Permit #2024050464
Permit Details
Status: COED
| Parcel Id: 07-11-31-7032-00660-0150 |
| CONDITIONED SPACE: 1443 sqft |
| GARAGE: 406 sqft |
| OPENED PORCH (WITH ROOF) : 31 sqft |
| Total Square Footage: 1880 sqft |
| Block: 00660 |
| Subdivision: - |
| Job Phone: 904-268-7730 |
| Location Address: 46 ROCKING HORSE DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 07/11/2024 |
| NOC: RECORDED |
| Applicant name: SCOTT CHRISTIAN HOWARD |
| Owner: FOCUS HOMES LLC OF FLORIDA |
|
Address 5220 SHAD RD JACKSONVILLE, FL 32257 |
| Lot: 0150 |
| Contracted Stated Job Value: ¤210,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
FOCUS HOMES LLC OF FLORIDA
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
5220 SHAD RD JACKSONVILLE, FL 32257 |
# 202 JACKSONVILLE, FL 32257 |
CRC1332443 (Exp: 08/31/2026) | 904-268-7730 |
Sub Contractors
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
DANA SUE COOLEY
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 1718 FLAGLER BEACH, FL 32136 |
CCC1333449 (Exp: 08/31/2026) | 904-535-1680 |
RONALD KEVIN HAUPT
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4005 MARONDA WAY SANFORD, FL 32771 |
CAC058534 (Exp: 08/31/2026) | 407-321-0064 |
ADAM JASON OCONNOR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4005 MARONDA WAY SANFORD, FL 32771 |
EC13013779 (Exp: 08/31/2026) | 407-321-0064 X3432 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 11/14/2024 | APPROVED | CVANSTRAHLEN |
| U -UTILITY RESIDENTIAL FINAL | 11/14/2024 | FINAL APPROVED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9035 *** NOTES ADDED BY LFITZGERALD 11/4/2024 10:56:45 AM *** no irr-no cross connection | |||
| ROW - FINAL APRON (AFTER POUR) | 11/13/2024 | APPROVED | TPOLACEK |
| Note: PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 11/13/2024 | APPROVED | TPOLACEK |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/13/2024 | APPROVED | TPOLACEK |
| Note: UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW - STORMWATER FINAL | 11/13/2024 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| U-CROSS CONNECTION | 11/04/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 11/4/2024 10:56:45 AM *** no irr-no cross connection | |||
| ROW- PRE-APRON (PRE-POUR) | 10/21/2024 | CANCELLED BY APPLICANT | WEB |
| ROW- PRE-APRON (PRE-POUR) | 10/18/2024 | APPROVED | PFLANAGAN |
| Note: IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. | |||
| ELECTRIC - EARLY POWER | 10/14/2024 | APPROVED - AS NOTED | CVANSTRAHLEN |
| Note: 10/14/24 Approved as-noted ( C Van-Strahlen ) For Next Inspection Please #1 fix Sill Fence # Permit Box With new permit card and new set of plans with respectived seal Surge protector required before early power inspection Emailed FPL @ 2pm | |||
| ELECTRIC - EARLY POWER | 10/10/2024 | CANCELLED BY APPLICANT | BBEMBRY |
| Note: 10-8-24 - City offices and inspection services will be closed 10-10-24 due to Hurricane Milton. Your inspection request has been cancelled, please reschedule for another day. New inspection due to canceled inspection Inspector Notes from Inspection 2200 Surge protector required before early power inspection Emailed FPL @ 2pm | |||
| ELECTRIC - EARLY POWER | 10/07/2024 | CANCELLED BY APPLICANT | WEB |
| Note: Inspector Notes from Inspection 2200 Surge protector required before early power inspection Emailed FPL @ 2pm | |||
| SEWER TIE IN | 09/20/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| INSULATION | 09/06/2024 | APPROVED | KSANDOE |
| WINDOW NAILING | 09/04/2024 | APPROVED | JSTEWART |
| LATH/BRICK/ WATER BARRIER | 09/04/2024 | APPROVED | KSANDOE |
| Note: 8/30/2024 - PREVIOUS INSPECTION NOTES 8/29/2024 - PREVIOUS INSPECTION NOTES 08-29-2024 Contractor not ready. 08-30-2024 SGD not installed. Need to inspect taping around SGD. | |||
| LATH/BRICK/ WATER BARRIER | 08/30/2024 | Disapproved - NO FEE | AGAETANO |
| Note: 8/29/2024 - PREVIOUS INSPECTION NOTES 08-29-2024 Contractor not ready. 08-30-2024 SGD not installed. Need to inspect taping around SGD. | |||
| ALL ROUGH | 08/30/2024 | APPROVED - AS NOTED | AGAETANO |
| Note: 8/29/2024 - PREVIOUS INSPECTION NOTES 08-29-2024 1. Interior framing not complete. 2. Mechanical layot not on site. 08-30-2024 SGD not installed. Window nailing will be added. | |||
| ALL ROUGH | 08/29/2024 | Disapproved - NO FEE | AGAETANO |
| Note: 08-29-2024 1. Interior framing not complete. 2. Mechanical layot not on site. | |||
| LATH/BRICK/ WATER BARRIER | 08/29/2024 | Disapproved - NO FEE | AGAETANO |
| Note: 08-29-2024 Contractor not ready. | |||
| ROOF VALLEY & METAL | 08/23/2024 | APPROVED | AGAETANO |
| ELECTRIC-TUG | 08/20/2024 | APPROVED - AS NOTED | MKRASKI |
| Note: Surge protector required before early power inspection Emailed FPL @ 2pm | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/19/2024 | APPROVED - AS NOTED | AGAETANO |
| Note: 08-09-2024 SD1 Detail KK FM 30/1.1 not installed per plan. Check all areas with missing anchors. Check at next inspection. | |||
| ROOF SHEATHING | 08/16/2024 | APPROVED | AGAETANO |
| WALL SHEATHING | 08/16/2024 | APPROVED | AGAETANO |
| MONOLITHIC SLAB | 08/07/2024 | APPROVED | KSANDOE |
| Note: 8/6/2024 - PREVIOUS INSPECTION NOTES 8-6-24 1. Detail FM02 is not extended all the way down the right side of the garage wall. 2. Detail FM19 is not in every corner. | |||
| MONOLITHIC SLAB | 08/06/2024 | Disapproved - NO FEE | BTAYLOR |
| Note: 8-6-24 1. Detail FM02 is not extended all the way down the right side of the garage wall. 2. Detail FM19 is not in every corner. | |||
| MONOLITHIC SLAB | 08/05/2024 | CANCELLED BY APPLICANT | WEB |
| MONOLITHIC SLAB | 08/05/2024 | CANCELLED BY APPLICANT | WEB |
| FOUND SURVEY APPROVED (OFFICE) | 08/01/2024 | APPROVED | TBAKER |
| PLUMBING 1ST ROUGH UNDERGROUND | 07/31/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: P-311.1 NEED PORTABLE RESTROOM BY NEXT INSPECTION | |||
| GRAVITY SEWER TEST | 07/31/2024 | APPROVED | MGIBSON |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 07/29/2024 | APPROVED | JMUNSON |
| WATER METER INSTALLATION REQUEST | 07/25/2024 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 08/12/2024 | 08/12/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/12/2024 | 08/12/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | CANCEL | 07/31/2024 | 08/01/2024 |
| ENGIN1 | COMPLETE | 07/31/2024 | 08/01/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/31/2024 | 07/31/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | HOLD | 07/24/2024 | 07/24/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Cannot result Geotech inspection without NOC | |||
| BLD | COMPLETE | 07/21/2024 | 07/24/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/28/2024 | 06/28/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Benchmark elevation is off from center of road elevations by .4' | |||
| SW1 | COMPLETE | 06/28/2024 | 07/10/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD | |||
| ZON | COMPLETE | 06/28/2024 | 06/28/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 06/03/2024 | 06/03/2024 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Benchmark elevation is off from center of road elevations by .4' | |||
| BADMIN | COMPLETE | 05/20/2024 | 05/24/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | HOLD | 05/09/2024 | 05/16/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide geotechnical investigation report in accordance with FBCB Section 1803.2. Report to be conducted per Sections 1803.3 through 1803.5. Completed report shall comply with Section 1803.6. Report shall be signed and sealed by a Florida licensed professional engineer in accordance with F.S. 471.025 and Florida Administrative Code Sections 61G15-30.001 and 61G15-23.001 through .005. You can request a deferred submittal by providing a letter on company letterhead. | |||
| BLD | COMPLETE | 05/09/2024 | 05/16/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 05/09/2024 | 05/14/2024 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 05/09/2024 | 05/16/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/09/2024 | 05/09/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 05/09/2024 | 05/15/2024 |
| LOCATE | COMPLETE | 05/09/2024 | 05/16/2024 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 05/09/2024 | 05/15/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/09/2024 | 05/09/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/09/2024 | 05/13/2024 |
| Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 05/09/2024 | 09/05/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 11/14/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤8.25 | 11/14/2024 |
| INSPECTION - RESIDENTIAL | ¤737.00 | 07/11/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤209.04 | 07/11/2024 |
| CONNECTION FEES | ¤1,187.26 | 07/11/2024 |
| WATER- TURN ON | ¤25.00 | 07/11/2024 |
| ADJUSTMENT 10% | (¤97.60) | 07/11/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 07/11/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 07/11/2024 |
| IMPACT FEE FIRE | ¤428.09 | 07/11/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 07/11/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 07/11/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 07/11/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 07/11/2024 |
| IMPACT FEE TRANSPORTATION | ¤1,862.00 | 07/11/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 07/11/2024 |
| SURCHARGE FS 533.721 | ¤8.78 | 07/11/2024 |
| SURCHARGE - FS 468.631 | ¤13.18 | 07/11/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 07/11/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 07/11/2024 |
| SW ENG PRE APRON | ¤30.00 | 07/11/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 07/11/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 07/11/2024 |
| SEWER CREDIT | (¤1,466.00) | 07/11/2024 |
| SEWER INSPECTION | ¤25.00 | 07/11/2024 |
| SEWER CAPITAL FACILITY | ¤6,120.52 | 07/11/2024 |
| WATER CAPITAL FACILITY FEE | ¤4,351.14 | 07/11/2024 |
| SITE PLAN 30 | ¤30.00 | 07/11/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤21,665.65 |