I want to search for...
Permit #2024050701
Permit Details
Status: COED
| Parcel Id: 07-11-31-7032-00730-0200 |
| CONDITIONED SPACE: 2306 sqft |
| GARAGE: 466 sqft |
| OPENED PORCH (WITH ROOF) : 142 sqft |
| OPENED PORCH (WITH ROOF) : 32 sqft |
| Total Square Footage: 2946 sqft |
| Block: 00730 |
| Subdivision: 7032 - |
| Job Phone: 831-383-2883 |
| Location Address: 1 ROLLINS LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 08/29/2024 |
| NOC: RECORDED |
| Applicant name: EDWARD LEE DAUBERT JR |
| Owner: BRITE LAND INVESTMENT FUND LP |
|
Address 21380 LORIAN ROAD CLEVELAND, OH 44126 |
| Lot: 0200 |
| Contracted Stated Job Value: ¤252,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
BRITE BUILDING GROUP LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
6751 FORUM DRIVE SUITE 210 ORLANDO, FL 32821 |
CBC1266303 (Exp: 08/31/2026) | 831-383-2883 |
Sub Contractors
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
JOSEPH HORATIO STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PARKWAY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2026) | 877-906-1113 |
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
CAC043953 (Exp: 08/31/2026) | 877-906-1113 |
JOSEPH HORATIO STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PARKWAY , 0 |
CFC1432331 (Exp: 08/31/2026) | 877-906-1113 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 03/12/2026 | FINAL APPROVED | BWRIGHT |
| Note: Inspector Notes from Inspection 9035 No CC. IRR with potable water using PVB | |||
| BLD - BUILDING FINAL | 03/10/2026 | APPROVED | CVANSTRAHLEN |
| Note: 3/6/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1-FBC [A] 107.4-MECHANICAL EQUIPMENT DOES NOT MATCH ENERGY CALCS #2- Seal up soffit penetrations for electrical mast #3-M1502.4.7 Exhaust duct required. Where space for a clothes dryer is provided, an exhaust duct system shall be installed. Where the clothes dryer is not installed at the time of occupancy the exhaust duct shall be capped or plugged in the space in which it originates and identified and marked “future use.” | |||
| U-CROSS CONNECTION | 03/06/2026 | APPROVED - AS NOTED | BWRIGHT |
| Note: No CC. IRR with potable water using PVB | |||
| BLD - BUILDING FINAL | 03/06/2026 | Disapproved -FEE REQUIRED | CVANSTRAHLEN |
| Note: Please fix items before next inspection #1-FBC [A] 107.4-MECHANICAL EQUIPMENT DOES NOT MATCH ENERGY CALCS #2- Seal up soffit penetrations for electrical mast #3-M1502.4.7 Exhaust duct required. Where space for a clothes dryer is provided, an exhaust duct system shall be installed. Where the clothes dryer is not installed at the time of occupancy the exhaust duct shall be capped or plugged in the space in which it originates and identified and marked “future use.” | |||
| ROW - STORMWATER FINAL | 03/06/2026 | APPROVED | FSLADISH |
| Note: 3/6/26 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S AND/OR HOMEOWNER’S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| U -UTILITY RESIDENTIAL FINAL | 03/06/2026 | Disapproved - NO FEE | BWRIGHT |
| Note: Sewer clean-out is to close to 2 Roller back property line and need to be straighten. | |||
| ROW - FINAL APRON (AFTER POUR) | 03/06/2026 | APPROVED | FSLADISH |
| Note: 3/6/26 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S AND/OR HOMEOWNER’S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 03/05/2026 | APPROVED | FSLADISH |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 03/05/2026 | APPROVED | FSLADISH |
| Note: 3/4/26 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S AND/OR HOMEOWNER’S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ELECTRIC - EARLY POWER | 01/16/2026 | APPROVED | CVANSTRAHLEN |
| Note: EMAIL TO FPL 1/14/2026 - PREVIOUS INSPECTION NOTES PLEASE FIX ITEMS BEFORE NEXT INSPECTION #1-GROUND WIRE MISSING STRIP ON CONNECTING BOLD ( MAIN METTER BASE PANEL ) #2- TUG CONDUIT PIPEB NEED SUPPORT ATTACH ON EXTERIOR WALL ( CLAMP BROKEN ) | |||
| ELECTRIC - EARLY POWER | 01/14/2026 | Disapproved -FEE REQUIRED | CVANSTRAHLEN |
| Note: PLEASE FIX ITEMS BEFORE NEXT INSPECTION #1-GROUND WIRE MISSING STRIP ON CONNECTING BOLD ( MAIN METTER BASE PANEL ) #2- TUG CONDUIT PIOPE NEED SUPPORT ATTACH ON EXTERIOR WALL ( CLAMP BROKEN ) | |||
| ROW- PRE-APRON (PRE-POUR) | 01/05/2026 | APPROVED - AS NOTED | FSLADISH |
| Note: 1/6/26 CULVERT PIPE IS FLAT WITHIN SWALE PLAN DIAGRAM ALLOWABLE ELEVATION AT THE TIME OF THIS INSPECTION. PIPE INVERT IS GOOD AT THIS INSPECTION. BUILDER REFER TO CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. . IF FIBERGLASS OPTION IS USED, BUILDER REQUIRED TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR AT THE TIME OF THE INSPECTION READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK SITE FOR ANY STANDING WATER. ALSO VERIFY PIPE ELEVATION HAS NOT CHANGED. NO EXPANSION JOINTS ALLOWED, AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIREMENTS ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR 12/23/2025 - PREVIOUS INSPECTION NOTES 12-23-25 TPOLACEK** UPON CHECKING SWALE PLAN AND SURROUNDING CULVERT ELEVATION AS WELL AS THE VALLEY GUTTER ROAD CROSSING I DETERMINED THAT THE SWALE WOULD HOLD A SUBSTANTIAL AMOUNT OF WATER AND DRAIN TO OUTFALL. I CALLED THE SUPERVISOR FOR THE COPC SURVEYORS AND CONFIRMED WITH HIM ABOUT THE ELEVATIONS. THEY WILL BE SENDING OUT THE SURVEY CREW TO RE-CONFIRM THE SURROUNDING PIPE ELEVATIONS AS WELL AS THE VALLEY GUTTER TO POSSIBLY CHANGE THE SWALE PLAN DETAIL AND RAISE THE CULVERT ELEVATION SO DRAINAGE WILL FLOW. I AM CANCELING TODAYS INSPECTION DUE TO THE CIRCUMSTANCES INVOLVED. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 12/22/2025 - PREVIOUS INSPECTION NOTES 12/22/25 YOU HAVE HIGH SPOTS AS WELL AS AN AREA THAT WAS DISTURBED/DUG UP AND NOT RECOMPACTED AND CORRECT DEPTH. YOU ALSO HAVE TWO BM IN THE POWER POLE. BENCHMARK EASILY IDENTIFIED Section 300.01 B(9) V-15 "9) An on-site, easily identifiable benchmark referenced to NAVD 1988 (e.g., fire hydrant, nail in power pole [1 nail per power pole], and manhole covers). Pavement nails will be accepted if the above locations are not available on site. (The benchmark must be maintained throughout the construction cycle and will be used in the swale plan and Final Survey). NAVD 1988 data sheets are available http://www.ngs.noaa.gov" SEE PHOTO FOR REFERENCE | |||
| ROW- PRE-APRON (PRE-POUR) | 12/23/2025 | CANCELLED BY APPLICANT | TPOLACEK |
| Note: 12-23-25 TPOLACEK** UPON CHECKING SWALE PLAN AND SURROUNDING CULVERT ELEVATION AS WELL AS THE VALLEY GUTTER ROAD CROSSING I DETERMINED THAT THE SWALE WOULD HOLD A SUBSTANTIAL AMOUNT OF WATER AND DRAIN TO OUTFALL. I CALLED THE SUPERVISOR FOR THE COPC SURVEYORS AND CONFIRMED WITH HIM ABOUT THE ELEVATIONS. THEY WILL BE SENDING OUT THE SURVEY CREW TO RE-CONFIRM THE SURROUNDING PIPE ELEVATIONS AS WELL AS THE VALLEY GUTTER TO POSSIBLY CHANGE THE SWALE PLAN DETAIL AND RAISE THE CULVERT ELEVATION SO DRAINAGE WILL FLOW. I AM CANCELING TODAYS INSPECTION DUE TO THE CIRCUMSTANCES INVOLVED. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 12/22/2025 - PREVIOUS INSPECTION NOTES 12/22/25 YOU HAVE HIGH SPOTS AS WELL AS AN AREA THAT WAS DISTURBED/DUG UP AND NOT RECOMPACTED AND CORRECT DEPTH. YOU ALSO HAVE TWO BM IN THE POWER POLE. BENCHMARK EASILY IDENTIFIED Section 300.01 B(9) V-15 "9) An on-site, easily identifiable benchmark referenced to NAVD 1988 (e.g., fire hydrant, nail in power pole [1 nail per power pole], and manhole covers). Pavement nails will be accepted if the above locations are not available on site. (The benchmark must be maintained throughout the construction cycle and will be used in the swale plan and Final Survey). NAVD 1988 data sheets are available http://www.ngs.noaa.gov" SEE PHOTO FOR REFERENCE | |||
| ROW- PRE-APRON (PRE-POUR) | 12/22/2025 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 12/22/25 YOU HAVE HIGH SPOTS AS WELL AS AN AREA THAT WAS DISTURBED/DUG UP AND NOT RECOMPACTED AND CORRECT DEPTH. YOU ALSO HAVE TWO BM IN THE POWER POLE. BENCHMARK EASILY IDENTIFIED Section 300.01 B(9) V-15 "9) An on-site, easily identifiable benchmark referenced to NAVD 1988 (e.g., fire hydrant, nail in power pole [1 nail per power pole], and manhole covers). Pavement nails will be accepted if the above locations are not available on site. (The benchmark must be maintained throughout the construction cycle and will be used in the swale plan and Final Survey). NAVD 1988 data sheets are available http://www.ngs.noaa.gov" SEE PHOTO FOR REFERENCE | |||
| INSULATION | 12/02/2025 | APPROVED | CVANSTRAHLEN |
| LATH/BRICK/ WATER BARRIER | 12/02/2025 | APPROVED | CVANSTRAHLEN |
| ALL ROUGH | 11/26/2025 | APPROVED | CVANSTRAHLEN |
| Note: *** NOTES ADDED BY CVANSTRAHLEN 11/26/2025 11:37:20 AM *** Please fix studs on laundry room wall 10/28/2025 - PREVIOUS INSPECTION NOTES Please fix previous items 10/24/2025 - PREVIOUS INSPECTION NOTES please fix items before next inspection #1-Dowel / down rods do not meet the minimum clearance (2" from face of block and/or 3/4: from inside of block) as required. (FBC-R606.3.4) ( all mark with orange spray paint ) #2-FBCR 606.3.1-HEAD AND BED JOINT LIMITS total 5 mark with pink market on page A-01 ( all mark with orange spry paint ) #3- window silt crack damage right side back window #4-FBC [A]107.3.1 -NEEDS APPROVED PLANS ON SITE ( need new set of plans | |||
| ROOF VALLEY & METAL | 11/13/2025 | APPROVED - AS NOTED | CVANSTRAHLEN |
| Note: Please fix items before next inspection #1- Missing nails on hangers on trusses over garage area , please make sure nails are install on hangers ( garage trusses hangers ) 10/28/2025 - PREVIOUS INSPECTION NOTES Please fix previous items 10/24/2025 - PREVIOUS INSPECTION NOTES please fix items before next inspection #1-Dowel / down rods do not meet the minimum clearance (2" from face of block and/or 3/4: from inside of block) as required. (FBC-R606.3.4) ( all mark with orange spray paint ) #2-FBCR 606.3.1-HEAD AND BED JOINT LIMITS total 5 mark with pink market on page A-01 ( all mark with orange spry paint ) #3- window silt crack damage right side back window #4-FBC [A]107.3.1 -NEEDS APPROVED PLANS ON SITE ( need new set of plans | |||
| WALL SHEATHING | 11/10/2025 | CANCELLED BY INSPECTOR | CVANSTRAHLEN |
| Note: Inspector Notes from Inspection 2340 10/29/25 Following items need to be fixed by next inspection to avoid failure and fees 1. Silt fence needs to be reapired and maintained FBC 3307.1 2. Swale needs to be cleared and kept cleared FBC 3303.5 3. Need a new set of plans on site FBC(A) 107.3.1 10/28/2025 - PREVIOUS INSPECTION NOTES Please fix previous items 10/24/2025 - PREVIOUS INSPECTION NOTES please fix items before next inspection #1-Dowel / down rods do not meet the minimum clearance (2" from face of block and/or 3/4: from inside of block) as required. (FBC-R606.3.4) ( all mark with orange spray paint ) #2-FBCR 606.3.1-HEAD AND BED JOINT LIMITS total 5 mark with pink market on page A-01 ( all mark with orange spry paint ) #3- window silt crack damage right side back window #4-FBC [A]107.3.1 -NEEDS APPROVED PLANS ON SITE ( need new set of plans | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/10/2025 | APPROVED - AS NOTED | CVANSTRAHLEN |
| Note: Please fix items before next inspection #1-Missing screws and nails on LGT3-SDS2.5 ,LGT2 w/Heta-16 and trusses T06 ,t07,t08,t09,t10 and t11 on straps #3-Please doble check hangers and straps for trusses , missing nails #2- Silt fence needs to be reapired and maintained FBC 3307.1 #4-Missing framing for master suite ceiling 10/28/2025 - PREVIOUS INSPECTION NOTES Please fix previous items 10/24/2025 - PREVIOUS INSPECTION NOTES please fix items before next inspection #1-Dowel / down rods do not meet the minimum clearance (2" from face of block and/or 3/4: from inside of block) as required. (FBC-R606.3.4) ( all mark with orange spray paint ) #2-FBCR 606.3.1-HEAD AND BED JOINT LIMITS total 5 mark with pink market on page A-01 ( all mark with orange spry paint ) #3- window silt crack damage right side back window #4-FBC [A]107.3.1 -NEEDS APPROVED PLANS ON SITE ( need new set of plans | |||
| ROOF VALLEY & METAL | 11/10/2025 | Disapproved -FEE REQUIRED | CVANSTRAHLEN |
| Note: Job is not done Missing valleys , metal and underlayment 1. Silt fence needs to be reapired and maintained FBC 3307.1 10/28/2025 - PREVIOUS INSPECTION NOTES Please fix previous items 10/24/2025 - PREVIOUS INSPECTION NOTES please fix items before next inspection #1-Dowel / down rods do not meet the minimum clearance (2" from face of block and/or 3/4: from inside of block) as required. (FBC-R606.3.4) ( all mark with orange spray paint ) #2-FBCR 606.3.1-HEAD AND BED JOINT LIMITS total 5 mark with pink market on page A-01 ( all mark with orange spry paint ) #3- window silt crack damage right side back window #4-FBC [A]107.3.1 -NEEDS APPROVED PLANS ON SITE ( need new set of plans | |||
| ELECTRIC-TUG | 10/31/2025 | APPROVED | CVANSTRAHLEN |
| TIE BEAM / LINTEL | 10/29/2025 | APPROVED - AS NOTED | MCONTRYMAN |
| Note: 10/29/25 Following items need to be fixed by next inspection to avoid failure and fees 1. Silt fence needs to be reapired and maintained FBC 3307.1 2. Swale needs to be cleared and kept cleared FBC 3303.5 3. Need a new set of plans on site FBC(A) 107.3.1 10/28/2025 - PREVIOUS INSPECTION NOTES Please fix previous items 10/24/2025 - PREVIOUS INSPECTION NOTES please fix items before next inspection #1-Dowel / down rods do not meet the minimum clearance (2" from face of block and/or 3/4: from inside of block) as required. (FBC-R606.3.4) ( all mark with orange spray paint ) #2-FBCR 606.3.1-HEAD AND BED JOINT LIMITS total 5 mark with pink market on page A-01 ( all mark with orange spry paint ) #3- window silt crack damage right side back window #4-FBC [A]107.3.1 -NEEDS APPROVED PLANS ON SITE ( need new set of plans | |||
| TIE BEAM / LINTEL | 10/28/2025 | Disapproved -FEE REQUIRED | CVANSTRAHLEN |
| Note: Please fix previous items 10/24/2025 - PREVIOUS INSPECTION NOTES please fix items before next inspection #1-Dowel / down rods do not meet the minimum clearance (2" from face of block and/or 3/4: from inside of block) as required. (FBC-R606.3.4) ( all mark with orange spray paint ) #2-FBCR 606.3.1-HEAD AND BED JOINT LIMITS total 5 mark with pink market on page A-01 ( all mark with orange spry paint ) #3- window silt crack damage right side back window #4-FBC [A]107.3.1 -NEEDS APPROVED PLANS ON SITE ( need new set of plans | |||
| GRAVITY SEWER TEST | 10/27/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| SEWER TIE IN | 10/27/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: Inspector Notes from Inspection 2075 THIS WAS A VIRTUAL INSPECTION THIS WAS A VIRTUAL INSPECTION | |||
| TIE BEAM / LINTEL | 10/24/2025 | Disapproved -FEE REQUIRED | CVANSTRAHLEN |
| Note: please fix items before next inspection #1-FBCR 606.3.4- rebar to closed to celinder block wall need 1" space min , total 3 mark with pink market on page A-01 #2-FBCR 606.3.1-HEAD AND BED JOINT LIMITS total 5 mark with pink market on page A-01 #3- window silt crack damage right side back window #4-FBC [A]107.3.1 -NEEDS APPROVED PLANS ON SITE ( need new set of plans | |||
| MONOLITHIC SLAB | 10/14/2025 | APPROVED | CVANSTRAHLEN |
| FOUND SURVEY APPROVED (OFFICE) | 10/08/2025 | APPROVED | RRICKS |
| PLUMBING 1ST ROUGH UNDERGROUND | 10/08/2025 | APPROVED | MGIBSON |
| Note: 10/2/2025 - PREVIOUS INSPECTION NOTES FBCR-P-2503.7 NO PRESSURE ON WATER DISTRIBUTION LINES, FBCR-P-2503.5 NO HEAD TEST | |||
| WATER METER INSTALLATION REQUEST | 10/03/2025 | APPROVED | CBOWERMASTER |
| PLUMBING 1ST ROUGH UNDERGROUND | 10/02/2025 | Disapproved -FEE REQUIRED | MGIBSON |
| Note: FBCR-P-2503.7 NO PRESSURE ON WATER DISTRIBUTION LINES, FBCR-P-2503.5 NO HEAD TEST | |||
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 09/15/2025 | APPROVED | PKNAPIK |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 03/11/2026 | 03/11/2026 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 03/09/2026 | 03/10/2026 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Energy Calcs need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2023 8Th edition | |||
| SW1 | COMPLETE | 10/07/2025 | 10/08/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 10/07/2025 | 10/08/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/07/2025 | 10/07/2025 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 09/12/2025 | 09/15/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 09/10/2025 | 09/11/2025 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM THE GEO TECH. REPORT NEEDS TO BE DONE BEFORE THIS INSPECTION OR REVIEW IS COMPLETED | |||
| ZON | COMPLETE | 09/10/2025 | 09/10/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | HOLD | 08/28/2025 | 08/28/2025 |
| Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Please upload geotech density report | |||
| MECH | COMPLETE | 06/27/2025 | 07/01/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 06/02/2025 | 06/02/2025 |
| Note: Marked INFORMATION By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM extension request form incomplete. Must have all areas explains and details of why extension is needed 2nd request | |||
| BADMIN | INFORMATION | 05/30/2025 | 05/30/2025 |
| Note: Marked INFORMATION By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM extension request form incomplete. Must have all areas explains and details of why extension is needed | |||
| MECH | COMPLETE | 09/30/2024 | 10/01/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 09/24/2024 | 09/30/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 09/24/2024 | 09/26/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 09/24/2024 | 09/26/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Design location on Energy calcs needs to be Daytona Beach | |||
| ZON | COMPLETE | 09/24/2024 | 09/24/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 08/07/2024 | 08/12/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/18/2024 | 07/18/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 07/18/2024 | 07/25/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 07/09/2024 | 07/15/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD | |||
| ZON | HOLD | 07/09/2024 | 07/09/2024 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Garage door color missing on color sheet | |||
| BLD | COMPLETE | 07/09/2024 | 07/11/2024 |
| Note: Released By: JPI | |||
| MECH | COMPLETE | 07/09/2024 | 07/15/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 07/09/2024 | 07/15/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Need correct outlet spacing in bed 2 and living room.NEC 2020 210.52 | |||
| ENGIN1 | COMPLETE | 07/09/2024 | 07/10/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 05/14/2024 | 05/20/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | HOLD | 05/14/2024 | 05/17/2024 |
| Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet. | |||
| CUSVC | COMPLETE | 05/14/2024 | 05/21/2024 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 05/14/2024 | 05/20/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Electrical riser diagram needs to include the surge protector. NEC 2020 230.67 2. Submit Electrical load calculations 3. Need correct outlet spacing in bed 2 and living room.NEC 2020 210.52 4. Range needs to be GFCI protected. NEC 2020 210.8 | |||
| ENGIN1 | COMPLETE | 05/14/2024 | 05/14/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 05/14/2024 | 05/17/2024 |
| LOCATE | COMPLETE | 05/14/2024 | 05/16/2024 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | HOLD | 05/14/2024 | 05/20/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Design location on Energy calcs needs to be Daytona Beach | |||
| SW1 | HOLD | 05/14/2024 | 05/15/2024 |
| Note: Held By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM 1) Please include culvert pipe size and material to be used 2) Please include the garage FFE | |||
| ZON | HOLD | 05/14/2024 | 05/16/2024 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Bathrooms labeled incorrectly AC pad location on site plan/survey doesn't match landscape and floor plans | |||
| SWALE | COMPLETE | 05/14/2024 | 09/10/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 03/12/2026 |
| PLAN REVIEW - REVISION | ¤32.50 | 03/10/2026 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/10/2026 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/10/2026 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/10/2026 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/10/2026 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/10/2026 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/10/2026 |
| PLAN REVIEW - REVISION | ¤32.50 | 03/10/2026 |
| CONTRACTOR CHANGE | ¤20.00 | 03/10/2026 |
| CONTRACTOR CHANGE | ¤20.00 | 03/10/2026 |
| CONTRACTOR CHANGE | ¤20.00 | 03/10/2026 |
| ADMINISTRATIVE - EXTENSION | ¤40.00 | 03/10/2026 |
| ADMINISTRATIVE - EXTENSION | ¤40.00 | 03/10/2026 |
| EXTENSION | ¤40.00 | 03/10/2026 |
| RSI REINSPECTION 1 | ¤35.00 | 03/10/2026 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 08/29/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 08/29/2024 |
| IMPACT FEE TRANSPORTATION | ¤1,862.00 | 08/29/2024 |
| SURCHARGE - FS 468.631 | ¤20.61 | 08/29/2024 |
| SURCHARGE FS 533.721 | ¤13.74 | 08/29/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 08/29/2024 |
| CONNECTION FEES | ¤21.00 | 08/29/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 08/29/2024 |
| IMPACT FEE FIRE | ¤428.09 | 08/29/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 08/29/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 08/29/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 08/29/2024 |
| INSPECTION - RESIDENTIAL | ¤1,166.00 | 08/29/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 08/29/2024 |
| WATER-METER | ¤514.49 | 08/29/2024 |
| WATER- TURN ON | ¤25.00 | 08/29/2024 |
| ADJUSTMENT 10% | (¤152.67) | 08/29/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤330.72 | 08/29/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 08/29/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 08/29/2024 |
| SW ENG PRE APRON | ¤30.00 | 08/29/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 08/29/2024 |
| WATER CAPITAL FACILITY FEE | ¤427.26 | 08/29/2024 |
| SEWER CAPITAL FACILITY | ¤775.70 | 08/29/2024 |
| SITE PLAN 30 | ¤30.00 | 08/29/2024 |
| WATER CAPITAL FACILITY FEE | (¤427.26) | 08/07/2024 |
| WATER CAPITAL FACILITY FEE | ¤427.26 | 08/07/2024 |
| SITE PLAN 30 | ¤30.00 | 08/07/2024 |
| SITE PLAN 30 | (¤30.00) | 08/07/2024 |
| SEWER CAPITAL FACILITY | ¤775.70 | 08/07/2024 |
| SEWER CAPITAL FACILITY | (¤775.70) | 08/07/2024 |
| SW ENG - REVIEW 20 | (¤20.00) | 08/07/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 08/07/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 08/07/2024 |
| SW ENG RES REVIEW 200 | (¤200.00) | 08/07/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 08/07/2024 |
| SW ENG PRE APRON | ¤30.00 | 08/07/2024 |
| SW ENG PRE APRON | (¤30.00) | 08/07/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤330.72 | 08/07/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 08/07/2024 |
| FC IMPACT FEE EMS | (¤62.00) | 08/07/2024 |
| CONNECTION FEES | (¤21.00) | 08/07/2024 |
| WATER- TURN ON | ¤25.00 | 08/07/2024 |
| ADJUSTMENT 10% | (¤152.67) | 08/07/2024 |
| ADJUSTMENT 10% | ¤152.67 | 08/07/2024 |
| WATER- TURN ON | (¤25.00) | 08/07/2024 |
| WATER-METER | ¤514.49 | 08/07/2024 |
| WATER-METER | (¤514.49) | 08/07/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 08/07/2024 |
| ADMINISTRATIVE RESIDENTIAL | (¤30.00) | 08/07/2024 |
| PLAN REVIEW - RESIDENTIAL | (¤330.72) | 08/07/2024 |
| INSPECTION - RESIDENTIAL | ¤1,166.00 | 08/07/2024 |
| INSPECTION - RESIDENTIAL | (¤1,166.00) | 08/07/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 08/07/2024 |
| IMPACT FEE TRANSPORTATION | ¤1,862.00 | 08/07/2024 |
| IMPACT FEE TRANSPORTATION | (¤1,862.00) | 08/07/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 08/07/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 08/07/2024 |
| IMPACT FEE PARKS | (¤1,800.99) | 08/07/2024 |
| FC IMPACT FEE LIBRARY | (¤268.00) | 08/07/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 08/07/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | (¤218.00) | 08/07/2024 |
| IMPACT FEE FIRE | ¤428.09 | 08/07/2024 |
| IMPACT FEE FIRE | (¤428.09) | 08/07/2024 |
| CONNECTION FEES | ¤21.00 | 08/07/2024 |
| SW ENG INSPECTION 80 | (¤80.00) | 08/07/2024 |
| SURCHARGE - FS 468.631 | (¤20.61) | 08/07/2024 |
| SURCHARGE - FS 468.631 | ¤20.61 | 08/07/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 08/07/2024 |
| SW ENG - FOUNDATION SURVEY | (¤20.00) | 08/07/2024 |
| WATER -IRRIGATION INSPECTION | (¤25.00) | 08/07/2024 |
| IMPACT FEE SCHOOL | (¤5,450.00) | 08/07/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 08/07/2024 |
| SURCHARGE FS 533.721 | ¤13.74 | 08/07/2024 |
| SURCHARGE FS 533.721 | (¤13.74) | 08/07/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤14,218.43 |