I want to search for...

Permit #2024050885

Permit Details

Status: COED

Parcel Id: 07-11-31-7014-00050-0080
CONDITIONED SPACE: 2526 sqft
GARAGE: 711 sqft
OPENED PORCH (WITH ROOF) : 409 sqft
Total Square Footage: 3646 sqft
Block: 00050
Subdivision: -
Job Phone: 386-931-5741
Location Address: 16 CENTURY LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 06/18/2024
NOC: RECORDED
Applicant name: MICHAEL MARINO HANSEN
Owner: SANTOS MANUEL D & VIVIANE H&W

Address

20 FAWN LN A

PALM COAST, FL 32137

Lot: 0080
Contracted Stated Job Value: ¤370,000.00
Job Description: Single Family
Type: CN

Contractor

RBI HOMES
Status Location Address State License Number Phone
ACTIVE

PO BOX 1347

PALM COAST, FL 32137

RB29003877 (Exp: 08/31/2027) 386-585-4097

Sub Contractors

JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
GARY LLOYD SHEFFIELD
Status Location Address State License Number Phone
ACTIVE

PO BOX 912

PALM COAST, FL 32164

CAC1820539 (Exp: 08/31/2026) 386-264-0550
WILLIAM ROBERT BARRICK
Status Location Address State License Number Phone
CANCEL

21 CEDARWOOD CT

PALM COAST, FL 32137

RB29003845 (Exp: 08/31/2025) 386-585-4097
KEN DEPRINZIO
Status Location Address State License Number Phone Fax
ACTIVE

325 WALKER STREET

HOLLY HILL, FL 32117

11351 (Exp: 08/31/2026) 386-672-8494 386-673-7856
ARTHUR J PASCOE
Status Location Address State License Number Phone
ACTIVE

PO BOX 730007

ORMOND BEACH, FL 32174

EC13007168 (Exp: 08/31/2026) 386-547-6439

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 03/24/2025 FINAL APPROVED HCAMACHO
BLD - BUILDING FINAL 03/21/2025 Disapproved - NO FEE HCAMACHO
Note: 1. A/C Chase on the outside needs to be sealed. 2. Need locking breakers on Cooktop and Wall Oven. 3. Switched outlet on Bedroom 2 is always hot.
ROW - DRAINAGE 03/20/2025 APPROVED PFLANAGAN
Note: ROW FINAL PASSED ------------------------------------------------------------------------------ 3/19/2025 - PREVIOUS INSPECTION NOTES 1) NEED TO REMOVE ALL OVER POURED CONCRETE AND DIRT OUT OF CULVERT PIPE. 2) NEED TO PICK UP ALL CONSTRUCTION DEBRIS FROM VACANT TO THE LEFT AND IN THE BACK. 3) NEED TO SEED AND STRAW ALL BARE AREAS IN THE VACANT IN THE BACK AND 3' INTO THE VACANT TO THE LEFT. SEC 300,03 F4 V-21-The Stormwater Final Inspection will include visual inspection of the site and adjacent properties for debris, proper clean up and repair to damaged terrain. Bare earth on the site or surrounding properties must be sodded, or seeded with pine straw cover, to prevent soil erosion. 1/23/2025 - PREVIOUS INSPECTION NOTES Sediment pile still blocking swale. Pipe on site but not installed yet. Both need done before drainage will flow. 1/22/2025 - PREVIOUS INSPECTION NOTES ** 01/22/24 1) NEED TO REMOVE ALL SEDIMENT AND DIRT FROM ROADSIDE SWALE TO ALLOW STORMWATER TO FLOW ________________________________________________________________________________________________________________ 2) NEED TO RE-ESTABLISH SILT FENCE AROUND THE PROPERTY YOU HAVE 7DAY TO CORRECT ALL ABOVE OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** FOLLOW UP INSPECTION ON 01/22/25 1/21/2025 - PREVIOUS INSPECTION NOTES ** 1/21/2025 NO CORRECTIONS HAVE BEEN MADE YOUR SITE IS BEING PLACED ON AN INSPECTION HOLD A PRIORITY (1) UNTILL ALL CORRECTIONS HAVE BEEN MADE INSPECTIONS WILL BE CONDUCTED EVERY DAY UNTILL ALL CORRECTIONS HAVE BEEN MADE 1) NEED TO REMOVE ALL SEDIMENT AND DIRT FROM ROADSIDE SWALE 2) NEED TO RE-ESTABLISH SILT FENCE AROUND THE PROPERTY YOU HAVE 7DAY TO CORRECT ALL ABOVE OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** FOLLOW UP INSPECTION ON 01/22/25 ___________________________________________________________________________________________________________________ 1/14/2025 - PREVIOUS INSPECTION NOTES 1) NEED TO REMOVE ALL SEDIMENT AND DIRT FROM ROADSIDE SWALE 2) NEED TO RE-ESTABLISH SILT FENCE AROUND THE PROPERTY YOU HAVE 7DAY TO CORRECT ALL ABOVE OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT.
ROW - STORMWATER FINAL 03/20/2025 APPROVED - AS NOTED PFLANAGAN
Note: THERE IS STILL A SMALL AREA OF BARE DIRT IN THE VACANT BEHIND THIS LOT THAT NEEDS SEED AND STRAW. PASSING AS NOTED THAT YOU WILL TAKE CARE OF THIS AREA. ------------------------------------------------------------------------------ 3/19/2025 - PREVIOUS INSPECTION NOTES 1) NEED TO REMOVE ALL OVER POURED CONCRETE AND DIRT OUT OF CULVERT PIPE. 2) NEED TO PICK UP ALL CONSTRUCTION DEBRIS FROM VACANT TO THE LEFT AND IN THE BACK. 3) NEED TO SEED AND STRAW ALL BARE AREAS IN THE VACANT IN THE BACK AND 3' INTO THE VACANT TO THE LEFT. SEC 300,03 F4 V-21-The Stormwater Final Inspection will include visual inspection of the site and adjacent properties for debris, proper clean up and repair to damaged terrain. Bare earth on the site or surrounding properties must be sodded, or seeded with pine straw cover, to prevent soil erosion.
U -UTILITY RESIDENTIAL FINAL 03/19/2025 APPROVED - AS NOTED LFITZGERALD
Note: Inspector Notes from Inspection 9035 remove soils from water meter box potable irrigation with PVB-- no cross connection
ROW - STORMWATER FINAL 03/19/2025 Disapproved -FEE REQUIRED PFLANAGAN
Note: 1) NEED TO REMOVE ALL OVER POURED CONCRETE AND DIRT OUT OF CULVERT PIPE. 2) NEED TO PICK UP ALL CONSTRUCTION DEBRIS FROM VACANT TO THE LEFT AND IN THE BACK. 3) NEED TO SEED AND STRAW ALL BARE AREAS IN THE VACANT IN THE BACK AND 3' INTO THE VACANT TO THE LEFT. SEC 300,03 F4 V-21-The Stormwater Final Inspection will include visual inspection of the site and adjacent properties for debris, proper clean up and repair to damaged terrain. Bare earth on the site or surrounding properties must be sodded, or seeded with pine straw cover, to prevent soil erosion.
ROW - FINAL APRON (AFTER POUR) 03/19/2025 APPROVED PFLANAGAN
Note: At the time of the inspection, all minimum city requirements were met. The builder's responsible for ensuring that nothing changes after this Inspection is approved.
ROW FIELD SURVEY /GRADING CERTIFICATION 03/17/2025 APPROVED - AS NOTED PFLANAGAN
Note: PASSING AS NOTED THAT THE RIGHT SIDE AREA IN THE BACK NEEDS MORE OF A BERM AND LEFT ROADSIDE SWALE NEEDS TO MATCH EXISTING GRADE ON THE ADJACENT LOT. --------------------------------------------------------------- 3/14/2025 - PREVIOUS INSPECTION NOTES 1) THE DRAIN PIPE INBETWEEN THE CIRCLE DRIVEWAY NEEDS TO BE BEHIND THE FRONT PROPERTY LINE / RIGHT OF WAY LINE. Sec 300.03 C-F. Flat work, i.e., slabs, walkways, hardscaping, patios, decking or AC pads are not allowed in any utility easements. Additionally, decorative objects, columns, light poles, mulch, stones, plantings or landscaping of any kind, is not allowed in the Right of Way. 2) SOD ON THE LEFT AND RIGHT SIDE IN THE FRONT ROADSIDE SWALE NEEDS TO MATCH EXISTING GRADE ON ADJACENT LOTS. Sec 300.03 F4 Bare earth on the site or surrounding properties must be sodded and must be sodded to match grade. 3) BACK RIGHT SIDE BERM ALONG LEFT PROPERTY LINE NEEDS TO BE HIGHER FROM BACK PROPERTY LINE TO 20' DOWN THE PROPERTY LINE TOWARDS THE ROAD SO WATER WILL NOT IMPACT THE ADJACENT LOT IN THE FUTURE. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 4) ALL SOD ALONG THE RIGHT PROPERTY LINE NEEDS TO MATCH THE SOD EXISTING ON THE ADJACENT LOT.
U-CROSS CONNECTION 03/17/2025 APPROVED - AS NOTED LFITZGERALD
Note: potable irrigation with PVB-- no cross connection
ROW- FINAL SURVEY/GRADING CERTIFICATION 03/14/2025 APPROVED PFLANAGAN
Note: CORRECTIONS MADE TO SURVEY ---------------------------------------------------------- 3/6/2025 - PREVIOUS INSPECTION NOTES 1) THE FINAL SURVEY STATES THAT THE DRAINAGE WILL NOT WORK ALL WATER IN THE BACK WILL NOT FLOW TO THE FRONT ROADSIDE SWALE. Positive fall is considered to be 0.10 of a foot every 20 feet. Section 300.01 D(4) V-17 2) YOUR DRAINAGE PATTERN NEEDS TO HAVE .30 FROM THE TOE OF THE DRAINAGE PATTERN TO THE TOP OF THE DRAINAGE PATTERN SO WATER WILL NOT IMPACT ANY ADJACENT LOT SURROUNDING THIS LOT. The top of slope of swales along the property lines shall be a minimum of 0.30 of a foot higher than the toe of slope. Section 300.01 D(6) V-17
ROW FIELD SURVEY /GRADING CERTIFICATION 03/14/2025 Disapproved - NO FEE PFLANAGAN
Note: 1) THE DRAIN PIPE INBETWEEN THE CIRCLE DRIVEWAY NEEDS TO BE BEHIND THE FRONT PROPERTY LINE / RIGHT OF WAY LINE. Sec 300.03 C-F. Flat work, i.e., slabs, walkways, hardscaping, patios, decking or AC pads are not allowed in any utility easements. Additionally, decorative objects, columns, light poles, mulch, stones, plantings or landscaping of any kind, is not allowed in the Right of Way. 2) SOD ON THE LEFT AND RIGHT SIDE IN THE FRONT ROADSIDE SWALE NEEDS TO MATCH EXISTING GRADE ON ADJACENT LOTS. Sec 300.03 F4 Bare earth on the site or surrounding properties must be sodded and must be sodded to match grade. 3) BACK RIGHT SIDE BERM ALONG LEFT PROPERTY LINE NEEDS TO BE HIGHER FROM BACK PROPERTY LINE TO 20' DOWN THE PROPERTY LINE TOWARDS THE ROAD SO WATER WILL NOT IMPACT THE ADJACENT LOT IN THE FUTURE. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 4) ALL SOD ALONG THE RIGHT PROPERTY LINE NEEDS TO MATCH THE SOD EXISTING ON THE ADJACENT LOT.
ROW- FINAL SURVEY/GRADING CERTIFICATION 03/06/2025 Disapproved - NO FEE PFLANAGAN
Note: 1) THE FINAL SURVEY STATES THAT THE DRAINAGE WILL NOT WORK ALL WATER IN THE BACK WILL NOT FLOW TO THE FRONT ROADSIDE SWALE. Positive fall is considered to be 0.10 of a foot every 20 feet. Section 300.01 D(4) V-17 2) YOUR DRAINAGE PATTERN NEEDS TO HAVE .30 FROM THE TOE OF THE DRAINAGE PATTERN TO THE TOP OF THE DRAINAGE PATTERN SO WATER WILL NOT IMPACT ANY ADJACENT LOT SURROUNDING THIS LOT. The top of slope of swales along the property lines shall be a minimum of 0.30 of a foot higher than the toe of slope. Section 300.01 D(6) V-17
GAS FINAL 02/28/2025 APPROVED MGIBSON
ROW- PRE-APRON (PRE-POUR) 02/10/2025 APPROVED PFLANAGAN
Note: PLEASE COMPACT BASE ALITTLE MORE CREW ON SITE STATED THEY WAS GOING TO COMPACT 2 MORE TIMES BEFORE LAYING PAVERS. ------------------------------------------------------------------------------- 2/3/2025 - PREVIOUS INSPECTION NOTES ** 02/03/25 APRON READY TO POUR WITH PAVER RESTRAINT ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED
ROW- PAVER RESTRAINTS 02/03/2025 APPROVED EMADISON
Note: ** 02/03/25 READY TO PPAVER RESTRAINT ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (
ROW- PRE-APRON (PRE-POUR) 02/03/2025 PARTIALLY APPROVED EMADISON
Note: ** 02/03/25 APRON READY TO POUR WITH PAVER RESTRAINT ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED
ROW - DRAINAGE 01/23/2025 Disapproved -FEE REQUIRED RGROSS
Note: Sediment pile still blocking swale. Pipe on site but not installed yet. Both need done before drainage will flow. 1/22/2025 - PREVIOUS INSPECTION NOTES ** 01/22/24 1) NEED TO REMOVE ALL SEDIMENT AND DIRT FROM ROADSIDE SWALE TO ALLOW STORMWATER TO FLOW ________________________________________________________________________________________________________________ 2) NEED TO RE-ESTABLISH SILT FENCE AROUND THE PROPERTY YOU HAVE 7DAY TO CORRECT ALL ABOVE OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** FOLLOW UP INSPECTION ON 01/22/25 1/21/2025 - PREVIOUS INSPECTION NOTES ** 1/21/2025 NO CORRECTIONS HAVE BEEN MADE YOUR SITE IS BEING PLACED ON AN INSPECTION HOLD A PRIORITY (1) UNTILL ALL CORRECTIONS HAVE BEEN MADE INSPECTIONS WILL BE CONDUCTED EVERY DAY UNTILL ALL CORRECTIONS HAVE BEEN MADE 1) NEED TO REMOVE ALL SEDIMENT AND DIRT FROM ROADSIDE SWALE 2) NEED TO RE-ESTABLISH SILT FENCE AROUND THE PROPERTY YOU HAVE 7DAY TO CORRECT ALL ABOVE OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** FOLLOW UP INSPECTION ON 01/22/25 ___________________________________________________________________________________________________________________ 1/14/2025 - PREVIOUS INSPECTION NOTES 1) NEED TO REMOVE ALL SEDIMENT AND DIRT FROM ROADSIDE SWALE 2) NEED TO RE-ESTABLISH SILT FENCE AROUND THE PROPERTY YOU HAVE 7DAY TO CORRECT ALL ABOVE OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT.
ROW - DRAINAGE 01/22/2025 Disapproved -FEE REQUIRED EMADISON
Note: ** 01/22/24 1) NEED TO REMOVE ALL SEDIMENT AND DIRT FROM ROADSIDE SWALE TO ALLOW STORMWATER TO FLOW ________________________________________________________________________________________________________________ 2) NEED TO RE-ESTABLISH SILT FENCE AROUND THE PROPERTY YOU HAVE 7DAY TO CORRECT ALL ABOVE OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** FOLLOW UP INSPECTION ON 01/22/25 1/21/2025 - PREVIOUS INSPECTION NOTES ** 1/21/2025 NO CORRECTIONS HAVE BEEN MADE YOUR SITE IS BEING PLACED ON AN INSPECTION HOLD A PRIORITY (1) UNTILL ALL CORRECTIONS HAVE BEEN MADE INSPECTIONS WILL BE CONDUCTED EVERY DAY UNTILL ALL CORRECTIONS HAVE BEEN MADE 1) NEED TO REMOVE ALL SEDIMENT AND DIRT FROM ROADSIDE SWALE 2) NEED TO RE-ESTABLISH SILT FENCE AROUND THE PROPERTY YOU HAVE 7DAY TO CORRECT ALL ABOVE OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** FOLLOW UP INSPECTION ON 01/22/25 ___________________________________________________________________________________________________________________ 1/14/2025 - PREVIOUS INSPECTION NOTES 1) NEED TO REMOVE ALL SEDIMENT AND DIRT FROM ROADSIDE SWALE 2) NEED TO RE-ESTABLISH SILT FENCE AROUND THE PROPERTY YOU HAVE 7DAY TO CORRECT ALL ABOVE OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT.
ROW - DRAINAGE 01/21/2025 Disapproved -FEE REQUIRED EMADISON
Note: ** 1/21/2025 NO CORRECTIONS HAVE BEEN MADE YOUR SITE IS BEING PLACED ON AN INSPECTION HOLD A PRIORITY (1) UNTILL ALL CORRECTIONS HAVE BEEN MADE INSPECTIONS WILL BE CONDUCTED EVERY DAY UNTILL ALL CORRECTIONS HAVE BEEN MADE 1) NEED TO REMOVE ALL SEDIMENT AND DIRT FROM ROADSIDE SWALE 2) NEED TO RE-ESTABLISH SILT FENCE AROUND THE PROPERTY YOU HAVE 7DAY TO CORRECT ALL ABOVE OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** FOLLOW UP INSPECTION ON 01/22/25 ___________________________________________________________________________________________________________________ 1/14/2025 - PREVIOUS INSPECTION NOTES 1) NEED TO REMOVE ALL SEDIMENT AND DIRT FROM ROADSIDE SWALE 2) NEED TO RE-ESTABLISH SILT FENCE AROUND THE PROPERTY YOU HAVE 7DAY TO CORRECT ALL ABOVE OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT.
ROW - DRAINAGE 01/14/2025 Disapproved - NO FEE PFLANAGAN
Note: 1) NEED TO REMOVE ALL SEDIMENT AND DIRT FROM ROADSIDE SWALE 2) NEED TO RE-ESTABLISH SILT FENCE AROUND THE PROPERTY YOU HAVE 7DAY TO CORRECT ALL ABOVE OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT.
GRAVITY SEWER TEST 12/23/2024 APPROVED - AS NOTED MGIBSON
Note: Inspector Notes from Inspection 2060 WATER SERVICE HAS NOT BEEN RAN YET THIS WAS A VIRTUAL INSPECTION
SEWER TIE IN 12/23/2024 APPROVED - AS NOTED MGIBSON
Note: Inspector Notes from Inspection 2060 WATER SERVICE HAS NOT BEEN RAN YET THIS WAS A VIRTUAL INSPECTION
ELECTRIC - EARLY POWER 12/23/2024 APPROVED HCAMACHO
INSULATION 10/14/2024 APPROVED HCAMACHO
Note: Inspector Notes from Inspection 2420 1. Bath fans need mechanical attachment to flex pipe. FBCR M1601.4.1 Check at insulation. 9/26/2024 - PREVIOUS INSPECTION NOTES 1. Silt fence needs to be repaired before next inspection to prevent from a failed inspection with a fee. This note has been mentioned on 3 previuous inspections FBC 3307.1NEEDS SILT FENCE PROPERLY INSTALLED 2. Metal box on side garage light and outside pool bath needs to be grounded. NEC 314.4 BOND METAL BOXES 3. Nail plates missing at back wall in master. NEC 300.4 NEEDS NAIL GUARDS 4. Bath fans need mechanical attachment to flex pipe. FBCR M1601.4.1 5. Remove screws from drier vent. Screws in the vent catch the lint. 6. Product Approval sheet needs to be revised to match all windows, swing doors, and slidder. FBC (A) 107.4 7. Slider is missing screws. Need manufacturer installation sheets to verify proper installation. 8. Need manufacturer installation sheet for swing doors, to very proper instalation. Inspector Notes from Inspection 2467 8-30-24 1. Silt fence needs to be repaired before next inspection to prevent from a failed inspection with a fee.
GAS ROUGH 10/08/2024 APPROVED HCAMACHO
LATH/BRICK/ WATER BARRIER 10/08/2024 APPROVED HCAMACHO
ALL ROUGH 10/08/2024 APPROVED - AS NOTED HCAMACHO
Note: 1. Bath fans need mechanical attachment to flex pipe. FBCR M1601.4.1 Check at insulation. 9/26/2024 - PREVIOUS INSPECTION NOTES 1. Silt fence needs to be repaired before next inspection to prevent from a failed inspection with a fee. This note has been mentioned on 3 previuous inspections FBC 3307.1NEEDS SILT FENCE PROPERLY INSTALLED 2. Metal box on side garage light and outside pool bath needs to be grounded. NEC 314.4 BOND METAL BOXES 3. Nail plates missing at back wall in master. NEC 300.4 NEEDS NAIL GUARDS 4. Bath fans need mechanical attachment to flex pipe. FBCR M1601.4.1 5. Remove screws from drier vent. Screws in the vent catch the lint. 6. Product Approval sheet needs to be revised to match all windows, swing doors, and slidder. FBC (A) 107.4 7. Slider is missing screws. Need manufacturer installation sheets to verify proper installation. 8. Need manufacturer installation sheet for swing doors, to very proper instalation. Inspector Notes from Inspection 2467 8-30-24 1. Silt fence needs to be repaired before next inspection to prevent from a failed inspection with a fee.
ALL ROUGH 09/26/2024 Disapproved -FEE REQUIRED HCAMACHO
Note: 1. Silt fence needs to be repaired before next inspection to prevent from a failed inspection with a fee. This note has been mentioned on 3 previuous inspections FBC 3307.1NEEDS SILT FENCE PROPERLY INSTALLED 2. Metal box on side garage light and outside pool bath needs to be grounded. NEC 314.4 BOND METAL BOXES 3. Nail plates missing at back wall in master. NEC 300.4 NEEDS NAIL GUARDS 4. Bath fans need mechanical attachment to flex pipe. FBCR M1601.4.1 5. Remove screws from drier vent. Screws in the vent catch the lint. 6. Product Approval sheet needs to be revised to match all windows, swing doors, and slidder. FBC (A) 107.4 7. Slider is missing screws. Need manufacturer installation sheets to verify proper installation. 8. Need manufacturer installation sheet for swing doors, to very proper instalation. Inspector Notes from Inspection 2467 8-30-24 1. Silt fence needs to be repaired before next inspection to prevent from a failed inspection with a fee.
GAS ROUGH 09/26/2024 CANCELLED BY APPLICANT WEB
ROOF VALLEY & METAL 08/30/2024 APPROVED - AS NOTED BTAYLOR
Note: 8-30-24 1. Silt fence needs to be repaired before next inspection to prevent from a failed inspection with a fee.
WALL SHEATHING 08/26/2024 APPROVED FWILLIS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 08/26/2024 APPROVED FWILLIS
FOUND SURVEY APPROVED (OFFICE) 08/23/2024 APPROVED TBAKER
TIE BEAM / LINTEL 07/18/2024 APPROVED JWALKER
Note: Inspector Notes from Inspection 2250 Toilet facilities need to be onsite.
MONOLITHIC SLAB 07/10/2024 APPROVED - AS NOTED JWALKER
Note: Toilet facilities need to be onsite.
PLUMBING 1ST ROUGH UNDERGROUND 07/08/2024 APPROVED - AS NOTED MGIBSON
Note: WATER SERVICE HAS NOT BEEN RAN YET
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 06/27/2024 APPROVED JMUNSON
WATER METER INSTALLATION REQUEST 06/20/2024 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
MECH COMPLETE 02/24/2025 02/26/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ZON COMPLETE 10/02/2024 10/02/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
GAS COMPLETE 10/02/2024 10/07/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ZON HOLD 09/27/2024 09/27/2024
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please provide a revised site plan showing tank location and setbacks
ZON HOLD 09/27/2024 09/27/2024
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM REPEAT COMMENT: Please provide a revised site plan showing tank location and setbacks
GAS HOLD 09/27/2024 10/01/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide tank location with setbacks to house and property lines on site plan.
GAS HOLD 09/25/2024 09/27/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide tank location with setbacks to house and property lines on site plan.
ZON COMPLETE 08/30/2024 08/30/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ZON HOLD 08/28/2024 08/29/2024
Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Please submit original Right of Way Utilization Agreement for Paver Driveway.
SW1 COMPLETE 08/28/2024 08/29/2024
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD
ENGIN1 COMPLETE 08/28/2024 09/04/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ENGIN1 COMPLETE 08/26/2024 08/27/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 HOLD 08/26/2024 08/27/2024
Note: Held By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM 1) For the 16' circle driveway, please provide culvert pipe size and material to be used. 2) Please provide each driveway apron width at edge of pavement.
ZON HOLD 08/26/2024 08/26/2024
Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Please submit original Right of Way Utilization Agreement for Paver Driveway.
ENGIN1 COMPLETE 08/23/2024 08/23/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 08/23/2024 08/23/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BADMIN INFORMATION 08/16/2024 08/16/2024
Note: Marked INFORMATION By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM SUBMIT GAS SUBCONTRACTOR
ENGIN1 COMPLETE 08/07/2024 08/08/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON HOLD 08/07/2024 08/07/2024
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Concrete slab on right side of home is encroaching in the 5ft utility easement
BLD COMPLETE 06/24/2024 06/27/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BADMIN COMPLETE 06/06/2024 06/06/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ELEC COMPLETE 05/28/2024 06/03/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 05/28/2024 05/31/2024
Note: Released By: JPI
SWALE COMPLETE 05/17/2024 09/18/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BADMIN HOLD 05/16/2024 05/22/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide truss layout from truss manufacturer
BLD COMPLETE 05/16/2024 05/20/2024
Note: Released By: JPI
CUSVC COMPLETE 05/16/2024 05/17/2024
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC HOLD 05/16/2024 05/23/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Range and dryer need to be GFCI protected. NEC 2020 210.8 2. Electrical riser diagram needs to include the surge protector and outside disconnect. NEC 2020 230.67 230.85
ENGIN1 COMPLETE 05/16/2024 05/17/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 05/16/2024 05/22/2024
LOCATE COMPLETE 05/16/2024 05/20/2024
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 05/16/2024 05/22/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 05/16/2024 05/20/2024
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD
ZON COMPLETE 05/16/2024 05/20/2024
Note: Released By: LIBBY MUSGROVE - (386)986-3780 - LMUSGROVE@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤20.00 03/21/2025
CONTRACTOR CHANGE ¤20.00 03/21/2025
CONTRACTOR CHANGE ¤20.00 03/21/2025
CONTRACTOR CHANGE ¤20.00 03/21/2025
RECORDING FEE REIMBURSE DOC ¤44.00 03/21/2025
SW ENG REINSPECTION 20 ¤20.00 03/21/2025
SW ENG - INSPECTION 20 ¤20.00 03/21/2025
SW ENG - INSPECTION 20 ¤20.00 03/21/2025
SW ENG - INSPECTION 20 ¤20.00 03/21/2025
SW ENG - INSPECTION 20 ¤20.00 03/21/2025
SW ENG - INSPECTION 20 ¤20.00 03/21/2025
PLAN REVIEW - REVISION ¤32.50 03/21/2025
REINSPECTION RESIDENTIAL ¤40.00 03/21/2025
CONNECTION FEES ¤1,187.26 06/18/2024
SW ENG INSPECTION 80 ¤80.00 06/18/2024
SW ENG PRE APRON ¤30.00 06/18/2024
SW ENG - REVIEW 20 ¤20.00 06/18/2024
SW ENG RES REVIEW 200 ¤200.00 06/18/2024
SEWER CREDIT (¤2,465.75) 06/18/2024
SEWER INSPECTION ¤25.00 06/18/2024
SEWER CAPITAL FACILITY ¤6,120.52 06/18/2024
WATER CAPITAL FACILITY FEE ¤4,351.14 06/18/2024
SITE PLAN 30 ¤30.00 06/18/2024
IMPACT FEE TRANSPORTATION ¤1,862.00 06/18/2024
WATER -IRRIGATION INSPECTION ¤25.00 06/18/2024
WATER -IRRIGATION INSPECTION ¤25.00 06/18/2024
SURCHARGE FS 533.721 ¤15.87 06/18/2024
SURCHARGE - FS 468.631 ¤23.81 06/18/2024
SW ENG - FOUNDATION SURVEY ¤20.00 06/18/2024
WATER-METER ¤514.49 06/18/2024
WATER- TURN ON ¤25.00 06/18/2024
WATER- TURN ON ¤25.00 06/18/2024
ADJUSTMENT 10% (¤176.32) 06/18/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 06/18/2024
INSPECTION - RESIDENTIAL ¤1,350.25 06/18/2024
PLAN REVIEW - RESIDENTIAL ¤382.98 06/18/2024
FC IMPACT FEE EMS ¤62.00 06/18/2024
IMPACT FEE FIRE ¤428.09 06/18/2024
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 06/18/2024
FC IMPACT FEE LIBRARY ¤268.00 06/18/2024
IMPACT FEE PARKS ¤1,800.99 06/18/2024
IMPACT FEE SCHOOL ¤5,450.00 06/18/2024
Fees Total Due: ¤0.00 Total Paid: ¤22,244.83