visual inspection of the underlayment to the extent of the inspectors judgement for approval of the underlayment. also: the shingles are required per manufacturer instructions to be installed with 6 inch offset, in several areas the shingles did not meet this requirement.
ROOF AFFIDAVIT 05/05/2024 APPROVED LMUSGROVE

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ADJUSTMENT 10% (¤9.00) 05/03/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 05/03/2024
INSPECTION - RESIDENTIAL ¤60.00 05/03/2024
SURCHARGE FS 533.721 ¤2.00 05/03/2024
SURCHARGE - FS 468.631 ¤2.00 05/03/2024
Fees Total Due: ¤0.00 Total Paid: ¤85.00