I want to search for...
Permit #2024050771
Permit Details
Status: COED
| Parcel Id: 07-11-31-7004-00060-0130 |
| CONDITIONED SPACE: 2277 sqft |
| GARAGE: 922 sqft |
| OPENED PORCH (WITH ROOF) : 606 sqft |
| Total Square Footage: 3805 sqft |
| Block: 00060 |
| Subdivision: - |
| Job Phone: 863-647-5815 |
| Location Address: 41 CLINTON CT N |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 07/10/2024 |
| NOC: RECORDED |
| Applicant name: MARK ALLAN HULBERT |
| Owner: OBRIEN DONALD T & WENDI L OBRIEN |
|
Address 42 BICKFORD DRIVE PALM COAST, FL 32137 |
| Lot: 0130 |
| Contracted Stated Job Value: ¤478,000.00 |
| Job Description: Single Family Home |
| Type: CN |
Contractor
HULBERT HOMES INC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 6254 LAKELAND, FL 33813 |
CRC1331304 (Exp: 08/31/2026) | 863-647-5815 |
Sub Contractors
JOSEPH C WRIGHT
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
15 HARGROVE LANE PALM COAST, FL 32137 |
UNIT 3 D PALM COAST, FL 32137 |
EC13003278 (Exp: 08/31/2026) | 386-447-9644 | 386-447-9633 |
ANTONIO VINCENZO DAHM
| Status | Location Address | State License Number | Phone |
| ACTIVE |
10 RYBAR LANE PALM COAST, FL 32164 |
CFC1429951 (Exp: 08/31/2026) | 386-237-5692 |
KYLE RODBOURN
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1325 W HWY 100 BUNNELL, FL 32110 |
CAC1821358 (Exp: 08/31/2026) | 386-586-9039 |
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 04/23/2025 | FINAL APPROVED | HCAMACHO |
| Note: Energy Calcs ok and match installed units. 4/21/2025 - PREVIOUS INSPECTION NOTES 1. Waiting on Revision Approval for Energy calcs on equipment change. | |||
| BLD - BUILDING FINAL | 04/21/2025 | Disapproved - NO FEE | HCAMACHO |
| Note: 1. Waiting on Revision Approval for Energy calcs on equipment change. | |||
| U -UTILITY RESIDENTIAL FINAL | 04/09/2025 | APPROVED - AS NOTED | LFITZGERALD |
| Note: please use a flush mount cap-dont invert cap and srew on-possible cross threading can occur 4/3/2025 - PREVIOUS INSPECTION NOTES raise sewer clean out so not covered over by sod-please use a flush cap no square nut type | |||
| U-CROSS CONNECTION | 04/07/2025 | APPROVED | DHANEY |
| ROW- PROJECT STATUS | 04/07/2025 | Status Check | PFLANAGAN |
| Note: MEETING WITH HOMEOWNER FOR SWALE ALONG SEAWALL | |||
| ROW - FINAL APRON (AFTER POUR) | 04/03/2025 | APPROVED | EMADISON |
| Note: ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. | |||
| ROW - STORMWATER FINAL | 04/03/2025 | APPROVED | EMADISON |
| Note: ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. | |||
| U -UTILITY RESIDENTIAL FINAL | 04/03/2025 | Disapproved -FEE REQUIRED | LFITZGERALD |
| Note: raise sewer clean out so not covered over by sod-please use a flush cap no square nut type | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/01/2025 | APPROVED - AS NOTED | EMADISON |
| Note: Inspector Notes from Inspection 9465 THERE ARE WASH OUTS ON LEFT BACK AND RIGHT BACK NEED TO BE FIXED BEFORE FINAL ROW INSPECTION ** 04/01/25 YOUR FIELD SURVEY WAS PASSED ON 03/12/25 | |||
| ELEVATION CERTIFICATE-FINAL APPROVAL | 04/01/2025 | APPROVED | JMYERS |
| FINAL SURVEY (OFFICE USE ONLY) | 04/01/2025 | APPROVED | EMADISON |
| Note: ** 04/01/25 YOUR FINAL SURVEY WAS PREVIOUSLY APPROVED ON 03/12/25 THIS MUST BE A DUPLICATE INSPECTION. | |||
| GRAVITY SEWER TEST | 03/24/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: Inspector Notes from Inspection 2095 THIS WAS A VIRTUAL INSPECTION THIS INSPECTION WAS APPROVED WITH SEWER TIE IN AND WAS A VIRTUAL INSPECTION | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 03/12/2025 | APPROVED | PFLANAGAN |
| Note: LEFT FRONT RIGHT OF WAY LINE LITTLE LOWER THEN THE EDGE OF ROAD BUT THE IN THE FIELD IT OK | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 03/12/2025 | APPROVED - AS NOTED | PFLANAGAN |
| Note: THERE ARE WASH OUTS ON LEFT BACK AND RIGHT BACK NEED TO BE FIXED BEFORE FINAL ROW INSPECTION | |||
| ELECTRIC - EARLY POWER | 03/05/2025 | APPROVED | HCAMACHO |
| Note: | |||
| ROW- PRE-APRON (PRE-POUR) | 02/13/2025 | APPROVED | PFLANAGAN |
| Note: PLEASE COMPACT PAVER BASE MORE READY TO LAY PAVERS ------------------------------------------------------------------------ 2/3/2025 - PREVIOUS INSPECTION NOTES ** 02/03/25 ** APRON READY TO POUR WITH PAVER RESTRAINT ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED _______________________________________________________________________________________________________________________ 1/28/2025 - PREVIOUS INSPECTION NOTES ** 01/28/25 BUILDER NEEDS TO REVISE SITE PLAN AS YOU HAVE PROPOSED TO INSTALL A CONCRETE DRIVEWAY YOUR DRIVEWAY IS PREPED FOR A PAVER DRIVEWAY ** BUILDER ALSO NEEDS TO UPLOAD DRAWING 300.H FROM THE CITY OF PALM COASTS TECHNICAL MANUAL CIRCLE WHICH OPTION YOU ARE BUILDING YOUR DRIVEWAY SO THE INSPECTOR KNOWS WHAT TO LOOK FOR. ** THERE WERE NO HARD COPIES IN YOUR PERMIT BOX FOR INSPECTOR TO REVIEW AS WELL | |||
| ROW- PAVER RESTRAINTS | 02/03/2025 | APPROVED | EMADISON |
| Note: ** 02/03/25 READY TO POUR PAVER RESTRAINT ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE | |||
| ROW- PRE-APRON (PRE-POUR) | 02/03/2025 | PARTIALLY APPROVED | EMADISON |
| Note: ** 02/03/25 ** APRON READY TO POUR WITH PAVER RESTRAINT ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED _______________________________________________________________________________________________________________________ 1/28/2025 - PREVIOUS INSPECTION NOTES ** 01/28/25 BUILDER NEEDS TO REVISE SITE PLAN AS YOU HAVE PROPOSED TO INSTALL A CONCRETE DRIVEWAY YOUR DRIVEWAY IS PREPED FOR A PAVER DRIVEWAY ** BUILDER ALSO NEEDS TO UPLOAD DRAWING 300.H FROM THE CITY OF PALM COASTS TECHNICAL MANUAL CIRCLE WHICH OPTION YOU ARE BUILDING YOUR DRIVEWAY SO THE INSPECTOR KNOWS WHAT TO LOOK FOR. ** THERE WERE NO HARD COPIES IN YOUR PERMIT BOX FOR INSPECTOR TO REVIEW AS WELL | |||
| ROW- PRE-APRON (PRE-POUR) | 01/28/2025 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 01/28/25 BUILDER NEEDS TO REVISE SITE PLAN AS YOU HAVE PROPOSED TO INSTALL A CONCRETE DRIVEWAY YOUR DRIVEWAY IS PREPED FOR A PAVER DRIVEWAY ** BUILDER ALSO NEEDS TO UPLOAD DRAWING 300.H FROM THE CITY OF PALM COASTS TECHNICAL MANUAL CIRCLE WHICH OPTION YOU ARE BUILDING YOUR DRIVEWAY SO THE INSPECTOR KNOWS WHAT TO LOOK FOR. ** THERE WERE NO HARD COPIES IN YOUR PERMIT BOX FOR INSPECTOR TO REVIEW AS WELL | |||
| SEWER TIE IN | 01/23/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| GRAVITY SEWER TEST | 01/23/2025 | PARTIALLY APPROVED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| ROW - DRAINAGE | 01/21/2025 | APPROVED | EMADISON |
| Note: ** 01/21/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/14/2025 - PREVIOUS INSPECTION NOTES ** 01/14/25 SPOKE WITH BUILDER IN REGARD TO THE ISSUES NOTED STATED HE WOULD HAVE HIS SITE CREW OUT TO MAKE ALL ADDITIONAL REPAIRS AND CORRECTIONS BY MONDAY 01/20/25 I HAVE RESCHEDULED THE NEXT DRAINAGE INSPECTION FOR 01/21/25 ** 01/14/25 CORRECTIONS STILL REQUIRED AS NOTED IN PREVIOUS INSPECTION YOUR PERMIT HAS AN INSPECTION HOLD AND WILL NOT BE RELEASED UNTIL ALL NOTED CORRECTIONS HAVE BEEN MADE. INSPECTIONS WILL CONTINUE ON A DAILY BASIS 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM EDGE OF ROADWAY AND ROW PUT ONTO YOUR SITE ** FOLLOW UP INSPECTION ON 01/14/25 ____________________________________________________________________________________________________________________ 1/13/2025 - PREVIOUS INSPECTION NOTES ** 01/14/25 CORRECTIONS STILL REQUIRED AS NOTED IN PREVIOUS INSPECTION YOUR PERMIT HAS AN INSPECTION HOLD AND WILL NOT BE RELEASED UNTIL ALL NOTED CORRECTIONS HAVE BEEN MADE. INSPECTIONS WILL CONTINUE ON A DAILY BASIS 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. ** FOLLOW UP INSPECTION ON 01/14/25 ____________________________________________________________________________________________________________________ 1/10/2025 - PREVIOUS INSPECTION NOTES ** 01/10/25 NO CORRECTIONS HAVE BEEN MADE AS REQUIRED AND NOTED IN PREVIOUS INSPECTION YOUR PERMIT HAS AN INSPECTION HOLD AND WILL NOT BE RELEASED UNTIL ALL NOTED CORRECTIONS HAVE BEEN MADE. INSPECTIONS WILL CONTINUE ON A DAILY BASIS 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. ** FOLLOW UP INSPECTION ON 01/13/25 ------------------------------------------------------------------------------------ 1/9/2025 - PREVIOUS INSPECTION NOTES ** 01/08/25 NO CORRECTIONS HAVE BEEN MADE AS REQUIRED AND NOTED IN PREVIOUS INSPECTION YOUR PERMIT HAS AN INSPECTION HOLD AND WILL NOT BE RELEASED UNTIL ALL NOTED CORRECTIONS HAVE BEEN MADE. INSPECTIONS WILL CONTINUE ON A DAILY BASIS 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. ** FOLLOW UP INSPECTION ON 01/10/25 ------------------------------------------------------------------------------------ 1/8/2025 - PREVIOUS INSPECTION NOTES ** 01/08/25 NO CORRECTIONS HAVE BEEN MADE AS REQUIRED AND NOTED IN PREVIOUS INSPECTION YOUR PERMIT HAS AN INSPECTION HOLD AND WILL NOT BE RELEASED UNTIL ALL NOTED CORRECTIONS HAVE BEEN MADE. INSPECTIONS WILL CONTINUE ON A DAILY BASIS 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. ------------------------------------------------------------------------------------ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION; NEEDS TO READ THE INSPECTOR'S NOTE THE INSPECTOR BE BACK ON 1/7/25 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES ALL STILL NEED TO BE ADDRESSED 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. ------------------------------------------------------------------------------------ 12/31/2024 - PREVIOUS INSPECTION NOTES ALL STILL NEED TO BE ADDRESSED 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. --------------------------------------------------------------------------------- 12/30/2024 - PREVIOUS INSPECTION NOTES ALL STILL NEED TO BE ADDRESSED 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. -------------------------------------------------------------------------------------------- 12/27/2024 - PREVIOUS INSPECTION NOTES ALL STILL NEED TO BE ADDRESSED 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. ----------------------------------------------------------------------------------------------- 12/26/2024 - PREVIOUS INSPECTION NOTES ALL STILL NEED TO BE ADDRESSED 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. ------------------------------------------------------------------------------------------ 12/23/2024 - PREVIOUS INSPECTION NOTES ALL STILL NEED TO BE ADDRESSED 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. -------------------------------------------------------------------------------------------- 12/16/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. YOU WILL HAVE 7DAY TO CORRECT ALL LISTED ABOVE IF ALL ARE NOT CORRECTED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. | |||
| ROW - DRAINAGE | 01/14/2025 | Disapproved - NO FEE | EMADISON |
| Note: ** 01/14/25 SPOKE WITH BUILDER IN REGARD TO THE ISSUES NOTED STATED HE WOULD HAVE HIS SITE CREW OUT TO MAKE ALL ADDITIONAL REPAIRS AND CORRECTIONS BY MONDAY 01/20/25 I HAVE RESCHEDULED THE NEXT DRAINAGE INSPECTION FOR 01/21/25 ** 01/14/25 CORRECTIONS STILL REQUIRED AS NOTED IN PREVIOUS INSPECTION YOUR PERMIT HAS AN INSPECTION HOLD AND WILL NOT BE RELEASED UNTIL ALL NOTED CORRECTIONS HAVE BEEN MADE. INSPECTIONS WILL CONTINUE ON A DAILY BASIS 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM EDGE OF ROADWAY AND ROW PUT ONTO YOUR SITE ** FOLLOW UP INSPECTION ON 01/14/25 ____________________________________________________________________________________________________________________ 1/13/2025 - PREVIOUS INSPECTION NOTES ** 01/14/25 CORRECTIONS STILL REQUIRED AS NOTED IN PREVIOUS INSPECTION YOUR PERMIT HAS AN INSPECTION HOLD AND WILL NOT BE RELEASED UNTIL ALL NOTED CORRECTIONS HAVE BEEN MADE. INSPECTIONS WILL CONTINUE ON A DAILY BASIS 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. ** FOLLOW UP INSPECTION ON 01/14/25 ____________________________________________________________________________________________________________________ 1/10/2025 - PREVIOUS INSPECTION NOTES ** 01/10/25 NO CORRECTIONS HAVE BEEN MADE AS REQUIRED AND NOTED IN PREVIOUS INSPECTION YOUR PERMIT HAS AN INSPECTION HOLD AND WILL NOT BE RELEASED UNTIL ALL NOTED CORRECTIONS HAVE BEEN MADE. INSPECTIONS WILL CONTINUE ON A DAILY BASIS 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. ** FOLLOW UP INSPECTION ON 01/13/25 ------------------------------------------------------------------------------------ 1/9/2025 - PREVIOUS INSPECTION NOTES ** 01/08/25 NO CORRECTIONS HAVE BEEN MADE AS REQUIRED AND NOTED IN PREVIOUS INSPECTION YOUR PERMIT HAS AN INSPECTION HOLD AND WILL NOT BE RELEASED UNTIL ALL NOTED CORRECTIONS HAVE BEEN MADE. INSPECTIONS WILL CONTINUE ON A DAILY BASIS 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. ** FOLLOW UP INSPECTION ON 01/10/25 ------------------------------------------------------------------------------------ 1/8/2025 - PREVIOUS INSPECTION NOTES ** 01/08/25 NO CORRECTIONS HAVE BEEN MADE AS REQUIRED AND NOTED IN PREVIOUS INSPECTION YOUR PERMIT HAS AN INSPECTION HOLD AND WILL NOT BE RELEASED UNTIL ALL NOTED CORRECTIONS HAVE BEEN MADE. INSPECTIONS WILL CONTINUE ON A DAILY BASIS 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. ------------------------------------------------------------------------------------ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION; NEEDS TO READ THE INSPECTOR'S NOTE THE INSPECTOR BE BACK ON 1/7/25 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES ALL STILL NEED TO BE ADDRESSED 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. ------------------------------------------------------------------------------------ 12/31/2024 - PREVIOUS INSPECTION NOTES ALL STILL NEED TO BE ADDRESSED 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. --------------------------------------------------------------------------------- 12/30/2024 - PREVIOUS INSPECTION NOTES ALL STILL NEED TO BE ADDRESSED 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. -------------------------------------------------------------------------------------------- 12/27/2024 - PREVIOUS INSPECTION NOTES ALL STILL NEED TO BE ADDRESSED 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. ----------------------------------------------------------------------------------------------- 12/26/2024 - PREVIOUS INSPECTION NOTES ALL STILL NEED TO BE ADDRESSED 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. ------------------------------------------------------------------------------------------ 12/23/2024 - PREVIOUS INSPECTION NOTES ALL STILL NEED TO BE ADDRESSED 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. -------------------------------------------------------------------------------------------- 12/16/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. YOU WILL HAVE 7DAY TO CORRECT ALL LISTED ABOVE IF ALL ARE NOT CORRECTED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. | |||
| ROW - DRAINAGE | 01/13/2025 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 01/14/25 CORRECTIONS STILL REQUIRED AS NOTED IN PREVIOUS INSPECTION YOUR PERMIT HAS AN INSPECTION HOLD AND WILL NOT BE RELEASED UNTIL ALL NOTED CORRECTIONS HAVE BEEN MADE. INSPECTIONS WILL CONTINUE ON A DAILY BASIS 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. ** FOLLOW UP INSPECTION ON 01/14/25 ____________________________________________________________________________________________________________________ 1/10/2025 - PREVIOUS INSPECTION NOTES ** 01/10/25 NO CORRECTIONS HAVE BEEN MADE AS REQUIRED AND NOTED IN PREVIOUS INSPECTION YOUR PERMIT HAS AN INSPECTION HOLD AND WILL NOT BE RELEASED UNTIL ALL NOTED CORRECTIONS HAVE BEEN MADE. INSPECTIONS WILL CONTINUE ON A DAILY BASIS 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. ** FOLLOW UP INSPECTION ON 01/13/25 ------------------------------------------------------------------------------------ 1/9/2025 - PREVIOUS INSPECTION NOTES ** 01/08/25 NO CORRECTIONS HAVE BEEN MADE AS REQUIRED AND NOTED IN PREVIOUS INSPECTION YOUR PERMIT HAS AN INSPECTION HOLD AND WILL NOT BE RELEASED UNTIL ALL NOTED CORRECTIONS HAVE BEEN MADE. INSPECTIONS WILL CONTINUE ON A DAILY BASIS 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. ** FOLLOW UP INSPECTION ON 01/10/25 ------------------------------------------------------------------------------------ 1/8/2025 - PREVIOUS INSPECTION NOTES ** 01/08/25 NO CORRECTIONS HAVE BEEN MADE AS REQUIRED AND NOTED IN PREVIOUS INSPECTION YOUR PERMIT HAS AN INSPECTION HOLD AND WILL NOT BE RELEASED UNTIL ALL NOTED CORRECTIONS HAVE BEEN MADE. INSPECTIONS WILL CONTINUE ON A DAILY BASIS 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. ------------------------------------------------------------------------------------ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION; NEEDS TO READ THE INSPECTOR'S NOTE THE INSPECTOR BE BACK ON 1/7/25 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES ALL STILL NEED TO BE ADDRESSED 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. ------------------------------------------------------------------------------------ 12/31/2024 - PREVIOUS INSPECTION NOTES ALL STILL NEED TO BE ADDRESSED 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. --------------------------------------------------------------------------------- 12/30/2024 - PREVIOUS INSPECTION NOTES ALL STILL NEED TO BE ADDRESSED 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. -------------------------------------------------------------------------------------------- 12/27/2024 - PREVIOUS INSPECTION NOTES ALL STILL NEED TO BE ADDRESSED 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. ----------------------------------------------------------------------------------------------- 12/26/2024 - PREVIOUS INSPECTION NOTES ALL STILL NEED TO BE ADDRESSED 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. ------------------------------------------------------------------------------------------ 12/23/2024 - PREVIOUS INSPECTION NOTES ALL STILL NEED TO BE ADDRESSED 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. -------------------------------------------------------------------------------------------- 12/16/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. YOU WILL HAVE 7DAY TO CORRECT ALL LISTED ABOVE IF ALL ARE NOT CORRECTED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. | |||
| ROW - DRAINAGE | 01/10/2025 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 01/10/25 NO CORRECTIONS HAVE BEEN MADE AS REQUIRED AND NOTED IN PREVIOUS INSPECTION YOUR PERMIT HAS AN INSPECTION HOLD AND WILL NOT BE RELEASED UNTIL ALL NOTED CORRECTIONS HAVE BEEN MADE. INSPECTIONS WILL CONTINUE ON A DAILY BASIS 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. ** FOLLOW UP INSPECTION ON 01/13/25 ------------------------------------------------------------------------------------ 1/9/2025 - PREVIOUS INSPECTION NOTES ** 01/08/25 NO CORRECTIONS HAVE BEEN MADE AS REQUIRED AND NOTED IN PREVIOUS INSPECTION YOUR PERMIT HAS AN INSPECTION HOLD AND WILL NOT BE RELEASED UNTIL ALL NOTED CORRECTIONS HAVE BEEN MADE. INSPECTIONS WILL CONTINUE ON A DAILY BASIS 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. ** FOLLOW UP INSPECTION ON 01/10/25 ------------------------------------------------------------------------------------ 1/8/2025 - PREVIOUS INSPECTION NOTES ** 01/08/25 NO CORRECTIONS HAVE BEEN MADE AS REQUIRED AND NOTED IN PREVIOUS INSPECTION YOUR PERMIT HAS AN INSPECTION HOLD AND WILL NOT BE RELEASED UNTIL ALL NOTED CORRECTIONS HAVE BEEN MADE. INSPECTIONS WILL CONTINUE ON A DAILY BASIS 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. ------------------------------------------------------------------------------------ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION; NEEDS TO READ THE INSPECTOR'S NOTE THE INSPECTOR BE BACK ON 1/7/25 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES ALL STILL NEED TO BE ADDRESSED 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. ------------------------------------------------------------------------------------ 12/31/2024 - PREVIOUS INSPECTION NOTES ALL STILL NEED TO BE ADDRESSED 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. --------------------------------------------------------------------------------- 12/30/2024 - PREVIOUS INSPECTION NOTES ALL STILL NEED TO BE ADDRESSED 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. -------------------------------------------------------------------------------------------- 12/27/2024 - PREVIOUS INSPECTION NOTES ALL STILL NEED TO BE ADDRESSED 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. ----------------------------------------------------------------------------------------------- 12/26/2024 - PREVIOUS INSPECTION NOTES ALL STILL NEED TO BE ADDRESSED 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. ------------------------------------------------------------------------------------------ 12/23/2024 - PREVIOUS INSPECTION NOTES ALL STILL NEED TO BE ADDRESSED 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. -------------------------------------------------------------------------------------------- 12/16/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. YOU WILL HAVE 7DAY TO CORRECT ALL LISTED ABOVE IF ALL ARE NOT CORRECTED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. | |||
| ROW - DRAINAGE | 01/09/2025 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 01/08/25 NO CORRECTIONS HAVE BEEN MADE AS REQUIRED AND NOTED IN PREVIOUS INSPECTION YOUR PERMIT HAS AN INSPECTION HOLD AND WILL NOT BE RELEASED UNTIL ALL NOTED CORRECTIONS HAVE BEEN MADE. INSPECTIONS WILL CONTINUE ON A DAILY BASIS 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. ** FOLLOW UP INSPECTION ON 01/10/25 ------------------------------------------------------------------------------------ 1/8/2025 - PREVIOUS INSPECTION NOTES ** 01/08/25 NO CORRECTIONS HAVE BEEN MADE AS REQUIRED AND NOTED IN PREVIOUS INSPECTION YOUR PERMIT HAS AN INSPECTION HOLD AND WILL NOT BE RELEASED UNTIL ALL NOTED CORRECTIONS HAVE BEEN MADE. INSPECTIONS WILL CONTINUE ON A DAILY BASIS 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. ------------------------------------------------------------------------------------ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION; NEEDS TO READ THE INSPECTOR'S NOTE THE INSPECTOR BE BACK ON 1/7/25 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES ALL STILL NEED TO BE ADDRESSED 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. ------------------------------------------------------------------------------------ 12/31/2024 - PREVIOUS INSPECTION NOTES ALL STILL NEED TO BE ADDRESSED 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. --------------------------------------------------------------------------------- 12/30/2024 - PREVIOUS INSPECTION NOTES ALL STILL NEED TO BE ADDRESSED 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. -------------------------------------------------------------------------------------------- 12/27/2024 - PREVIOUS INSPECTION NOTES ALL STILL NEED TO BE ADDRESSED 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. ----------------------------------------------------------------------------------------------- 12/26/2024 - PREVIOUS INSPECTION NOTES ALL STILL NEED TO BE ADDRESSED 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. ------------------------------------------------------------------------------------------ 12/23/2024 - PREVIOUS INSPECTION NOTES ALL STILL NEED TO BE ADDRESSED 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. -------------------------------------------------------------------------------------------- 12/16/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. YOU WILL HAVE 7DAY TO CORRECT ALL LISTED ABOVE IF ALL ARE NOT CORRECTED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. | |||
| ROW - DRAINAGE | 01/07/2025 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 01/08/25 NO CORRECTIONS HAVE BEEN MADE AS REQUIRED AND NOTED IN PREVIOUS INSPECTION YOUR PERMIT HAS AN INSPECTION HOLD AND WILL NOT BE RELEASED UNTIL ALL NOTED CORRECTIONS HAVE BEEN MADE. INSPECTIONS WILL CONTINUE ON A DAILY BASIS 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. ------------------------------------------------------------------------------------ 1/3/2025 - PREVIOUS INSPECTION NOTES 1/3/25=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION; NEEDS TO READ THE INSPECTOR'S NOTE THE INSPECTOR BE BACK ON 1/7/25 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES ALL STILL NEED TO BE ADDRESSED 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. ------------------------------------------------------------------------------------ 12/31/2024 - PREVIOUS INSPECTION NOTES ALL STILL NEED TO BE ADDRESSED 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. --------------------------------------------------------------------------------- 12/30/2024 - PREVIOUS INSPECTION NOTES ALL STILL NEED TO BE ADDRESSED 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. -------------------------------------------------------------------------------------------- 12/27/2024 - PREVIOUS INSPECTION NOTES ALL STILL NEED TO BE ADDRESSED 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. ----------------------------------------------------------------------------------------------- 12/26/2024 - PREVIOUS INSPECTION NOTES ALL STILL NEED TO BE ADDRESSED 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. ------------------------------------------------------------------------------------------ 12/23/2024 - PREVIOUS INSPECTION NOTES ALL STILL NEED TO BE ADDRESSED 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. -------------------------------------------------------------------------------------------- 12/16/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. YOU WILL HAVE 7DAY TO CORRECT ALL LISTED ABOVE IF ALL ARE NOT CORRECTED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. | |||
| ROW - DRAINAGE | 01/03/2025 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: 1/3/25=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION; NEEDS TO READ THE INSPECTOR'S NOTE THE INSPECTOR BE BACK ON 1/7/25 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/2/2025 - PREVIOUS INSPECTION NOTES ALL STILL NEED TO BE ADDRESSED 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. ------------------------------------------------------------------------------------ 12/31/2024 - PREVIOUS INSPECTION NOTES ALL STILL NEED TO BE ADDRESSED 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. --------------------------------------------------------------------------------- 12/30/2024 - PREVIOUS INSPECTION NOTES ALL STILL NEED TO BE ADDRESSED 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. -------------------------------------------------------------------------------------------- 12/27/2024 - PREVIOUS INSPECTION NOTES ALL STILL NEED TO BE ADDRESSED 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. ----------------------------------------------------------------------------------------------- 12/26/2024 - PREVIOUS INSPECTION NOTES ALL STILL NEED TO BE ADDRESSED 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. ------------------------------------------------------------------------------------------ 12/23/2024 - PREVIOUS INSPECTION NOTES ALL STILL NEED TO BE ADDRESSED 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. -------------------------------------------------------------------------------------------- 12/16/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. YOU WILL HAVE 7DAY TO CORRECT ALL LISTED ABOVE IF ALL ARE NOT CORRECTED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. | |||
| ROW - DRAINAGE | 01/02/2025 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: ALL STILL NEED TO BE ADDRESSED 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. ------------------------------------------------------------------------------------ 12/31/2024 - PREVIOUS INSPECTION NOTES ALL STILL NEED TO BE ADDRESSED 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. --------------------------------------------------------------------------------- 12/30/2024 - PREVIOUS INSPECTION NOTES ALL STILL NEED TO BE ADDRESSED 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. -------------------------------------------------------------------------------------------- 12/27/2024 - PREVIOUS INSPECTION NOTES ALL STILL NEED TO BE ADDRESSED 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. ----------------------------------------------------------------------------------------------- 12/26/2024 - PREVIOUS INSPECTION NOTES ALL STILL NEED TO BE ADDRESSED 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. ------------------------------------------------------------------------------------------ 12/23/2024 - PREVIOUS INSPECTION NOTES ALL STILL NEED TO BE ADDRESSED 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. -------------------------------------------------------------------------------------------- 12/16/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. YOU WILL HAVE 7DAY TO CORRECT ALL LISTED ABOVE IF ALL ARE NOT CORRECTED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. | |||
| ROW - DRAINAGE | 12/31/2024 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: ALL STILL NEED TO BE ADDRESSED 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. --------------------------------------------------------------------------------- 12/30/2024 - PREVIOUS INSPECTION NOTES ALL STILL NEED TO BE ADDRESSED 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. -------------------------------------------------------------------------------------------- 12/27/2024 - PREVIOUS INSPECTION NOTES ALL STILL NEED TO BE ADDRESSED 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. ----------------------------------------------------------------------------------------------- 12/26/2024 - PREVIOUS INSPECTION NOTES ALL STILL NEED TO BE ADDRESSED 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. ------------------------------------------------------------------------------------------ 12/23/2024 - PREVIOUS INSPECTION NOTES ALL STILL NEED TO BE ADDRESSED 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. -------------------------------------------------------------------------------------------- 12/16/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. YOU WILL HAVE 7DAY TO CORRECT ALL LISTED ABOVE IF ALL ARE NOT CORRECTED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. | |||
| ROW - DRAINAGE | 12/30/2024 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: ALL STILL NEED TO BE ADDRESSED 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. -------------------------------------------------------------------------------------------- 12/27/2024 - PREVIOUS INSPECTION NOTES ALL STILL NEED TO BE ADDRESSED 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. ----------------------------------------------------------------------------------------------- 12/26/2024 - PREVIOUS INSPECTION NOTES ALL STILL NEED TO BE ADDRESSED 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. ------------------------------------------------------------------------------------------ 12/23/2024 - PREVIOUS INSPECTION NOTES ALL STILL NEED TO BE ADDRESSED 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. -------------------------------------------------------------------------------------------- 12/16/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. YOU WILL HAVE 7DAY TO CORRECT ALL LISTED ABOVE IF ALL ARE NOT CORRECTED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. | |||
| ROW - DRAINAGE | 12/27/2024 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: ALL STILL NEED TO BE ADDRESSED 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. ----------------------------------------------------------------------------------------------- 12/26/2024 - PREVIOUS INSPECTION NOTES ALL STILL NEED TO BE ADDRESSED 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. ------------------------------------------------------------------------------------------ 12/23/2024 - PREVIOUS INSPECTION NOTES ALL STILL NEED TO BE ADDRESSED 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. -------------------------------------------------------------------------------------------- 12/16/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. YOU WILL HAVE 7DAY TO CORRECT ALL LISTED ABOVE IF ALL ARE NOT CORRECTED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. | |||
| ROW - DRAINAGE | 12/26/2024 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: ALL STILL NEED TO BE ADDRESSED 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. ------------------------------------------------------------------------------------------ 12/23/2024 - PREVIOUS INSPECTION NOTES ALL STILL NEED TO BE ADDRESSED 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. -------------------------------------------------------------------------------------------- 12/16/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. YOU WILL HAVE 7DAY TO CORRECT ALL LISTED ABOVE IF ALL ARE NOT CORRECTED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. | |||
| ROW - DRAINAGE | 12/23/2024 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: ALL STILL NEED TO BE ADDRESSED 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. THERE IS NOW A INSPECTION HOLD ON THIS PERMIT. -------------------------------------------------------------------------------------------- 12/16/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. YOU WILL HAVE 7DAY TO CORRECT ALL LISTED ABOVE IF ALL ARE NOT CORRECTED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. | |||
| ROW - DRAINAGE | 12/16/2024 | Disapproved - NO FEE | PFLANAGAN |
| Note: 1) NEED TO PUT PORTER JOHN ON YOUR LOT AND OUT OF THE RIGHT OF WAY. 2) NEED TO ALL SEDIMENT FRONT THE FRONT ROADSIDE SWALE. 3) NEED TO REMOVE DUMPSTER FROM RIGHT OF WAY. YOU WILL HAVE 7DAY TO CORRECT ALL LISTED ABOVE IF ALL ARE NOT CORRECTED THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. | |||
| INSULATION | 12/03/2024 | APPROVED - AS NOTED | HCAMACHO |
| Note: 1. Need revision to Electrical Riser for adding Transfer switch for future Generator. Will look at Final for Revision. 11/26/2024 - PREVIOUS INSPECTION NOTES 11/22/2024 - PREVIOUS INSPECTION NOTES 1. Electrician needs to finish the Service line. 2. Need revision to Electrical Riser for adding Transfer switch for future Generator. 3. All Windows need to be screwed off in accordance with manufacturer and need window installed in Nook. 4. Need service outlet in Attic for A/C. | |||
| INSULATION | 11/26/2024 | CANCELLED BY APPLICANT | HCAMACHO |
| Note: 11/22/2024 - PREVIOUS INSPECTION NOTES 1. Electrician needs to finish the Service line. 2. Need revision to Electrical Riser for adding Transfer switch for future Generator. 3. All Windows need to be screwed off in accordance with manufacturer and need window installed in Nook. 4. Need service outlet in Attic for A/C. | |||
| INSULATION | 11/22/2024 | Disapproved -FEE REQUIRED | HCAMACHO |
| Note: 1. Electrician needs to finish the Service line. 2. Need revision to Electrical Riser for adding Transfer switch for future Generator. 3. All Windows need to be screwed off in accordance with manufacturer and need window installed in Nook. 4. Need service outlet in Attic for A/C. | |||
| LATH/BRICK/ WATER BARRIER | 11/21/2024 | APPROVED | HCAMACHO |
| Note: Inspector Notes from Inspection 2420 1. Electrician needs to finish the Service line. 2. Need revision to Electrical Riser for adding Transfer switch for future Generator. 3. Windows need to be screwed off and window installed in Nook. 4. Need service outlet in Attic for A/C. New inspection due to canceled inspection 11/8/2024 - PREVIOUS INSPECTION NOTES 1. Electrician needs to finish the Service line. 2. Please fire block the wires going through the top plate on exterior walls, because it will be covered once insulation goes up and we can not inspect at insulation. 3. Bath fans need two types of connection. 4. Need Product approval and instalation instructions for windows. 5. Need Energy calcs to verify HVAC ducks, layout and pressures. Inspector Notes from Inspection 2460 1. C06 missing connector on Garage bearing wall next to Girder. 2. C10,C11,C12 Missing Engineering 3. Roof Valey Framing missing Conectors. See Plans 4. Missing Dripedge on front of house upper level.(from Roof Valey and metal Inspection) ***Check at Rough Inspection Inspector Notes from Inspection 2450 No wall sheathing installed at the time of inspection. | |||
| ALL ROUGH | 11/18/2024 | APPROVED - AS NOTED | HCAMACHO |
| Note: 1. Electrician needs to finish the Service line. 2. Need revision to Electrical Riser for adding Transfer switch for future Generator. 3. Windows need to be screwed off and window installed in Nook. 4. Need service outlet in Attic for A/C. New inspection due to canceled inspection 11/8/2024 - PREVIOUS INSPECTION NOTES 1. Electrician needs to finish the Service line. 2. Please fire block the wires going through the top plate on exterior walls, because it will be covered once insulation goes up and we can not inspect at insulation. 3. Bath fans need two types of connection. 4. Need Product approval and instalation instructions for windows. 5. Need Energy calcs to verify HVAC ducks, layout and pressures. Inspector Notes from Inspection 2460 1. C06 missing connector on Garage bearing wall next to Girder. 2. C10,C11,C12 Missing Engineering 3. Roof Valey Framing missing Conectors. See Plans 4. Missing Dripedge on front of house upper level.(from Roof Valey and metal Inspection) ***Check at Rough Inspection Inspector Notes from Inspection 2450 No wall sheathing installed at the time of inspection. | |||
| ALL ROUGH | 11/14/2024 | CANCELLED BY APPLICANT | WEB |
| Note: 11/8/2024 - PREVIOUS INSPECTION NOTES 1. Electrician needs to finish the Service line. 2. Please fire block the wires going through the top plate on exterior walls, because it will be covered once insulation goes up and we can not inspect at insulation. 3. Bath fans need two types of connection. 4. Need Product approval and instalation instructions for windows. 5. Need Energy calcs to verify HVAC ducks, layout and pressures. Inspector Notes from Inspection 2460 1. C06 missing connector on Garage bearing wall next to Girder. 2. C10,C11,C12 Missing Engineering 3. Roof Valey Framing missing Conectors. See Plans 4. Missing Dripedge on front of house upper level.(from Roof Valey and metal Inspection) ***Check at Rough Inspection Inspector Notes from Inspection 2450 No wall sheathing installed at the time of inspection. | |||
| ALL ROUGH | 11/08/2024 | Disapproved - NO FEE | HCAMACHO |
| Note: 1. Electrician needs to finish the Service line. 2. Please fire block the wires going through the top plate on exterior walls, because it will be covered once insulation goes up and we can not inspect at insulation. 3. Bath fans need two types of connection. 4. Need Product approval and instalation instructions for windows. 5. Need Energy calcs to verify HVAC ducks, layout and pressures. Inspector Notes from Inspection 2460 1. C06 missing connector on Garage bearing wall next to Girder. 2. C10,C11,C12 Missing Engineering 3. Roof Valey Framing missing Conectors. See Plans 4. Missing Dripedge on front of house upper level.(from Roof Valey and metal Inspection) ***Check at Rough Inspection Inspector Notes from Inspection 2450 No wall sheathing installed at the time of inspection. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/22/2024 | APPROVED - AS NOTED | HCAMACHO |
| Note: 1. C06 missing connector on Garage bearing wall next to Girder. 2. C10,C11,C12 Missing Engineering 3. Roof Valey Framing missing Conectors. See Plans 4. Missing Dripedge on front of house upper level.(from Roof Valey and metal Inspection) ***Check at Rough Inspection Inspector Notes from Inspection 2450 No wall sheathing installed at the time of inspection. | |||
| ROOF VALLEY & METAL | 10/21/2024 | APPROVED - AS NOTED | MCONTRYMAN |
| Note: 10/21/24 1. Missing 2 pieces of drip edge on entry way. Please verify installation on next inspection Inspector Notes from Inspection 2450 No wall sheathing installed at the time of inspection. | |||
| WALL SHEATHING | 10/15/2024 | APPROVED - AS NOTED | HCAMACHO |
| Note: No wall sheathing installed at the time of inspection. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/15/2024 | Disapproved -FEE REQUIRED | HCAMACHO |
| Note: 1. Missing SP4 on top of bearing walls-all 2. Missing Connector Schedule from plans. Plans Damaged 3. Plans call for Right wall at Entry to be bearing, no connections installed. 4. Shinners through out roof. Remove shinners. 5. Missing connectors at bearing wall behind kitchen. 6. Truss gurders missing connectors to bearing walls. Could not check because of missing connector schedule. 7. Missing wall straps at king jacks and orher trusses. Marked on wall. No connector schedule. 8. Need new set of plans, and approved truss package to finish inspection. 9. Check all connections. 10. Need detail showing bearing point over framed doors. Plans damaged. 11. Still need to check trusses. 12. Checked down cells | |||
| ELECTRIC-TUG | 10/14/2024 | APPROVED - AS NOTED | HCAMACHO |
| Note: Spoke with Builder about cleaning Garbage in front of house and Silt Fence reinstall. Dumbster is in place. I was told it would be done on Wednesday 10/16. FBC 3307.1 NEEDS SILT FENCE PROPERLY INSTALLED | |||
| FOUND SURVEY APPROVED (OFFICE) | 10/03/2024 | APPROVED | JMYERS |
| ELEV CERT-FOUNDATION APPROVAL | 10/03/2024 | APPROVED | JMYERS |
| TIE BEAM / LINTEL | 09/30/2024 | APPROVED | HCAMACHO |
| MONOLITHIC SLAB | 09/17/2024 | APPROVED | FWILLIS |
| PLUMBING 1ST ROUGH UNDERGROUND | 09/13/2024 | APPROVED | MGIBSON |
| Note: 9/10/2024 - PREVIOUS INSPECTION NOTES 9/9/2024 - PREVIOUS INSPECTION NOTES NEED TO CLEAR RAIN AND MUD FROM WHERE RAIN WASHED IN AND COVERED UP ALL 'DWV'' PLUMBING | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 09/10/2024 | CANCELLED BY APPLICANT | MGIBSON |
| Note: 9/9/2024 - PREVIOUS INSPECTION NOTES NEED TO CLEAR RAIN AND MUD FROM WHERE RAIN WASHED IN AND COVERED UP ALL 'DWV'' PLUMBING | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 09/09/2024 | Disapproved - NO FEE | MGIBSON |
| Note: NEED TO CLEAR RAIN AND MUD FROM WHERE RAIN WASHED IN AND COVERED UP ALL 'DWV'' PLUMBING | |||
| FOOTER | 08/21/2024 | APPROVED | BTAYLOR |
| Note: 8/19/2024 - PREVIOUS INSPECTION NOTES 8/16/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LMILLER 8/16/2024 3:19:45 PM *** 1. returns not positioned prerly per plans FBC 107.3 2. Check minimum required return per plans FBC 107.3 3. Reinforcing steel in direct contact with soils minimum 3 inch clearance required per FBC R404.1.2.3.7.4 8-19-24 1. Reinforcing steel in direct contact with soils minimum 3 inch clearance required per FBC R404.1.2.3.7.4 | |||
| FOOTER | 08/19/2024 | Disapproved - NO FEE | BTAYLOR |
| Note: 8/16/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LMILLER 8/16/2024 3:19:45 PM *** 1. returns not positioned prerly per plans FBC 107.3 2. Check minimum required return per plans FBC 107.3 3. Reinforcing steel in direct contact with soils minimum 3 inch clearance required per FBC R404.1.2.3.7.4 8-19-24 1. Reinforcing steel in direct contact with soils minimum 3 inch clearance required per FBC R404.1.2.3.7.4 | |||
| FOOTER | 08/16/2024 | Disapproved - NO FEE | LMILLER |
| Note: *** NOTES ADDED BY LMILLER 8/16/2024 3:19:45 PM *** 1. returns not positioned prerly per plans FBC 107.3 2. Check minimum required return per plans FBC 107.3 3. Reinforcing steel in direct contact with soils minimum 3 inch clearance required per FBC R404.1.2.3.7.4 | |||
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 08/15/2024 | APPROVED | JMUNSON |
| WATER METER INSTALLATION REQUEST | 07/15/2024 | APPROVED | CBOWERMASTER |
| WILDLIFE CHECK - ENVIRONMENTAL | 06/06/2024 | APPROVED | DRODRIGUEZ |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 04/22/2025 | 04/22/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 04/21/2025 | 04/22/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Duct layout signed by wrong contractor | |||
| ZON | COMPLETE | 04/16/2025 | 04/16/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| PLFM | COMPLETE | 03/31/2025 | 04/01/2025 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM The Final elevation certificate has been approved. | |||
| PLFM | HOLD | 03/24/2025 | 03/24/2025 |
| Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM The BFE in B9 seems to have changed, it was 7.0' on the Foundation EC and on the Final Survey. The garage FFE is not on the Final Survey so C2d cannot be verified. C2f has also dropped over 3' since the Foundation EC was done. C2f should be adjacent to the main structure not a porch or accessory. | |||
| ZON | HOLD | 02/04/2025 | 02/04/2025 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Please submit original Right of Way Utililzation Agreement for Paver Driveway. | |||
| SW1 | COMPLETE | 02/04/2025 | 02/06/2025 |
| Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/04/2025 | 02/05/2025 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 01/28/2025 | 01/28/2025 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM repeat comment, the site plan still has approvals on them. | |||
| ENGIN1 | COMPLETE | 01/28/2025 | 01/29/2025 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 01/28/2025 | 02/04/2025 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Please raise elevation at front left property line to 8.90 | |||
| ZON | HOLD | 01/28/2025 | 01/28/2025 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Please submit a fully completed, signed and notarized Right of Way Utilization Agreement for Paver Driveway. This Agreement must be signed by all persons on deed to property and all owner's signatures must be notarized. Once this is complete, please submit this Agreement electronically within the building portal for staff review. | |||
| ELEC | COMPLETE | 12/18/2024 | 12/23/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 12/03/2024 | 12/09/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Are you installing a generator? If not then you need to put a note saying this is for future so the home owner knows he or she has to permit the generator. | |||
| BLD | COMPLETE | 11/12/2024 | 11/18/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/02/2024 | 10/03/2024 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM | |||
| PLFM | COMPLETE | 10/02/2024 | 10/03/2024 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM The Foundation elevation certificate has been approved. Please provide Final prior to CO. | |||
| SW1 | COMPLETE | 10/02/2024 | 10/02/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD | |||
| ZON | COMPLETE | 10/02/2024 | 10/02/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| GAS | COMPLETE | 08/19/2024 | 08/19/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 08/15/2024 | 08/15/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 08/15/2024 | 08/19/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/15/2024 | 08/16/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/15/2024 | 08/16/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 08/15/2024 | 08/19/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| GAS | HOLD | 08/15/2024 | 08/19/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Make subcontractor inactive | |||
| BADMIN | INFORMATION | 08/13/2024 | 08/13/2024 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM If this is a geotech certification, please upload under geotech certification for the document type and the file name should be geotech certification. | |||
| BLD | HOLD | 08/13/2024 | 08/15/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need to upload certification letter from universal 2. Need to upload density reports from universal. | |||
| BLD | COMPLETE | 07/29/2024 | 08/01/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| PLFM | COMPLETE | 07/08/2024 | 07/09/2024 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM The Construction elevation certificate has been approved. However, at Foundation, A9b needs to be No not N/A and A9f needs to be N/A not 0. | |||
| PLFM | HOLD | 06/28/2024 | 07/02/2024 |
| Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM A9b-e need to be 0 not N/A, 3rd time commenting on this. | |||
| PLFM | HOLD | 06/27/2024 | 06/28/2024 |
| Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM A9b-e need to be 0 not N/A. C2f and C2g seem to be reversed as 2.6 should not be the highest adjacent grade. 2.6 is also very low for slab on grade construction, please check if this is true slab on grade 1A or stem wall 1B construction. | |||
| PLFM | HOLD | 06/18/2024 | 06/24/2024 |
| Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM A1 needs to be the property owner, not the builder. A9b-e need to be 0 not N/A. B1a should be City of Palm Coast not Flagler County. B1b needs to have the Community Number or Palm Coast not Flagler County. B4 needs to have the whole Map and Panel number. C2 needs to have a box checked for if a conversion was used or not. C2a should be rounded up not down since the FFE on the site plan is 10.25. C2b & c should not have a measurement box checked as they are N/A. C2d should be rounded up not down since the FFE on the site plan is 9.75. C2e has to have a proposed elevation for machinery and be noted what kind of machinery in Section D comments. C2f & g are unlikely to be Natural grade, please double check. C2h should not have a measurement box checked as it is N/A. | |||
| PLFM | HOLD | 06/13/2024 | 06/13/2024 |
| Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM According to the Site Plan submitted on 6/5/24, the structure will fall inside the floodplain. Elevation certificates are required at construction drawings, foundation, and final. | |||
| ZON | COMPLETE | 06/13/2024 | 06/13/2024 |
| Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM Held By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM 1. PROVIDE TOTAL LENGTH OF DRIVEWAY FOR 3RD GARAGE ON SITE PLAN. PER CODE, MINIMUM 20' LENGTH FOR DRIVEWAY | |||
| PLFM | HOLD | 06/13/2024 | 06/13/2024 |
| Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM According to the Site Plan submitted on 6/13/24, the structure will fall inside the floodplain. Elevation certificates are required at construction drawings, foundation, and final. | |||
| ENGIN1 | COMPLETE | 06/13/2024 | 06/13/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 06/13/2024 | 06/14/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD | |||
| MECH | COMPLETE | 06/05/2024 | 06/10/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 06/05/2024 | 06/11/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 06/05/2024 | 06/11/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/05/2024 | 06/05/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 06/05/2024 | 06/05/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| PLENV | COMPLETE | 06/05/2024 | 06/06/2024 |
| Note: Released By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM Staff conducted a site visit on 06/06/24 and found no Gopher Tortoise or their burrows. Staff suggests placing silt fence as soon as possible to prevent tortoise from moving into the lot. If any gopher tortoises are located in the future further coordination may be necessary. | |||
| ZON | HOLD | 06/05/2024 | 06/05/2024 |
| Note: Held By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM 1. PROVIDE TOTAL LENGTH OF DRIVEWAY FOR 3RD GARAGE ON SITE PLAN. PER CODE, MINIMUM 20' LENGTH FOR DRIVEWAY | |||
| PLFM | HOLD | 05/17/2024 | 05/20/2024 |
| Note: Held By: JERRY REITER - - JREITER@PALMCOASTGOV.COM Site Plan/Survey are missing all flood zone information from FEMA FIRMs. This information needs to be included along with the flood zone line. Should any part of the structure or accessory machinery fall within the SFHA, elevation certificates will be required at construction drawings, foundation, and final. | |||
| BADMIN | HOLD | 05/15/2024 | 05/21/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide geotechnical investigation report in accordance with FBCB Section 1803.2. Report to be conducted per Sections 1803.3 through 1803.5. Completed report shall comply with Section 1803.6. Report shall be signed and sealed by a Florida licensed professional engineer in accordance with F.S. 471.025 and Florida Administrative Code Sections 61G15-30.001 and 61G15-23.001 through .005. You can request a deferred submittal by providing a letter on company letterhead. | |||
| BLD | COMPLETE | 05/15/2024 | 05/20/2024 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 05/15/2024 | 05/17/2024 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 05/15/2024 | 05/21/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Washer and dryer out need to be GFCI protected. NEC 2020 210.8 2. Electrical riser diagram needs to include the surge protector. NEC 2020 230.67 | |||
| ENGIN1 | COMPLETE | 05/15/2024 | 05/15/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | COMPLETE | 05/15/2024 | 05/20/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 05/15/2024 | 05/20/2024 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | HOLD | 05/15/2024 | 05/21/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Duct layout needs to be signed by the AC contractor per 107.1 FBC Residential 2023 8th Edition | |||
| SW1 | COMPLETE | 05/15/2024 | 05/15/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | HOLD | 05/15/2024 | 05/17/2024 |
| Note: Held By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM 1. MISSING TOTAL WIDTH DRIVEWAY | |||
| SWALE | COMPLETE | 05/15/2024 | 09/13/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 04/20/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/02/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/02/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 04/02/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 04/02/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 04/02/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 04/02/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 04/02/2025 |
| SW ENG REINSPECTION 30 | ¤30.00 | 04/02/2025 |
| RECORDING FEE REIMBURSE DOC | ¤44.00 | 04/02/2025 |
| IMPACT FEE TRANSPORTATION | ¤1,862.00 | 07/10/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 07/10/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 07/10/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 07/10/2024 |
| SEWER INSPECTION | ¤25.00 | 07/10/2024 |
| SEWER CAPITAL FACILITY | ¤6,120.52 | 07/10/2024 |
| WATER CAPITAL FACILITY FEE | ¤4,351.14 | 07/10/2024 |
| SITE PLAN 30 | ¤30.00 | 07/10/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 07/10/2024 |
| SW ENG PRE APRON | ¤30.00 | 07/10/2024 |
| CONNECTION FEES | ¤1,187.26 | 07/10/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 07/10/2024 |
| IMPACT FEE FIRE | ¤428.09 | 07/10/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 07/10/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 07/10/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 07/10/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 07/10/2024 |
| SURCHARGE FS 533.721 | ¤15.46 | 07/10/2024 |
| SURCHARGE - FS 468.631 | ¤23.19 | 07/10/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 07/10/2024 |
| WATER- TURN ON | ¤25.00 | 07/10/2024 |
| ADJUSTMENT 10% | (¤171.73) | 07/10/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 07/10/2024 |
| INSPECTION - RESIDENTIAL | ¤1,314.50 | 07/10/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤372.84 | 07/10/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤24,081.26 |