Permit #2024050441
Permit Details
Status: COED
| Parcel Id: 07-11-31-7059-00920-0030 |
| CONDITIONED SPACE: 1504 sqft |
| GARAGE: 397 sqft |
| OPENED PORCH (WITH ROOF) : 112 sqft |
| Total Square Footage: 2013 sqft |
| Block: 00920 |
| Subdivision: - |
| Job Phone: 202-494-2019 |
| Location Address: 10 SEABURY PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 06/05/2024 |
| NOC: RECORDED |
| Applicant name: GARY ANDREW FISCHER |
| Owner: FELDMAN PAUL ESQ TRUSTEE |
|
Address 2750 NE 185TH STREET AVENTURA, FL 33180 |
|
Address SUITE 203 AVENTURA, FL 33180 |
| Lot: 0030 |
| Contracted Stated Job Value: ¤150,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
INB HOMES
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
3670 MAGUIRE BLVD ORLANDO, FL 32803 |
SUITE 210 ORLANDO, FL 32803 |
CGC048746 (Exp: 08/31/2026) | 407-476-8195 |
Sub Contractors
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
JOSEPH C WRIGHT
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
15 HARGROVE LANE PALM COAST, FL 32137 |
UNIT 3 D PALM COAST, FL 32137 |
EC13003278 (Exp: 08/31/2026) | 386-447-9644 | 386-447-9633 |
ROBERT MICHAEL RENNER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
531 CODISCO WAY SANFORD, FL 32771 |
CAC051477 (Exp: 08/31/2026) | 407-333-2665 |
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 12/19/2024 | FINAL APPROVED | BTAYLOR |
| U-CROSS CONNECTION | 12/16/2024 | APPROVED | BWRIGHT |
| U -UTILITY RESIDENTIAL FINAL | 12/16/2024 | FINAL APPROVED | BWRIGHT |
| ROW - STORMWATER FINAL | 12/13/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 12/13/24 MAKE SURE TO CLEAN UP SMALL AMOUNT OF TRASH ON LEFT SIDE CULVERT END. APPROVING AS NOTED. AT THE TIME OF THIS INSPECTIONS ALL COPC REQUIREMENTS WERE MET, NEITHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW - FINAL APRON (AFTER POUR) | 12/13/2024 | APPROVED | FSLADISH |
| Note: 12/13/24 AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 12/13/2024 | APPROVED | FSLADISH |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 12/13/2024 | APPROVED | FSLADISH |
| Note: 12/13/24 UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW- PRE-APRON (PRE-POUR) | 11/22/2024 | APPROVED | FSLADISH |
| Note: 11/22/24 Pipe elevation good. 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. AT THE TIME OF THE INSPECTION READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK ELEVATIONS MAKE SURE IS 3000 PSI AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIEMENT ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. Inspector Notes from Inspection 9470 9/30/24 CORRECTIONS MADE AT THE TIME OF THIS INSPECTION. YOU STILL NEED TO REMOVE YOUR PORTA POTTY OUT OF THE ROW. MAINTAIN CULVERT PIPE AND SWALE THROUGHOUT CONSTRUCTION PROCESS. I AM APPROVING THIS AS NOTED THAT YOU NEED TO MOVE YOUR PORTA POTTY OUT OF THE ROW. WILL MONITOR FOR COMPLIANCE. _______________________________________________________________________________________________________________________ 9/27/2024 - PREVIOUS INSPECTION NOTES 9/27/24 GRADER IS ON SITE GRADING SWALE. MAKKE SURE PORTA POTTY IS REMOVED FROM ROW AND DIRT IS SCRAPED UP OFF OFF ROAD. I AM GOING TO PATIALLY APPROVE THIS INSPECTION. I WILL BE BACK TO REINSPECT TO MAKE SURE CORRECTIONS HAVE BEEN MADE ON 9/30/24 ________________________________________________________________________________________________________________________ 9/25/2024 - PREVIOUS INSPECTION NOTES 9/25/24 YOU ARE REQUIRED TO KEEP YOUR TEMPORARY PIPE AND SWALE OPEN TO DRAINAGE FLOW THROUGHOUT TO CONSTRUCTION PROCESS. YOU ARE BLOCKING THE DRAINGE FROM FLOWING TO THE DRAINAGE DITCH AT THE END OF THE CUL DE SAC. WITH A TROPICAL STORM WARING CURRENTLY FOR OUR AREA IT IS IMPERATIVE THAT THIS IS REMEDIED IMMEDIATELY. I WILL BE BACK FOR COMPLIANCE REINSPECTION OM 9/27/24. PHOTO FOR REFERENCE. | |||
| ELECTRIC - EARLY POWER | 11/22/2024 | APPROVED - AS NOTED | BTAYLOR |
| Note: Inspector Notes from Inspection 2200 10-9-24 1. Emailed FPL 11:41. 11-22-24 1. Emailed FPL at 11:13. | |||
| GRAVITY SEWER TEST | 11/20/2024 | APPROVED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 FBCR-319.1 ADRESS NEEDS TO BE POSTED FOR 9-1-1 PURPOSE | |||
| SEWER TIE IN | 11/20/2024 | APPROVED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 FBCR-319.1 ADRESS NEEDS TO BE POSTED FOR 9-1-1 PURPOSE | |||
| PEP TANK INSTALLATION REQUEST | 10/25/2024 | APPROVED | CBOWERMASTER |
| INSULATION | 10/24/2024 | APPROVED | BTAYLOR |
| PEP TANK INSTALLATION REQUEST | 10/21/2024 | CANCELLED BY APPLICANT | WEB |
| LATH/BRICK/ WATER BARRIER | 10/15/2024 | APPROVED | BTAYLOR |
| Note: Inspector Notes from Inspection 2420 10-14-24 1. Garage door not installed. 2. Dryer vent elbow needs to be sealed. | |||
| ALL ROUGH | 10/14/2024 | APPROVED - AS NOTED | BTAYLOR |
| Note: 10-14-24 1. Garage door not installed. 2. Dryer vent elbow needs to be sealed. | |||
| ELECTRIC-TUG | 10/09/2024 | APPROVED - AS NOTED | BTAYLOR |
| Note: 10-9-24 1. Emailed FPL 11:41. | |||
| ROOF VALLEY & METAL | 09/30/2024 | APPROVED | BTAYLOR |
| ROW - DRAINAGE | 09/30/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 9/30/24 CORRECTIONS MADE AT THE TIME OF THIS INSPECTION. YOU STILL NEED TO REMOVE YOUR PORTA POTTY OUT OF THE ROW. MAINTAIN CULVERT PIPE AND SWALE THROUGHOUT CONSTRUCTION PROCESS. I AM APPROVING THIS AS NOTED THAT YOU NEED TO MOVE YOUR PORTA POTTY OUT OF THE ROW. WILL MONITOR FOR COMPLIANCE. _______________________________________________________________________________________________________________________ 9/27/2024 - PREVIOUS INSPECTION NOTES 9/27/24 GRADER IS ON SITE GRADING SWALE. MAKKE SURE PORTA POTTY IS REMOVED FROM ROW AND DIRT IS SCRAPED UP OFF OFF ROAD. I AM GOING TO PATIALLY APPROVE THIS INSPECTION. I WILL BE BACK TO REINSPECT TO MAKE SURE CORRECTIONS HAVE BEEN MADE ON 9/30/24 ________________________________________________________________________________________________________________________ 9/25/2024 - PREVIOUS INSPECTION NOTES 9/25/24 YOU ARE REQUIRED TO KEEP YOUR TEMPORARY PIPE AND SWALE OPEN TO DRAINAGE FLOW THROUGHOUT TO CONSTRUCTION PROCESS. YOU ARE BLOCKING THE DRAINGE FROM FLOWING TO THE DRAINAGE DITCH AT THE END OF THE CUL DE SAC. WITH A TROPICAL STORM WARING CURRENTLY FOR OUR AREA IT IS IMPERATIVE THAT THIS IS REMEDIED IMMEDIATELY. I WILL BE BACK FOR COMPLIANCE REINSPECTION OM 9/27/24. PHOTO FOR REFERENCE. | |||
| ROW - DRAINAGE | 09/27/2024 | PARTIALLY APPROVED | FSLADISH |
| Note: 9/27/24 GRADER IS ON SITE GRADING SWALE. MAKKE SURE PORTA POTTY IS REMOVED FROM ROW AND DIRT IS SCRAPED UP OFF OFF ROAD. I AM GOING TO PATIALLY APPROVE THIS INSPECTION. I WILL BE BACK TO REINSPECT TO MAKE SURE CORRECTIONS HAVE BEEN MADE ON 9/30/24 ________________________________________________________________________________________________________________________ 9/25/2024 - PREVIOUS INSPECTION NOTES 9/25/24 YOU ARE REQUIRED TO KEEP YOUR TEMPORARY PIPE AND SWALE OPEN TO DRAINAGE FLOW THROUGHOUT TO CONSTRUCTION PROCESS. YOU ARE BLOCKING THE DRAINGE FROM FLOWING TO THE DRAINAGE DITCH AT THE END OF THE CUL DE SAC. WITH A TROPICAL STORM WARING CURRENTLY FOR OUR AREA IT IS IMPERATIVE THAT THIS IS REMEDIED IMMEDIATELY. I WILL BE BACK FOR COMPLIANCE REINSPECTION OM 9/27/24. PHOTO FOR REFERENCE. | |||
| ROW- PROJECT STATUS | 09/25/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 9/25/24 I AM PUTTING A DRAINAGE ON THIS PERMIT. THE TEMPORARY PIPE AND SWALE WILL NEED TO BE CLEANED OUT AND OPEN TO DRAINAGE FLOW. APPROVING AS NOTED. PHOTO FOR REFERENCE. ___________________________________________________________________________________________________________________________ RESIDENT AT 4 SAYS TEMP CULVERT IS BLOCKED PLS INSPECT MH | |||
| ROW - DRAINAGE | 09/25/2024 | Disapproved - NO FEE | FSLADISH |
| Note: 9/25/24 YOU ARE REQUIRED TO KEEP YOUR TEMPORARY PIPE AND SWALE OPEN TO DRAINAGE FLOW THROUGHOUT TO CONSTRUCTION PROCESS. YOU ARE BLOCKING THE DRAINGE FROM FLOWING TO THE DRAINAGE DITCH AT THE END OF THE CUL DE SAC. WITH A TROPICAL STORM WARING CURRENTLY FOR OUR AREA IT IS IMPERATIVE THAT THIS IS REMEDIED IMMEDIATELY. I WILL BE BACK FOR COMPLIANCE REINSPECTION OM 9/27/24. PHOTO FOR REFERENCE. | |||
| WALL SHEATHING | 09/25/2024 | APPROVED | BTAYLOR |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/25/2024 | APPROVED - AS NOTED | BTAYLOR |
| Note: 9-25-24 1. Rear porch trusses do not have correct anchors. Plans call for SDWC screws. | |||
| TIE BEAM / LINTEL | 09/16/2024 | APPROVED | BTAYLOR |
| FOUND SURVEY APPROVED (OFFICE) | 09/11/2024 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 08/28/2024 | APPROVED | BTAYLOR |
| PLUMBING 1ST ROUGH UNDERGROUND | 08/23/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: FBCR-319.1 ADRESS NEEDS TO BE POSTED FOR 9-1-1 PURPOSE | |||
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 08/19/2024 | APPROVED | AWATERS |
| WATER METER INSTALLATION REQUEST | 08/02/2024 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 12/04/2024 | 12/09/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/10/2024 | 09/11/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/10/2024 | 09/10/2024 |
| Note: Released By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 08/16/2024 | 08/19/2024 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Formboard survey is unacceptable as foundation survey. Please submit foundation survey showing location, dimensions and elevation of finished concrete foundation/slab. | |||
| ZON | COMPLETE | 08/16/2024 | 08/16/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 08/13/2024 | 08/16/2024 |
| Note: Released By: ALPHANETTE WATERS - (386)986-2624 - AWATERS@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 05/09/2024 | 05/16/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/09/2024 | 05/13/2024 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 05/09/2024 | 05/10/2024 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 05/09/2024 | 05/16/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/09/2024 | 05/09/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 05/09/2024 | 05/15/2024 |
| LOCATE | COMPLETE | 05/09/2024 | 05/16/2024 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 05/09/2024 | 05/15/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/09/2024 | 05/09/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/09/2024 | 05/10/2024 |
| Note: Released By: LIBBY MUSGROVE - (386)986-3780 - LMUSGROVE@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 05/09/2024 | 08/27/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG REINSPECTION 20 | ¤20.00 | 12/16/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 12/16/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 12/16/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 12/16/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 06/05/2024 |
| SW ENG PRE APRON | ¤30.00 | 06/05/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 06/05/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 06/05/2024 |
| SEWER CREDIT | (¤1,466.00) | 06/05/2024 |
| SEWER INSPECTION | ¤25.00 | 06/05/2024 |
| SEWER CAPITAL FACILITY | ¤6,120.52 | 06/05/2024 |
| WATER CAPITAL FACILITY FEE | ¤4,351.14 | 06/05/2024 |
| SITE PLAN 30 | ¤30.00 | 06/05/2024 |
| WATER- TURN ON | ¤25.00 | 06/05/2024 |
| ADJUSTMENT 10% | (¤102.55) | 06/05/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 06/05/2024 |
| INSPECTION - RESIDENTIAL | ¤775.50 | 06/05/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤219.96 | 06/05/2024 |
| CONNECTION FEES | ¤1,187.26 | 06/05/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 06/05/2024 |
| IMPACT FEE FIRE | ¤428.09 | 06/05/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 06/05/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 06/05/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 06/05/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 06/05/2024 |
| IMPACT FEE TRANSPORTATION | ¤1,862.00 | 06/05/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 06/05/2024 |
| SURCHARGE FS 533.721 | ¤9.23 | 06/05/2024 |
| SURCHARGE - FS 468.631 | ¤13.85 | 06/05/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 06/05/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤21,762.99 |