I want to search for...

Permit #2024050699

Permit Details

Status: COED

Parcel Id: 07-11-31-7032-00730-0190
CONDITIONED SPACE: 2306 sqft
GARAGE: 466 sqft
OPENED PORCH (WITH ROOF) : 142 sqft
OPENED PORCH (WITH ROOF) : 32 sqft
Total Square Footage: 2946 sqft
Block: 00730
Subdivision: 7032 -
Job Phone: 831-383-2883
Location Address: 2 ROLLER LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 07/31/2024
NOC: RECORDED
Applicant name: EDWARD LEE DAUBERT JR
Owner: BRITE LAND INVESTMENT FUND LP

Address

21380 LORIAN ROAD

CLEVELAND, OH 44126

Lot: 0190
Contracted Stated Job Value: ¤252,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

BRITE BUILDING GROUP LLC
Status Location Address State License Number Phone
ACTIVE

6751 FORUM DRIVE SUITE 210

ORLANDO, FL 32821

CBC1266303 (Exp: 08/31/2026) 831-383-2883

Sub Contractors

DUSTIN L ESTEP
Status Location Address State License Number Phone Fax
ACTIVE

2041 N HIAWASSEE RD

APOPKA, FL 32703

CCC1330971 (Exp: 08/31/2026) 407-702-0206 352-988-6629
JOSEPH HORATIO STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PARKWAY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2026) 877-906-1113
JOSEPH H STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PKWY

SANFORD, FL 32771

CAC043953 (Exp: 08/31/2026) 877-906-1113
JOSEPH HORATIO STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PARKWAY

, 0

CFC1432331 (Exp: 08/31/2026) 877-906-1113

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 03/12/2026 APPROVED CVANSTRAHLEN
Note: 3/6/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1-FBC [A] 107.4-MECHANICAL EQUIPMENT DOES NOT MATCH ENERGY CALCS
U -UTILITY RESIDENTIAL FINAL 03/12/2026 FINAL APPROVED BWRIGHT
Note: Inspector Notes from Inspection 9035 No CC. IRR with potable water using PVB
BLD - BUILDING FINAL 03/06/2026 Disapproved - NO FEE CVANSTRAHLEN
Note: Please fix items before next inspection #1-FBC [A] 107.4-MECHANICAL EQUIPMENT DOES NOT MATCH ENERGY CALCS
ROW - STORMWATER FINAL 03/06/2026 APPROVED FSLADISH
Note: 3/6/26 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S AND/OR HOMEOWNER’S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
U -UTILITY RESIDENTIAL FINAL 03/06/2026 Disapproved - NO FEE BWRIGHT
Note: Sewer clean-out is to close to 1 Rollins back property line and need to be straighten.
U-CROSS CONNECTION 03/06/2026 APPROVED - AS NOTED BWRIGHT
Note: No CC. IRR with potable water using PVB
ROW - FINAL APRON (AFTER POUR) 03/06/2026 APPROVED FSLADISH
Note: 3/6/26 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S AND/OR HOMEOWNER’S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
ROW- FINAL SURVEY/GRADING CERTIFICATION 03/05/2026 APPROVED FSLADISH
ROW FIELD SURVEY /GRADING CERTIFICATION 03/05/2026 APPROVED FSLADISH
Note: 3/4/26 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S AND/OR HOMEOWNER’S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
ELECTRIC - EARLY POWER 01/16/2026 APPROVED CVANSTRAHLEN
Note: EMAIL PFL 1/15/2026 - PREVIOUS INSPECTION NOTES #2 item from previous inspection is not been fix 1/13/2026 - PREVIOUS INSPECTION NOTES Tug inspection was approved 10/31/25 #1-as today inspection not metter is install on electrical panel base , therefor services feeds need to be install unless metter is install prior to reeinspection , #2-Services feeds ground wire is not install as required
ELECTRIC - EARLY POWER 01/15/2026 Disapproved -FEE REQUIRED CVANSTRAHLEN
Note: #2 item from previous inspection is not been fix 1/13/2026 - PREVIOUS INSPECTION NOTES Tug inspection was approved 10/31/25 #1-as today inspection not metter is install on electrical panel base , therefor services feeds need to be install unless metter is install prior to reeinspection , #2-Services feeds ground wire is not install as required
ELECTRIC - EARLY POWER 01/13/2026 Disapproved -FEE REQUIRED CVANSTRAHLEN
Note: Tug inspection was approved 10/31/25 as today inspection not metter is install on electrical panel base , therefor services feeds need to be install unless metter is install prior to reeinspection , Services feeds ground wire is not install as required
ROW- PRE-APRON (PRE-POUR) 12/23/2025 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR. 12/22/2025 - PREVIOUS INSPECTION NOTES 12/22/25 NO ONE ON SITE AT THE TIME OF THIS INSPECTION. DO NOT KNOW IF IRRIGATION OR WHY THIS IS DUG UP, BUT AT THE TIME OF THIS INSPECTION IT IS NOT COMPACTED OR CORRECT DEPTH SO I HAVE TO FAIL IT. SEE PHOTO FOR REFERENCE.
ROW- PRE-APRON (PRE-POUR) 12/22/2025 Disapproved -FEE REQUIRED FSLADISH
Note: 12/22/25 NO ONE ON SITE AT THE TIME OF THIS INSPECTION. DO NOT KNOW IF IRRIGATION OR WHY THIS IS DUG UP, BUT AT THE TIME OF THIS INSPECTION IT IS NOT COMPACTED OR CORRECT DEPTH SO I HAVE TO FAIL IT. SEE PHOTO FOR REFERENCE.
INSULATION 12/03/2025 APPROVED CVANSTRAHLEN
Note: *** NOTES ADDED BY CVANSTRAHLEN 12/1/2025 2:03:43 PM *** Please resummit E-cals for revision and approval Please fix item before call for next inspection #1-FBC [A]107.4-DUCT LAYOUT DOES NOT MATCH ENERGY CALCS( 2 layout one by garage entrance one on permit box ) E-cals documents need to have seal approved by building deparment Inspector Notes from Inspection 2467 Please fix stud 2x6 on share bathroom wall 11/13/2025 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1-LGT2 w/HETA-16 missing nails on both sides of the truss ( left side back bedroom back top wall )
INSULATION 12/02/2025 Disapproved -FEE REQUIRED CVANSTRAHLEN
Note: Notes from previous inspections are not fix , please Missing register over foyer ceiling Inspector Notes from Inspection 2420 *** NOTES ADDED BY CVANSTRAHLEN 12/1/2025 2:03:43 PM *** Please resummit E-cals for revision and approval Please fix item before call for next inspection #1-FBC [A]107.4-DUCT LAYOUT DOES NOT MATCH ENERGY CALCS( 2 layout one by garage entrance one on permit box ) E-cals documents need to have seal approved by building deparment Inspector Notes from Inspection 2467 Please fix stud 2x6 on share bathroom wall 11/13/2025 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1-LGT2 w/HETA-16 missing nails on both sides of the truss ( left side back bedroom back top wall )
LATH/BRICK/ WATER BARRIER 12/02/2025 APPROVED CVANSTRAHLEN
Note:
ALL ROUGH 12/01/2025 APPROVED - AS NOTED CVANSTRAHLEN
Note: *** NOTES ADDED BY CVANSTRAHLEN 12/1/2025 2:03:43 PM *** Please resummit E-cals for revision and approval Please fix item before call for next inspection #1-FBC [A]107.4-DUCT LAYOUT DOES NOT MATCH ENERGY CALCS( 2 layout one by garage entrance one on permit box ) E-cals documents need to have seal approved by building deparment Inspector Notes from Inspection 2467 Please fix stud 2x6 on share bathroom wall 11/13/2025 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1-LGT2 w/HETA-16 missing nails on both sides of the truss ( left side back bedroom back top wall )
ROOF VALLEY & METAL 11/26/2025 APPROVED - AS NOTED CVANSTRAHLEN
Note: Please fix stud 2x6 on share bathroom wall 11/13/2025 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1-LGT2 w/HETA-16 missing nails on both sides of the truss ( left side back bedroom back top wall )
ROOF VALLEY & METAL 11/13/2025 Disapproved -FEE REQUIRED CVANSTRAHLEN
Note: Please fix items before next inspection #1-LGT2 w/HETA-16 missing nails on both sides of the truss ( left side back bedroom back top wall )
WALL SHEATHING 11/10/2025 CANCELLED BY INSPECTOR CVANSTRAHLEN
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/10/2025 APPROVED - AS NOTED CVANSTRAHLEN
Note: *** NOTES ADDED BY CVANSTRAHLEN 11/10/2025 9:38:25 AM *** #2-Please frix silt fence #3-Please double check hangers and straps , missing screws or nails Please fix items before next inspection #1- Missing screws on LGT2 w/meta-16 & LGT3-SDS2.5 on masonary walls & trusses
ROOF VALLEY & METAL 11/10/2025 Disapproved -FEE REQUIRED CVANSTRAHLEN
Note: Job not done Missing valleys and metal
ELECTRIC-TUG 10/31/2025 APPROVED CVANSTRAHLEN
TIE BEAM / LINTEL 10/30/2025 APPROVED JSTEWART
Note: 10/29/2025 - PREVIOUS INSPECTION NOTES 10/29/25 1. Still 1 window on left side of house that exceeds head/bed joint limits FBCR 606.3.1 10/28/2025 - PREVIOUS INSPECTION NOTES please fix items front previous inspection 10/24/2025 - PREVIOUS INSPECTION NOTES Please fix items befofre next inspection #1-FBCR 606.3.1-HEAD AND BED JOINT LIMITS windows silt ( mark on plans with blue market total 6 windows ) All mark with spray orange paint #2-crack window silt (right side back window ) #3-FBCR 606.3.4- rebars are too closed to cilender block wall < ( Mark on plans with blue market ) please center COVERAGE OF REBAR (5/8 " HORIZONTAL) (3/4" MIN. OTHER) (2" EXPOSED TO WEATHER OR SOIL) all mark with orange spray paint )
TIE BEAM / LINTEL 10/29/2025 Disapproved -FEE REQUIRED MCONTRYMAN
Note: 10/29/25 1. Still 1 window on left side of house that exceeds head/bed joint limits FBCR 606.3.1 10/28/2025 - PREVIOUS INSPECTION NOTES please fix items front previous inspection 10/24/2025 - PREVIOUS INSPECTION NOTES Please fix items befofre next inspection #1-FBCR 606.3.1-HEAD AND BED JOINT LIMITS windows silt ( mark on plans with blue market total 6 windows ) All mark with spray orange paint #2-crack window silt (right side back window ) #3-FBCR 606.3.4- rebars are too closed to cilender block wall < ( Mark on plans with blue market ) please center COVERAGE OF REBAR (5/8 " HORIZONTAL) (3/4" MIN. OTHER) (2" EXPOSED TO WEATHER OR SOIL) all mark with orange spray paint )
TIE BEAM / LINTEL 10/28/2025 Disapproved -FEE REQUIRED CVANSTRAHLEN
Note: please fix items front previous inspection 10/24/2025 - PREVIOUS INSPECTION NOTES Please fix items befofre next inspection #1-FBCR 606.3.1-HEAD AND BED JOINT LIMITS windows silt ( mark on plans with blue market total 6 windows ) All mark with spray orange paint #2-crack window silt (right side back window ) #3-FBCR 606.3.4- rebars are too closed to cilender block wall < ( Mark on plans with blue market ) please center COVERAGE OF REBAR (5/8 " HORIZONTAL) (3/4" MIN. OTHER) (2" EXPOSED TO WEATHER OR SOIL) all mark with orange spray paint )
GRAVITY SEWER TEST 10/27/2025 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
SEWER TIE IN 10/27/2025 APPROVED - AS NOTED MGIBSON
Note: Inspector Notes from Inspection 2075 THIS WAS A VIRTUAL INSPECTION Inspector Notes from Inspection 2075 THIS WAS A VIRTUAL INSPECTION THIS WAS A VIRTUAL INSPECTION
TIE BEAM / LINTEL 10/24/2025 Disapproved -FEE REQUIRED CVANSTRAHLEN
Note: Please fix items befofre next inspection #1-FBCR 606.3.1-HEAD AND BED JOINT LIMITS windows silt ( mark on plans with blue market total 6 windows ) #2-crack window silt (right side back window ) #3-FBCR 606.3.4- rebars are too closed to cilender block wall < ( Mark on plans with blue market ) please center COVERAGE OF REBAR (5/8 " HORIZONTAL) (3/4" MIN. OTHER) (2" EXPOSED TO WEATHER OR SOIL)
MONOLITHIC SLAB 10/14/2025 APPROVED CVANSTRAHLEN
PLUMBING 1ST ROUGH UNDERGROUND 10/08/2025 APPROVED MGIBSON
Note: 10/2/2025 - PREVIOUS INSPECTION NOTES FBCR-P-2503.7, NO PRESSURE ON WATER DISTRIBUTION LINES, , FBCR P- 2503.5 NO WATER ON HEAD TEST
FOUND SURVEY APPROVED (OFFICE) 10/08/2025 APPROVED RRICKS
Note: 9/10/2025 2:33:54 PM- PREVIOUS INSPECTION NOTES NEED TO UPLOAD GEO TECH. CERT AND HAVE YOUR GEO TECH. INSPECTION PASSED BEFORE THIS INSPECTION.
WATER METER INSTALLATION REQUEST 10/03/2025 APPROVED CBOWERMASTER
PLUMBING 1ST ROUGH UNDERGROUND 10/02/2025 Disapproved -FEE REQUIRED MGIBSON
Note: FBCR-P-2503.7, NO PRESSURE ON WATER DISTRIBUTION LINES, , FBCR P- 2503.5 NO WATER ON HEAD TEST
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 09/15/2025 APPROVED PKNAPIK
FOUND SURVEY APPROVED (OFFICE) 09/10/2025 Disapproved - NO FEE PFLANAGAN
Note: NEED TO UPLOAD GEO TECH. CERT AND HAVE YOUR GEO TECH. INSPECTION PASSED BEFORE THIS INSPECTION.
ROW - DRAINAGE 08/21/2025 APPROVED TPOLACEK
Note: 08/21/25 TPOLACEK*** AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 8/14/2025 - PREVIOUS INSPECTION NOTES NEED TO INSTALL SILT FENCE AROUND THE ENTIRE PROPERTY AND LEAVE A CONSTRUCTION ENTERANCE. YOU WILL HAVE 7DAY TO FIX ALL ISSUES OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT.
ROW - DRAINAGE 08/14/2025 Disapproved - NO FEE PFLANAGAN
Note: NEED TO INSTALL SILT FENCE AROUND THE ENTIRE PROPERTY AND LEAVE A CONSTRUCTION ENTERANCE. YOU WILL HAVE 7DAY TO FIX ALL ISSUES OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT.

Review History

Department Status Date In Date Out
MECH COMPLETE 03/11/2026 03/11/2026
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH HOLD 03/09/2026 03/10/2026
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Energy Calcs need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2023 8Th edition
SW1 COMPLETE 10/07/2025 10/08/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
BLD COMPLETE 10/07/2025 10/08/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ZON COMPLETE 10/07/2025 10/07/2025
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
BLD COMPLETE 09/12/2025 09/15/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
BLD HOLD 09/10/2025 09/10/2025
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide geotech certification and density reports
SW1 HOLD 09/10/2025 09/10/2025
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM MUST HAVE YOUR GEO TECH. CERT INSPECTION APPROVED BEFORE THIS INSPECTION
ZON COMPLETE 09/10/2025 09/10/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD HOLD 08/28/2025 08/29/2025
Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Upload density report for geotech
MECH COMPLETE 07/14/2025 07/14/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BADMIN INFORMATION 07/14/2025 07/14/2025
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM rename your files correctly.
MECH HOLD 06/27/2025 07/01/2025
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide return air out of study on duct layout.
MECH COMPLETE 09/30/2024 10/01/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH HOLD 09/24/2024 09/26/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Design location on Energy calcs needs to be Daytona Beach
BLD COMPLETE 09/24/2024 09/26/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ZON COMPLETE 09/24/2024 09/24/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ELEC COMPLETE 09/24/2024 09/30/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD HOLD 08/22/2024 08/28/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Please cloud revisions on building plans to show what was removed. Remove energy star wording from cover page
MECH HOLD 08/22/2024 08/27/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Design location on energy calcs needs to be Daytona Beach 2. Energy Calcs need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2023 8Th edition
BLD COMPLETE 08/06/2024 08/12/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BADMIN INFORMATION 08/01/2024 08/01/2024
Note: Marked INFORMATION By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM address missing from forms
BLD HOLD 08/01/2024 08/05/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Submit only revise numbers or highlight revised numbers per city of palmcoast guidelines.
ZON COMPLETE 08/01/2024 08/01/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ZON COMPLETE 07/15/2024 07/15/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ELEC COMPLETE 07/15/2024 07/22/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ZON HOLD 07/08/2024 07/08/2024
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM REPEAT COMMENT: Bathrooms labeled incorrectly
BLD COMPLETE 07/08/2024 07/09/2024
Note: Released By: JPI
ELEC HOLD 07/08/2024 07/15/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 3. Need correct outlet spacing in bed 2. and living room. NEC 220 210.52
MECH COMPLETE 07/08/2024 07/11/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BADMIN COMPLETE 07/08/2024 07/15/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BADMIN HOLD 05/14/2024 05/21/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide truss engineering packet with the approval stamp from engineer of record
BLD HOLD 05/14/2024 05/17/2024
Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet.
CUSVC COMPLETE 05/14/2024 05/21/2024
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC HOLD 05/14/2024 05/20/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Electrical riser diagram needs to include the surge protector. NEC 2020 230.67 2. Submit Electrical load calculations 3. Need correct outlet spacing in bed 2. and living room. NEC 220 210.52 4. Range Needs to be GFCI protectedddddd. NEC 2020 210.8
ENGIN1 COMPLETE 05/14/2024 05/14/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 05/14/2024 05/17/2024
LOCATE COMPLETE 05/14/2024 05/16/2024
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH HOLD 05/14/2024 05/20/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Design location on Energy Calcs needs to be Daytona Beach
SW1 COMPLETE 05/14/2024 05/14/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON HOLD 05/14/2024 05/15/2024
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Ac pad location on site plan doesn't match landscape and floor plans Bathrooms labeled incorrectly
SWALE COMPLETE 05/14/2024 09/10/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 03/12/2026
REINSPECTION RESIDENTIAL ¤40.00 03/10/2026
REINSPECTION RESIDENTIAL ¤40.00 03/10/2026
REINSPECTION RESIDENTIAL ¤40.00 03/10/2026
REINSPECTION RESIDENTIAL ¤40.00 03/10/2026
REINSPECTION RESIDENTIAL ¤40.00 03/10/2026
REINSPECTION RESIDENTIAL ¤40.00 03/10/2026
REINSPECTION RESIDENTIAL ¤40.00 03/10/2026
REINSPECTION RESIDENTIAL ¤40.00 03/10/2026
REINSPECTION RESIDENTIAL ¤40.00 03/10/2026
SW ENG - INSPECTION 20 ¤20.00 03/10/2026
SW ENG - INSPECTION 20 ¤20.00 03/10/2026
RSI REINSPECTION 1 ¤35.00 03/10/2026
PLAN REVIEW - REVISION ¤32.50 07/23/2025
CONTRACTOR CHANGE ¤20.00 07/23/2025
CONTRACTOR CHANGE ¤20.00 07/23/2025
CONTRACTOR CHANGE ¤20.00 07/23/2025
ADMINISTRATIVE - EXTENSION ¤40.00 07/23/2025
EXTENSION ¤40.00 07/23/2025
EXTENSION ¤40.00 07/23/2025
INSPECTION - RESIDENTIAL ¤1,166.00 07/31/2024
PLAN REVIEW - RESIDENTIAL ¤330.72 07/31/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 07/31/2024
WATER-METER ¤514.49 07/31/2024
WATER- TURN ON ¤25.00 07/31/2024
ADJUSTMENT 10% (¤152.67) 07/31/2024
CONNECTION FEES ¤21.00 07/31/2024
FC IMPACT FEE EMS ¤62.00 07/31/2024
IMPACT FEE FIRE ¤428.09 07/31/2024
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 07/31/2024
FC IMPACT FEE LIBRARY ¤268.00 07/31/2024
IMPACT FEE PARKS ¤1,800.99 07/31/2024
IMPACT FEE SCHOOL ¤5,450.00 07/31/2024
IMPACT FEE TRANSPORTATION ¤1,862.00 07/31/2024
WATER -IRRIGATION INSPECTION ¤25.00 07/31/2024
SW ENG INSPECTION 80 ¤80.00 07/31/2024
SW ENG PRE APRON ¤30.00 07/31/2024
SW ENG - REVIEW 20 ¤20.00 07/31/2024
SW ENG RES REVIEW 200 ¤200.00 07/31/2024
SEWER CAPITAL FACILITY ¤775.70 07/31/2024
WATER CAPITAL FACILITY FEE ¤427.26 07/31/2024
SITE PLAN 30 ¤30.00 07/31/2024
SURCHARGE FS 533.721 ¤13.74 07/31/2024
SURCHARGE - FS 468.631 ¤20.61 07/31/2024
SW ENG - FOUNDATION SURVEY ¤20.00 07/31/2024
Fees Total Due: ¤0.00 Total Paid: ¤14,345.93